Loading...
HomeMy WebLinkAboutResolution 93-070-CCBOARD OF COUNTY COMMISSIONERS GRANT COUNTY, WASHINGTON IN THE MATTER O£' ADOPTING A COMPREHENSIVE SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM FOR THE ENSUING SIX YEARS WHEREAS, pursuant Grant County did prepare a Program for the ensuing six WIiEREAS, priority was consulted by the Board Program; and RESOLUTION NO. 93 -70 -CC to the requirements of RCW 36.81.121, Comprehensive Transportation Improvement year; and array of projects was made available and during the preparation of this Six Year WHEREAS, the Engineer's report with respect to deficient bridges was available to the Board during the preparation of the Six Year Program; and WHEREAS, an environmental pre --assessment of the Six Year Program indicated that the social, economic and aesthetic values would not be significantly affected; and WHEREAS, pursuant further to said Law, the Board of County Commissioners, being the legislative body of the County, did prepare, revise and extend said Six Year Program and did hold a public hearing on said Comprehensive Plan at 11:00 A.M. at the Courthouse, Ephrata, Washington on the 22nd day*of June, 1993; NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Grant County, Washington, that the Comprehensive Six Year Road Program presented at the public hearing on the 22nd day of June, 1993, and revised as necessary, and attached hereto be hereby adopted. DONE THIS `��� DAY OF ATTEST: Q Jerk of the Board Chairman - Commissioner Commissioner Constituting the Board of County Commissioners of Grant County, Washington 08 4 27 -SW RD (L -SW TO O -SW) 91042 -MP 0.99 TO MP 4.00 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. 08 •5 BRIDGE #104,31 -NE 51600 - MP 0.30 TO MP 0.50 BRIDGE REPLACEMENT: FINISHED WIDTH = 28 FT. 16 -6 DOVER ST (SR 17 TO PATTON BLVD) 45010 - MP 0.00 TO MP 0.74 GRADE, DRAIN, SURFACE (ACP), AND CURB AND GUTTER FINISHED WIDTH = 48 FT. Six Year Transportation Improvement Program 1994 to 1999 Hearing Date: June 22, 1993 Adoption Date: June 22, 1993 ___ _ Resolution No.: 93- -CC _ 1 U PROJECT COSTS IN THOUSANDS OF DOLLARS M L TC FUND SOURCE INFORMATION P T E 10 FEDERAL FUNDING EXPENDITURE SCHEDULE R Y N L D- PE 141 1401 3781 3781 1 Agency O P Grant County County No. 13 City No. CAPP TOTAL VE MPO TS PHASE YEAR F P TIA U C R PROJECT IDENTIFICATION N L I CODE C A O A. PROJECT TITLE T S R B. STREET/COUNTY ROAD NAME OR NUMBER I S I C. TERMINAL BEGINNING AND END O T D. DESCRIBE WORK TO BE DONE N Y i 12 13 14 1 2 3 08 -1 MARTIN RD (SR 28 TO E -NW) 04 1.01 36940 - MP 0.00 TP MP 0.90 PE GRADE, DRAIN, SURFACE (BST), BRIDGE REPLACEMENT #315 FINISHED WIDTH = 34 FT. 07 '2 FRENCHMAN HILL RD (BEWBURKE TO ADAMS) 91035 - MP 5.85 TO MP 10.73: 91044 - MP 0.00 TO MP 1.05 CONST 3/94 91013 - MP 14.68 TO MP 15.34 GRADE, DRAIN, SURFACE (BSTL FINISHED WIDTH = 34 FT. 09 3 13-SW/SE (DIVISION -S TO SR 262) 04 3.01 20800 - MP 0.00 TO MP 1.01 PE SURFACE (BST): FINISHED WIDTH = 26 FT 08 4 27 -SW RD (L -SW TO O -SW) 91042 -MP 0.99 TO MP 4.00 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. 08 •5 BRIDGE #104,31 -NE 51600 - MP 0.30 TO MP 0.50 BRIDGE REPLACEMENT: FINISHED WIDTH = 28 FT. 16 -6 DOVER ST (SR 17 TO PATTON BLVD) 45010 - MP 0.00 TO MP 0.74 GRADE, DRAIN, SURFACE (ACP), AND CURB AND GUTTER FINISHED WIDTH = 48 FT. Six Year Transportation Improvement Program 1994 to 1999 Hearing Date: June 22, 1993 Adoption Date: June 22, 1993 ___ _ Resolution No.: 93- -CC _ 1 U PROJECT COSTS IN THOUSANDS OF DOLLARS M L TC FUND SOURCE INFORMATION P T E 10 FEDERAL FUNDING EXPENDITURE SCHEDULE R Y N L D- PE 141 1401 3781 3781 1 RAP O P G I E PROJECT MONTH/ FEDERAL FEDERAL LOCAL CAPP TOTAL VE T TS PHASE YEAR COST FUND TIA M S H Y PHASE BY CODE DATA 1st T STARTS PHASE RIW OTHER .4 5 6 7 8 9 10 11 i 12 13 14 03 0.90 P PE 141 1401 3781 3781 1 09 745 T RIW 1 6291 6291aµ~��~_f_ C CONST TOTAL 1 1 2241 03 6.59 P PE 1 T RIW 1 CONST I 2/94 491 TOTAL 1 4911 04 1.01 P PE T R/W CONST 3/94 TOTAL 04 3.01 P PE T R/W 1 CONST 1 4/94 TOTAL 09 0.20 P PE 1 T R/W CONST 1/94 130 TOTAL ! 