To: Honorable Board of County Commissioners
Grant County
From: Jeff Tincher, P.E.
Director/County Road Engineer
Date: January 29, 2019
Re: Prioritization of Gravel Road Upgrades
2019 MINOR UPDATE
Prioritization of Gravel Road Upgrades
January 22, 2019
Background
6Ti .fx rI FP.M11V
In 1999, Grant County embarked on a program of upgrading existing gravel roads to paved with
updates in 2006 and 2011. In 2017 Phase 4 of evaluations and rankings was completed and
approved by the BOCC.
2019 Minor Update
This 2019 update is an evaluation and ranking of County road 7.8 -NE. This update is being
completed because in 2013/2014 McConihe flats area roads were part of the project evaluations;
but this gravel road segment was not on the original gravel to oil list or the evaluations that
followed. With continued development along this segment of 7.8 -NE Grant County Public
Works deemed it necessary to do an evaluation based upon previous ranking criteria used on
other evaluations The data complied was:
1. ADT (Average Daily Traffic) traffic Counts & ADT truck counts
2. Adjacent residences
3. Bus route ADT
4. Network completion/missing link
5. County maintenance costs
6. Dust susceptible crops
7. Accident history (2012-2017)
8. Agricultural land values (based on crop type)
Based upon the data gathered in 2019 for road 7.8 -NE the existing gravel to oil list will be
updated and the roads listed will given new rankings. Project cost for road 7.8 -NE is included
with the proposed construction year (see attached Appendix A).
Ranking factors can be attributed to the amount of residences along 7.8 -NE and accident history
along the road. Other contributing factors are listed above, numbers 1-8. The 2019 priority array
will reflect changes based upon these characteristic values.
Recommendations
The Department of Public Works has the following recommendations:
1. Accept the addition of road 7.8 -NE onto the rank -ordered list as shown in Appendix B to
serve as the basis for selecting specific projects to be constructed, if sufficient funds are
available.
2. Maintain the existing Cost Share Program as it provides an alternate means of funding gravel
road upgrades for projects that do not rank well or not at all on the priority array.
Dated this2 ay o4tilsVsionle2019
Board of County
GrantCounty, Washington
APPro)Y0 Disapprove
Abstain
Dist #1_0 Dist #1
Dist #1
Dist Dist #2
Dist #2
Dist # Dist #3
Dist #3
"To meet current and future needs, serving together with public and private entities, while fostering a respectful and successful
work environment."
Information .................................................(509) 7546082
Ed Lowry, Supervisor -Dist. No. I ............................... 3540
FAX...............................................................(509) 754.6087
Bob Bersanti, Construction Engineer ....................
Ext. 3503
Mike DeTrollo, Supervisor -Dist. No. 2 ........................ Ext. 3591
E -mall ............................. publicworks@grantoountywa.gov
Loc Ohl, Accountant Lead .......................................
Ext. 3555
John Brissey, Supervisor -Dist. No. 3 ........................... Ext. 3541
Jeff Tincher, PE, Director/County Engineer ........ Ext. 3504
Rod Follett, Foreman -Sign Shop............................Ext.
3579
Darrell Doolittle, Supervisor -Central Shop (509) 754-6086
Jerome Wawers, Assistant Director ....................Ext. 3502
Jason Collings, Solid Waste ........................
(509) 7544319
Andy Booth, Bridge Supervisor ................................... Ext. 3535
APPENDIX A
2017 Gravel to Oil Priority Array
UPDATED: 1/22/2019
Rank
Rd No
Rd Name
BMP
EMP
Length
FFC
Begin
End
Project Cost
Approx.
