BOARD OF COUNTY COMMISSIONERS
GRANT COUNTY, WASHINGTON
IN THE MATTER OF ADOPTING
A COMPREHENSIVE SIX YEAR
TRANSPORTATION IMPROVEMENT
PROGRAM FOR THE ENSUING
SIX YEARS
RESOLUTION NO. 96 -80 -CC
WHEREAS, pursuant to the requirements of Section 6, Chapter 83,
Laws of Extraordinary Session of the State of Washington, Grant County
did prepare a Comprehensive Transportation Improvement Program for the
ensuing six year; and
WHEREAS, priority array of projects prepared in accordance with
County Road Administration Board Standards of Good Practice (WAC 136-14)
was made available and was consulted by the Board during the preparation
of this Six Year Program; and
WHEREAS, the Engineer's report with respect to deficient
bridges was available to the Board during the preparation of the Six Year
Program; and
WHEREAS, an environmental pre -assessment iof the Six Year
Program indicated that the social, economic and aesthetic values would
not be disturbed; and
WHEREAS, pursuant further to said Law, the Board of County
Commissioners, being the legislative body of the County, did prepare,
revise and extend said Six Year Program and did hold a public hearing on
said Comprehensive Plan at 11:00 A.M. at'the Courthouse, Ephrata,
Washington on the 25th day of June, 1996;
NOW, THEREFORE, BE IT RESOLVED by the Board of County
Commissioners of Grant County, Washington, that the Comprehensive Six
Year Road Program presented at the public hearing on the 25th day of
June, 1996, and revised as necessary, be hereby adopted.
DONE THIS 25th DAY OF Ju a 19_ 46_,
�ATTEST; . llikI T
U ,C rk of the Board
Chairman
Constituting the Board of County Commissioners
of Grant County, Washington
Six Year Transportation Improvement Program
1997 to 2002
Agency
Grant County
County No. 13
Hearing Date:
June 1996
City No.
Adoption Date:
June 19%
MPO
Resolution No.:
96- -cc
F
P::
I
U
PROJECT
COSTS IN THOUSANDS OF DOLLARS
U C :::R
PROJECT IDENTIFICATION
M
S
T L
T C
FUND SOURCE INFORMATION
N L
I.:: A. FEDERAL AID NO.
PTT
0 E
10
FEDERAL FUNDING
EXPENDITURE SCHEDULE.:-:::
FEDERALLY FUNDED
C A
0 B. BRIDGE NO.
R Y
A
T N
L D
RAPPROJEf'TS
(LOCAL AGENCY)
ONLY
T S
R C. PROJECT TITLE
0 P
T
A G
I E
PROJECT
MONTH/
FEDERAL FEDERAL
CAPP
RAM REQ
I S
1. D. STREET/COUNTY ROAD NAME OR NUMBER
VE
U
LT
TS
PHASE
YEAR
FUND COST
TIA
STATE LOCAL
4th
YIN
0
T- E. TERMINAL BEGINNING AND END
M S
S
H
Y
PHASE
CODE BY
UATA
FUNDS FUNDS
TOTAL
1st
2nd 3rd thru
ENVIR. DATE
N
Y F. DESCRIBE WORK TO BE DONE
T
STARTS
PHASE
OTHER
6th
TYPE MONTH/YR
:::2.:...
... ... ... ... ..
, ... .— .: �
3�
. . :4,::
:5
6.::.,:.:
7::::::
.8
.9
i:'�:
15
16
17. :18::
07
V SAGEBRUSH FLATS RD (J -NE TO 24 -NW)
03
F
3.57
P
PE
25
25
25
EIS
93047 - MP 9.37 TO 11.60; 93048 - MP 5.28 TO MP 6.62
T
R/W
I I
RAP
CE
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT-
CONST
3/97
4501
2101
6601
660
EA_
TOTAL
M1
235
685
685
07
2..5-NWfU-NW RDS (SR 281 TO SR 28)
03
F
8.91
P
PE
36
4
1.
40
40
EIS
93010 - MP 14.07 TO 22.98
T
R/W
I
RAP
I
i
CE_
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 36 FT.
CONST
2/97
I
9411
1041
10451
1045
1
EA_
.......... ......
....... . ...... . .......... .... . .............. . .... ..... ........ ............. ......................... ...............
. ........
... .......
.. .
. .......
TOTAL
........... ........ ...............
9771
108
1085.,::1085
07
3, BRIDGE #389,5 -NW
09
F
0.21
P
PE
.....
............
.. .. . . .... .... . .. .... ..........
EIS
93010 -MP 16.02 TO MP MP 16.23
T
RIW
RAP
CE
BRIDGE REPLACEMENT; FINISHED WIDTH 34 FT.
CONST
2/97
1 711
81
79:
791
EA
TOTAL
71
8
79
491
08
AVE (PATTON BLVD TO FORGES)
04
F
0.33
P
PE
4
1
5
w
EIS
45170 - MP 1.28 TO MP 1.61 (Rural)
T
RM
RAP
CE
GRADE, DRAIN, SURFACE (ACP), FINSHED WIDTH = 40 FT.
CONST
7/97
108
12
1201;..120
EA
TOTAL
I 112
13
:;>, 129)
08 ....:X.5:
STP(U)-6073
04
F
0.27
P
PE
1
9
EIS
22nd AVE (FORBES TO RANDOLPH RD.)
T
R/W
STP(U)
CE X N
45170 -MP 1.61 TO MP 1.88 (Urban)
CONST
7/97
90
151
105[::_
05i
EA_
GRADE, DRAIN, SURFACE (ACP), FINISHED WIDTH 40 FT.
. ........ . . .. ...... .... ........ .... I .... . ......... ... ..... ......... ....... ......
. . .. .... ..
. ..
...... ... .
TOTAL
1 981
16
114:* -:.-.._414
07
RANDOLPH AND TYNDALL RDS (1 9TH AV TO STRATFORD RD)
04
F
2.42
.. ....
P
.. .........
PE
45
$
50
... . ... ...
EIS
45010 -MP 1.13 TO MP 2.85; 45080 - MP 0.00 TO MP 0.70
T
RNV
I
RAP
CE_
GRADE. DRAIN, SURFACE (ACP), FINSHED WIDTH 40 FT.