1 1301 02 0.74 P PE I 1/94 30 T R/W 1 CONST 3/94 645 TOTAL 1 -� 6751 BR �-'tI� 2nd 15 RAP 1 14 1401 3781 378 _ 141 1401 3781 3781 1 RAP 745 84 54 629 629 841- - -- - ' 541 6291 6291aµ~��~_f_ 501 501 120 1201 BR 1 1 1 331 1 331 pfl� 4th 3rd • thru 6th 16 17 I 1 1 1 I �I 50 50 1 501 501 F _ TIA 100 1 1051 120 1201 1201 1201 163 163 1631 1631 351 35 745 745 7801 7801 1 1 Note: An ' by the priority number indicates the project has been selected for funding using the Federal or State source shown Page 1 of V,: 08 '8 BRIDGE #122,19 -NW 34200 - MP 2.32 TO MP 2.64 BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 07 -9 BRIDGE #130, R -NE 95037 - MP 18.87 TO MP 19.08 BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 07 '10 BRIDGE #358, 5 -NW 93010 - MP 15.09 TO MP 15.10 BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 07 "11 DODSON RD (SR 26 TO FRENCHMAN HILLS) 91030 - MP 0.00 TO MP 5.90 3R (BST); FINISHED WIDTH = 34 FT. 09 12 MARINE VIEW RID 93-3 NEW GRADE, DRAIN, SURFACE(BST); FINISHED WIDTH 24, 26, & 34 FT. Six Year Transportation improvement Program 1994 to -1999- Hearing Date: June 22, 1993 Adoption Date: June 22, 1993 Resolution No.: 93- -CC I 124 U Agency PROJECT COSTS IN THOUSANDS OF DOLLARS Grant County County No. 13 City No. 14 1 15 - FUND SOURCE MPO P T E F P 1 1 U C R PROJECT IDENTIFICATION N L I L D C A O A. PROJECT TITLE T S R B. STREET/COUNTY ROAD NAME OR NUMBER I S I C. TERMINAL BEGINNING AND END O T D. DESCRIBE WORK TO BE DONE N Y CAPP 1 2 3 07 '7 BRIDGE #395, ADAMS RD FUND 91017 -MP 6.28 TO MP 6.45 M S H BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 08 '8 BRIDGE #122,19 -NW 34200 - MP 2.32 TO MP 2.64 BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 07 -9 BRIDGE #130, R -NE 95037 - MP 18.87 TO MP 19.08 BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 07 '10 BRIDGE #358, 5 -NW 93010 - MP 15.09 TO MP 15.10 BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 07 "11 DODSON RD (SR 26 TO FRENCHMAN HILLS) 91030 - MP 0.00 TO MP 5.90 3R (BST); FINISHED WIDTH = 34 FT. 09 12 MARINE VIEW RID 93-3 NEW GRADE, DRAIN, SURFACE(BST); FINISHED WIDTH 24, 26, & 34 FT. Six Year Transportation improvement Program 1994 to -1999- Hearing Date: June 22, 1993 Adoption Date: June 22, 1993 Resolution No.: 93- -CC I 124 U 1241 1 1 PROJECT COSTS IN THOUSANDS OF DOLLARS M L T C stn .13 14 1 15 - FUND SOURCE INFORMATION P T E 10 2051 1 1 1 FEDERAL FUNDING 350 ' IJ R Y N L D RAP O P G I E PROJECT MONTH/ FEDERAL FEDERAL LOCAL CAPP VE T TS PHASE YEAR COST FUND TIA M S H Y PHASE BY CODE DATA T STARTS PHASE OTHER 4 5 6 7 :8 9 10 11 12 09 0.17 P PE T R/W I BR I RAP CONST 1/94 165 4 36 TOTAL 1 1 165 41 361 09 0.34 P PE 1 T RNV 1 BR RAP CONST 1/94 _ 280 I 70 TOTAL i 1 2801 1 1 701 09 0.21 P PE 1 T RNV I BR RAP Ij CONST I 1/94 99 3 221 TOTAL 1 - 1 991 1 31 221 09 0.22 P PE 1 T RNV , BR RAP CONST 1/94 116 29 TOTAL 1 1 1161 1 1 291 03 5.90 P PE 1 1/94 451 1 7 161 T R/W1 I STP RAP CONST 1 11/94 4541 1 .68 146 TOTAL 1 1 4991 _ 1 751 1621 01 3.75 P PE 1 T RNV 1 RID 93-3 CONST 1 1/94 231 TOTAL 1 1 1 1 2311 1 EXPENDITURE SCHEDULE TOTAL 124 124 4th 1241 1 1 1st 2nd 3rd thru 1451 1451 1 1 stn .13 14 1 15 - 15 17 1 205 205 7361 2051 2051 1 1 1 350 350 ' IJ 3501 3501 1 1 124 124 1241 1241 1 1 145 145 1451 1451 1 1 68 611 7 668 6681 7361 7361 1 1 i 231 231 2311 2311 1 1 , Nqte: An • by the priority number indicates the project has been selected for funding using the Federal or State source shown Page 2 of 13 I Agency Grant County County No. 13 City No. MPO F P U C R PROJECT IDENTIFICATION N L I C A O A. PROJECT TITLE T S R B. STREET/COUNTY ROAD NAME OR NUMBER I S I C. TERMINAL BEGINNING AND END O T D. DESCRIBE WORK TO BE DONE N Y 1 1 2 3 09 13 A -NW RD (SR 282 TO DRUMHELLER) 37949 -MP 0.00 TO MP 0.13 GRADE, DRAIN, SURFACE; FINISHED WIDTH = 28 FT. 08 '14 BRIDGE #338 -MONUMENT HILL 93035 - MP 1.34 TO MP 1.55 BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 09 '15 BRIDGE #345, R -NW 93025 - MP 0.67 TO MP 0.88 BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 