HomeMy WebLinkAboutContract Award - Public WorksMemo Grant County Department of Public Works 124 Enterprlse St. S.E. Ephrata, WA 98823 To: Honorable Board of County Commissioners Grant County From: Samuel Dart Assistant Director of Public Works Date: October 13, 2020 Re: Award Recommendation, Alternate Daily Cover 2020 I have examined the bids received and recommend the following action: Serial No. 20.146 Item No. 1, furnish and delivery Alternate Dailv Cover, E.O.B.. Ephrata Landfill, 3803 Neva Lake Rd. NW, Ephrata, WA. The bidder is proposing their product can cover more working area with a Yz tank batch of product. Furnish and deliver 62,440 lbs. of ProGuard SB2 & Cellulose, ADC in the amount of $50,076.88, including shipping but not including sales tax, with one (1) scheduled delivery. The unit bid price was $0.802 per pound (includes shipping cost per pound). New Waste Concepts, Inc. 26624 Glenwood Road Perrysburg, OH 43551 This product being proposed is subject to testing prior to approval for use on this site. The determination of product adequacy is at the discretion of the Solid Waste Manager/Supervisor. In the event that the material does not meet requirements, an alternate material meeting contract specifications and Solid Waste Manager/Supervisor determination shall be provided at no additional cost to the County. Dated this' `- day of L '�, 2020 Board of County Commissioners Grant County, Washington A ro Disapprove Abstain Dist #I Dist 91 Dist #1 Dist #Dist #2 Dist #2 Dist #3 Dist #3 Dist #3 f_,.._ RECEIVED 1 OCT 2 2 2020 . ,;Alff COUNTY COMMISSIONERS "To meet current and future needs, serving together with public and private entities. while fostering a respectful and successful work environment." Information .... ....... ___ .........._................ (509) 754.6082 Keith Elefson. County Road Engineer ................... Ext. 3502 Ed Lowry, Supervisor -Dist. No. 1 ............................... Ext. 3540 FAX...............................................„..............(509) 7546087 Bob Bersanti, Construction Engineer ................ ....ExL 3503 Mike DeTrolio, Supervisor -Dist. No. 2........ ................ Ext 3591 E•mall.............. ___ ..... publicworks0grantcountywa.gov Loc Ohl, Accountant Lead... ............. ............... . ..... Ext. 3555 John Brissey, Supervlsor-Dist. No. 3 ........................... Ext. 3541 Sam Castro. Public Works Director..................Ext. 3504 Rod roilett. Foreman -Sign Shop ............................ Ext. 3579 John Spiess, Supervisor -Central Shop ............. (509) 7546086 Samuel Dart, Assistant Director ..................... ....Ext 3519 Jason Collings, Solid Waste.. ....................... (509) 754-4319 Andy Booth, Bridge Supervisor .......... ...... .................. Ext. 3535 �W"'0-"GCHD GRANT COUNTY HEALTH DISTRICT October 19, 2020 Ephrata Landfill ATTN: Jason Collings PO Box 37 Ephrata, WA 98823 Jason Collings, 1038 West Ivy, Suite 1 Moses Lake, WA 98837 Your Permit Modification request to use Pro Guard S132 as Alternative Daily Cover is approved. The ADC should only be used for daily cover and should not be used for intermediate or final cover. Your Operating Procedures must be updated to reflect the approved ADC. If you have any questions, please let me know. Th k you, Stephanie Shopbell Environmental Health Manager sshopbetl@-,granthealth..o.rg 509-766-796o ext 41 Cc: Sam Castro (by email) Sam Dart (by email) Martyn Quinn (by email) arg Public Health P --t. r. -M, P -t -t. NWC Proposal Bid Original Bid request Description asked: Furnish and deliver WASTE COVER ADC in 50 Ib bags Requested 176,000 lbs FOB Separate deliveries Quarterly Delivery requested Semi -Annual or Annual Delivery quoted Additional information based upon site information: • Permitted size of working face is 100' x 50' = 5000 sq ft / day o Assumes Landfill covers 6 days per week and 52 weeks a year= 312 days • Tonnage per day: 300 tons • Landfill did initially fill a Kincaid 1200 gallon machine with 500 gallons of water (1/2 tank) and 6 bags of Posishell basic mix with fiber. NWC proposes that a Y tank batch is sufficient to cover the working face, and that be the cost comparison between products on a per day basis for 5000 square foot working face New Waste Concepts Inc Proposes: Unit price total cost . 2 PROGUARD SB2 & CELLULOSE: 62,4401bs $ 0.601/Ib $ 9g540:89 537,524- 94 Freight: $ 0.201/Ib $ =102-sO 4 12r SSv. 4 4 Sales Tax (7.9%): $ 0 Total $ 5eAft5B t56,01(9-08 NWC recommends that to compare bids properly, the cost per Ib should be not be the comparative. The reason is that NWC is penalized for using less weight (1/1 of the weight of your current product) to cover your working face annually. A competitor could cost 1.9 times more annually, and still remain at a lower per pound cost. ABETTER MEASURE IS TO EVALUATE THE PRODUCTS ON THEIR BATCH COST PER DAY WHICH CAN EASILY BE PUSHED UP TO ANNUAL COST. THIS GIVES YOU A TRUE MEASURE OF YOUR COST OF USINGAN ADC'. PROGUARD S132 AND CELLULOSE (Mixed with 400 gallons of H2O orleachate) Cost Information per batch (without freight): 1/2 bag of ProGuard SB2 $65.00 1-4oz dye pack $ 5.50 3.5 bags - #50 bag of cellulose $52.50 Total Daily Batch cost: $122.00 Freight cost allocation: 200.25 lbs of cellulose & Chemical —Daily cost per Ib: $0.597 Total Bags of Cellulose: 1092 bags (about 28 pallets) Total Bags of chemical: 156 bags - 3 pallets This product will actually cover over 10,000 square feet so in the event you have a larger working face it would be able to provide complete cover for the day, or go over some of the areas from a previous day Replaces the top of page 4 of the proposal 1