CONST
7/97
698
77
......
775
. .....
-.77 5.
I
EA
. . ..... .. . . . . . .. ..... . ...... . . . ...... . . ..... .. .. ...... ...... .......
......
TOTAL
.... ... .. .
1 7431
. ... .. I ....
.. 821
825j:..w:.w:.:-_
8251
1 1
1
Page 1 of 11
Agency Grant County
County No. 13
City No.
MPO
Six Year Transportation Improvement Program
1997 to 2002
Hearing Date: June 1996
Adoption Date: June 1996
Resolution No.: 96- -CC
F
P:
I
U
PROJ.CT COSTS IN THOUSANDS OF DOLLARS
U C :R:::
PROJECT IDENTIFICATION
M
S
T L
T C
FUND SOURCE INFORMATION
N L
1 := A. FEDERAL AID NO.
PT
T
OE
10
FEDERAL FUNDING (
EXPENDITUR.E SCHEDULE ..
FEDERALLY
FUNDED
C A
O: B. BRIDGE NO.
RYA
T N
L D
RAP(LOCAL'AGENcY)
PROJECTS ONLY
T S __.R
C. PROJECT TITLE
OPT
AG
I E
PROJECT
MONTH/
FEDERAL
FEDERAL
CAPP
RM/ REQ
I S
I. D. STREET/COUNTY ROAD NAME OR NUMBER
VE
U
LT
TS
PHASE
YEAR
FUND
COST
TIA
STATE LOCAL
4th
Y/N
O
T; -: E. TERMINAL BEGINNING AND END
M S
S
H
Y
PHASE
CODE
BY
UATA
FUNDS FUNDS
TOTAL
1st 2nd 3rd
thru
ENVIR.
DATE
N
Y: F. DESCRIBE WORK TO BE DONE
T
STARTS
PHASE
OTHER
6th
TYPE
MONTHNR
......
_.. 4
6..;:;:::;7':
is>:i::g ::.:.,:
9?.::
10
>:11:::.' .:'
:12
.. .13:, � ''14.>::..
15:>':::.::16<:..::::
17.::. 18:*:::::::..
1
....
08
T STP(U)-6074
04
F
0.38
P
PE
9I
1
10:::
>:'%::101
Eis_
RANDOLPH RD (PAT -TON BLVD TO 19TH AV)
T
R/W
STP(U)
{
CE x
N
45010 -MP 0.75 TO MP 1.13
CONST
7/97
+{+
I 108
I
17
125`
:': 125'{
EA_
.:::. GRADE, DRAIN, SURFACE (ACP), FINISHED WIDTH = 40 FT.
TOTAL
1 1171
{
181
135
07 :`.:::::8.
STP(R)-E131
03
F
6.52
P
PE
1/97
{ 861
{
14
100:<
'>100
Eis_
DODSON RD (FRENCHMAN HILLS TO 4 -SW & 1 -SW TO 1-90)
T
RNV
STP(R)
(
{
CE x
N
91030 - MP 5.90 TO MP 10.60; MP 13.60 TO MP 15.42CONST
3/97
{ 7791
121 {
900
';;:.:900{
EA_
.............
GRADE, DRAIN ,SURFACE(BST); FINISHED WIDTH = 36 FT.
....... ......... ............. ,.,.............................. ..................... ................... ,..............
,,.............
....
..,.... ,.,..
..........
TOTAL
,.............. ,.,..
...................
1 865
1
135
1000 `:
i1000
..
.,,,.,... ,....
.........................................
.
07
9. ADAMS RD (SR 26 TO FRENCHMAN HILLS)
07
F
6.28
P
PE
1/97
.......,.........
......................................,...
{
.........,
Eis_
91017 - MP 0.00 TO MP 6.28
T
R/W
{
CAPP
{
{
; CE`
SURFACE (ACP); FINISHED WIDTH = 34 FT.
CONST
7/97
{ {
800
800
EA;
TOTAL
{ 800
800 ::.::::::800
08
": 10: BROS-2013
09
F
0.02
P
PE
1/97
12
{
3
15 .:>:;
1.5
Eis_
BRIDGE #306, WILLOW SPRINGS
T
RNV
BR
{
I
CE x
N
32300 - MP 20.00 TO MP 20.02
CONST
9/97
{ 50 {
{
12
621
. z'<62
EA
BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT.
�.
TOTAL
62
15
77'._,.....
':
_.
....77:
08
::1:1._ 3 SE RD (SR 17 TO R -SE)
03
F
3.28
P
PE
1/97
22
3
25
;;>25
Eis_
22000 - MP 0.00 TO MP 3.28
T
RNV
{
RAP
<:<<
CE_
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT.
CONST
4/97
+
I {
1 347
38
3851`x:::;::
385
EA_
...P......
36
1
44
4'.
410
i.. . ..........
BROS-2013
09
P
0.08
PETAL
16
{
, ...:
20:
Els_
BRIDGE #393, O -SW
T
RNV
BR
I
I
'
;.:.{
{
!
CE_
15910 - MP 0.00 TO MP 0.08
CONST
{ 1401
{
35
175 >
-<175{ {
1
1 EA_
BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT.
........ . ...... I .... ..........................
TOTAL
........
..........
{ 1561
.............
1 1
391
. ..
1951-N-195:{
........... .
{
{
Page 2 of 11
Six Year Transportation Improvement Program
1997 to 2002
Agency Grant County
County No. 13
Hearing Date:
June 1996
City No.
Adoption Date:
June 1996
MPO
Resolution No.:
96- -CC
F
U
PROJECT COSTS IN THOUSANDS OF DOLLARS
U C
R*: PROJECT IDENTIFICATION
M S
T L
T C
FUND SOURCE INFORMATION
N L
V: A. FEDERAL AID NO.
PTT
0 E
10I
FEDERAL
FUNDING
. . ..... ....
EXPENDITURE'S,CHEDULE
FEDERALLY FUNDED
C A
B. BRIDGE NO.
R A
TN
LD
RAP
PROJECTS ONLY
T S
C. PROJECT TITLE
OP T
AG
I E
PROJECT
MONTH/
FEDERAL
FEDERAL
CAPP
... .. ...
