HomeMy WebLinkAboutGrant Related - BOCC (002)GRANT COUNTY
COMMISSIONERS AGENDA MEETING REQUEST FORM
(Must be submitted to the Clerk of the Board by 12:00pm on Thursday)
REQUESTING DEPARTMENT: BOCC
REQUEST SUBMITTED BY: K Stockton
CONTACT PERSON ATTENDING ROUNDTABLE: Kal"ile Stockton
CONFIDENTIAL INFORMATION: ❑YES ® NO
SATE: 7/13/2026
PHONE: 2937
❑Agreement / Contract
❑AP Vouchers
❑Appointment / Reappointment
®ARPA Related
❑ Bids / RFPs / Quotes Award
❑ Bid Opening Scheduled
❑ Boards / Committees
❑ Budget
❑Computer Related
❑County Code
El Emergency Purchase
❑Employee Rel.
❑ Facilities Related
❑ Financial
❑ Funds
❑ Hearing
❑ Invoices / Purchase Orders
*Grants — Fed/State/County
❑ Leases
❑ MOA / MOU
❑ Minutes
❑ Ordinances
❑ Out of State Travel
❑ Petty Cash
❑ Policies
❑ Proclamations
❑ Request for Purchase
❑ Resolution
❑ Recommendation
❑ Professional Serv/Consultant ❑ Support Letter
❑ Surplus Req.
❑Tax Levies
❑Thank You's
❑Tax Title Property
❑WSLCB
Reimbursement request from Beverly Water District on the American Rescue Plan
Act (ARPA) in the amount of $83,027.50 for the Water Distribution System Project.
If necessary, was this document reviewed by accounting? ❑ YES ❑ NO W N/A
If necessary, was this document reviewed by legal? ❑ YES ❑ NO R N/A
ET�Mvw�� 0"Z-0-
DATE OF ACTION: y Zl Z(?
APPROVE: DENIED ABSTAIN
D 1: �
D2:
D3-
DEFERRED OR CONTINUED TO:
WITHDRAWN -
4/23/24
BEVERLY WATER DISTRICT
Project: Water Distribution System
Fund: ARPA
Period: May 16, 2026 thru June 19, 2026
Historical
Review/ Bid Documents
Environmental Cultural (Design
Vendor Invoice # Invoice Date Review Review Engineering) Construction Total Invoice
Anderson Perry 83737 6/19/2026 - - 3,027.50 - 3,027.50
P.O.W. Contracting App #3A 6/16/2026 - - - 80,000.00 80,000.00
Reimbursement Request #6 - - 3,027.50 80,000.00 $ 83,027.50.
Project Update on reservoir —
Contractor completed several rings of the concrete reservoir along with minor site work within the project area.
Distribution System - The current phase of the desin=gn of the water main design was completed.
anderson
Please remit payment to:
IL "
pperry
P-0- Box 1107
La Grande, OR 97850
(541) 963-8309
Enginisering Surveying
HartGIB Resources
I S
Beverly Water District
Invoice No:
83737
8610 Hillcrest Dr. NE
Invoice Date:
June 19, 2026
Moses Lake, WA 98837
Project No:
6051-01 - Distribution
System
Improvements
Invoice Total
39027.50
Professional Services through June 15, 2026
Invoice Summary
Contract
Prior Total
Current
Description
Amount
% Comp
Billed Billed
Remaining Billed
020 - Planning / Design Engineering
250,000.00
246,972.48 249,999.98
1
0.02 3,027.50
250,000.00
246,972.48 2499999.98
3,027.50
Planning I Design Engineering
Professional Personnel
Hours Rate
Amount
Technician VI
6.25 110.00
687.50
Prof. Land Surveyor IV
12.00 195.00
2,340.00
Total Professional
Services
3,027.50
Task Total
3,027.50
Total this Invoice 39027.501
Outstanding Invoices
Number
Date
Balance
83233
4/17/2026
10,058.75
83455
5/21/2026
8,305.00
Total
189363.75
Beverly Water District
Project: Water Distribution System
Budget period: September 2024 through June 2026
Project to -date Activity
Budget
Original
Budget Revised
Project -to -Date
Balance
No. Line Item
Budget
Adjustments Budget
Expenditures
Available
1 Environmental Review
$ -
$ 35.00
$
(35.00)
2 Historical Review/Cultural Review
- -
875.00
$
(875.00)
3 Bid Documents (Design Engineering)
250,000.00
250,000.00
249,589.98
$
410.02
4 Construction (including pre)
80,000.00
80,000.00
80,000.00
$
-
5 DOH Review/Approval Fees
-
$
-
6 Audit
-
-
$
-
7 Construction Administration
-
$
-
8 Geotechnical Investigation
-
$
-
9 Project Administration
-
$
-
10 Contingencies
-
$
-
11 Sales or Use Taxes
- -
-
$
-
TOTAL PROJECT COSTS
$ 330,000.00
$ - $ 330,000.00
$ 330,499.98
$
(499.98)
Notes: Over budget by approximately $500.00 due
to the interpreting services required for community review billed with request #5.
