Loading...
HomeMy WebLinkAboutResolution 22-083-CCBOARD OF COUNTY COMMISSIONERS Grant County, Washington RESOLUTION INITIATING COUNTY RESOLUTION ROAD PROJECT DESIGNATED AS No. 22-�,-CC CRP NO. 22-03 WHEREAS, IT IS HEREBY RESOLVED THAT 9 -NW Road SR 283 to Dodson R No. 93020 from milepost 5 84 to milepost 10.06 be improved as follows: �•�� State Road Log This project will resurface 9 -NW with a new Class A BST, add crushed surfacin load carry capacity and widen the pavement from 22 feet to 34 feet. Pro' g to improve the rk rotomilling, roadway excavation, embankment, crushed surfacing base and to oc will include surfacing, drainage and permanent signing. p urse, BST This project is hereby declared to be a public necessity and the County Road Engineer and authorized to report and proceed thereon as by law provided. (RCW 36.75 050 is hereby ordered 36.80 050 .070) , 36.80.030, NOW, THEREFORE, BE IT FURTHER RESOLVED that an appropriation from the fund budget and based on the County Engineer's estimate is hereby made in the officially adopted road purposes shown: amounts and for the PURPOSE Preliminary Engineering Preliminary Engineering PROGRAM SOURCE Local RATA TOTAL (Not Subject to 36.77.060) Construction Local Construction RATA TOTAL AMOUNT OF APPROPIATION $15,100 $132,900 $148.000 $195,500 -$1,759.500 $2,103,000 (Check appropriate box) ❑ This project is included in the officially adopted Annual Road Program as item No. ® This project is hereby made a part of the officiallyadopted p Annual Road Program in accordance with RCW 36.81.130 BE IT FURTHER RESOLVED: (Check appropriate box) ® The construction is to be accomplished by contract in accordance with RCW 36.81.130 ❑ The construction is to be accomplished by count forces in 36.77.060 and WAC 136-18 y accordance with RCW DATED this Day of , 2022. BOARD OF COUNTY COMMISSIONERS GRANT COUNTY, WASHINGTON Yea ay Abstain ❑ ❑ ATT T: Barbara Vasa u Clerk of the Bd