. ... ...
R/W REQ
I S
I... D. STREET/COUNTY ROAD NAME OR NUMBER
VE U
LT
TS
PHASE
YEAR
FUND
COST
TIA
STATE LOCAL
4th
YIN
..:*...T:'
:' E. TERMINAL BEGINNING AND END
MS S
H
Y
PHASE
CODE
BY
UATA
FUNDS FUNDS
TOTAL
1st
2nd
3rd thru
ENVIR. DATE
Y::!: F. DESCRIBE WORK TO BE DONE
T
STARTS
PHASE
OTHER
6th
TYPE MONTH/YR
:3
.5
8
9.:
18. 1:9:
07
1.3. STP (R) -C131
03 F
7.91
P
PE
1/97
73
1 12
85::-:..:85
EIS
12-SW/SE RD (G -SW TO SR 262)
T
R/W
STP(R)
CE X Y
91027 - MP 0.00 TO MP 4.00; 10270 - MP 0.00 TO MP 3.91
CONST
5/98
I 946
154
1100
EA
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT.
TOTAL
1 1019
166
1185:
:,85
:::11100
4/98
07
14 10 -NE (STRATFORD TO SR 17)
03 F
6.53
.
P
. ..... .
PE
....
10/97
1
36 4
40:
40
EIS
94040 - MP 0.00 TO MP 6.53
T
R/W
RAP
CE
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
CONST
5/98
594 66
660'[::::'::6601
EA -
.......... ....
..... . ...... .......... ......................................
630
P
700
N:40w.
1'<:`<6601
07
. ... ........... ........... ............... .. ....
STP(R)-Q 137
...... . . ...... .. . ...
04 F
4.60
P
.............. .....
PE
.......
1197
..... . . ...
1 51
1 45
.1
... .... ......... .
....
..... .... ..... . . .
EIS
PINTO RIDGE (31 -NE TO COULEE CITY)
T
R/W
STP
I I
RAP
CE X N
.... 95025 - MP 10.14 TO MP 14.74
CONST
5/98
851
1 7651 1
8 50
.... .. 8w
EA
WIDEN AND SURFACE (BST; FINISHED WIDTH = 28 FT.
TOTAL
901
1 8101
........
......
goo
MISCELLANEOUS PROJECTS
03 F
P
PE
EIS
T
R/W
......
CE
*INCL. COST SHARE PROJECTS
CONST
1/97-12/02
1200
100 z`
.2�::.:
200
200 600:
EA
TOTAL
1200
1200:
::�:200
. ....
.:::.� �200
.. ... .
»> >200 .�:.:::::600'
08
BROS-20113
09 P
0.02
P
PE
121
- - --
------
3
115�
....
......
. ..... 15
EIS_
BRIDGE #347, S -NW
T
R/W
BR
I I
1
CE
31550 - MP 1.43 TO MP 1.44
CONST
1
581
1
is
73
........
.....
7:1
EA
BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT.
. .... ... . .. ..
TOTAL
701
18
.
...........
.. .. w -X.88
09
MATTAWA AREA ROADS
01 P
8.00
P
PE
I
.. ...... ... . ......... ......
. ........ ...
.. . ... ...
... ... ....
. . .... .... . . . .. . .... .. ...... .
FJS
....
...........S-SW-SW25/U/SW/28-SW/29SW
. .
T
RAA1
I
I
......... . .
...................................... ... .... . ...
....... . . . . . .
......... .. ............... ..-... ...
.......... .
.....
CE
GRADE. DRAIN, SURF.(GRAV/BST); FINISHED WIDTH 26 FT
CONST
300
300:
EA
... . ... . ... .......... .. ..... ..... . .. .. ...... . .. ... . . ... .. .... ..........
... . .
TOTAL
..... .. .
... .... .. . ....
1 3001
3MI
.1:::*-:
-180:
.......
... . ... .. ..
Page 3 of 11
Agency Grant County
County No. 13
City No.
MPO
Six Year Transportation Improvement Program
1997 to 2002
Hearing Date: June 1996
Adoption Date: June 1996
Resolution No.: 96- -CC
F
P::.;
I
U
PROJECT COSTS IN THOUSANDS OF DOLLARS
U C ::
_R .. PROJECT IDENTIFICATION
M S
T L
T C
FUND SOURCE INFORMATION
N L
' I _ A. FEDERAL AID NO.
P T T
O E
10
FEDERAL
FUNDING
EXPENDITURE,SCHEDULE
.::
FEDERALLY FUNDED
C A
':0;: B. BRIDGE NO.
R Y A
TN
LD
RAP
3
t1OC °� cvj
`,>; ;.
PROJEr ONLY
T S
R :. C. PROJECT TITLE
OPT
AG
I E
PROJECT
MONTHI
FEDERAL
FEDERAL
CAPP
o
R/
R/W REQ
S
.1_:. D. STREET/COUNTY ROAD NAME OR NUMBER
VE U
LT
T S
PHASE
YEAR
FUND
COSTTIA
STATE LOCAL
'
4th
YIN
O
T;: E. TERMINAL BEGINNING AND END
M S S
H
Y
PHASE
CODE
BY
UATA
FUNDS FUNDS
TOTAL
1st
2nd
3rd I
thru
ENVIR. DATE
N
Y:: F. DESCRIBE WORK TO BE DONE
RIB
T
STARTS
PHASE
OTHER
g�g
i
6th
TYPE MONTH/YR
_...
...-
4 5
6:::;:.:;7
8 ..
9
0......
......17............12........
13
;.::;::`.::
1 5:::::.: _:
1 6
1 7>::::::.;::18:<;::;...:
t g.>:::::::::>20:::::<:`
:::::_:::>:21'>:;;:;..:
07
19 DODSON RD (SR 26 TO FRENCHMAN HILLS)
07 F
5.90
P
PE
1/99
50
I
50;
50
EIS_
91030 - MP 0.00 TO MP 5.90
T
R/W
I
CAPP
I
4
CE_
ACP OVERLAY; FINISHED WIDTH = 34 FT,
CONST
7/99
750
I
750:.
