Loading...
HomeMy WebLinkAboutResolution 98-190-CCBOARD OF COUNTI( COMMtSSIONERS Grant County, Washington IN THE MATTER OF ADOPTING THE 1999 ANNUAL ROAD PROGRAM Resolution No. 98-190—CC WHEREAS, pursuantto the requirements of R.C.W. 36.40.070, Grant County did prepare a 1999 Annual Road Construction Program, and a Comprehensive Road Program for the ensuing six years of 1999 - 2004, and WHEREAS, in accordance with W.A.C.136.16 an environmental assessment was made on all work within the Annual Program, and WHEREAS, pursuant to the requirements of R.C.W. 36.40.80, a public hearing was held and included the 1999 Annual Road Program, and WHEREAS, all comments and/or objections wvere heard and evaluated, NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Grant County, Washington that the 1999 Annual Road Construction Program attached hereto is hereby adopted. DONE THIS �th DAY OF l�ec�emher , 1998. ATTEST: I rk of the ard LeRoy Allison, Chairman �� - / ��� ✓� � _ �l_..�L' Helen Fancher f i �P Tim Snead Constituting the Board of County Commissioners af Grant Counfy, Washington (7) TYPE OF WORK CODE A. GRADING AND DRAINING F. SIDEWALKS B. BASE AND TOP COURSE O. TRAFFIC FACILITIES C. BITUM. SURF. TREATMEN7 H. PATHS, TRAII.S 8 BIKEWAYS D. A.C. lP.C.C. PAVEMENT I. BRIDGES E. CURBS AND GUT7ERS J. FERRY FACILITIES (1) (2) (3) (4) 6YEAR ROAD ROAD/PROJECT NAME AND LOCATION PROGRAM ROAD (Include brie( termint descriptlon of MP's; Bridge #) ITEM ITEM LOG NO, NO. NO, 1 Carryover 32300 BRIDGE #306, WILLOW SPRINGS 32300 - MP 20,00 TO MP 20.02 BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. 2 Carryover 95025 PINTO RIDGE (31-NE TO COULEE CITI� 95025 - MP 10.14 TO MP 14.74 WIDEN AND SURFACE (BS't�; FINISHED WIDTH = 28 FT. 3 Carryover 45170 22ND AVE (PATTON BLVD TO FORBES) 45170 - MP 1.28 TO MP 1.61 SURFACE (ACP); FINISHED WIDTH = 40 FT. ' 4 Carryover 45170 22ND AVE (FORBES TO RANDOLPH RD) 45170 - MP 1.61 TO MP 1.88 SURFACE (ACP); FINISHED WIDTH = 40 FT. 5 Carryover A5010 RANDOLPH - TYNDALL RDS (191h ST TO STRATFORD RD) 45Q80 45010 - MP 1.13 TO MP 2.85; 45080 - MP 0.00 TO MO 0.70 SURFACE (ACP); FINISHED WIDTH = 40 FT, 6 Carryover 45010 RANDOLPH RD (PATTON BLVD TO 19th S� 45010 - MP 0.75 TO PAP 1.13 SURFACE (ACP); FINISHED WIDTH = AO FT. 7 Carryover NEW 7-NE RD. (RANDQLPH TO STRATFORD) 40300 NEW - MP 0.00 TO MP 0.40; A0300 - MP O.OQ TO MP 0.48 GRADE, DRAIN, SURFACE (BS'T); FINISHED WIDTH = 34 FT. 8 1 91027 12-SW/SE RD (G-SW TO SR 262) 10270 91027 - MP 0.00 TO MP 4.00; 10260. - MP 0.00 TO MP 3.91 GRADE, DRAIN, SURFACE (BS'�; FINISHED WIDTH = 34 FT. 9 2 46780 BRIDGE #120,18-NE 46780 - MP 1.50 TO MP 1.52 BRIDGE R�PLACEMENT; FINISHED WIDTH = 28 FT. 10 3 93041 BRIbGE #385, K-NW 30410 - MP 5,53 TO MP 5.76 BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. ANNUAL CONSTRUCTION PROGRAM FOR 1999 DAYLABOR COMPUTAT/ON (A) TOTAL CONSTRUCTIqN PROGRAM - column (14) + (15) (B) COMPUTED DAY LABOR LIMIT (see baak) (C) TOTAL DAY LABOR PROGRAM - column (15) '" ine C musl be smaller than Line B"' is) is) m c8) i9) c�o) F C TYPE E A SOURCES OFFUN PROJECT U L OF N S COUNTY OTHER LENGTH N A WORK V S FUNDS C S I E AMOUNT (Ml�es) T S (seevrorlc R S (St,0o0) (St,00O) cales N S 0.02 8 I E $19 $116 4,60 7 C E $6 $50 0,33 8 0 E $3 $28 0.27 17 D E $5 $31 2.42 7 D E $25 $220 0.38 16 D E $6 $36 0.88 8 C E $12 7.91 7 ABC E $154 $946 0.02 9 I E $211 $23 0,23 8 I E $211 $23 AOENCVACTION COUNTY: GRANT Date of Submittal of $7,263,000 Recommended Program July 7,1998 31,089,450 Date of Environmental $767,000 Assessment July 21, 1998 Date oi Finat Adoption Dec. ,1998 Resolution No. 9& -CC �5 FUNDS PROGRAM SOURCE BROS RAP RAP � STP(U) RAP STP(U) STP(R) BROS RAP BROS RAP E S T PRELIMINARY ENGINEERING 595.10 $15 $5 $5 $5 I M A T E D RIGHT OF WAY 59520 E X P E N D I j CONSTf CONTRACT 5120 356 $31 $36 $245 $42 $12 $1,095 3229 $229 T U R E S $1,000's tUCTION GRAND TOTAL DAY LABOR 695.00 S 3 $1, $ $ CRAB FORM NO. 3(REV 11/91) Pa e 1 of 3 9 (7) TYPE OF WORK CODE A. GRADING AND DRAINING F. SIDEWALKS B. BASE AND TOP COURSE G. TRAFFIC FACILITIES C. BITUM. SURF. TR�ATMENT H. PATHS, TRAILS & BIKEWAYS D. A.C. /P.C.C. PAVEMENT I. BRIDGES E. CURBS AND GUTTERS J. FERRY FACILITIES (1) (2) (3) (4) 6 YEAR ROAD ROAD/PROJECT NAME AND LOCATION PROGRAM ROAD (Inciude briet terminf description of MP's; Bridge #) ITEM ITEM LOG NO. NO. NO. 11 4 37690 BRIDGE #314, GS-NW; (Joint Agency Project) 37690 - MP 0.08 TO MP 0,11 BRIDGE REPLACEMENT 12 5 94040 10-NE RD (STRATFORD RD TO SR 1n 94040 - MP 0.00 TO MP 6.53 GRADE, DRAIN, SURFACE (BS�; FINISHED WIDTH = 28 FT. 13 6 00017 SR 17 BIKE/PEDESTRIAN PATH (PAT7'ON BLVD TO RANDOLPH) 00017 - MP 20.91 TO MP 23.18 SURFACE (PCC); FINISHED WIDTH = 10FT, 14 7 93047 SAGEBRUSH FLATS i2D (J-NW TO 2�1-NVV) 93048 93047 - MP 9.37 TO MP 11,60; 93Q48 - NIP 5.28 TO MP 6,62 GRADE, DRAIN, SURFACE (BS'T); FINISHED WIDTH = 28 FT. 15 8 91030 DODSON RD (FRENCHMAN HILLS TO I-90) 91030 - MP 5,90 TO MP 15.42 ACP OVERLAY; FINISHED WIDTH = 34 FT. 16 9 39200 7-NW RD (SR 283 TO DODSON RD) 39200 - MP 2.01 TO MP 8.31 GRADE, DRAIN, SURFACE (BS�; FINISHED WIDTH = 28 FT. 17 10 45170 PATTON BLVD/LORING DR TRAFFIC SIGNAL 45170 - MP Q.53 TRAFFIC / PEDESTRIAN SIGNAI, 18 17 93010 5-NW/U-NW RDS (SR 281 TO SR 28) 93010 - MP 14.07 TO MP 22.98 ACP OVERLAY; FINISHED WIDTH = 34 FT. 19 NEW 43100 5-NE RD (@ ROYAL ROOSTER RIDGE) 43100 - MP 0.66 TO MP 1.02 GRADE, DRAIN, SURFACE (BS�; FINISHED WIDTH = 28 FT. 20 11 93010 5-NW RD (SR 283 70 SR 281) 93010 - MP 8.62 TO MP 14.07 GRADE, DRAIN, SURFACE (BS'T); FINISHED WIDTH = 34 FT. ANNUAL CONSTRUCTION PROGRAM FOR 1999 DAY LABOR COMPUTAT/ON (A) TOTAL CONSTRUCTION PROGRAM - column (14) + (15) �7,263,000 (B) COMPUTED DAY LABOR LIMIT (see back) 51,089,450 (C) TOTAL DAY LABOR PROGRAM - column (15) 5767,000 PROJECTI LENGTH ' (�i�es► 0.03 6.53 2.27 3.57 7.91 6.30 0.10 8.91 0.36 5.45 U � N A C S T S 9 8 6 i 7 7 8 16 OF WORK (see wak codes) I ABC H ABC D ABC G N S V S I E R S N S E E E E E E E 7 D E 9 ABC E 7 ABC E COUNTY FUNDS ($1,000) $34 $66 ' $233 $75 $79 $20 $169 $50 $11 CES OF FUN OTHER AMOUNT (S� ��) $266 $594 $100 $472 $800 $711 $125 $1,081 $69 �S FUNDS PROGRAM SOURCE BROS RAP PATHS Q TRAILS RAP CAPP RAP STP(U) STP(R) STP(R) (PE ONL 1� E S T PRELIMINARY ENGINEERING I 595.10 $5 $5 $5 $15 $5 $40 $15 $15 $2 $80 IMATED RIGHT OF WAY 59520 AGENCYACTION . COUNTY: GRANT Date of Submirial of 'r Recommended Program July 7,1998 Date of Enviranmental Assessment July 21,1998 Date of Final Adoptfon Dec. ,1998 Resolution No. 9& -CC E X P E N D I CONSTf CONTRACT $295 $544 $95 $600 $870 $632 $130 $1,235 T U R E S ( tUCTION DAYLABOR $111 aso $118 $48 61,000's GRAND TOTAL 695.00 9 a 9 5 9 9 � $1 CRAB FORM NO. 3(f2EV 11/91) Page 2 of 3 (7) TYPE OF WORK CODE A. GRADING AND DRAINING B. BASE AND TOP COURSE C. BITUM. SURF. TREATMENT D. A,C. /P.C.C. PAVEMENT E. CURBS AND GUTTERS F. SIDEWALKS C3. TRAFFIC FACILITIES H. PATHS, TRAILS & BIKEWAYS I. BRIDGE5 J. FERRY FACILITIES ANNUAL CONSTRUCTION PROGRAM FOR 1999 DAY LABOR COMPUTAT/ON (A) TOTAL CONSTRUCTION PROORAM - column (14) + (15) (B) COMPUTED DAY LABOR LIMIT (see back) (C) TOTAL DAY LABOR PROGRAM - column (15j '" Line C must be smaller than Line B"* AGENCYACTION COUNTY: Date of Submittol of $7,263,OQ0 Recommended Program 51,089,450 Date of Environmental 5767,000 Assessment Date of Final Adoption Resolution No. GRANT �uy r,lsss July 21,1988 Dec. ,1998 98- -CC (1) (2) (3) (4) (5) (6) (� (8) (9) (10) (11) (12) (13) (14) (15) (16) 6 YEAR F C TYPE E A SOURCES OF FUNDS E S T( M A T E D E X P E N D I T U R E S $1,000's ROAD ROAD/PROJEC7 NAME AND LOCATION PROJECT U L OF N S COUNTY OTHER FUNDS CONSTRUCTION PROGRAM ROAD (Include briet termini description of MP's; Bridge #) LENOTH N A WORK V S FUNDS PRELIMINARY RIGHT GRAND ITEM I7EM LOG C S t E AMOUNT PROGF2AM ENGINEERING OF WAY TOTAL NO. NO. NO. �Mi�es) 7 S (seewodc R S �a�,000� ($�,000) SOURCE ss5.�o ess.2o CONTRACT DAYLABOR 698.00 codes) N S 21 12 21750 K-SE / 1-SE RDS (BASELINE E TO SR 1� 2.55 8 ABC E $3 $27 RAP $30 $30 21780 21750 - MP 0.00 TO MP O,A5; 21780 - MP 0.00 TO MP 2.10 (PE ONLI� GRADE, DRAIN, SURFACE (BS�; FINISHED WIDTH = 28 FT. 22 13 95035 W-NE RD (3-NE TO 12-NE) 9.06 7 ABC E $6 $52 RAP $58 $58 95035 . MP 0,00 TO MP 9.06 (PEONL� GRADE, DRAIN, SURFACE (BS�; FINISHED WIDTH = 28 FT. 23 T6 52410 BRIDGE #156, FIESS RD 0.05 9 I E $1 $9 BROS $10 a10 52410 - MP 0,00 TO MP 0.05 (PE ONLI� BRIDGE REPLACEMEN7; FINISHEb WIbTH = 2i F7. a4 15 - - - MI3GELLANE9US PR9JE�TS" - - - - - - AEC E $30Q $10� CO3T SHARE $400 $4pQ "INCLUDES COST SHARE PROJECTS Program Totals =____> $1,277 $6,301 $315 $6,496 $767 37,578 CRAB FORM NQ. 3(REV 11l91) Page 3 of 3