Construction
Year
Total
Adjusted
Score
1
46220
7.8 -NE
0
1.16
1.16
8
at Lake Vista Drive
D.5 -NE
$261,000
2021
5.2673
2
94030
12 -NE
8.24
9.01
0.77
8
at M NE
East End Bridge #158
$173,250
2021
4.485853
3
94020
8 -NE
1.18
1.98
0.8
8
end of oil E of N -NE
begin of oil
$180,000
2022
4.42494
4
38830
G.7 -NW/
5.6 -NW/
H -NW
0
2.17
2.17
9
at 5 -NW
at 7 -NW
$488,250
2021
4.356887
5
43750
S -NE
3.52
5.53
2.01
9
End of Oil
Where 5.5 -NE would be
$452,250
2022
4.327416
6
13200
11 -SW
0
0.75
0.75
9
at Dodson Rd
at Beginning of pavement
$168,750
2023
4.318342
7
32260
12 -NW
1
1.33
0.33
9
at U -NW
0.33 miles W of U -NE
$74,250
2023
4.149551
8
10270
12 -SW
1 6.74
7.97
1.23
9
at end pvmt E of 1 -SW
W to K -SW
$276,750
2024
3.976999
9
21930
K -SE
1.5
2.01
0.51
9
0.50 m north 5 -SE
at 4 -SE
$114,750
2023
3.777927
10
22100
ne
Baseline
0
1.01
1.01
9
at M -SE
at N -SE
$227,250
2024
3.426342
11
30400
Martin Rd
0
2.1
2.1
9
at T -NW
E to R -NW
$472,500
2025
3.411054
12
51600
31 -NE
3.98
6.99
3.01
8
at N -NE
at Q -NE
$677,250
2026
3.394788
13
93039
3 -NW
0
0.79
0.79
9
at Adams Rd
at SR -283
$177,750
2025
3.204388
14
45880
18 -NE
0.5
2.01
1.51
9
at W -NE
at U -NE
$339,750
2027
3.168113
15
46750
16 -NE
7.4
9.69
2.29
9
at gate
at Stratford Rd
$515,250
2028
3.159958
16
46628
B.5 -NE
0
0.62
0.62
9
at 20 NE
0.62 mi. NE of 20 NE
$139,500
2027
3.1213
NOTES: Average Project Cost $225,000 per mile, Approx.
$600,000 to $700,000 funding per year
I Total: $4,738,500
Approximate Funding Each Year
2021
$922,500
2022
$632,250
2023
$357,750
2024
$504,000
2025
$650,250
2026
$677,250
2027
$479,250
2028
$515,250
TOTAL:
$4,738,500
APPENDIX B
2017 Priority Array - Sorted (2019 Minor Update)
1/22/2019
Ref #
Rd No
Rd Name
BMP
EMP
Length
FFC
Begin
End
School
District
Total
Adjusted
Score
Rank
1
46220
7.8 -NE
0
1.16
1.16
8
at Lake Vista Dr
D.5 -NE
MLK
5.26
1
2
94030
12 -NE
8.24
9.01
0.77
8
at M NE
East End Bridge #158
MLK
4.49
2
3
94020
8 -NE
1.18
1.98
0.8
8
end of oil E of N -NE
begin of oil
MLK
4.42
3
4
38830
G.7-NW/5.6-NW/H-NW
0
2.17
2.17
9
at 5 -NW
at 7 -NW
EPH
4.36
4
5
43750
S -NE
3.52
5.53
2.01
9
End of Oil
Where 5.5 -NE would be
MLK
4.33
5
6
13200
11 -SW
0
0.75
0.75
9
at Dodson Rd
at Beginning of pavement
ROY
4.32
6
7
32260
12 -NW
1
1.33
0.33
9
at U -NW
0.33 miles W of U -NE
QUI
4.15
7
8
12530
H SW
0
1.02
1.02
9
at 12 SW
at SR 26
ROY
4.15
8
9
10270
12 -SW
6.74
7.97
1.23
9
at end pvmt E of J -SW
W to K -SW
ROY
3.98
9
10
21930
K -SE
1.5
2.01
0.51
9
0.50 m north 5 -SE
at 4 -SE
MLK
3.78
10
11
22100
Baseline .5 -SE
0
1.01
1.01
9
at M -SE
at N -SE
MLK
3.43
11
12
30400
Martin Rd
0
2.1
2.1
9
at T -NW
E to R -NW
QUI
3.41
12
13
51600
31 -NE
3.98
6.99
3.01
8
at N -NE
at Q -NE
WIL
3.39
13
14
93039
3 -NW
0
0.79
0.79
9
at Adams Rd
at SR -283
QUI
3.20
14
15
45880
18 -NE
0.5
2.01
1.51
9
at W -NE
at U -NE
ODE/WIL
3.17
15
16
46750
16 -NE
7.4
9.69