I 750
EA_
TOTAL
800
800 6
800
09
20 BROS-2013
09 P
0.02
P
PE
I 12
I
3
15.
1.5.
Eis_
BRIDGE #390 - 3 -NW
T
RAN
BR
I
I
c
I
CE_
31200 - MP 0.99 TO MP 1.01
CONST
156
39
195'
195
EA—
BRIDGE _: BRII.DGE REPLACEMENT; FINISHED WIDTH = 28 FT.
_..
TOTAL
1.68.
I
42
210;
I
210
08 :::21:
EROS -2013
09 P
0.02
.......................
P
PE
16
...........
.....
4
....... E..
20
.,., .....
...........,
.:. _
20
..,.,,, .,.
Eis_
BRIDGE #388 - 7 -NW
T
R/W
BR
CE
31700- MP 4.00 TO MP 4.02
CONST
+
I 188
47 1
2356
235
EA_
BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT.
TOTAL9
204
St
255 (
1
09 `<22
BROS-2013
09 P
0.02
P
PE
2
1
3
>3:
Eis_
BRIDGE #251, 2.7 -SE
T
R/W
BR
CE_
22010 - MP 0.20 TO MP 0.22
CONST
I 48
11
59
59
En_
BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT.
TOTAL
1 50
12I
626
62
09 ..,"..23.:
BROS-2013
09 P
0.05
P
PE
2
1
3
3;
Eis_
BRIDGE #126, O -NE
T
R/W
BR
CE_
54150 - MP 4.20 TO MO 4.25
CONST
1 43
1
101
53
En_
BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT,
.............................................................................................
TOTAL
1 45
11
5656
1 6 ::
..4
2.., PATTON BLVD TRAFFIC F SIGNAL
12 P
0.10
P
..........................
PE
........
6
2
8:
`
Ess_
45170 - MP 0.53
T
R/W
I
UATA
CE_
TRAFFIC/PEDESTRIAN SIGNAL
CONST
54
18
72:
72
EA_
TOTAL
601
201
801
1.. .�
' = :*&
Page 4 of 11
Agency Grant County
County No. 13
City No.
MPO
Six Year Transportation Improvement Program
1997 to 2002
Hearing Date: June 1996
Adoption Date: June 1996
Resolution No.: 96- -CC
F
P::
I
U
PROJECT COSTS IN THOUSANDS OF DOLLARS
U C
:R PROJECT IDENTIFICATION
M
S
T L
T C
FUND SOURCE INFORMATION
N L
J: A. FEDERAL AID NO.
P T
T
O E
10
( FEDERAL FUNDING
:;EXPENDITURE SCHEDUL,E<''
FEDERALLY FUNDED
C A
O::_ B. BRIDGE NO.
RYA
T N
L D
RAP
IiocAi AGENCrj_-:
: ,.:
PROJECTS ONLY
T S
..R:>:: C. PROJECT TITLE
O P
T
A G
I E
PROJECT
MONTH/
FEDERAL
FEDERAL CAPP
RNV REQ
I S
I::.. D. STREET/COUNTY ROAD NAME OR NUMBER
VE
U
LT
TS
PHASE
YEAR
FUND
COST TIA
STATE LOCAL
4th
Y/N
O
T::. E. TERMINAL BEGINNING AND END
M S
S
H
Y
PHASE
CODE
BY UATA
FUNDS FUNDS
TOTAL
1st 2nd 3rd
I
thru
ENVIR.
DATE
N
' Y . F. DESCRIBE WORK TO BE DONE
T
STARTS
PHASE OTHER
6th
TYPE
MONTH/YR
3 .. .. :, .::::::::.:::::........
_.:......................... _. ... .................
4 ....5
.. 6.....
7..
8
9..
10:::.:
x'::::::::::1;1::;>;:;.: ".:<:.12:';:<;
;_::?13::.;::::::::14:.:.'::::....
15:` `' ; .:::::16::'
: '::1:7:;:: <; :::.18::::: s:::;J
9
20`::::'
::>::>:i: 21.>:::::::
19
?25 PATTON BLVD BIKE PATH (SR 17 TO AIRWAY)
12
P
0.30
P
PE
2
2
2
EIS_
T
RNV
I
CE_
BIKE PATH
CONST
I
13
13:
13
EA_
TOTAL
i 15
_ 15 ..
.. ...E.
15
�::.":,
09 :26:
1 -SE (U -SE TO TIFLIS)....
03
P
0.75
P .
PE
,
I
11
11
1:.1
EIS_
23400 - MP 0.00 TO MP 0.75
T
RNV
�:::: `'
CE_
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
CONST
1041
104i
�:: 104
EA_
........................................................................................................................................
..............................................................................
TOTALI
115
..............................,................,.......,...............
115:
1:15
..
.............-
... ,.,.,,.................
09
>27: 2 -SE (Q -SE TO R -SE)
03
P
1.01
P
PE
1
15
15
15
EIS_
92045 - MP 6.94 TO MP 7.95
T
R/W
CE _
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
CONST(
135
135
:135
EA_
TOTAL
I 1501
150
150
07
;:28' 7 -NW RD (SR 283 TO DODSON RD)
03
P
6.30
P
PE
I` 36 4if
40
40
EIS_
39200- MP 2.01 TO MP 8.31
T
R/W
,
RAP
I
(
CE_
`. GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
CONST
(
675 751
7501
EA_
_
TOTAL
711 79
790:
790
w
08
:z:> 29. BROS-2013
09
P
0.23
P
PE
2
24.
';.241
EIS_
BRIDGE#385, K NW
T
RNV
BR
1
CE_
93041 - MP 0.07 TO MP 0.30
CONST
194
22
216
EA_
BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT.
TOTAL
1 216
24
240:
240.
07
:30: Q -NE (N FRONTAGE TO 3 -NE)
03
P
2.84
P
PE
1 26
1 4
30
::30
EIS_
43590 - MP 0.00 TO MP 2.84
T
RNV
STP(R)
1
CE_
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
CONST
( 363
57
420:
420:
EA_
.........
....
TOTAL
�..... 3891
.. .....�. .....61.1.......450M...
I .... �......._ �`>:450:
Page 5 of 11
Agency Grant County
County No. 13
City No.