CONTRACTOR'S APPLICATION FOR PAYMENT
Owner: Beverly Water District
Engineer: Anderson Perry & Associates, Inc.
Contractor-. P.O.W. Contracting, Inc.
Project: New Reservoir, Well, and Site Improvements
Application No.: 3A Application Date; 6/16/2026
Application Period: From 5/18/2026 to 6/16/12026
1. Original Contract Price $ 1,1390887.00
2. Net change by Change Orders $ 10,0278,05
3. Current Contract Price (Line 1 + Line 2) $ 1J150,165.05
4. Total Work completed and materials stored to date (see attached) $ S30J489.74
5. Retainage Withheld (N/A) $
6. Retainage Paid
7. Sales Tax (8.2%) 420835.14
8. Liquidated Damages Withheld $ -
9. Less Previous Applications for Payments $ 320,111-19
10, Amount due this application 253,213.69
Contractor's Certification
The undersigned Contractor certifies, to the best of its knowledge, the following:
(1) All previous progress payments received from Owner on account of Work done under the Contract have been
applied on account to discharge Contractor's legitimate obligations incurred in connection with the Work covered
by prior Applications for Payment; (2) Title to all Work, materials and equipment incorporated in said Work, or
otherwise listed in or covered by this Application for Payment, will pass to Owner at time of payment free and clear
of all liens, security interests, and encumbrances (except such as are covered by a bond acceptable to Owner
indemnifying Owner against any such liens, security interest, or encumbrances); and (3) All the Work co'vered by
this Application for Payment is in accordance with the Contract Documents and is not defective; (4) Record
Drawings and required job photos are up-to-date, accurate, and complete for Work performed; and (5) certified
payroll forms are current and account for all applicable personnel.
Contractor Okjtb* �4jned by Scott SeWin
1111, C�11S, E-,w�"mnhadiq.com,
Q-PMN CDotractirts. W-up"act
Scott SeguihCN=Sco4 SeoWn
By (signature): CM. 2M,06J7 1221:29-ZM
Title: Project Manager Scott Segulh
Date: 06/17/26
Recommended by Engineer
By ftignature)- Brent Thompson DCRO4.=W9-til �--F
.1)Nrb4Wy 5Mm, TWMrn
bubo. ?,A6 "K.. 11
Title: Contract Administartor
Date: 6/17/2026
Approved by Owner
By (signature):
4 4-6 c
Title:
Date:
(0
6/17/2026 Page 1 of 3
App4PayNo3SchA-13WD—NewResWeliSiteimp_7008-794-069,xlsx
Progress Estimate Contractor's Application for Payment
Owner: Beverly Water District
Engineer: Anderson Perry & Associates, Inc. v
Contractor: P.O.W. Contracting, Inc.
Project: New Reservoir, Well, and Site Improvements
Application No.: 3A Application Period: From 5/18/2026 to 6/16/2026 Application Date: 6/16/2026
Bid Item
Contract Information
Previous
This Period
Total to Date
Qty. Unit Unit Price Value of Bid Item
Qty. Amount
Qty. Amount
Qty. Amount
No.
