HomeMy WebLinkAboutUpdate Documents - BOCCSYNTHETIC TRACK SURFACING
a) Supply and Installation of the polyurethane track surfacing system described above.
STRIPING
a) Stripe the running track with all lane lines, numbers, and event markings per owner approved
striping diagram.
PRICE DOES NOT INCLUDE:
a) The supply of or adjustment to existing manholes, clean -outs or grates
b) Any alteration or deviation from specifications/proposal involving extra costs, which alteration or
deviation will be provided only upon executed change order, will become an extra charge over
and above the offered price.
c) The design and implementation of a storm water pollution prevention plan other than what is
listed above.
d) Remedy of unsuitable soils
) Repair or resurfacing existing asphalt parking lot if damaged by truck traffic.
f) Permit fees, Inspection fees.
) WSST not included in price.
The price is valid for a period of 90 days. The price is subject to increase if affected by an increase in raw materials,
freight, or other manufacturing costs, a tax increase, new taxes, levies or any new legally binding imposition affecting
the transaction. The parties recognize that the impacts of the COVID-19 pandemic are currently unpredictable and
could lead to limitations in labor availability and delays in the supply and delivery of materials, equipment or products.
In addition, as these contingencies have not been factored into this proposal, materials, equipment and/or products to
be used in performing the work may become subject to a price increase. Accordingly, it is acknowledged that the
seller/Beynon Sports shall (a) not be subject to any damages for any delay due to events beyond its control and, (b)
be allowed an equitable adjustment of the time and/or of the price of this proposal or any contractual document
resulting therefrom. Please note that the seller/Beynon Sports shall use its best efforts to ensure that it fulfills its
commitments and will strive to minimize any negative impacts as they may arise. Thank you for your kind
understanding.
Reed McNeil
Northwest Sales Manager
(503) 519-9150
RMcNeil(ab-beynonsports.com
Thank you again for your interest in Beynon Sports, we look forward to working with you.
CONDITIONS►
Notwithstanding any other document or agreement entered into by Beynon Sports Surfaces,
Inc. (Beynon Sports) in connection with the supply and installation only of its product pursuant to
the present bid proposal, the following shall apply:
a) This bid proposal and its acceptance is subject to
strikes, accidents, delays beyond our control and
force majeure.
b) Beynon Sports' preferred payment terms are as
follows: (i) 50% of the Price upon Customer's
execution of contract; (ii) 40% of the Price upon
shipment of materials from Beynon Sports'
manufacturing facility; and (iii) Remaining balance
of ten percent (10%) upon substantial completion
of the field, which shall be achieved when
Customer is able to use the field for its intended
purpose, even if punch list items remain and the
Certificate of Completion has not been executed
by Customer.
c) Accounts overdue beyond 30 days of invoice
date will be charged at an interest rate of 10%
per annum.
e)
Beynon Sports requires a minimum of 21 days after
receiving a fully executed contract or purchase
order and final approvals on shop drawings to
manufacture, coordinate delivery and schedule
arrival of installation crew. Under typical field size
and scenario, Beynon Sports further requires a
minimum of 28 days per field to install the Product
subject to weather and force majeure
Beynon Sports requires a suitable staging area.
Staging area must be square footage of field x 0.12,
have a minimum access of 15 feet wide by 15 feet
high, and, no more than 100 ft from the site. A 25-
foot wide by 25-foot long hard or paved clean surface
area located within 50 feet of the playing surface
shall be provided for purposes of proper mixing of
infill material. Access to any field will include suitable
bridging over curbs from the staging area to permit
suitable access to the field by low clearance vehicles.
Staging area surface shall be suitable for passage
with motor vehicles used to transport materials to the
site and/or staging area. Beynon Sports shall not be
liable for any damages to the staging area or its
surface unless such damages are caused by Beynon
Sports intentional misconduct or negligence.
f) This proposal is based on a single mobilization. If
the site is not ready and additional mobilizations
are necessary, additional charges will apply.
g) Upon substantial completion of the project as
outlined in the contract documents, the Customer
shall sign Beynon Sports' Certificate of Completion
in the form currently in force; to accomplish this
purpose, the Customer will ensure that an
authorized representative is present at the walk-
through to determine substantial completion and
acceptance of the field, which may include a list of
punch list items.
h) Beynon Sports shall not be a party to any penalty
clauses and/or liquidated damages provisions.
Beynon Sports shall be entitled to recover all costs
and expenses, including attorney fees, associated
with collection procedures in the event that Beynon
Sports pursues collection of payment of any past
due invoice.
j) All colors are to be chosen from Beynon Sports'
standard colors.
1g600 5W 121th Avenue, 5uite A 0
Tualatin, OR 117062
PH: (505) 6q1-24&4 BEYNON
'`
FAX: (505) bq2-04g1
WWW.5EYNON5P0RT5.COM A Tarkett Sports Company
FACILITY NOTES
OPROP05ED TRACK COLORS:
BEYNON RED AND DARK 6REY
* ALL COLOR5 ARE ILLU57RATIVE ONLY. OWNER TO APPROVE ALL COLOR5 PRIOR TO ORDERING.
