HomeMy WebLinkAboutAgreements/Contracts - Public Works (005)GRANT COUNTY
COMMISSIONERS AGENDA MEETING REQUEST FORM
(Must be submitted to the Clerk of the Board by 12:00pm on Thursday)
REQUESTING DEPARTMENT: PUBLIC WORKS
REQUEST SUBMITTED BY: Victoria Seim
CONTACT PERSON ATTENDING ROUNDTABLE: John Brissey
CONFIDENTIAL INFORMATION: ❑YES *NO
DATE: 08.31.2026
PHONE: 509-754-6082
®Agreement / Contract
❑AP Vouchers
❑Appointment / Reappointment
❑ARPA Related
❑ Bids / RFPs / Quotes Award
❑ Bid Opening Scheduled
❑ Boards / Committees
❑ Budget
❑ Computer Related
❑ County Code
❑ Emergency Purchase
❑ Employee Rel.
❑ Facilities Related
❑ Financial
❑ Funds
❑ Hearing
❑ Invoices / Purchase Orders
❑ Grants - Fed/State/County
❑ Leases
❑ MOA / MOU
❑ Minutes
❑ Ordinances
❑Out of State Travel
❑ Petty Cash
❑ Policies
❑ Proclamations
fl---1 Request for Purchase
❑ Resolution
❑Recommendation
❑Professional Serv/Consultant
❑Support Letter
❑Surplus Req.
[--]Tax Levies
❑Thank You's
❑Tax Title Property
❑WSLCB
Washington State Department of Transportation Local Agency Federal Aid Project Prospectus for
County Road Project 21-08 (Bridge #426), AND Washington State Department of Transportation
Local Agency Agreement, Supplement 2 to Agreement LA11069, for Bridge #426. Signatures
needed on page 3 of the Prospectus AND on page 1 of the Local Agency Agreement.
If necessary, was this document reviewed by accounting? ❑ YES ❑ NO 0 N/A
If necessary, was this document reviewed by legal? * YES ❑ NO ❑ N/A
DATE OF ACTION: 9 /-
APPROVE: DENIED ABSTAIN
D1.�
D-Z--
D3:
DEFERRED OR CONTINUED TO:
WITHDRAWN:
4/23/24
Adb�
'V/Washington State
AfDepartment of Transportation
Prefix
Federal Aid BHOS
Project Number
Local Agency CRP 21-08
Project Number
Local Agency Federal Aid
Project Prospectus
Route Date 8/26/2026
13AJ 001 DUNS Number 010202562
WSDOT 1 Federal Employer 91-6001319
Use Only j Tax ID Number
Agency
CA Agency
Federal Program Title
Grant County Public Works
Yes ❑ No
Z 20.205 [:]Other
Project Title
Start Latitude N 47.0865
Start Longitude W 119.8556
West Canal @ George (Bridge#426) Deck RepairEnd
Latitude N 47-0867 I
End Longitude w 119.8553
Project Termini From -To
. . .. ........ .
Nearest City Name
Project Zip Code (+4)
S. End of Bridge #426 N. End Bridge #426
George
98848-9513
Begin Mile Post
End Mile Post
Length of Project
Award Type
1.51
1.53
0.02
1 Local 1:1 Local Forces [:] State [:] Railroad
Route ID
Begin Mile Point
End Mile Point
City Number
County Number
County Name
16570
1.51
1.53
N/A
13
Grant
WSDOT Region
Legislative District(s)
Congressional District(s)
Urban Area Number
North Central Region
13
4
N/A
- -----------
Total Local Agency Federal Funds Phase Start
Phase Estimated Cost Funding Date
Nearest Hundred Dollar) (Nearest Hundred Dollar Nearest Hundred Dollar Month Year
P. E. 127,800 0 127,800 11/2024
RIW
Const. 8953.200 0 8951200 09/2026
Total 11.0231000 0 11023,000
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width
48 Feet
Number of Lanes
2
Existing deck surface is showing significant signs of deterioration.