Description
Original Contract
Schedule A- Reservoir and Site Improvements
Al
Mobilization/Demobilization
All Req'd
LS
$83,300.00
$83,300.00
75%
$62,475.00
0%
$0.00
75%
$62,475.00
A2
Construction Facilities and Temporary Controls
All Req'd
LS
$4,000.00
$4,000.00
30%
$1,200.00
15%
$600.00
45%
$1,800.00
A3
Temporary Protection and Direction of Traffic/Project Safety
All Req'd
LS
$1,000.00
$1,000.00
30%
$300.00
15%
$150.00
45%
$450.00
A4
Earthwork
All Req'd
LS
$25,000.00
$25,000.00
85%
$21,250.00
0%
$0.00
85%
$21,250,00
A5
Trench Excavation Safety System
All Req'd
LS
$1,000.00
$1,000.00
30%
$300.00
o
15%
$150.00
45%
$450.00
A6
Potholing All Known Connections and Known Utility Crossings
All Req'd
LS
$10,000.00
$10,000.00
100%
$10,000.00
0%
$0.00
100%
$10,000.00
A7
4-inch Drain Pipe
10
LF
$300.00
$3,000.00
10
$3,000.00
0
$0.00
10
$3,000.00
A8
8-inch Drain Pipe
210
LF
$130.00
$27,300.00
23
$2,990.00
0
$0.00
23
$2,990,00
A9
8-inch Restrained Ductile Iron (DI) Pipe
130
LF
$285.00
$37,050.00
34
$9,690.00
0
$0.00
34
$9,690.00
A10
12-inch Restrained DI Pipe
60
LF
$465.00
$27,900.00
60
$27,900.00
0
$0.00
60
$27,900.00
All
8-inch Gate Valve
2
EA
$2,500.00
$5,000.00
1
$2,500.00
0
$0.00
1
$2,500.00
Al2
8-inch Butterfly Valve
2
EA
$4,250.00
$8,500.00
0
$0.00
1
$4,250.00
1
$4,250.00
A13
12-inch Gate Valve
2
EA
$4,500.00
$9,000.00
2
$9,000.00
0
$0.00
2
$9,000.00
A14
Connection to Existing Water Line
4
EA
$4,500.00
$18,000.00
2
$9,000.00
0
$0.00
2
$9,000.00
A15
Pressure Transducer, Vault, and Appurtenances
ALL Req'd
LS
$11,000.00
$11,000.00
18%
$1,980.00
0%
$0.00
18%
$1,980.00
A16
6-inch Well No. 1 Meter/Injection, Vault, and Appurtenances
All Req'd
LS
$23,000.00
$23,000.00
13%
$2,990.00
0%
$0.00
13%
$2,990.00
A17
6-inch Well No. 3 Meter/Injection, Vault, and Appurtenances
All Req'd
LS
$23,000.00
$23,000.00
13%
$2,990.00
0%
$0.00
13%
$2,990.00
A18
Electrical and Telemetry
Ali Req'd
LS
$141,000.00
$141,000.00
4%
$5,640.00
0
2 /a
$2,820.00
0
6/o
$8,460.00
A19
Concrete Reservoir and Appurtenances
All Req'd
LS
$545,000.00
$545,000.00
11%
$59,950.00
41%
$223,450.00
52%
$283,400.00
A20
Crushed Surfacing, Site Improvements
270
CY
$50.00
$13,500.00
0
$0.00
0
$0.00
0
$0.00
A21
Crushed Surfacing, Reservoir Structural Fill
250
CY
$50.00
$12,500.00
250
$12,500.00
0
$0.00
250
$12,500.00
A22
Geotextile for Reservoir Pad
100
SY
$15.00
$1,500.00
100
$1,500.00
40
$600.00
140
$2,100,00
A23
Boulder Removal and Disposal (rocks 12 inches in diameter and larger)
25
CY
$50.00
$1,250.00
25
$1,250,00
0
$0.00
25
$1,250.00
A24
Chain Link Fence
280
LF
$60.00
$16,800.00
0
$0.00
0
$0.00
0
$0.00
A25
Chain Link Gate, 20-foot
1
EA
$2,100.00
$2,100.00
0
$0.00
0
$0.00
0
$0.00
A26
Chain Link Gate, 16-foot
1
EA
$1,800.00
$1,800.00
0
$0.00
0
$0.00
0
$0.00
A27
I Erosion/Water Pollution Control
1
FA
$1,000.00
$1,000.00
0
$0.00
0
$0.00
0
$0.00
6/17/2026
App4PayNo3SchA_BWD_NewResWeI1Sitelmp_7008-794-069.xlsx Page 2 of 3
Progress Estimate Contractor's Application for Payment
Owner: Beverly Water District
Engineer: Anderson Perry & Associates, Inc.
Contractor: P.O.W. Contracting, Inc.
Project: New Reservoir, Well, and Site Improvements
Application No.: 3A Application Period: From 5/18/2026 to 6/16/2026 Application Date: 6/16/2026
Bid Item
No.
