HomeMy WebLinkAboutGrant Related - BOCC (006)GRANT COUNTY
COMMISSIONERS AGENDA MEETING REQUEST FORM
(Must be submitted to the Clerk of the Board by 12:00pm on Thursday)
REQUESTING DEPARTMENT: BOCC
REQUEST SUBMITTED BY: Karrl@ Stockton
CONTACT PERSON ATTENDING ROUNDTABLE: K81"1"I@ Stockton
CONFIDENTIAL INFORMATION: ❑YES 8 NO
DATE. 7/13/2026
PHONE:2937
OEM
---------------
❑Agreement / Contract
❑AP Vouchers
❑Appointment / Reappointment
❑ARPA Related
❑ Bids / RFPs / Quotes Award
❑ Bid Opening Scheduled
❑ Boards / Committees
❑ Budget
❑Computer Related
El County Code
❑Emergency Purchase
El Employee Rel.
❑ Facilities Related
❑ Financial
❑ Funds
❑ Hearing
❑ Invoices / Purchase Orders
*Grants — Fed/State/County
❑ Leases
❑ MOA / MOU
❑ Minutes
❑ Ordinances
❑ Out of State Travel
❑ Petty Cash
❑ Policies
❑ Proclamations
❑ Request for Purchase
❑ Resolution
❑ Recommendation
❑ Professional Serv/Consultant
❑ Support Letter
❑ Surplus Req.
❑Tax Levies
❑Thank You's
❑Tax Title Property
❑WSLCB
Reimbursement request from Beverly Water District on the Strategic Infrastructure
Program (SIP) No. 2025-04, New Reservoir Project in the amount of $205,947.89
If necessary, was this document reviewed by accounting?
Ll
!!Z r rurm rive to 5uOM15510".
■YES ■ N • ❑
91:1i101A114'J1:4YA4
If necessary, was this document reviewed by legal? ❑YES ❑ NO 7m N/A
DATE OF ACTION: 7 21 ZQ DEFERRED OR CONTINUED TO:
APPROVE: DENIED ABSTAIN
D 1:
D2:
D3:
WITHDRAWN:
4/23/24
GRANT COUNTY
STRATEGIC INFRASTRUCTURE PROGRAM
PROJECT CERTIFICATION
This form must he signed and returned, with an invoice, for the approved funding,
before reimbursement can be approved by Grant County..
SIP Project Proposal Number: 2025-04
SIP Funding Recipient: Beverly Water District
SIP Project Description: New Reservoir Project
L the undersigned, do hereby certify under penalty of perjury, that the materials have been
furnished, the services rendered, and/or the labor performed as described in the project
proposal for the above -referenced SIP Project and that I am authorized to authenticate and
certify to this claim. I also certify that this claim of $205,947.89 is just and due and is ati
unpaid obligation against Grant County.
Further, according to the SIP Project Funding Policies, I attest that at the next audit of my
entity, this project shall be called to the attention of the Washington State Auditor's Office,
and an emphasis audit will be requested to ensure that these funds werc expended toward
the project and according to the intent of the proposal.
Signaturee"
Su���r � .�c�r�l�
Printed Name
Date igned
C
0,)K/ e-0
Printed Title
Completed, signed original certification and invoice can be mailed to:
Grant Administrative Specialist, PO Box 37, Ephrata, WA 98823 or emailed to the
Grants Administrative Specialist, Kstockton@grantcountywagov
ATTACHMENT 4
anderson
Please remit payment to:
EpPerry
P 0 a Box 1107
La Grande, OR 97850
(541 ) 963-8309
Engine -acing Surveying
Naturat Resources
GIB
Beverly Water District
Invoice No: 83739
8610 Hillcrest Dr. NE
Invoice Date: June 19, 2026
Moses Lake, WA 98837
Project No: 7008-794 - New Reservoir Tank
Invoice Total
32,734.20
Professional Services through June 15, 2026
Invoice Summary
Contract
Prior
Total
Current
Description
Amount
% Comp Billed
Billed
Remaining
Billed
060 - Design Engineering
121,000.00
- 120,999.99
120,999.99
0.01
-
070 - Construction Engineering
219,000.00
- 64,562.80
97,297.00
121,703.00
32734.20
220 - Environmental Services
20,000.00
- 18,533.66
18,533.66
1,466.34
-
360,000.00
2049096.45
236,830.65
32,734.20
Construction Engineering
Professional Personnel
Hours
Rate
Amount
Engineering Technician 111
10.25
130.00
1,332.50
Project Engineer 1
115.75
150.00
17,362.50
Project Engineer II