I I
Description of Proposed Work ---
Description of Proposed Work (Attach additional sheet(s) if necessary)
This project will repair the bridge deck of County Bridge #426 with new concrete surfacing
Local Agency Contact Person Title Phone
Tyler Brady Design/Construction Engineer (509)754-6082
Mailing Address City State Zip Code
124 Enterprise St. SE Ephrata WA 98823
By
Project Prospectus Approving Authority
County Road Engineer
Title Date
DOT Form 140-101
Revised 01/2022 Previous Editions Obsolete I %4zl,
Agency
Project Title
Date
Grant County Public Works
West Canal @ George (Bridge#426) Deck R
8/26/2026
Type of Proposed Work
Project Type (Check all that Apply)
Roadway Width
Number of Lanes
E] New Construction ❑Path / Trail ❑ 3-R
48
2
[] Reconstruction ❑ Pedestrian I Facilities ❑ 2-R
0 Railroad ❑Parking ❑Other
Z Bridge
Geometric Design Data
Description
Through Route
Crossroad
❑ Principal Arterial
El Principal Arterial
F1 Minor Arterial
El Urban
ElMinorArterialFederal
UrbanCollector
Functional
Collector
Rural
El Rural
Classification❑NHS
Major Collector
❑Major Collector
[:] NHS
F] Minor Coilector
El minor collector
[:] Local Access
[:] Local Access
Terrain
Z Flat [:1 Roll ❑Mountain
❑Flat [I Roll ❑Mountain
Posted Speed
55
NO CROSSROADS
Design Speed
55
Existing ADT
736
Design Year ADT
1094
Design Year
2038
Design Hourly Volume (DWG
109
'Performance of Work
Preliminary Engineering Will Be Performed By
Others
Agency
Grant County Public Works, Consultant
90 %
10 %
Construction Will Be Performed By
Contract
Agency
Contractor
I too %
%1
Environmental Classification
El Class I - Environmental Impact Statement (EIS) Class 11 - Categorically Excluded (CE)
❑Project involves NEPAISEPA Section 404 []✓ Projects Requiring Documentation
Interagency Agreement (Documented CE)
❑ Class III - Environmental Assessment (EA)
[:] Project Involves NEPAISEPA Section 404
Interagency Agreements
Environmental Considerations
NEPA CE Approved 11/21/2024
DOT Form 140-101 Face 2
Revised 01/2022 Previous Editions Obsolete
Agency
Project Title
Date
Grant County Public Works
West Canal @George (Bridge#426) Deck R.
8/26/2026
Right of Way
F7 No Right of Way Needed Right of Way Needed
* All construction required by the [ No Relocation [] Relocation Required
contract can be accomplished
within the existing right of way.
Utilities Railroad
Z No utility work required Z No railroad work required
[:]All utility work will be completed prior to the start[:]All railroad work will be cony leted rior to the start of
p p p p
of the construction contract the construction contract
[. All utility work will be completed in coordination [:]All the railroad work will be completed in coordination
with the construction contract with the construction contract
IDescription of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? []lies No
Remarks
T his project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Agency
s
F
Date 9 t 7xe By
Mayor/Chairperson
DOT Form 140-101 Page 3
Revised 01/2022 Previous Editions Obsolete
Addft
WrWashington State
AfDepartment of Transportation
Local Agency Agreement Supplement
Agency
Supplement Number
Grant County Public Works
2
Project Number
Agreement Number
ALN. 20.205 - Highway Planning
BHOS-13AJ(001)
LA11069
and Construction
Federal Highway Administration FHWA
All provisions in the basic agreement remain in effect except as modified by this supplement.
The Local Agency certifies that it is not excluded from receiving Federal funds by a Federal suspension or debarment
(2 CFR Part 180). Additional changes to the agreement are as follows:
Project Description
Name West Canal @ George (Bridge #426) Deck Repair
Termini MP 1.51 to MP 1.53
Description of Work No Change
Repair the bridge deck of County Bridge #426 with new concrete surfacing.
Reason for Supplement
Obligate Funds for the CN Phase
Length 0.02
Indirect Cost Rate F-] Yes No Project Agreement End Date 12/31/2030
Advertisement Date 10/1/2026
Estimate of Funding
(1)
2
()
(3)
(4)
(5)
Type of Work
Yp
Previous
Supplement
Estimated Total
Estimated A 9 yenc
Estimated Federal
Agreement/Suppl.