09 16 1 -SW (SILICA RD. TO V -SW) NEW - MP 0.00 TO MP 1.00 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 26 FT. 07 17 DODSON RD (1-90 TO SR 282) 91030 - MP 15.88 TO MP 29.71 ACP OVERLAY; FINISHED WIDTH = 34 FT. 07 "18 SAGEBRUSH FLATS RD (BAIRD SPRINGS TO J -NE) 93047 - MP 2.55 TO MP 9.37 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT Note: An . by the priority number indicates the project has been selected for funding using the Federal or State source shown Page 3 of -11 Six Year Transportation Improvement Program 1994 to 1999 Hearing Date: June 22, 1993 Adoption Date: June 22, 1993 Resolution No.: 93- -CC I U PROJECT COSTS IN THOUSANDS OF DOLLARS M L T C FUND SOURCE INFORMATION P T E 1 0 FEDERAL FUNDING I EXPENDITURE SCHEDULE R Y N L D RAP O P G I E PROJECT MONTH/ FEDERAL FEDERAL LOCAL CAPP TOTAL V E T T S PHASE YEAR COST FUND TIA 4th M S H Y PHASE BY CODE UATA 1st 2nd 3rd thru T STARTS PHASE OTHER 6th 4 5 6 7 8 9. 10 1 11 12 s 13 14 15 16 17 01 0.13 P PE T RNV CONST 4/94 I 1 10 101 101 1 TOTAL J_ -- 1 1 101 1 101 101 1 09 0.21 P PE 1/94 1 2 3 3 T R/W RAP CONST 3/94 4 43 47 47 TOTAL 1 _.. 1 51 451 501 501 1 1 1 09 0.21 P PE 1 1/94 1 2 3 3 T RIW RAP CONST 3/94 1 4 39 431 43 TOTAL I 1 ... 51 411 461 461 01 1.00 P PE ` 3/94 _-_ --.. 20I i 201 20 T R/W f Ij ! it CONST 6/94 100 1 1001 1001 1 TOTAL (_ 1 1 1 1201 ! 1201 201 1001 1 04 13.83 P PE 3194-3/95 f _ 70 70 , 30 40 f I T RNV CAPP CONST I 6/94 1 I 1530 15301 670 8601 1 TOTAL 1 i 1 1 16001 16001 7001 9001 1 03 6.27 P PE 3/94 1 1 41 361 401 401 1 T RNV RAP 1 ' CONST 3/95_ I 581 5221 5801 5801 1 TOTAL 1 1 1 I 621 5581 6201 401 5801 1 Note: An . by the priority number indicates the project has been selected for funding using the Federal or State source shown Page 3 of -11 Six Year Transportation Improvement Program Agency Grant County 1994 to 1999 County No. 13 Hearing Date: June 22, 1993 City No. Adoption Date: June 22, 1993 MPO_ Resolution No.: 93- -CC F P I U 1 PROJECT COSTS IN THOUSANDS OF DOLLARS U C R PROJECT IDENTIFICATION M L' T C FUND SOURCE INFORMATION N L I P T E 10 FEDERAL FUNDING EXPENDITURE SCHEDULE C A O A. PROJECT TITLE R Y N L D RAP T S R B. STREET/COUNTY ROAD NAME OR NUMBER O P G I E PROJECT MONTH/ FEDERAL FEDERAL LOCAL CAPP TOTAL I S I C. TERMINAL BEGINNING AND END VE T TS PHASE YEAR COST FUND TIA 4th O T D. DESCRIBE WORK TO BE DONE M S H Y PHASE BY CODE DATA 1st 2nd 3rd thru N Y T STARTS PHASE OTHER 6th 1 2 3 4 5 6 7. 8 9 10 I 11 1 12 13 I 14 ( 15-. 16 .. 17 07 -19 B -NW RD (SR 28 TO WEST CANAL BRIDGE) 03 1.31 P PE 3/94 li 21 18 20 + 201 93045 - MP 0.00 TO MP 1.31 T R/W I RAP I GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. CONST 3/95 1 1 211 1841 2051 I 2051 TOTAL 1 1 231 2021 2251 201 2051 1 07 20 BASELINE EAST RD (POTATO HILL TO SR 17) 02 2.37 P PE i 6/94 17 3 201 201 21700 -MP 0.00 TO MP 1.77; 21740 - MP 0.00 TO MP 0.60 T R/W I STP GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. CONST 1 5/95 242 38 2801 ! 280 TOTAL 2591 1 411 1 3001 201 2801 1 — 21 MISCELLANEOUS PROJECTS 03 — P PE 1 1 I 1 T R/W I II *INCL. COST SHARE PROJECTS CONST 11/94-12/99 I! 1 1200 1 12001 200 200 2001 601 __ TOTAL 1 1 12001 1 12001 2001 _-200 L__200t 601 09 22 1 -SW RD (G -SW TO I -SW) 01 2.02 P PE NEW - MP 0.00 TO MP 2.02 T R/W GRADE, DRAIN, SURFACE (GRAVEL); FINISHED WIDTH = 26 FT CONST I 3/95 I 1 I 70 701 701 TOTAL 1 i 1 701 -I 701 1 - 7011 — 07 23 M -SE RD (SR 17 TO SR 262) 04 6.46 P PE I 6/94 26 4 301 301 92015 - MP 0.00 TO MP 6.46 T R/W STP SURFACE (ACP); FINISHED WIDTH = 34 FT. CONST _ _ _ 2/95 666 104 77011 I 770 _ TOTAL 1 1 692 1 1081 1 8001 3017701 1 07 24 BRIDGE #238, M -SE 09 0.20 P PE I 6/94 8 1 91 -- -- . 9 -� 92015 - MP 1.47 TO MP 1.68 T R/W 1 STP BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. CONST I 2195 87 - - - 14 101 I 101 TOTAL 1 1 951 1 151 1 1101 1 1101 1 Ncte: An 'try the priority number indicates the project has been selected for funding using the Federal or State source shown Page 4 of 13 Agency Grant County County No. 13 City No. MPO F P 1994 to 1999 U C R PROJECT IDENTIFICATION N L I C A O A. PROJECT TITLE T S R B. STREETICOUNTY ROAD NAME OR NUMBER I S I C. TERMINAL BEGINNING AND END O T D. DESCRIBE WORK TO BE DONE N Y 1 2. 