MPO
PROJ .CT COSTS IN THOUSANDS OF DOLLARS
F
P
M S
U C i
:R
PROJECT IDENTIFICATION
N L
F:
A. FEDERAL AID NO.
C A ...0:
P T T
B. BRIDGE NO.
T S
::::R
. C. PROJECT TITLE
I S
:..: F.
D. STREET/COUNTY ROAD NAME OR NUMBE
O
T:...
E. TERMINAL BEGINNING AND END
N
Y>.
F. DESCRIBE WORK TO BE DONE
(LOCAL AGENCY)
PROJECTS ONLY
O P T
07
31
Q -NE RR SIGNALIZATION
MONTH/
FEDERAL FEDERAL CAPP
43590 - MP 1.02
R/W REQ
R VE U
RAILROAD CROSSING SIGNALIZATION
Six Year Transportation Improvement Program
1997 to 2002
Hearing Date: June 1996
Adoption Date: June 1996
Resolution No.: 96- -CC
I
U
PROJ .CT COSTS IN THOUSANDS OF DOLLARS
TOTAL
1 1291
M S
T L
T C
130
16
FUND SOURCE INFORMATION
'' .....
P 0.25
P T T
O E
10
FEDERAL FUNDING I ':'>:EXPENDITURE`SCHEDULE.:
Eis_
FEDERALLY FUNDED
RY A
TN
LD
T
R/W
RAP
(LOCAL AGENCY)
PROJECTS ONLY
O P T
A G
I E
PROJECT
MONTH/
FEDERAL FEDERAL CAPP
R/W REQ
R VE U
LT
T S
PHASE
YEAR
FUND COST TIA STATE LOCAL
170 EA
4th
Y/N
M S S
H
Y
TOTAL.....,.....................
PHASE
CODE BY UATA FUNDS FUNDS TOTAL
1st 2nd 3rd
thru
ENVIR. DATE
T
..............................................................................
33 1 -SW (SILICA RD. TO V -SW)
01
P 1.00
STARTS
PHASE OTHER
. .. ...
.......,......
6th
TYPE MONTH/YR
4
.,.......
201 Eis_
9
10
11 ......... 1 13.
2. <14 15::: ->:..:16.;
.::.17 ...::.; .16.:.: ':::19:: ::::;20
'21:::::>::::
12 P
---
P
PE
CE _
4
1 5:
5:
Eis_
CONST
TOTAL
I
T
RM/
100;
120::
-:::-100 EA_
120
09
- :,34
BROS-2013
a
CE -
P
PE
CONST
STP(S)
1251 1 1 125:
12
125
EA_
Page 6 of 11
TOTAL
1 1291
1
130::
130
16
:.32. VALLEY RD (CASCADE VALLEY PARK TO OTTMAR)
04
P 0.25
P
PE
Eis_
41250 - MP 0.50 TO MP 0.75
T
R/W
I
I TIA I
CE_
GRADE, DRAIN, SURFACE (ACP), CURB AND GUTTER, AND
CONST
136
34
170
170 EA
SIDEWALKIBIKE PATH; FINISHED WIDTH = 48 FT.
TOTAL.....,.....................
I
361
180
09
..............................................................................
33 1 -SW (SILICA RD. TO V -SW)
01
P 1.00
P
PE
. .. ...
.......,......
.....1 ...........44
.,.,.,.,180
20+
20
.,.......
201 Eis_
NEW - MP 0.00 TO MP 1.00
T
R/W
I I
CE _
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 26 FT.
CONST
TOTAL
I
1001
1201
100;
120::
-:::-100 EA_
120
09
- :,34
BROS-2013
09
P 0.20
P
PE
10
2
12
>: ?::12 EIS_
BRIDGE #219, W -SE
T
RM/
BR
CE_
24650 - MP 0.00 TO MP 0.20
CONST
I 307
47
354:
354: EA_
BRIDGE REPLACEMENP FINISHED WIDTH = 28 FT.
TOTAL
317
49
366'
366
08 1>:1.35.
U -SW RD (24 -SW TO 26 -SW)
03
P 2.01
P
PE
25
3
28:
< :28 Eis_
10590 -MP 1.01 TO MP 3.02
T
R/W
RAP
CE_
GRADE, DRAIN, SURFACE (GRAVEL); FINISHED WIDTH = 28 FT.
CONST
216
24
240
240: EA
TOTAL
241
27
268:
::::::::::268'.
07
36 STP(R)-G132
03
P 5.45
P
PE
68I
12
80 '
...........
80_ EIS
5 -NW RD (SR 283 TO SR 281)
T
R/W
STP(R)
CE_
93010 - MP 8.62 TO 14.07
CONST
654111 1
104
745.
745 EA_
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT.
..................................................................................................
.......
TOTAL ......
1 7091 • 1
.....
1
1161
825' 1
Page 6 of 11
Six Year Transportation Improvement Program
1997 to 2002
Agency Grant County
County No. 13
Hearing Date:
June 1996
City No.
Adoption Date:
June 1996
MPO
Resolution No.:
96- -cc
F
I
U
PROJECT
COSTS IN THOUSANDS OF
DOLLARS
U C
PROJECT IDENTIFICATION
M
S
T L
T C
FUND SOURCE INFORMATION
N L
A. FEDERAL AID NO.
PT
T
OE
10
I FEDERAL FUNDING
EXPENDITURE :SCHEDULE :.:
FEDERALLY FUNDED
C A
B. BRIDGE No.
R Y
A
T N
L D
RAP
'AOC INGENCY)
PROJECTS ONLY
T S :R::
C. PROJECT TITLE
0 P
T
A G
I E
PROJECT
MONTH/
FEDERAL FEDERAL
CAPD
RNV REQ
I S
D. STREET/COUNTY ROAD NAME OR NUMBER
VE
U
LT
TS
PHASE
YEAR
FUND COST
TIA
STATE LOCAL
4th
Y/N
0
E. TERMINAL BEGINNING AND END
M S
S
H
Y
PHASE
CODE BY
UATA
FUNDS FUNDS
TOTAL
1st 2nd 3rd thru
ENVIR. DATE
N
Y-.. F. DESCRIBE WORK TO BE DONE
T
STARTS
PHASE
OTHER6th
TYPE MONTH/YR
.... . . .... ......... .......