1.00
155.00
155.00
Senior Engineer VIII
19.50
235.00
4,582.50
Senior Engineer XI
3.50
255.00
892.50
Senior Engineer XII
3.50
260.00
910.00
Technician VI
1.75
110.00
192.50
Senior Technician XI
28.50
175.00
4,987.50
Total Professional Services
30,415.00
Expenses
Permit Fee
Unit Billing
Auto Mileage
Outstanding Invoices
Number Date Balance
83457 5/21/2026 19,122.20
Total 19,122.20
Amount
57.20
3,120.0 Miles @ 0.725
Task Total 32,734.20
Total this Invoice 32,734.20
2,262.00
BEVERLY WATER DISTRICT
Project: Reservoir Project
Fund: SIP
Period: May 15, 2026 to June 16, 2026
Historical
Review/ Bid Documents
Environmental Cultural (Design Amount
Vendor Invoice # Invoice Date Review Review Engineering) Construction Total Invoice Outstanding
Anderson Perry 83739 6/19/2026 - - 32,734.20 - 32,734.20 32,734.20 ,''
P.O.W. Contracting, LLC App #3A 6/16/2026 - - 173,213.69 173,213.69 173,213.69/
Reimbursement Request #1 - - 32,734.20 173,213.69 $ 205,947.89 $ 205,947.89
Project Update on reservoir —
Contractor completed several rings of the concrete reservoir along with minor site work within the project area funding.
P.O.W. Contracting LLC invoice App #3A split $80,000 (distribution system - ARPA)/$173,213.69 (reservoir - SIP)
CONTRACTOR'S APPLICATION FOR PAYMENT
Owner; Beverly Water District
Engineer: Anderson Perry & Associates, Inc.
Contractor-. P.O.W. Contracting, Inc.
Project: New Reservoir, Well, and Site Improvements
Application No.: 3A Application Date; 6/16/2026
Application Period: From 5/18/2026 to 6/16/2026
1. Original Contract Price $ 1J390887.00
2. Net change by Change Orders $ 100278.05
3. Current Contract Price (Line 1 + Line 2) $ 1.J150J65.05
4. Total Work completed and materials stored to date (see attached) $ S30.1489.74
5. Retainage Withheld (N/A) $
6. Retainage Paid
7. Sales Tax (8.2%) 420835.14
8. Liquidated Damages Withheld $ -
9. Less Previous Applications for Payments $ 320?111.19
10, Amount due this application 253,213.69
Contractor's Certification
The undersigned Contractor certifies, to the best of its knowledge, the following:
(1) All previous progress payments received from Owner on account of Work done under the Contract have been
applied on account to discharge Contractor's legitimate obligations incurred in connection with the Work covered
by prior Applications for Payment; (2) Title to all Work, materials and equipment incorporated in said Work, or
otherwise listed in or covered by this Application for Payment, will pass to Owner at time of payment free and clear
of all liens, security interests, and encumbrances (except such as are covered by a bond acceptable to Owner
indemnifying Owner against any such liens, security interest, or encumbrances); and (3) All the Work covered by
this Application for Payment is in accordance with the Contract Documents and is not defective; (4) Record
Drawings and required job photos are up-to-date, accurate, and complete for Work performed- and (5) certified
payroll forms are current and account for all applicabie personnel.
Contractor 0k,4bAy signed by Scod Stein
M&Vkp
`c0n"",",
0-povy CarstracU tz P"act ff,
Scott Segui'nC"N"=c$cKcu0s'Se"gL"A �" n ortg, O
By (signature): 00M.2076.06.t7 12,21:N-CM
Title: Project Manager Scott Seguin
Date: 06/17/26
Recommended by Engineer
DgM$r, s1TW by "I T-wM,.n
DR. C4G. F C,'Ap4orgm
Brent Thompson Cw-&W, luxuTpi-re.
By ftignature).- L-M".
Title: Contract Administartor
Date: 6/17/2026
Approved by Owner
By (signature): I Pc
Title:
Date: -6plI_;7Z
6/17/2026 Page 1 of 3
App4PayNo3SchA—SWD—NewResWe[l$iteimp_7008-794-069,xlsx
Progress Estimate Contractor's Application for Payment
Owner: Beverly Water District
Engineer: Anderson Perry&Associates, Inc.
Contractor: P.O.W. Contracting, Inc.