Project Funds
Funds
Funds
PE
a.Agency
1400.00
145000.00
141000.00
100 %
b. Other Consultant
1129847.00
1121847.00
1121847.00
Federal Aid
c. Other
0.00
Participation
d. State Services
I M00.00
I,000.00
I M00.00
Ratio(s) for PE
e. Total PE Cost Estimate
127, 847.00
0.00
127, 847.00
0.00
127, 847.00
RW
f. Agency
0.00
.Other
0.00
Federal Aid
h.Other
0.00
Participation
i. State Services
0.00
Ratio(s) for RW
i. Total R t E tim to
0.00
0.00
0.00
0.00
0.00
CN
k. Contract
7661908.00
7661908.00
7661908.00
100 %
1. Other Consultant
975857.00
97,857.00
97,857.00
Federal Aid
m. Other
0.00
n.Other
0.00
Participation
Ratio(s) for CN
o.Agency
271888.00
271888.00
2708.00
. State Services
21500.00
21500.00
25500.00
. Total CN Cost Estimate
0.00
8955153.00
895J 53.00
0.00
895,153.00
r. Total Project Cost Estimate
127,847.00
8955153.00
1 190231000.00
1 0.00
150235000.00
The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a
condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions.
Agency Official Washington State Department of Transportation
By By
Title Kevin R. _Burgess, Chair Director, Local Programs
Agency Date q11 /7V )�4 Date Executed
DOT Form 140-041 LP Revised 09/2025 Page 1
• Previous Versions Obsolete •
Agency
Supplement Number
Grant County Public Works
2
Project Number
Agreement Number
ALN 20.205 - Highway Planning
BHOS-13AJ(001)
LA11069
and Construction
Federal Highway Administration FHWA
VI. Payment and Partial Reimbursement
The total cost of the project, including all review and engineering costs and other expenses of the State, is to be paid
by the Agency and by the Federal Government. Federal funding shall be in accordance with the Federal Transportation
Act, as amended, 2 CFR Part 200. The State shall not be ultimately responsible for any of the costs of the project. The
Agency shall be ultimately responsible for all costs associated with the project which are not reimbursed by the Federal
Government. Nothing in this agreement shall be construed as a promise by the State as to the amount or nature of federal
participation in this project.
The Agency shall bill the state for federal aid project costs incurred in conformity with applicable federal and state laws.
The agency shall minimize the time elapsed between receipt of federal aid funds and subsequent payment of incurred
costs. Expenditures by the Local Agency for maintenance, general administration, supervision, and other overhead
shall not be eligible for federal participation unless a current indirect cost plan has been prepared in accordance with
the regulations outlined in 2 CFR Part 200 - Uniform Admin. Requirements, Cost Principles and Audit Requirements for
Federal Awards, and retained for audit.
The State will pay for State incurred costs on the project. Following payment, the State shall bill the Federal Government
for reimbursement of those costs eligible for federal participation to the extent that such costs are attributable and properly
allocable to this project. The State shall bill the Agency for that portion of State costs which were not reimbursed by the
Federal Government (see Section IX).
VII. Audit of Federal Consultant Contracts
The Agency, if services of a consultant are required, shall be responsible for audit of -the consultant's records to determine
eligible federal aid costs on the project. The report of said audit shall be in the Agency's files and made available to the
State and the Federal Government.
An audit shall be conducted by the WSDOT Internal Audit Office in accordance with generally accepted governmental
auditing standards as issued by the United States General Accounting Office by the Comptroller General of the United
States; WSDOT Manual M 27-50, Consultant Authorization, Selection, and Agreement Administration; memoranda of
understanding between WSDOT and FHWA; and 2 CFR Part 200.501 -Audit Requirements.
If upon audit it is found that overpayment or participation of federal money in ineligible items of cost has occurred, the
Agency shall reimburse the State for the amount of such overpayment or excess participation.
IX. Payment of Billing
The Agency agrees that if payment or arrangement for payment of any of the State's billing relative to the project (e.g.,
State force work, project cancellation, overpayment, cost ineligible for federal participation, etc.) is not made to the State
within 45 days after the Agency has been billed, the State shall effect reimbursement of the total sum due from the regular
monthly fuel tax allotments to the Agency from the Motor Vehicle Fund. No additional Federal project funding will be
approved until full payment is received unless otherwise directed by the Director, Local Programs.
