Loading...
HomeMy WebLinkAboutAgreements/Contracts - Public Works (002)Aft WrWashington State AfDepartment of 'Transportation Agency Grant County Public Works Address 124 Enterprise Street Ephrata, WA 98823 K21-143 Local Agency Agreement CFDA No. 20.205 (Catalog or Federal Domestic Assistance) Project No. Agreement No. For OSC WSDOT Use Only The Local Agency having complied, or hereby agreeing to comply, with the.terms and conditions set forth in (1) Title 23, U.S. Code Highways, (2) the regulations issued pursuant thereto, (3) 2 CFR Part 200, (4) 2 CFR Part 180 — certifying that the local agency is not excluded from receiving Federal funds by a Federal suspension or debarment, (5) the policies and procedures promulgated by the Washington State Department.of Transportation, and (6) the federal aid project agreement entered into between the State and Federal Government, relative to the above project, the Washington. State Department of Transportation will authorize the Local Agency to proceed on the project by a separate, notification. Federalfunds which are.to be -obligated for the project may'not exceed the amount shown herein on line r, column 3*, without written authority by the State, subject to'' the approval of the Federal Highway Administration. All project costs not reimbursed by the Federal Government shall be the responsibility of the Local Agency. Project Description Name Dodson RD. Overlay (2021) Termini N. Frontage RD. To 4 -NW Description of Work Length* 2.82 Miles This project will resurface the existing HMA pavement with an HMA overlay, shoulder finishing, traffic control and other work on Dodson RD.. Project Agreement End Date December 31, 2024 Claiming Indirect Cost Rate e September 7, 2021 F-1Yes �✓ No Proposed Advertisement Dat Agen 110 i I By Title c M r sswe.. V, OOT Form 140-039 Revised 12/2020 7 n ,Z Washington State Department of Transportation By Director, Local Program Date Executed Page 1 Estimate of Fundin 'Type (1) (2) (3) �p of Work Estimated Total Estimated Agency Estimated Federal Project Funds Funds Funds PE a. Agency b. Other Federal Aid c. Other Participation d. State Ratio for PE e. Total PE Cost Estimate a+b+c+d 0.00 0.00 0.00 Right of Way f. Agency .Other Federal Aid h. Other Participation Ratio for RW i. State '. Total RIW Cost Estimate f+ +h+i 0.00 0.00 0.00 Construction k. Contract 6287000.00 841780.00 543,220.00 I. Other Contract (Other Funds) 257235.00 251235.00 m. Other Federal Aid n. Other Participation o.Agency 32,660.00 32,660.00 0.00 Ratio for CN , State 21000.00 270.00 11730.00 Total CN Cost Estimate k+i+m+n+o+ 687,895.00 142,945.00 544,950.00 r. Total Project Cot Estimate e+i+ 687,895.00 142,945.00 544,950.00 Agen 110 i I By Title c M r sswe.. V, OOT Form 140-039 Revised 12/2020 7 n ,Z Washington State Department of Transportation By Director, Local Program Date Executed Page 1