2.29
9
at gate
at Stratford Rd
MLK
3.16
16
17
46628
B.5 -NE
0
0.62
0.62
9
at 20 NE
0.62 mi. NE of 20 NE
SLK
3.12
17
18
20790
E -SE/ 15.1 -SE
0
4.12
4.12
9
at D -SE
at 12 -SE
ROY
3.11
18
19
50850
Dry Coulee Rd
3.91
9.79
5.88
9
end of oil vic D -NE
at Pinto Ridge Rd
SLK/C-H
3.01
19
20
36550
M.7 -NW
0
2
2
9
at 8 -NW
at 6 -NW
QUI
2.98
20
21
46800+
46880
N / 21 / 22 -NE
0.00
4.16
4.67
5.78
6.29
9
at inter w/22 -NE at N -NE
at Stratford Rd at end of oil
WIL
2.94
21
22
30431
10 -NW
0
1.03
1.03
9
at H -NW
E to end county road
EPH
2.93
22
23
16790
N -NW
0
0.99
0.99
9
at Baseline West
N to S Frontage Rd
QUI
2.91
23
24
30040
4 -NW
0
2.02
1 2.02
9
at E -NW
at Dodson Rd
EPH
2.88
24
Page 1 of 4
APPENDIX 6
2017 Priority Array - Sorted (2019 Minor Update)
1/22/2019
Ref #
Rd No
Rd Name
BMP
EMP
Length
FFC
Begin
End
School
District
Total
Adjusted
Score
Rank
25
15300
Royal Slope Rd
2.71
4.31
1.6
8
at G.5 -SW
W to I -SW
ROY
2.80
25
26
32850
Q-NW/Overen Rd
3.28
4.12
0.84
8
at end of oil on Q -NW
N to X w/14 -NW
QUI
2.79
26
27
11500+
11590
10 -SW / P -SW
2.05
2.07
3.06
3.07
2.01
9
at Beverly -Burke Rd at 11 -SW
at P -SW at 10 -SW
ROY
2.79
27
28
36950
J -NW
1.15
1.64
0.49
9
at Martin Rd
end county road
QUI
2.75
28
29
20550
B -SE
5.78
6.83
1.05
9
at 13 -SE
at 12 -SE
ROY
2.73
29
30
46370
Bouldercrest Rd
0
0.34
0.34
9
at Nepple Rd
begin oil vic 7.5 -NE
MLK
2.73
30
31
36700
8 -NW
4.02
5.03
1.01
9
at L -NW
at K -NW
QUI
2.66
31
32
40200
8 -NE
0
1.09
1.09
9
at M -NE
at Beginning of pavement
MLK
2.62
32
33
10330
23 -SW
0
3.16
3.16
9
at R -SW
E to O -SW
WAL
2.58
33
34
25000+
25190
7 -SE / T -SE
0.00
0.00
1.00
1.01
2.01
9
at S -SE
E to T -SW then S to SR -170
WAR
2.56
34
35
45900
19 -NE
0
2.91
2.906
9
at 19-NE/Blackrock Xsect
0.98 mi E of U -NE
ODE/WIL
2.54
35
36
91010
Lower Crab Creek
3.16
5.79
2.63
8
at end of oil
W end Bridge 308
ROY
2.52
36
37
11510
11 -SW/ R -SW
0
2.02
2.02
9
at Beverly -Burke Rd
at 10 -SW
ROY
2.50
37
38
25690
W.2 -SE
0
1.23
1.23
9
at V -SE at X -w/5 -SE
E to X w/W.2-SE SE to 6 -NE
WAR
2.49
38
39
30850
T -SW/ 2 -SW
2.01
3.83
1.82
9
at 1 -SW
end county road
QUI
2.47
39
40
16550
1.5/2 -SW
0
1.17
1.17
9
at Q -SW
at Beverly -Burke Rd (R -SW)
QUI
2.41
40
41
36900
11.5/F -NW
5.25
8.06
2.81
9
0.10 mi E of H -NW
E to F -NW; N to Martin Rd
EPH
2.40
41
42
52500
29 -NE
0
1 6.23
6.23
9
at R -NE
at X -NE (county line)
WIL
2.35
42
43
38920
6 -NW
0
1.01
1.01
9
at F -NW
at G -NW
EPH
2.34
43
44
16850
L.5 -NW
0
1
1
9
at Baseline West
N to S Frontage Rd
QUI
2.22
44
45
32750
M.5 -NW
0
0.91
0.91
9
at 13 -NW
end county road
QUI
2.20
45
46
12150+
12280
K /14.5 / L.5 -SW
1.55
1.78
2.05
3.84
2.56
9
at 13.5 -SE
S to 14.5 then W to end of L.5
ROY
2.19
46
F-47714050
Division -S
0
1 0.94
0.94
9
at 11 -SW
at End County Road
ROY
2.18
47
Page 2 of 4
APPENDIX 6
2017 Priority Array - Sorted (2019 Minor Update)
1/22/2019
Ref #
Rd No