3 07 25 BRIDGE #230, MCDONALD RD I 92015 -MP 4.64 TO MP 4.85 PROSECT COSTS IN THOUSANDS BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 07 26 PINTO RIDGE (DRY COULEE TO COULEE CITY) 95025 - MP 6.23 TO MP 14.74 WIDEN AND SURFACE (BST); FINISHED WIDTH = 28 FT. 09 27 MATTAWA AREA ROADS S -S W/U-S W/25 -S W/28 -S W/29 -S W GRADE, DRAIN, SURF.(GRAV/BST); FINISHED WIDTH = 26 FT 08 28 3 -SE RD (SR 17 TO R -SE) 22000 - MP 0.00 TO MP 3.28 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. 07 29 7 -NW RD (SR 283 TO DODSON RD) 39200 - MP 2.01 TO MP 8 31 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. 07 30 Q -NE (N FRONTAGE TO 3 -NE) 43590 - MP 0.00 TO MP 2.84 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. Note: An ' by the priority number indicates the project has been selected for funding using the Federal or State source shown Page 5 of 13 Six Year Transportation improvement Program 1994 to 1999 Hearing Date: June 22, 1993 Adoption Date: June 22, 1993 Resolution No.: 93- -CC I U PROSECT COSTS IN THOUSANDS OF DOLLARS M L T C FUND SOURCE INFORMATION P T E 10 FEDERAL FUNDING EXPENDITURE SCHEDULE R Y N L D RAP O P G I E PROJECT MONTH/ FEDERAL FEDERAL LOCAL CAPP TOTAL VE T TS PHASE YEAR COST FUND TIA 4th MS H Y PHASE BY CODE UATA 1st 2nd 3rd thru T STARTS PHASE OTHER 6th 4 5 6 7 8 9 4 10 11 .1 12 1 13. 14 15 16 17 09 0.21 PPET 6/94 51 ' 11 � 6 6 R/W 1 STP CONST 1 2/95 561 81 ! 64 64 TOTAL 1 1 611 1 91 1 701 1 70 1 1 04 8.51 P PE 1 1/96 43 7 50 50 T R/W I STP 1 CONST 3/97 735 115 850 8501 TOTAL L 1 7781 1 1221 1 9001 1 501 8501 01 8.00 P PE 1 T R/W CONST 1/94-12/991 I 1 3001 300 60 60 18: TOTAL 1 1 I 3001 1 3001 1 601 601 18t. 03 3.28 P PE 1 1196 31 22 251 1 25 T R/W I RAP CONST I 3/97 381 347 3851 1 385 TOTAL ( i 1 I . _ _ _ 41 ( 36911 4101 _ _ 1 251 3851 03 6.30 P PE I 1196 ' 8 I 32 40 40 T R/W I RAP CONST 1 3/97 1 1501 _ 600 750 750 TOTAL 1 _ 1 1 1581 6321 7901 401 7.501 03 2.84 P PE 1 5195 1 26 1 41 301 30 1 T R/W 1 1 STP I i ISI CONST 1 3/96 I 363 571 4201 4201 ! TOTAL 1 I 3891 I 611 1 4501 301 4201 { y Note: An ' by the priority number indicates the project has been selected for funding using the Federal or State source shown Page 5 of 13 Sic Year Transportation Improvement Program Agency Grant County 1994 to 1999 County No. 13 Hearing Date: June 22, 1993 City No. Adoption Date: June 22, 1993 MPO Resolution No.: 93- -CC F P I U PROJECT COSTS IN THOUSANDS OF DOLLARS U C R PROJECT IDENTIFICATION M L T C FUND SOURCE INFORMATION j N L I P T E 10 FEDERAL FUNDING I EXPENDITURE SCHEDULE C A O A. PROJECT TITLE R Y N L D RAP T S R B. STREET/COUNTY ROAD NAME OR NUMBER O P G I E PROJECT MONTH/ FEDERAL FEDERAL LOCAL CAPP TOTAL I S I C. TERMINAL BEGINNING AND END VE T TS PHASE YEAR COST FUND TIA 4th O T D. DESCRIBE WORK TO BE DONE M S H Y PHASE BY CODE UATA 1st 2nd 3rd thru N Y T STARTS PHASE OTHER 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 16 1 17 07 31 Q-NE RR SIGNALIZATION 15 - - - P PE 5/95 4 1 5 5 43590 - MP 1.02 T R/W RAILROAD CROSSING SIGNALIZATION CONST 3/96 125 STP (RRP) 125 1251 TOTAL 1 1 1291 1 1 1301 1 51 1251 16 32 VALLEY RD (CASCADE VALLEY PARK TO OTTMAR) 02 0.25 P PE 1 5/95 21 8 10 10 41250 - MP 0.50 TO MP 0.75 T R/W I TIA GRADE, DRAIN, SURFACE (ACP), CURB AND GUTTER, AND CONST 1 5/96 34 136 170 170 SIDEWALK/BIKE PATH; FINISHED WIDTH = 48 FT. TOTAL ! �.__. 