.. ............ ... ..
:6::
7::.
-'.8:.:
9-...
10
'::I
15
X :1
- T:X: 19-
20. :21-
08
K-SE/1-SE RDS (BASELINE -E TO SR 17)
03
P
2,55
P
PE
I
27
3
30
30
EIS
21750 - MP 0.00 TO MP 0.45121780 - MP 0.00 TO MP 2.10
T
RM
RAP
CE
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
CONST
2431
27
270.
:::.�:,270:
EA
TOTAL
1
270
30
300
.300
16 :.'..38
, VALLEY RD (OTTMAR TO COLE)
04
P
0.78
P
PE
45
5
50
561
0
EIS_
41250 - MP 0.70 TO MP 1.53
41250M
T
R
UATA
CE
GRADE, DRAIN, SURFACE(ACP), AND CURB AND GUTTER;......
CONST
1 4051
45
450
:-450
EA_
FINISHEDWIDTH = 48 FT.
.......... ... ....... ... . . ............... . .... .. ...................................... . .......... .......... .........
. . ........
.... .........
..
....
TOTAL
......................
.... ...
450
50
5W:
500
... .............. .. .............. .. .. ....
08 .:.:39
7 -NE (M -NE TO N -NE)
03
P
1.03
P
PE
........ .
........ ....... ...
I
.... ....... . ....
12
.........
1
... ........... . .....
13
.... . . . ... .. ..... .. . .... . .. I ...
136
EIS
... 42700 -MP 0.00 TO MP 1.03
T
R/W
RAP
CE
GRADE, DRAIN, SURFACE(BST); FINISHED WIDTH = 26 FT.
CONST
108
12
120;:
::-120
EA -
TOTAL
I 120
131
133
2561
08
40 MAE VALLEY RD (HIAWATHA TO E -NE)
03
P
1.93
P
PE
Ij 38
4
42
42
EIS
40560 - MP 3.04 TO MP 4.97
T
RAN
I
RAP
CE
GRADE, DRAIN, -SURFACE (BST); FINISHED WIDTH 28 FT
CONST
367
—408
EA
TOTAL
405
45
450:
450:
09
1 F -NE (N FRONTAGE TO MAE VALLEY)
01
P
.
095
P
PE
13
113��
EIS
NEW -MP 0.00 TO 0.95
T
RM
CE
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 26 FT.
CONST
I
117
117
7
EA_
.... .... ... .. ..... .... ....... ....... . . ........ ... .. ...... .... . .
.... . .
. .....
TOTAL
1301
30
09
BLACK SANDS AREA ROADS
01
P
2.00
.
P
...... . .......
PE
.. .. .... ...
I
16
.130:.
16
... ... .. .. .... . .. . . .. ........
16.
. ... . ..... . ..
EIS
NEW
T
RAN
...... .....
CE
GRADE, DRAIN, SURFACE (GRAVEL); FINISHED WIDTH = 26 FT
CONST
1441
144
EA
. . . ....... . .. ....
TOTAL
.. .. ......
1
1601
1601
1 1 1: .160
. ... ...
Page 7 of 11
Page 8 of 11
Six Year Transportation
Improvement Program
1997 to 2002
Agency
Grant County
County
No. 13
Hearing Date: June 1996
City No.
Adoption Date: June 11996
MPO
Resolution No.: 96- -cc
F
I
U
PROJ --CT COSTS IN THOUSANDS OF
DOLLARS
U C
R:,'-:.: PROJECT IDENTIFICATION
M
S
T L
T C
FUND SOURCE INFORMATION
N L --4:
A. FEDERAL AID NO.
P T
T
0 E
10
FEDERAL FUNDING
.... FEDERALLY FUNDED
...EXPENDITURtSCHEDULE..
C A
B. BRIDGE NO.
R Y
A
T N
L D
RAP
PROJECTS ONLY
T S
R:: C. PROJECT TITLE
0 P
T
A G
I E
PROJECT
MONTH/ FEDERAL FEDERAL CAPP
. . . ..... .. R/W REQ
I S
D. STREET/COUNTY ROAD NAME OR NUMBER
VE
U
LT
T S
PHASE
YEAR FUND COST TIA
STATE LOCAL
4th Y/N
0
T::. E. TERMINAL BEGINNING AND END
M S
S
H
Y
PHASE CODE BY UATA
FUNDS FUNDS
TOTAL 1st
2nd 3rd thru ENVIR. DATE
N
Y..,: F. DESCRIBE WORK TO BE DONE
T
STARTS PHASE OTHER
6th TYPE MONTH/YR
.2-:
�3
.:7,:::
8
9 10 :12
:15,:::: �16
17::.: :18: 21
19
07
:.43 W-NE (3-NE TO 12-NE)
07
P
9.06
P
PE
50
8
58::
58: EIS
95035 - MP 0.00 TO MP 9.06
T
R/W
RAP
CE-
SURFACE (BST); FINISHED WIDTH = 24 FT.
CONST
856
134
990:
EA
.......... ...........
TOTAL
906
142
1048:
1048
08
44* 31-NE (PINTO RIDGE TO R-NE)
05
P
3,99
P
PE
31
4
35::
35: EIS
51600 - MP 0.00 TO MP 7.99
T
RAN
I RAP
CE_
SURFACE (BST); FINISHED WIDTH 28 FT.
CONST
284
31
315:
... :315,
......
..... .... . ........ ............ .. . ............ .................. ........
.... .. . ........
. ....
.... .. ....
.
TOTAL
.............
.......................... ..
... ... .............
315
... .....
35
.. . ... .
350::
... ............ ............
1 350
.. ... . . .... . . . . .......... . ......... .... .... . .... ...
08 -'-.45
'm.sqqs
6-SE (M-SE TO J-SE)
05
P
2.01
P
PE
22
3
25
--25 EIS
20100-MP0.00TOMP3.01
T
R/W
I RAP
CE_
3R (BST); FINISHED WIDTH = 28 FT.