Project: New Reservoir, Well, and Site Improvements
Application No.: 3A Application Period: From 5/18/2026 to 6/16/2026 Application Date: 6/16/2026
Bid Item
No.
Description
Contract Information
Previous
This Period
Total to Date
Qty. Unit I Unit Price
Value of Bid Item
Qty. Amount
Qty. Amount
Qty. Amount
Original Contract Totals
$1,053,500.00
$ 248,405.00
$232,020.00
$480,425.00
Sales Tax (8.2%)
$86,387.00
Original Contract Total
$1,139,887.00
Change Orders
1-1
2-1
Grant County Building Permit (non-taxable)
Added Concrete for Pipe Incasements
All Req'd
All Req'd
LS
LS
$8,110.00
$2,003.74
$8,110.00
$2,003.74
100%
0%
$8,110.00
$0.00
0%
100%
$0.00
$2,003.74
100%
100%
$8,110.00
$2,003.74
Change
Order Totals
$10,113.74
$8,110.00
$2,003.74
$10,113.74
Change Order Sales Tax (8.2%)
$164.31
Change Order TotaLl
$10,278.05
Materials Stored
to Date
A7
A8
A9
A10
All
Al2
A13
A14
A15
A16
A17
A19
4-inch Drain Pipe
8-inch Drain Pipe
8-inch Restrained Ductile Iron (DI) Pipe
12-inch Restrained DI Pipe
8-inch Gate Valve
8-inch Butterfly Valve
12-inch Gate Valve
Connection to Existing Water Line
Pressure Transducer, Vault, and Appurtenances
6-inch Well No. 1 Meter/Injection, Vault, and Appurtenances
6-inch Well No. 3 Meter/Injection, Vault, and Appurtenances
lConcrete Reservoir and Appurtenances
10
210
130
60
2
2
2
4
All Req'd
All Req'd
ALL Req'd
All Req'd
LF
LF
LF
LF
EA
EA
EA
EA
LS
LS
LS
LS
$90.00
$39.00
$85.50
$139.50
$750.00
$1,275.00
$1,350.00
$1,350.00
$3,300.00
$6,900.00
$6,900.00
1 $163,500.001
$900.00
$8,190.00
$11,115,00
$8,370.00
$1,500.00
$2,550.00
$2,700.00
$5,400.00
$3,300.00
$6,900.00
$6,900.00
$163,500.00
0
187
96
0
1
2
0
3
100%
100%
100%
0%
$0.00
$7,293.00
$8,208,00
$0.00
$750.00
$2,550.00
$0.00
$4,050.00
$3,300.00
$6,900.00
$6,900.00
$0.00
0
0
0
0
0
0
0
0
0%
0%
0%
0%
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0
187
96
0
1
2
0
3
100%
100%
100%
1 0-/0
$0.00
$7,293.00
$8,208.00
$0,00
$750.00
$2,550.00
$0.00
$4,050.00
$3,300.00
$6,900,00
$6,900.00
$0.00
TotalMate rials
Stored toDate
1 $221,325.00
$ 39,951.00
$0.00
$39,951.00
Original Contract, Change Orders, and Materials Stored to Date
Pre-tax Total
$1,053,500.00
$288,356.00
$23,645.19
$232,020.00
$19,025.64
$520,376.00
$42,670.83
Sales Tax (8.2%)
$86,387.00
Change Order 1-1 (non-taxable)
$8,110.00
$8,110.00
$0.00
$0.00
$2,003.74
$8,110.00
$2,003.74
Change Orders
$2,003.74
Change Order Tax (8.2%)
$164.31
$0.00
1 $320,111.19
$164.31
$253,213.691
$164.31
1 $573,324.88
Retainage (N/A)
TOTAL
$1,150,165.05
6/17/2026
App4PayNo3SchA_BWD_N ewResWellSitel mp_7008-794-069.xlsx Page 3 of 3
Progress Estimate Contractor's Application for Payment
Owner: Beverly Water District
Engineer: Anderson Perry&Associates, Inc.
Contractor: P.O.W. Contracting, Inc.
Project: New Reservoir, Well, and Site Improvements
Application No.: 3A Application Period: From 5/18/2026 to 6/16/2026 Application Date: 6/16/2026
Bid Item
Contract Information
Previous
This Period
Totalto Date
Qty. Unit Unit Price Value of Bid Item
Qty. Amount
Qty. I Amount
Qty. Amount
No.