1 1 361 1441 1801 1 101 1701 09 33 BRIDGE #251, 2.7-SE 09 0.02 P PE I 1/96 2 1 3 3 22010 - MP 0.20 TO MP 0.22 T RNV SR BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. CONST 1 8196 48 11 59 59 TOTAL 1 501 1 121 1 621 1 1 621 09 34 BRIDGE #125, O-NE 09 0.05 P PE _1 1/96 2 1 3 3 54150 - MP 4.20 TO MO 4.25 T R/W ( BR _ BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. CONST 1 8/96 43 _ __- _ _ _ 10 53 53 TOTAL 1 1 451 1 111 1 561 1 1 561 09 35 E-SE RD (10.5-SE TO SR 262) 02 1.97 P PE 1 1/96 20790-MP 5.43 TO MP 7.40 T RNV GRADE, DRAIN, SURFACE (GRAVEL); FINISHED WIDTH = 28 FT. CONST I 4/96 1 I 64 641 641 i TOTAL 1 i 1 1 701 ----� — 701 1 1 70.1 I 08 36 U-SW RD (24.7-SW TO 26-SW) 1 02 1.27 P PE 1 1/96 41 4 41 – -~ 10590-MP 1.75 TO MP 3.02 T RNV ! GRADE, DRAW, SURFACE (GRAVEL); FINISHED WIDTH = 28 FT. CONST 1 4196 41 41 4,1 i TOTAL 1 1 1 1 451 I 451 1 1 451 – Note: An ' by the priority number indicates the project has been selected for funding using the Federal or State source shown Page 6 of 13 Agency I 13 4 Grant County County No. 13 City No. T C fl 6th MPO 15 16 FUND SOURCE INFORMATION F P 10 U C R PROJECT IDENTIFICATION N L I R Y C A O A. PROJECT TITLE T S R B. STREET/COUNTY ROAD NAME OR NUMBER I S I C. TERMINAL BEGINNING AND END O T D. DESCRIBE WORK TO BE DONE N Y FEDERAL 1 2 3 09 37 BRIDGE #347, S -NW YEAR COST 31550 - MP 1.40 TO MP 1.50 TIA BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. 09 38 BRIDGE #234, 2 -SE PHASE BY 21820 -MP 0.15 TO MP 0.34 UATA BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT, 08 39 7 -NE (M -NE TO N -NE) 42700 -MP 0.00 TO MP 1.03 GRADE, DRAIN, SURFACE(BST); FINISHED WIDTH = 26 FT. 16 40 PATTON BLVD TRAFFIC SIGNAL 45170 - MP 0.53 TRAFFIC/PEDESTRIAN SIGNAL 19 41 PATTON BLVD BIKE PATH (SR 17 TO AIRWAY) BIKE PATH 09 42 1 -SE (U -SE TO TIFLIS) 23400 - MP 0.00 TO MP 0.75 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. Six Year Transportation Improvement Program 1994 to 1999 Hearing Date: June 22, 1993 Adoption Date: June 22, 1993 Resolution No.: 93- -CC I I 13 4 U j 1st PROJECT COSTS IN THOUSANDS OF DOLLARS M L T C fl 6th 13 14- 15 16 FUND SOURCE INFORMATION P T E 10 64 1 641 FEDERAL FUNDING 68 1 _1 1 681 R Y N L D I RAP O P G I E PROJECT MONTH/ FEDERAL I FEDERAL LOCAL CAPP V E T T S PHASE YEAR COST FUND TIA M S H Y PHASE BY CODE UATA T STARTS PHASE OTHER 4 5 6 7 8 9 10 11 1 12 09 0.10 P PE 1/96 3 11 T RNV BR CONST 8/96 52 12 TOTAL 1 551 13� 09 0.19 P PE 1/96 31 1 1 T RNV i BR 1 CONST 8/96 521 1 11 - TOTAL 1 551 1 131 1 04 1.03 P PE 1/96 2 11 T RNV RAP CONST 4/96 12 108 TOTAL 141 1191 12 0.10 P PE ( 1/96 2 6 T RNV UATA CONST 4/96 14 56_1 TOTAL 1 1 1 161 641 05 0.30 P PE 1 4/96 1 1 21 T R/W I I I I I EXPENDITURE SCHEDULE TOTAL 64 681 131 1201 1331 81 721 801 21 CONST 1 7_/_96 I 13 4 4th + 1st 2nd 3rd thru 03 0.75 P PE 1 1/96 fl 6th 13 14- 15 16 17 4 41 -1 1 64 1 641 1 1151 68 1 _1 1 681 4 1 4 64 681 131 1201 1331 81 721 801 21 CONST 1 7_/_96 I 13 4 1 131 TOTAL I L_ _ 1 151 1 151 03 0.75 P PE 1 1/96 T R/W I 1 f 1 CONST 4/96 1 I 1041 _ - - 104 TOTAL 1 I 1 1 1151 1 1151 64 681 — 13 1 120 1 133 I 8 1 721 _ 1 801 2 13 1 151 11 104 1 1151 1 Note: An ' by the priority number indicates the project has been selected for funding using the Federal or State source shown Page 7 of 13 Agency Grant County County No. 13 City No. VIPO F P U C R PROJECT IDENTIFICATION N L I C A O A. PROJECT TITLE T S R B. STREET/COUNTY ROAD NAME OR NUMBER I S I C. TERMINAL BEGINNING AND END O T D. DESCRIBE WORK TO BE DONE N Y 1 2 3 09 43 2 -SE (Q -SE TO R -SE) 92045 - MP 6.94 TO MP 7.95 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. 08 44 MCCONIHE RD (SR 17 TO F -NE) 46200 - MP 0.00 TO MP 0.81 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. 09 45 BRIDGE #219, W SE 24650 - MP 0.00 TO MP 0.20 BRIDGE REPLACEMENT; FINISHED WIDTH 28 FT. 07 46 SAGEBRUSH FLATS RD (J -NE TO COUNTY LINE) 93047 - MP 9.37 TO 11.60; 93048 - MP 5.28 TO MP 6 62 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. 