CONST
I
202
23
225:-
EA_
TOTAL224
26
2501
250
08 .-AS
20-NE RD (E-NE TO STRATFORD)
05
P
4.82
P
PE
36
4
40
EIS
94046 - MP 4.44 TO MP 9.26
T
R/W
RAP...
.... ... ...... CE
.. ........
SURFACE (BST); FINISHED WIDTH = 28 FT.
CONST
369
41
410
EA_
TOTAL405
45
450:
....:-.450:
08 :::,-:'47:
P-NW RD (5-NW TP SIR 28)
04
P
5.03
P
PE
40
5
45::
45w EIS
36250 - MP 0.00 TO MP 5.03
T
R/W
RAP
I
CE
SURFACE (BST); FINIDHED WIDTH = 34 FT.
CONST
I
364
41
405:
405 EA
....... . . ....... . ... . ................ . .. ... .... .. ...... . . .... .. .... ..
.......
..... ..
TOTAL
............
.. ............
404
....... ..........
46
450:
.... .....
. ...... . ..... .. ... .......... . .... .. .. . ...
09
....
-.48.. K-NW RD (SR 28 TO SR 283)
03
P
. .
5.46
P
PE
...
.............
65
65:
EIS
30410 - MP 0.00 TO MP 5.46
T
R/W
CE
GRADE. DRAIN, SURFACE(BST); FINISHED WIDTH = 28 FT.
CONST
585
585.
...... EA
..... . .. .... ........
TOTAL
............
1
6501
6501
... .......... .
1 1
Page 8 of 11
Six Year Transportation Improvement Program `
1997 to 2002
Agency Grant County
County No. 13
Hearing Date:
June 1996
City No.
Adoption Date:
June 1996
MPO
Resolution No.:
96- -CC
F
P
I
U
PROJ =CT COSTS IN THOUSANDS OF DOLLARS
U C .
R. ` PROJECT IDENTIFICATION
M S
T L
T C
FUND SOURCE INFORMATION
N L ' :.:I_:'
A. FEDERAL AID NO.
P T T
O E
1 0
FEDERAL
FUNDING I
EXPENDITURE:_SCHEDULE'.;;:
FEDERALLY FUNDED
C A
O: B. BRIDGE NO.
R Y A
T N
L D
RAP
tLocai.ACENCYi
PROJECTS ONLY
T S
R;;:` C. PROJECT TITLE
O P T
A G
I E
PROJECT
MONTH/
FEDERAL
FEDERAL
CAPP
RNV REQ
I S
F D. STREET/COUNTY ROAD NAME OR NUMBER
VE U
LT
T S
PHASE
YEAR
FUND
COST
TIA
STATE LOCAL4th
Y/N
O
T;:.' E. TERMINAL BEGINNING AND END
M S S
H
Y
PHASE
CODE
BY
UATA
FUNDS FUNDS
TOTAL
1st 2nd 3rd
I thru
- ENVIR. DATE
N
Y::: F. DESCRIBE WORK TO BE DONE
T
STARTS
PHASE
OTHER
6th
TYPE MONTHNR
3
11::..
2 ..
3.......14..
... 15.
16 :: ::17 1 .......
19...
20._.._ ...2 .
19 ::::49.
MAPLE DR (STRATFORD TO GRAPE)
03 P
0.75
P
PE9
9
9
Eis_
42600 - MP 0.00 TO MP 0.75
T
RNV
1
CE_
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 40 FT.
CONST
I I
I
81
81
1
81
= EA_
TOTAL
90
go `
90
19
50 GRAPE DR (SR 17 TO MAPLE DR)
03 P
0.25
P
PE
1
5
5
5
Eis_
42350 - MP 0.00 TO MP 0.25
T
RNV
I I
(
CE
GRADE, DRAIN, SURFACE(BST); FINISHED WIDTH = 40 FT.
CONST
I (
I
35
35
: 35
EA_
....... :..........
.... ..... ...................
TOTAL
.................. ................�
`
40
403
`` 40
09 ;"51.
5 -NE (WESTSHORE DR TO F -NE)
01 P
0.40
P
PE
..................1
I
L .........,.,.L.....,............................,.,...,.....I+.,.,,
6
6;
..
6
., ...........,,,
Eis_
NEW
T
RNV
I
I <'
CE_
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 26 FT.
CONST
1
I I
54I
sa
I ansa °
EA_
..'>.
TOTAL
60
60
60
07
'.'52 STP(R)-J131
03 P
1.35
P
PE
15
2�
17
Eis_
Q -NW RD (MOUNTAIN VIEW RD TO MARTIN RD)
T
RNV
STP(R)
I
1
CE_
32850 - MP 0.57 TO MP 1.92
CONST132
1
21
153:
153:
EA_
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT.
TOTAL
1 147
23
170'
1:70
07 >.53.:
STP(R)-N132µ
03 P
2.98
P
PE
+ 43
17
50
50
Eis_
8 -SE RD (WARDEN CITY LIMITS TO ADAMS COUNTY LINE)
T
R/W
STP(R)
I
1
CE_
91027 - MP 0.24 TO MP 3.22
CONST
1 387
I
631
450.
I 450:
EA_
GRADE DRAIN SURFACE (BST); FINISHEDWIDTH 34 FT.
TOTAL L
430
70
500
'500:
07 ::.
...
54: U -SE (1-90 TO EVAN HALL ST)
07 P
7.91
P
PE
I
40
40:
":4q
Els _
92035 - MP 4.82 TO MP 12.59
T
R/W
I
CAPP
CE_
ACP OVERLAY; FINISHED WIDTH = 34 FT.
CONST
1
I 900
900:
soti
EA
TOTAL
I
I.... ..... ...I
9401
1
940...
....1. 1'940�
Page 9 of 11
Agency Grant County
County No. 13
City No.
MPO
F
U
U C PROJECT IDENTIFICATION M S T L T C
N L I A. FEDERAL AID NO.
