HomeMy WebLinkAboutRequest to Purchase - Facilities & MaintenanceGRANT COUNTY
COMMISSIONERS AGENDA MEETING REQUEST FORM
(Must be submitted to the Clerk of the Board by 12:00pm on Thursday)
REQUESTING DEPARTMENT: Facilites and Maintenance DATE: 8/27/2026
REQUEST SUBMITTED BY: Kevin Schmidt
PHONE: 509-754-2011, 3272
CONTACT PERSON ATTENDING ROUNDTABLE: Kevin Schmidt/Tom Gaines
CONFIDENTIAL INFORMATION: DYES ® NO
M ON,
M 1,
❑Agreement / Contract
❑AP Vouchers
❑Appointment / Reappointment
❑ARPA Related
im7 Bids / RFPs / Quotes Award
❑ Bid Opening Scheduled
❑ Boards / Committees
❑ Budget
❑ Computer Related
❑ County Code
❑ Emergency Purchase
❑ Employee Rel.
® Facilities Related
❑ Financial
❑ Funds
❑ Hearing
❑ Invoices / Purchase Orders
❑ Grants — Fed/State/County
Ell -eases
❑ MOA / MOU
❑ Minutes
❑ Ordinances
❑ Out of State Travel
❑ Petty Cash
❑ Policies
❑ Proclamations
8 Request for Purchase
❑ Resolution
❑ Recommendation
❑ Professional Serv/Consultant
❑ Support Letter
❑ Surplus Req.
❑Tax Levies
❑Thank You's
❑Tax Title Property
❑WSLCB
The roof on the Wheeler Road facility has some damage to the edge of the roof. Garland Roofing provided
quotes to repair the roof. There are using Omnia Contract Pricing for this project. Facilities did try to contact
other roofing companies about this repair and did not receive any respones. The cost will be paid from Public Works
operating funds. I am respectfully asking approval to proceed with this project to help prevent damage to the building.
If necessary, was this document reviewed by accounting? ❑ YES ❑ NO 0 N/A
If necessary, was this document reviewed by legal? ❑ YES ❑ NO 0 N/A
DATE OF ACTION: 5;Ll-c,?k� DEFERRED OR CONTINUED TO:
APPROVE: DENIED ABSTAIN
D1:
D2:
D3:
WITHDRAWN:
4/23/24
since 1895
Garland/DBS, Inc. i
3800 East 91 St Street
Cleveland, OH 44105
Phone: (800) 762-8225
Fax: (216) 883-2055 f
ROOFING MATERIAL AND SERVICES PROPOSAL
Grant County
Public Works Department
35 C St. NW.
Epharata, WA 98823
Date Submitted: 07/22/2026
Proposal #: 25-WA-260824
MICPA # PW1925
Washinton General Contractor License #: UBI # 603-013-262 GARLAI*903K4
Purchase orders to be made out to: Garland/DBS, Inc.
Please Note: The following proposal is being provided according to the pricing established under
the Master Intergovernmental Cooperative Purchasing Agreement (MICPA) with Racine County, WI
and OMNIA Partners, Public Sector (U.S. Communities). The line item pricing breakdown from
Attachment C: Bid Form should be viewed as the maximum price an agency will be charged under
the agreement. Garland/DBS, Inc. administered an informal competitive process for obtaining
quotes for the project with the hopes of providing a lower market -adjusted price whenever possible.
Scope of Work:
1. First, we will need to set up a work area- this will include cones and caution tape around our
lift, as well as ground and roof protection.
2. Next, we will need to remove all Precast Caps from the top of the peak to the bottom of the
Northeast Corner.
3. The 3 Precast caps that are damaged will need to be replaced. The new caps will match as
close as possible to the original color and texture.
4. Next, we will relay the caps stones adding anchors to support them in place.
5. Finally, we will wash the area to remove any staining during the repair process.
�� / % � / •ter / / i 'i / / �//� /�/ ii�i
Garland/DBS Price Based Upon Local Market Competition:
//i%ice. /i "':%//i/ice �%i/, �� j� ����� � ���/ • �� �
/��% ii�- �- �,���/ice• -/•.�/ i; �; - ii. �.�•�; /. � " ��. � ��� i i' /® i/%
Potential issues that could arise during the construction phase of the project will be addressed via
unit pricing for additional work beyond the scope of the specifications. This could range anywhere
from wet insulation, to the replacement of deteriorated wood nailers.