07 47 10 -NE (STRATFORD TO H -NE) 94040 - MP 4.25 TO MP 6.53 3R (BST); FINISHED WIDTH = 28 FT. 07 48 10 -NE (SR 17 TO H -NE) 94040 - MP 0.00 TO MP 4.25 SURFACE (BST); FINISHED WIDTH = 28 FT. Note: An ' by the priority number indicates the project has been selected for funding using the Federal or State source shown Page 8 of 13 Six Year Transportation Improvement Programa 1994 to 1999 Hearing Date: June 22, 1993 Adoption Date: June 22, 1993 Resolution No.: 93- -CC t U PROJECT COSTS IN THOUSANDS OF DOLLARS M L T C FUND SOURCE INFORMATION j P T E 10 FEDERAL FUNDING EXPENDITURE SCHEDULE R Y N L D RAP I O P G I E PROJECT MONTH/ FEDERAL FEDERAL LOCAL CAPP TOTAL VE T TS PHASE YEAR COST FUND TIA 4th M S H Y PHASE BY CODE UATA 1st 2nd 3rd • thru T STARTS PHASE OTHER 6th 4 5 6 7 8 9 10 11 12 13 14 15' 16 17 03 1.01 P PE 1/96 15, 15 15 T RNV I � ' CONST 1 4/96 1351 135_ 135 TOTAL I 1501 - 1501--- 1 1 1501 71 03 0.81 P PE 1/96 2 16 18 18 j T RNV RAP 1 CONST 4/96 16 141 157 157 I TOTAL `` I i 1 1 181 1571 1751 1 1 1751 09 0.20 P PE 1 6/96 10 2 12 121 T RNV BR CONST ( 1/97 307 47 354 354 TOTAL 1 _ _ 3171 491 1 3661 1 1 121 03 3.57 P PE 1 6/96 - - 1 3 271 30 1 301 T R/W RAP 1 CONST 1/97 I 421 3781 420 4201 1 1 1 1 4s 1-- --- -405.1.._.... _. 450 1 1 1 301 42C. 04 2.28 P PE � I _ I _ 21 I I 201 I � 20 RAP18 +11 CONST ! 1 261 2341 2601 1 260; TOTAL i i ! 1 281 2521 2801 1' 1 1 2801 04 4.25 P PE T RNV RAP CONST 15 135 150 150 TOTAL 1 1 151 1351 1501 1 1 1 150 Note: An ' by the priority number indicates the project has been selected for funding using the Federal or State source shown Page 8 of 13 Note: An ' by the priority number indicates the project has been selected for funding using the Federal or State source shown Page 9 of 13 ' Six Year Transportation Improvement Program Agency Grant County 1994 to 1999 County No. 9 3 Hearing Date: June 22, 1993 City Nc, Adoption Date: June 22, 1993 MPO Resolution, No.: 93- -CC F P I U { PROJECT COSTS IN THOUSANDS OF DOLLARS U C R PROJECT IDENTIFICATION M L T C FUND SOURCE INFORMAT.ON N L I P T E 1 0 _ FEDERAL FUNDING EXPENDITURE SCHEDULE C A O A. PROJECT TITLE R Y N L D I RAP T S R B. STREET/COUNTY ROAD NAME OR NUMBER O P G I E PROJECT MONTH/ FEDERALI FEDERAL LOCAL CAPP TOTAL I S I C. TERMINAL BEGINNING AND END VE T TS PHASE YEAR COST FUND TIA 4th O T D. DESCRIBE WORK TO BE DONE M S H Y PHASE BY CODE UATA ( 1st 2nd 3rd thru N Y T STARTS PHASE I OTHER I 6th 1 2 3 4. 5 fi j 7 8 9 10 11 12 13 - 14 1 15 16 17 09 49 BRIDGE #241, M -NE 09 0.22 P PE 10 I 2 12 I 12 94030 - MP 5.83 TO MP 6.05 T RNV BR BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. CONST 125 32 157 157" TOTAL ---- ----- --- ---- 169. 16 50 AIRWAY DRIVE (FAIRGROUNDS TO SR 17) I 02 f 1.321 P PE 16 67 83 ( 83 41690 - MP 1.89 TO 3.21 I T R/W _ _ _ _ UATA ! GRADE, DRAIN, SURFACE (ACP), AND CURB AND GUTTER; CONST 1511 602 753 7531 FINISHED WIDTH = 48 FT. TOTAL I I I I 1671 _ _ 6691 8361 1 1 1 83`= { 16 51 AIRWAY DRIVE BIKE PATH (VALLEY RD TO COCHRAN DR) 05 1.20 P PE 1 101 10 T R, W BIKE PATH CONST — -- - — -100 100 10i -- TOTAL 1 1 1 1 1101 1 —1101— I ( 1 11 07 52 5-NW/U-NW RDS (SR 281 TO 6 -NW) 03 4.90 P PE _ --- -- - -- 7 I 58 65 I I L _ I 93010 - MP 14.07 TO 18.97 T RNV I I RAP I_ i GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. CONST 1 1 58 527 5851 -- TOTAL I 1 -- - - j 651 5851 6501 II 1 ! — I_ 650- 07 53 BRIDGE #389, 5 -NW 09 0.21 I P PE 5 i 1 6 6, 93010 - MP 16.02 TO MP MP 16.23 T R/W BR BRIDGE REPLACEMENT,- FINISHED WIDTH 34 FT, CONST 601 1 151 75! ! 75' I TOTAL I { 651 1 161 1 811 I 1 07 54 ADAMS RD (1-90 TO SR 26) 04 14.51 P PE 1 1 91017 - MP 0.00 TO MP 14.51 T RNV I CAPP SURFACE (ACP); FINISHED WIDTH = 34 FT. CONST — _ _ — _ 1 1 18001 1800 I 18001 7OTAL l I 1 1 18601 18001 1 1 ! 18001 Note: An ' by the priority number indicates the project has been selected for funding using the Federal or State source shown Page 9 of 13 Agency Grant County County No. 13 City No. h..PO F P U G R PROJECT IDENTIFICATION N LI I C A O A. PROJECT TITLE T S R B. STREET/COUNTY ROAD NAME OR NUMBER I S I C. TERMINAL BEGINNING AND END O T D. DESCRIBE WORK TO BE DONE (N Y i 1. 'I 2 3 08 55 K -NW RD (SR 283 TO N FRONTAGE RD) 38550 - MP 0.00 TO MP 4.55 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. 08 56 K -SE/ i -SE RDS (BASELINE -E TO SR 17) 21750 - MP 0.00 TO MP 0.45/21780 - %11P 0 00 TO MP 2.10 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. 