Project Agreement End Date - This date is based on your projects Period of Performance (2 CFR Part 200.309).
Any costs incurred after the Project Agreement End Date are NOT eligible for federal reimbursement. All eligible costs
incurred prior to the Project Agreement End Date must be submitted for reimbursement within 90 days after the Project
Agreement End Date or they become ineligible for federal reimbursement.
VIII. Single Audit Act
The Agency, as a subrecipient of federal funds, shall adhere to the federal regulations outlined in 2 CFR Part 200.501
as well as all applicable federal and state statutes and regulations. A subrecipient who expends $1,000,000 or more in
federal awards from all sources during a given fiscal year shall have a single or program -specific audit performed for
that year in accordance with the provisions of 2 CFR Part 200.501. Upon conclusion of the audit, the Agency shall be
responsible for ensuring that a copy of the report is transmitted promptly to the State.
XVII. Assurances
Local Agencies receiving Federal funding from the USDOT or its operating administrations (i.e., Federal Highway
Administration, Federal Transit Administration, Federal Aviation Administration) are required to submit a written policy
statement, signed by the Agency Executive and addressed to the State, documenting that all programs, activities and
services will be conducted in compliance with Section 504 and the Americans with Disabilities Act (ADA).
DOT Form 140-041 LP Revised 09/2025 Page 2
• Previous Versions Obsolete •
Instructions
1. Agency — Enter the agency name as entered on the original agreement.
2. Supplemental Number — Enter the number of the supplement. Supplement numbers will be assigned in sequence beginning
with Number 1 for the first supplement.
3. Project Number — Enter the federal aid project number assigned by WSDOT on the original agreement.
4. Agreement Number — Enter the agreement number assigned by WSDOT on the original agreement.
5. Project Description — Enter the project name, length, and termini.
6. Description of Work — Clearly describe if there is a change in work such as the addition or deletion of work elements and/or
changes to the termini. If the work has not changed, put a check mark in the "No Change" box.
7. Reason for Supplement — Enter the reason for this supplement, i.e., increase PE funding to cover design changes presented
in the revised prospectus; request funding of construction phase; decrease construction funding to the contract bid amount.
If the supplement is authorizing a construction phase, the project's proposed advertisement date must be included in the
space provided.
8. Indirect Cost Rate — Check the Yes box if the agency will be claiming indirect costs on the project. For those projects claiming
indirect costs, supporting documentation that clearly shows the indirect cost rate being utilized must be provided with the
supplement. Indirect cost rate approval by your cognizant agency or through your agency's self -certification and supporting
documentation is required to be available for review by FHWA, WSDOT and /or State Auditor. Check the No box if the agency will
not be claiming indirect costs on the project. See Section 23.5 for additional guidance.
9. Project Agreement End Date —Enter your previously established Project Agreement End Date. If authorizing anew phase of
the project, update the Project Agreement End Date based on the following guidance:
a. For PE and RW — WSDOT recommends agencies estimate when the phase will be completed and add three years to
determine the "Project Agreement End Date".
b. For Construction — WSDOT recommends agencies estimate when construction will be completed and add three years to
determine the "Project Agreement End Date".
c. If an extension to a Project Agreement End Date is required between phase authorizations, the need for the extension must
be described in the Reason for Supplement. Adequate justification to approve the extension must be submitted with the
supplement. See Section 22.3 for additional guidance.
10. Advertisement Date - At construction authorization only, enter the proposed project advertisement date (mm/dd/yy).
11. Type of Work and Funding (Round all amounts to the nearest whole dollar).
a. Column 1 — Enter the amounts from column 1 of the original local agency agreement. If the agreement has already been
supplemented, enter the amounts by type of work from column 3 of the last supplemental agreement.
b. Column 2 — Enter increase/decrease to total amounts requested by type of work.
c. Column 3 —Add the amounts in columns 1 and 2.
d. Columns 4 and 5 — Enter the appropriate amounts based on the participation ratio recorded on the original agreement.
12. Signatures —An authorized official of the local agency signs the Supplemental Agreement and enters their title and date of
signature (mm/dd/yy). Note: Do NOT enter a date on the Date Executed line.
DOT Form 140-041 LP Revised 09/2025 Page 3
• Previous Versions Obsolete •