Description
Original Contract
Schedule A - Reservoir and Site Improvements
Al
Mobilization/Demobilization
All Req'd
LS
$83,300.00
$83,300.00
75%
$62,475.00
0%
$0.00
75%
$62,475.00
A2
Construction Facilities and Temporary Controls
All Req'd
LS
$4,000.00
$4,000.00
30%
$1,200.00
15%
$600.00
45%
$1,800.00
A3
Temporary Protection and Direction of Traffic/ProjectSafety
ALL Req'd
LS
$1,000.00
$1,000.00
30%
$300.00
15%
$150.00
45%
$450.00
A4
Earthwork
All Req'd
LS
$25,000.00
$25,000.00
85%
$21,250.00
o
0%
$0.00
0
85/o
$21,250.00
A5
Trench Excavation Safety System
Alt Req'd
LS
$1,000.00
$1,000.00
30%
$300.00
15/o o
$1 50.00
45/o o
$450.00
A6
Potholing All Known Connections and Known Utility Crossings
All Req'd
LS
$10,000.00
$10,000.00
100%
$10,000.00
0%
$0.00
100%
$10,000.00
A7
4-inch Drain Pipe
10
LF
$300.00
$3,000.00
10
$3,000.00
0
$0.00
10
$3,000.00
A8
8-inch Drain Pipe
210
LF
$130.00
$27,300.00
23
$2,990.00
0
$0.00
23
$2,990.00
A9
8-inch Restrained Ductile Iron (DI) Pipe
130
LF
$285.00
$37,050.00
34
$9,690,00
0
$0.00
34
$9,690.00
A10
12-inch Restrained DI Pipe
60
LF
$465.00
$27,900,00
60
$27,900.00
0
$0.00
60
$27,900.00
All
8-inch Gate Valve
2
EA
$2,500.00
$5,000.00
1
$2,500.00
0
$0.00
1
$2,500.00
Al2
8-inch Butterfly Valve
2
EA
$4,250.00
$8,500.00
0
$0.00
1
$4,250.00
1
$4,250,00
A13
12-inch Gate Valve
2
EA
$4,500.00
$9,000.00
2
$9,000.00
0
$0.00
2
$9,000.00
A14
Connection to Existing Water Line
4
EA
$4,500.00
$18,000.00
2
$9,000.00
0
$0.00
2
$9,000.00
A15
Pressure Transducer, Vault, and Appurtenances
All Req'd
LS
$11,000.00
$11,000.00
18%
$1,980.00
0%
$0.00
18%
$1,980.00
A16
6-inch Well No. 1 Meter/Injection, Vault, and Appurtenances
All Req'd
LS
$23,000.00
$23,000.00
13%
$2,990.00
0%
$0.00
13%
$2,990.00
A17
6-inch Well No. 3 Meter/Injection, Vault, and Appurtenances
All Req'd
LS
$23,000.00
$23,000.00
13%
$2,990.00
0%
$0.00
13%
$2,990.00
A18
Electrical and Telemetry
All Req'd
LS
$141,000.00
$141,000.00
4%
$5,640.00
2%
$2,820.00
6%
$8,460.00
A19
Concrete Reservoir and Appurtenances
All Req'd
LS
$545,000.00
$545,000.00
11 %
$59,950.00
41 %
$223,450.00
52%
$283,400.00
A20
Crushed Surfacing, Site Improvements
270
CY
$50.00
$13,500.00
0
$0.00
0
$0.00
0
$0.00
A21
Crushed Surfacing, Reservoir Structural Fill
250
CY
$50.00
$12,500.00
250
$12,500.00
0
$0.00
250
$12,500.00
A22
Geotextile for Reservoir Pad
100
SY
$15.00
$1,500.00
100
$1,500.00
40
$600.00
140
$2,100.00
A23
Boulder Removal and Disposal (rocks 12 inches in diameter and larger)
25
CY
$50.00
$1,250.00
25
$1,250.00
0
$0.00
25
$1,250.00
A24
Chain Link Fence
280
LF
$60.00
$16,800.00
0
$0.00
0
$0.00
0
$0.00
A25
Chain Link Gate, 20-foot
1
EA
$2,100.00
$2,100.00
0
$0.00
0
$0.00
0
$0.00
A26
Chain Link Gate, 16-foot
1
EA
$1,800.00
$1,800.00
0
$0.00
0
$0.00
0
$0.00
A27
I Erosion/Water Pollution Control
1
FA
$1,000.00
$1,000.00
0
$0.00
0
$0.00
0
$0.00
6/17/2026
App4PayNo3SchA_BWD_NewResWellSitelmp_7008-794-069.xlsx Page 2 of 3