16 57 VALLEY RD (OTTMAR TO COLE) 41250 - MP 0.70 TO MP 1.53 1 GRADE, DRAIN, SURFACE(ACP), AND CURB AND GUTTER:...... FINISHED WIDTH = 48 FT. 08 I 58 BRIDGE #385, K -NW 93041 - MP 0.07 TO MP 0.30 BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 08 59 MAE VALLEY RD (HIAWATHA TO WESTSHORE) 40560 - MP 0.00 TO MP 4.97 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT 09 60 F -NE (N FRONTAGE TO MAE VALLEY) NEW - MP 0.00 TO 0.95 GRADE, DRAIN, SURFACE (BST): FINISHED WIDTH = 26 FT. Six Year Transportation Improvement Program 1994 to 1999 Hearing Date: June 22, 1993 Adoption Date: June 22, 1993 Resolution No.: 93- -CC I U PROJECT COSTS IN THOUSANDS OF DOLLARS M L T C FUND SOURCE INFORMATION P T E 1 0 FEDERAL FUNDfNG I EXPENDITURE SCHEDULE R N LD I RAP O P G I E PROJECT MONTH/ FEDERAL FEDERAL LOCAL CAPP TOTAL V E T T S PHASE YEAR COST FUND TIA I 4th M S H Y PHASE BY CODE i UATA 1st 2nd 3rd thru TI STARTS PHASE i OTHER 61h 4 5 1 6 7 8 9 10 11 12 13 14 15 16 1 04 4.55 P PE 4 31 35 35 I ; 1 T I CONST I 31 284 315 1 1 i 315 TOTAL j I I _ _ L 35 _ 3151 3501 I I I 350 03 2.55 P PE 1 1 31 27 301 30 T RAM I RAP ` 1I CONST I — 1 271 2431 2701 270 I TOTAL I I i 301 2701 300I.__-_ I I 1 300 02 0.78 P PE I �- 51 45 50 501 T R/W UATA CONST 451 405 450 4 S TOTAL -- - _ I I - I 501 - 4501 5001 1 1 1 5m � 09 0.23 21 221 241 24I 2 T R/W RAP I I CONST I 1 1 221 1941 216 1 1 1 I TOTAL 1--- -- I I 241 2161 2401 1 1 1 03 4.97 P PE ; 7 641 71 7� T RfW RAP I CONST 64 5731 637 637 ' TOTAL I 1 711 6371 7081 1 I 1 708; 01 0.95 P PE I I 13I I 131 1 1 13' f i T R/W-- f CONST - 117 I 117 1 117 TOTAL 1301 1 1301 I I { 130'. Note: An ' by the priority number indicates the project has been selected for funding using the Federal or State source shown Page 10 of 13 Agency Grant County County No. 13 City No. MPO F P U C R PROJECT IDENTIFICATION N L I C A O A. PROJECT TITLE T S R B. STREET/COUNTY ROAD NAME OR NUMBER I S I C. TERMINAL BEGINNING AND END O T D. DESCRIBE WORK TO BE DONE N Y - 1 2 3 09 61 BLACK SANDS AREA ROADS NEW GRADE, DRAIN, SURFACE (GRAVEL); FINISHED WIDTH = 26 FT 09 62 BRIDGE #246, S -NE 43750 - MP 0.00 TO MP 0.25 BRIDGE REPLACEMENT: FINISHED WIDTH = 28 FT. 07 63 W -NE (3 -NE TO 12 -NE) 95035 - MP 0.00 TO MP 9.06 SURFACE (BST); FINISHED WIDTH = 24 FT. 08 64 31 -NE (PINTO RIDGE TO R -NE) 51600 - MP 0.00 TO MP 7.99 SURFACE (BST); FINISHED WIDTH = 28 FT. 08 65 6 -SE (M -SE TO J -SE) 20100 - MP 0.00 TO MP 3.01 3R (BST); FINISHED WIDTH = 28 FT, 08 66 20 -NE RD (E -NE TO STRATFORD) 94046 - MP 4,44 TO MP 9.26 SURFACE (BST); FINISHED WIDTH = 28 FT. I M PT R OP VE MS T 4 01 U I L TC E IO N LD G I E PROJECT T TS PHASE H Y Six Year Transportation Improvement Program 1994 to 1999 Hearing Date: June 22, 1993 Adcption Date: June 22; 1993 Resclution No.: 93- -CC PROJECT COSTS IN THOUSANDS OF DOLLARS _ FUND SOURCE INFO <MATION FEDERAL FUNDING MONTH/ YEAR PHASE STARTS 5 6 . 7 8 ! 2.00 P PE ! T R/W , 1 CONST FEDERAL FEDERAL COST FUND BY CODE PHASE 9 10 TOTAL I... i----- — 09 0.25 P PE ! 15 T R/W 1 BR CONST ! 2281 04 04 04 04 EXPENDITURE SCHEDULE TOTAL 1 st 2nd 13 14 .15 16 1441 1 1601 1 19 251 TOTAL ! ! 2431 I 27 9.06 P PE - I 5018 581 k r /W T R ! STP CONST _ 6851 1— 107 792 7921 TOTAL I 1. 7351 1 1151 1 8,501 1 1 1 8501 4th 3rd thru 6th 16 I 17 ! 16 I ! 1441 160] 25 27( 3.99 P RAP LOCAL CAPP R/W TIP. UATA 1 311 OTHER 11 12 16 R/W 144 1 ' 1601 _3151 221 4 TOTAL --— 23 PE EXPENDITURE SCHEDULE TOTAL 1 st 2nd 13 14 .15 16 1441 1 1601 1 19 251 TOTAL ! ! 2431 I 27 9.06 P PE - I 5018 581 k r /W T R ! STP CONST _ 6851 1— 107 792 7921 TOTAL I 1. 7351 1 1151 1 8,501 1 1 1 8501 4th 3rd thru 6th 16 I 17 ! 16 I ! 1441 160] 25 27( 3.99 P PE ` T R/W RAP CONST I 1 311 TOTAL - 2.01 P PE 1 T R/W ! 1 ' CONST _3151 221 - TOTAL --— 4.82 P PE T R/W 23 2021 CONST 2251 1 I 1 261 TOTAL 1 1 - 41 - ---- 31 35 1 RAP 1 311 2841 315 1 I 3151 1 - 351 3501 ( I 1 ' 3 _3151 221 251 ! 