Page 1 of 2
Please Note ® The construction industry is experiencing unprecedented global pricing and
availability pressures for many key building components. Specifically, the roofing industry is
currently experiencing long lead times and significant price increases with roofing insulation and
roofing fasteners. Therefore, this proposal can only be held for 30 days. DBS greatly values your
business, and we are working diligently with our long-term suppliers to minimize price increases
and project delays which could effect your project. Thank you for your understanding and
cooperation.
Clarifications/Exclusions:
1. Sales and use taxes are excluded. Please add applicable Washington State Taxes in
addition to the final proposal price.
2. Permits are excluded. If permits are required this will be addressed via change order.
3. Plumbing, Mechanical, Electrical work is excluded.
4. Masonry work is included to which it obtains to the scope of work.
5. Interior Temporary protection is excluded.
6. Any work not exclusively described in the above proposal scope of work is excluded.
If you have any questions regarding this proposal, please do not hesitate to call me at my number
listed below.
Respectfully Submitted,
r
Benjamin Schaefer
Garland/DBS, Inc.
(216) 302-3788
Page 2of2
Facility Condition Map
.R. t J yj • OL
r• '1 c ... �r ..i - k
Nw
? <
AP
ds
IL Aloo
r
r`
.., y
;O k�
0
JK-
'y s
__ 4k
le.
Inspection Report
Inspection Information
Inspection Date 03/26/2026
Inspection Type Visual Inspection
Rating Fair
Condition
GRANT COUNTY
35 C STREET NW
EPHRATA, WASHINGTON 98823
Cap flashing at the roof edge is displaced,
creating a visible gap above the masonry
wall. Potential entry point for water at the
joint where cap flashing segments do not
meet tightly. No other roof membrane or
drainage features visible from this angle.
Inspection- Mar 26. 2026
Page 30
Inspection: Mar 26, 2026Page 31
to
Ct
CL
O
f IF
r V0
R4
OK
UM
10
Cap flashing joints at the roof parapet show
visible separation and cracking, which may
permit water intrusion if not sealed. The
photo is taken from ground level, focusing
on the junctions at the top of the concrete
masonry wall.
Open gap visible at metal coping corner
where it meets masonry parapet —potential
entry point for water intrusion.
inspection: Mar 26. 2026
Page 34
Vertical cracking observed along mortar
joint in block wall beneath roof eave; crack
extends continuously from below the soffit
to the -lower course and widens noticeably
near the bottom.
Vertical expansion joint in masonry block
wall. Expansion joint sealant is deteriorating
and cracking
M,
z wo"
��}fix""T,-A;'es'71rR''�8 sti Bf¢`"''t7�'..`�'.t`
inspection: Mar 26, 2026 Page 35
t a
t �
r�
�'t�CL �r �, .tn�.✓1 ; +✓ Y#A'� 'r '4 .{ �, y{ 'p �• �l `� a 3,t �F a 1 .nY Y
r •.� f #„ r - . r � �3:.3' .+` X .,'���'s'fi}5'�'�s &�r��a�"�,,�y �'k„g .'�- ty E ,.� r -:
� x ' d3L �" -. i' . �Yr y. yyZ.4 t �, sAfi. � ��,rr,� M �. '^ <t>• j :aiiZ ' l ,
S(i • y :tf u y - 43 ti J. ?s s}�, � ` P 1 r�C�.4+,.-�>:
13
Vertical crack observed along the mortar
joint at the inside corner of the CMU wall;
crack extends from roof level downward. No
visible sealant or repair at this joint.
Inspection: Mar 26, 2026 Page 37
m
77
Vertical control joint in masonry wall is fully
sealed; no visible gaps or cracking observed
in sealant along the joint.
Vertical crack observed at the intersection of
two concrete block walls, extending from
the soffit down through multiple courses of
block in the corner. Crack width is consistent
and runs the full visible height in the photo.
inspection: Mar 2, 2026 Page. 38
---Mortar joints cracks
----''----- --- - ----1
Sealant masonry joint
below coping stone
Inspection: Mar 26, 20216
Page 39
It appears there are multiple gaps in the
mortar below the coping stones
Inspection: Near 26, 2026 Page 40
Vertical efflorescence staining observed
running down masonry wall from roof edge,
indicating potential moisture migration from
the roof level.
Cap flashing gaps in mortar
Inspection, Mar 26, 2026 Page 4
Vertical crack observed running through
multiple courses of masonry. Mortar joints
remain intact but show alignment with the
crack. Color variation in masonry patching
visible on upper left section of wall.