WAHLUKE HIGH SCHOOL
Track & Field Renovation
Mattawa, WA
Date: 04/02/2026 Scale: NTS Drawn By: BKJ
Revised Approved By: Sheet:
0
m AM
WSRTRACKp RO
ORT OF MATTAWA
RIL 6 2926, 5:00 PM -'
4 V 4
to, A bo,
A�IA
F�1
3udget: Reserve above 8%
-Staffing: less than 84 % of WSD budget
*Staffing target: 80-84
04: Passed Bond + Built HS
-Beautiful structure
-Center-piece of WSD
,apital Projects
-'06 Carpet: ME, SME, MSE;, JH
-'06 Laminate: JH Cafeteria
VSD "all -in" on HS, limited capacity
or other Capital Projects
Budget: Reserve falls below 8%
-Staffing: rises above 90%
`18 McCleary Decision
-Significant pay increase for teachers
`18 HS Bond Expires
-No Capital Levy or Project plans
Capital Projects
-Maintenance Shop, Tech Building,
DO Roof, JH Chiller, JH Bleachers
Loans
-Portables (6), Busses (5)
Staffing +90%, McCleary, no Bond
replacement, purchase using loans
Budget: Reserve falls below 4%
-Staffing: rises above 95%
COVID I ESSER $$$'s
-Replaced Student &Teacher Tech
-Replaced ME Roof + WSD Cameras
No Bond or Capital Levy
-No major capital project
Transitions
-Cabinet: 1 00 % turnover
-Principals & Operations: 50 % turnover
Staffing +95%, reserve below 4%,
no Bond/Levy, paying on loans,
Admin transitions
rMMWV6■ 1 \VVVI V V %AIVV V V V /V
-Staffing: 82-84% of WSD budget
Zeduced 80+ Staffing Positions
-Admin, certified, classified staff
student Enrollment I 18: 2,600H `26: 21030
-National Birthrates El Public Schools Q Regional Ag'
=EB `25 Passed 3-Year Capital Levy
-ME HVAC +Safety &Security
=EB `26 Passed 4-Year EP&O Levy
-WSD Programs &Operations
)ecuring Grants
Balmer Summer School, Gear -Up, Safety & Security, Urgent
Repair, Levy Equalization, Transitional Kinder
V"VI%. ilI I ■ V,vV6%7
-ME HVAC, WJH & SME Roofs, Alarm System, Comprehensive
Safety & Security Communication System
Programs & Operations
-ELA Curriculum, Student &Teacher Tech
Loans
-PAID IN FULL: Portables (6) +Buses (5)
Thank goodness many of our buildings & assets have
FAR EXCEEDED their life spans!
Staff reductions, passing Capital Levy + EP&O Levy,
and securing various grants, have allowed WSD to start
long-term planning and moving WSD forward to the
next 25 years & beyond.
i
I
C
`The Numbers"...
19 2,000+ PreK-12 students rhoughout Year
? Mileage Club: 500+ JH students I Daily
5, 100+ HS Track team members I Spring
'+. 50+JH track team members I Spring
DO 30+ Cross Country Members/Fan
DO Host USA Olympiads + schools from
the region for Track Clinic (veariy
7, Elementary Track Olympics I Yearly
3, 25+ Community members I Daily
Af -
WAR►" WAic t *ietor WAQ, - I►RLviF .. lis8 - ' '` s'�
ti�71 �.,�,� HLOi, IlUlh `.
,,,1 4 - 4
�AFA F' p 1
0±4
fit)'
_ p .: _
• WAHLDEF
1 • �Z.Q 5 ��%'ice\ .
`L U t HLU .
t`' 'WIN
HL D ,t,
HLgjr,, 'firLu WA Rimicr LAI
MUF
ram. ;:1•�L.'�5 -... � � � .
77
Pill
•r l
ATE t" STATE � as? E � STATE ' T Jr
14 Am,
1,
. to
BOYS AMBUtATORY 400 METERS
ft
ED
40
VIAA�
Scope of Work, Condition are causi g competitive and economic
decline
IJIF
4`
LW p
� r � r y cs 4A';:tt � 5 ,.+. - •• ? 'e I • � " _ _ '-•}' 1 r *: � � ��ll� .
In
NT .1j f "
2026 7 Teams
Iti
w .♦
• �i
•
W..
va
tit
1 '
_ SS • i
i
r
A new track for WSD would mean...
1. JH & HS Track teams will be able to
host HOME meets
20
Long-term investment back into our
District &Community
Thank you for time
-and-
the opportunity to share
PrPF,_
_11 varlimm
Cost Saving Plans:
1. WSD Help Demolish current
track
2. Leaving LJ/TJ Pits in place to
reuse curbing
3. Leave current footprint to use
inside Curbing to stabilize
asphalt
4. WSD Reworking Irrigation
50 Lane Gates to spread out wear
and tear
F
k
e
a
i
f ..