25 RAP I ! I 23 2021 2251 2251 1 I 1 261 2241 _ -_ 2501 1 1 1 25�1 4 361 40 1 I 4D 1 RAP 1 J 41 3691 410 ! i 41:` 1 1 1 451 4051 4501 1 1 1 45 1 Note: An ' by the priority number indicates the project has been selected for funding using the Federal or State source shown Page 11 of 13 09 68 K -NW RD (SR 28 TO SR 283) 30410 - MP 0,00 TO PAP 5.46 GRADE. DRAIN, SURFACE(BST); FINISHED WIDTH = 28 FT. 19 69 MAPLE DR (STRATFORD TO GRAPE) 42600 - MP 0.00 TO MP 0.75 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 40 FT 19 1 70 GRAPE DR (SR 17 TO END) 42350 - MP 0.00 TO MP 0.71 GRADE, DRAIN, SURFACE(BST); FINISHED WIDTH = 40 FT. 08 71 P -NW RD (10.5 -NW TO MARTIN) 93035 - MP 0.57 TO MP 2.03 SURFACE(BST); FINISHED WIDTH = 28 FT. 09 i 7215 -NE (WESTSHORE DR TO F -NE) f i NEW GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 26 FT Agency Six Grant County County No. 13 City No. MPO F P U C R PROJECT IDENTIFICATION N L I C A O A. PROJECT TITLE T S R B. STREET/COUNTY ROAD NAME OR NUMBER I S I C. TERMINAL BEGINNING AND END O T D. DESCRIBE WORK TO BE DONE N Y PROJECT COSTS IN THOUSANDS OF DOLLARS 1 2 3 08 67 P -NW RD (5 -NW TP SR 28) i FUND SOURCE INFORMATION j 36250 -PAP 0.00 TO MP 5.03 E 10 SURFACE (BST); FINIDHED WIDTH = 34 FT. 09 68 K -NW RD (SR 28 TO SR 283) 30410 - MP 0,00 TO PAP 5.46 GRADE. DRAIN, SURFACE(BST); FINISHED WIDTH = 28 FT. 19 69 MAPLE DR (STRATFORD TO GRAPE) 42600 - MP 0.00 TO MP 0.75 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 40 FT 19 1 70 GRAPE DR (SR 17 TO END) 42350 - MP 0.00 TO MP 0.71 GRADE, DRAIN, SURFACE(BST); FINISHED WIDTH = 40 FT. 08 71 P -NW RD (10.5 -NW TO MARTIN) 93035 - MP 0.57 TO MP 2.03 SURFACE(BST); FINISHED WIDTH = 28 FT. 09 i 7215 -NE (WESTSHORE DR TO F -NE) f i NEW GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 26 FT Note: An ' by the priority number indicates the project has been selected for funding using the Federal or State source shown Page 12 of 13 Six Year Transportation Improvement Program 1994 to 1999 Hearing Date: June 22, 1993 Adoption Date: June 22, 1993 Resolution No.: 93- -CC I U PROJECT COSTS IN THOUSANDS OF DOLLARS M L T C! i FUND SOURCE INFORMATION j P T E 10 j FEDERAL FUNDING EXPENDITURE SCHEDULE R Y N L D RAP I O P G I E PROJECT MONTH/ FEDERAL FEDERAL LOCAL CAPP TOTAL VE T TS PHASE YEAR COST 1 FUND TIA 4th M S H Y PHASE BY CODE UATA 1st 2nd 3rd . -thru T 1 STARTS PHASE OTHER 6th 1 4 1 5 6 7 j 8 9 10 11 j 12 13 14 j 15 16 17 j 04 5.03 P PE 5 40 45 451 T R/WRA P CONST I I --- �- 41 364 ___4_05 --- 405 TOTAL 1 j 1 461 4041 4501 1 1 1 4501 03 5.46 P PE 65 65 65 T R/W I CONST _ _ 585 585 5851 TOTAL 1 1 1 6501 1 6501 1 1 1 650 l 03 0.75 P PE i 1 9 9 9 T R/W - - CONST 1 81 81 81 TOTAL 1 1 1 1 901- 1-- -- 90 F I 1 1 90 031 0.71 T PE 1 , 9 9' I I g N! ! 1 CONST ! 81 811 1 1 TOTAL I I - I I 901 1 90! I I I 9L 03 1.46 P PE 1 - 31 221 - - - 25 25 T R/W 1 I RAP CONST 221 2031 2251 1 225, 1 TOTAL ---�-- --- I � - --- -- -- � _ .. 25.1 2251 2501------�---!_ 1 250: 01 0.40 P PE 1 _- J 61 61 61 T R/W f CONST _ E - 54 54 TOTAL I -----L-- - -54 I I 1 - 60 I — � - - -- 60 ---- -- 1------ -� --_ - � 60 Note: An ' by the priority number indicates the project has been selected for funding using the Federal or State source shown Page 12 of 13 Agency Grant County County No. 13 City No. MPO F P U C R PROJECT IDENTIFICATION N L I C A O A. PROJECT TITLE T S R B. STREET/COUNTY ROAD NAME OR NUMBER I S I C. TERMINAL BEGINNING AND END O T D. DESCRIBE WORK TO BE DONE N Y 1 - 2 3 07 73 ©-NW RD (MOUNTAIN VIEW DR TO MARTIN RD) 32850 - MP 0.57 TO MP 1.92 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. I FEDERAL( U LOCAL CAPP M L TC COST PT E 10 4th R N LD UATA O P G I E PROJECT V E T TS PHASE MS H Y 11 12 T 15 16 17 15 4 5 6 7 03 1.35 P PE _• - T RMJ II ! 132L CONST 153 15 TOTAL Six Year `transportation Improvement Program 1994 to 1999 Hearing Date: June 22, 1893 Adoption Date: June 22, 1993 Resolution No.: 93- -CC PROJECT COSTS IN THOUSANDS OF DOLLARS FUND SOURCE INFORMATION FEDERAL FUNDING EXPENDITURE SCHEDULE ------ —---------------- RAP MONTH/ FEDERAL( FEDERAL LOCAL CAPP TOTAL YEAR COST FUND TIA 4th PHASE BY CODE UATA 1st 2nd 3rd thru STARTS PHASE OTHER 6th 8 ,. .9 10 11 12 :13 14 15 16 17 15 2 17 ( 17 STP _• - - • -� II ! 132L 21 153 15 '----- -------14� ------- � 23 170 ---- 17101 Note: An ' by the priority number indicates the project has been selected for funding using the Federa! or State source shown Page 13 of 13