PTT CE 10
Six Year Transportation Improvement Program
1997 to 2002
PROJECT COSTS IN THOUSANDS OF DOLLARS
FUND SOURCE INFORMATION
FEDERAL FUNDING I
C A B. BRIDGE NO. R A TN LD RAP
T S R: C. PROJECT TITLE OP T AG I E PROJECT MONTH/ FEDERAL FEDERAL CAPP
I S .::I D. STREET/COUNTY ROAD NAME OR NUMBER VE U LT TS PHASE YEAR FUND COST TIA STATE LOCAL
0 .-T. E. TERMINAL BEGINNING AND END MSS H Y
PHASE CODE BY UATA FUNDS FUNDS TOTAL
N F. DESCRIBE WORK TO BE DONE
T
..... ..... . .. ... ............. ..
01 P 0.55
STARTS PHASE OTHER
.3�
4:: 5
,::6::.:
8:,: ..10-:: ;12 -:13
13 -NW RD (P -NW TO ADAMS RD)
03 P
3.02 P
PE
t -09
32740 - MP 0.00 TO 3.02
20:.-:: 21...
T
R/W
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT.
01 P 0.30
P
CONST
(COST SHARED) ........... ... - ....... ...
.....
TOTAL
08 . . 56 10 -NE (SR 17 TO NEPPEL RD)
.
01 P
0.50 P
PE
NEW -MP 0.00 TO MP 0.50
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
.......... .......... .. ................ ......
T R/W I I I
CONST I I
16
. ........ ................... .. .....................................
VALLEY RD EXTENSION (SCOTT RD TO ELGIN RD)
..... ..... . .. ... ............. ..
01 P 0.55
.... ..
P
......... I ................ .... ..........
PE
R/WREQ
NEW - MP 0.00 TO MP 0.55
Y/N
T
R/W
6th
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 40 FT.
:16 17 19
20:.-:: 21...
CONST
16
PATTON BLVD EXTENSION (SR 17 TO AIRWAY DR)
01 P 0.30
P
PE
NEW -MP 0.00 TO MP 0.30
T
R/W
GRADE, DRAIN, SURFACE (ACP); FINISHED WIDTH = 50 FT.
CONST
07
'::::::59. DODSON RD (FRENCHMAN HILLS TO 1-90)
07 P 9.52
P
RM
PE
91030 - MP 5.90 TO MP 15.42
T
RNV
ACP OVERLAY; FINISHED WIDTH = 34 FT.
CONST
..... ...
..... ......... . . .............. . . ... . . .. ...... .
TOTAL
07
.. .........
STP(R)-C131
.... ..... . . . .......... .
03 P 7.56
P
....... ... .. ... ....
PE
12-SFJSW RD (SR 262 TO ADAMS COUNTY LINE)
T
RM
91027 -MP 4.00 TO MP 11.56
CONST
.. .....
GRADE, DRAIN, SURFACE (BST); fINISHED WIDTH 34 FT.
........ ...... ....... ... .. ... .... ......
.
TOTAL
STP(R)
681
9251
9931
1 75
CAPP I
14: 15�
Hearing Date: June 1996
Adoption Date: June 1996
Resolution No.: 96- -cc
..........
.. .. ...... . ..
EXPENOITURE:SCHEE)L)LE:.:::.::.::::
FEDERALLY FUNDED
jLOCALAPENCY):::I
PROJECTS ONLY
..... ... ... ..........
. . ........
R/WREQ
4th
Y/N
1st 2nd 3rd I thru
ENVIR. DATE
6th
TYPE MONTH/YR
:16 17 19
20:.-:: 21...
10 10)
10: EIS
*
1250. EA
CE-
110 1101
. . . .........
-.110 EA
120 120::
120;
10 10
10- EIS
CE
60 60. 60 FA
70 70 70.
15 15 15: BS
CE
1001 100 <-:100. EA
1250
1250
*
1250. EA
1325 . .
1325
.............
.............. .
12
.. ........ ......
80
... ... .. ....... ........... . .. . ..... .............
EIS
..... . ..... CE_
145
1070
1070 EA
1 1571
11501 11
.. .... . .......
. . . 150:
Page 10 of 11
If
Agency Grant County
County No. 13
City No.
MPO
F
U C PROJECT IDENTIFICATION
N L
A. FEDERAL AID NO.
C A
PROJ
B. BRIDGE NO.
T S
TC
C. PROJECT TITLE
I S
1:
D. STREET/COUNTY ROAD NAME OR NUMBER
0 ::*..T:.:-
E. TERMINAL BEGINNING AND END
N
TN
F. DESCRIBE WORK TO BE DONE
RAP
... ....... .. 3
07 :61:
I E
5-NW/U-NW RDS (SR 281 TO SR 28)
MONTH/
VE U
93010 - MP 14.07 TO 22.98
TS
PHASE
ACP OVERLAY; FINISHED WIDTH = 34 FT.
........ . .
I
U
PROJ
M S
T L
TC
PT T
OE
10
RY A
TN
LD
RAP
OP T
AG
I E
PROJECT
MONTH/
VE U
LT
TS
PHASE
YEAR
MS S
H
Y
FUND COST
PHASE
T
4th
STARTS
Y/N
CODE BY
UATA
FUNDS FUNDS
TOTAL
07 P
8.91
P
PE
PHASE
OTHER
T
RM/
6th
TYPE
MONTH/YR
>::`<;>:<::::::»:1<_:>::>:>:::13:
CONST
::16
17
TOTAL
2
Six Year Transportation Improvement Program
1997 to 2002
Hearing Date: June 1996
Adoption Date: June 1996
Resolution No.: 96- -cc
ECT COSTS IN THOUSANDS OF DOLLARS
FUND SOURCE INFORMATION
I FEDERAL FUNDING
EXPENDITUREi.S6,i4E6OL9::i';�j i
FEDERALLY FUNDED
RAP
PROJEr.TS ONLY
FEDERAL FEDERAL
CAPP
R/W REQ
FUND COST
TIA
STATE LOCAL
4th
Y/N
CODE BY
UATA
FUNDS FUNDS
TOTAL
1st 2nd 3rd
thru
ENVIR.
DATE
PHASE
OTHER
6th
TYPE
MONTH/YR
>::`<;>:<::::::»:1<_:>::>:>:::13:
2
::16
17
2
60
60:
EIS
CAPP
CE_
1250
1250:
1250.
EA -
1
1 1310
13101.
1. 1**:.,*.*w.1310.
6274
12682 5710
24666
5905 3758 2233
12893
24789
Page 11 of 11