Rd Name
BMP
EMP
Length
FFC
Begin
End
School
District
Total
Adjusted
Score
Rank
48
40730
D -NE
0
0.96
0.96
9
at Mae Valley Rd
at N Frontage Rd
MLK
2.17
48
49
22600
R-SE/11-SE
6.64
9.38
2.74
9
at end of oil S of SR -170
S to 11 -SE then W to SR -17
WAR
2.16
49
50
94020
8 -NE
0
0.98
0.98
9
at M -NE
at N -NE
MLK
2.05
50
51
43048
Sheep Canyon Rd
5.01
6.98
1.97
9
at Johnson Rd
at G -NW
EPH
2.05
51
52
46780
18 -NE
0
2.03
2.03
9
at Stratford Rd
W to 0.51 mi. W of Br#120
EPH/WIL
2.03
52
53
36900
F -NW
8.06
8.42
0.36
9
at Martin Rd
N to irrigation canal
EPH
2.03
53
54
33700
24 -NW
4.31
6.12
1.81
7
at end of oil
W to 45D turn
QUI/EPH
1.99
54
55
50100
44 -NE
0
3.02
3.02
9
at R -NE
at O -NE
C -H
1.98
55
56
47150
K -NE
3.18
5.14
1.96
9
at K -NE at end oil
at Stratford Rd at 15 -NE
MLK
1.92
56
57
12010
K -SW
0
1.4
1.4
9
at 11 -SW
at begin new oil
ROY
1.84
57
58
32300
Baird Springs Rd
13.7
20
6.28
8
at Overen Rd
at end of oil at Bridge 306
QUI
1.84
58
59
10560
I -SW
0
1.5
1.5
9
at 24 -SW
S to 25.5 -SW
WAL
1.81
59
60
13600
11.2 SW
0.38
1
0.62
9
end oil
A SW
ROY
1.77
60
61
53250
J.5 -NE
0
1 1.05
1.05
9
at SR -2
at 36 -NE
C -H
1.73
61
62
53750
P -NE
7.03
12.1
5.09
9
at 31 -NE
at 36 -NE
WIL/C-H
1.72
62
63
39120
6 -NW
0.25
1.26
1.01
9
at E -NW
end county road
EPH
1.72
63
64
30550
V -SW
1.19
2
0.81
9
at end oil S of 1 -SW
S to end county road
QUI
1.63
64
65
Trinidad streets
0.205
9
QUI
1.61
65
66
20450
S -SE
0.56
1.69
1.13
9
at end oil on S -SE
at County Gravel Pit
WAR
1.59
66
67
45090
M.2 NE
0
0.25
0.25
9
at 10 NE
at End County Road
MLK
1.55
67
68
40610
CNE
0
0.9
0.9
9
Mae Valley Road
N. Frontage Road
MLK
1.51
68
69
20740
14.7 SE
0
2.01
2.01
9
at D SE
at B SE
ROY
1.48
69
70
32740
13 NW
4
5.18
1.18
9
end oil
.41 miles E of K NW
QUI
1.41
70
71
12410
I -SW
1
2.23
1.23
9
at 11 -SW
at Royal Slope Rd SW
ROY
1.40
71
72
94034
Troutlodge Rd NE
0
2.1
2.1
9
at SR -17
at B.5 -NE
EPH
1.37
72
73
38670
1.6 -NW
0
0.28
0.28
9
at 5 -NW
S 0.28 miles
EPH
1.34
73
Page 3 of 4
APPENDIX B
2017 Priority Array - Sorted (2019 Minor Update)
1/22/2019
Ref #
Rd No
Rd Name
BMP
EMP
Length
FFC
Begin
End
School
District
Total
Adjusted
Score
Rank
74
10320
25.5 -SW
1
4.96
3.96
9
at L -SW
to SR24
WAL
1.24
74
75
20520
10.5 SE
0
1.07
1.07
9
at B SE
at C SE
ROY
1.15
75
76
91010
Lower Crab Cr.
11.6
13.1
1.5
8
at Public Fishing access
at E end begin pavement
ROY
1.09
76
77
30710
U -SW
3
3.7
0.7
9
at 1 -SW
S to 53 ft S of wasteway
QUI
0.92
77
78
46750
E / 19 / D.7 -NE
0.6
2.25
1.65
9
at end pvmt S of 20 -NE
S 1.4 miles to last residence
EPH
0.83
78
79
21690
A -SE
1.8
2.78
0.98
9
end of oil
end county road
MLK
0.79
79
80
15000
S -SW
4.53
7.03
2.5
9
at 9 -SW
S to SR -26
ROY
0.77
80
81
11450
R -SW
1
1.53
0.53
9
end oil 1 mi S of SR -26
1.01 mi. S of 13-SW/R-SW X
ROY
0.64
81
82
52250
Q -NE
8.21
13.3
5.1
9
at 31 -NE
at 36 -NE
WIL/C-H
0.41
82
Page 4 of 4