Loading...
HomeMy WebLinkAboutResolution 22-119-CCBOARD OF COUNTY COMMISSIONERS Grant County, Washington RESOLUTION INITIATING COUNTY RESOLUTION No. 22- -CC ROAD PROJECT DESIGNATED AS CRP NO. 22-04 WHEREAS, IT IS HEREBY RESOLVED THAT 23 -NE Bridge Replacement, State Road Log No. 93048 from milepost 9.32 to milepost 9.64 be improved as follows: This project will replace the existing CMP with a Box Culvert. Project work will include roadway excavation, embankment, crushed surfacing base and top course, and guardrail. This project is hereby declared to be a public necessity and the County Road Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.0507 36.80.0307 36.80.070) NOW, THEREFORE, BE IT FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County Engineer's estimate is hereby made in the amounts and for the purposes shown: Preliminary Engineering PROGRAM SOURCE Local TOTAL (Not Subject to 36.77.060) Construction Local TOTAL AMOUNT OF APPROPIATION $40,000 �401000 $250,000 �2901000 (Check appropriate box) R This project is included in the officially adopted Annual Road Program as item No. 10 F-1 This project is hereby made a part of the officially adopted Annual Road Program in accordance with RCW 36.81.130 BE IT FURTHER RESOLVED: (Check appropriate box) F-1 The construction is to be accomplished by contract in accordance with RCW 36.81.130 ® The construction is to be accomplished by county forces in accordance with RCW 36.77.060 and WAC 136-18 DATED this � 2 � Day of /�Gf'/���� , 2022. BOARD OF COUNTY COMMISSIONERS GRANT COUNTY, WASHINGTON Yea Nay Abstain 2`�' F� F� Danny E. Stone, air ATTEST' r,7 1 ❑ El �� 1 on ,Vice-Cha'r jarbaraVasc�u � [+� El El I f t erk ohe B d Cindy Car r, Membe