Description
Contract Information
Previous
This Period
Totalto Date
Qty. Unit Unit Price
Value of Bid Item
Qty. Amount
Qty. Amount
Qty. Amount
Original Contract Totals
$1,053,500.00
$ 248,405.00
$232,020.00
$480,425.00
Sales Tax (8.2%)
$86,387.00
Original Contract Total
$1,139,887.00
Change Orders
1-1
2-1
Grant County Building Permit (non-taxable)
Added Concrete for Pipe Incasements
All Req'd
ALI Req'd
LS
LS
$8,110.00
$2,003.74
$81110.00
$2,003.74
100%
0%
$8,110,00
$0.00
00/0
100%
$0.00
$2,003.74
1000/0
100%
$8,110,00
$2,003.74
Change
OrderTotats
$10,113.74
$8,110.00
$2,003.74
$10,113.74
Change Order Sales Tax (8.2%)
$164.31
Change OrderTotaLl
$10,278.05
Materials Stored
to Date
A7
A8
A9
A10
All
Al2
A13
A14
A15
A16
A17
A19
4-inch Drain Pipe
8-inch Drain Pipe
8-inch Restrained Ductile Iron (DI) Pipe
12-inch Restrained DI Pipe
8-inch Gate Valve
8-inch Butterfly Valve
12-inch Gate Valve
Connection to Existing Water Line
Pressure Transducer, Vault, and Appurtenances
6-inch Well No. 1 Meter/Injection, Vault, and Appurtenances
6-inch Well No. 3 Meter/Injection, Vault, and Appurtenances
JConcrete Reservoir and Appurtenances
10
210
130
60
2
2
2
4
All Req'd
Alt Req'd
All Req'd
All Req'd
LF
LF
LF
LF
EA
EA
EA
EA
LS
LS
LS
LS
$90.00
$39.00
$85.50
$139.50
$750.00
$1,275.00
$1,350.00
$1,350.00
$3,300.00
$6,900.00
$6,900.00
$163,500.00
$900.00
$8,190.00
$11,115.00
$8,370.00
$1,500.00
$2,550.00
$2,700.00
$5,400.00
$3,300.00
$6,900.00
$6,900,00
$163,500.00
0
187
96
0
1
2
0
3
100%
100%
100%
0%
$0.00
$7,293.00
$8,208.00
$0.00
$750.00
$2,550.00
$0.00
$4,050.00
$3,300.00
$6,900.00
$6,900.00
$0.00
0
0
0
0
0
0
0
0
0%
0%
0%
0%
$0.00
$0.00
$0.00
$0.00
$0.00
$0,00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0
187
96
0
1
2
0
3
100%
100%
100%
0%
$0.00
$7,293.00
$8,208.00
$0.00
$750.00
$2,550.00
$0.00
$4,050.00
$3,300.00
$6,900,00
$6,900.00
$0.00
Total Materials
Stored to Date
$221,325.00
$ 39,951.00
$0.00
$39,951.00
Original Contract, Change Orders, and Materials Stored to Date
Pre-tax Total
$1,053,500.00
$288,356.00
$23,645.19
$232,020.00
$19,025.64
$520,376.00
$42,670.83
Sates Tax (8.2%)
$86,387.00
Change Order 1-1 (non-taxable)
$8,110.00
$8,110.00
$0.00
$0.00
$2,003.74
$8,110.00
$2,003.74
Change Orders
$2,003.74
Change Order Tax (8.2%)
$164.31
$0.00
r $320,111.19
$164.31
$253,213.613
$164.31
$573,324.88
Retainage (N/A)
TOTAL
$1,150,165.05
6/17/2026
App4PayNo3SchA_BW D_NewResW ellSitelmp_7008-794-069.xlsx Page 3 of 3
Contract #: ARPA
Submitted to GC by: Beverly Water District
Request for Reimbursement No.: 8
Grant County's Subrecipient Checklist:
State Auditor's Office Audit Procedures for Testing Activities Allowed
And Not Allowed, As Published In 2007
Questions to ask before submitting a payment request
Was the expenditure or cost:
_X Made for an allowable activity under the grant guidelines?
X Authorized (or not prohibited) under state or local laws or regulations?
_X Approved by the federal awarding agency, if required?
_X Allowable per Circular A-87 (June 2004 version), Attachment B, items 1-43?
For payroll transactions:
Does the employee's time and effort documentation meet the requirements of Circular A-122?
Allocable to the program? (i.e., was the dollar amount charged to the program relative to the
benefits received by the program? Is the federal grantor being charged its fair share of the
cost?)
Based on actual costs, not budgeted or projected amounts?
Applied uniformly to federal and non-federal activities (i.e., is the federal government being
charged the same amount as if non-federal funds were being used to pay the cost)?
Given consistent accounting treatment within and between accounting periods? (Consistency
in accounting requires that costs incurred for the same purpose, in like circumstances, be
treated as either direct costs only or indirect costs only with respect to final cost objectives).
Calculated in conformity with generally accepted accounting principles, or another
comprehensive basis of accounting, when required under the applicable cost principles?
Not included as a cost (or used to meet cost sharing requirements) of other federally -
supported activities of the current or a prior period?
Net of all applicable credits? (e.g., volume or cash discounts, insurance recoveries, refunds,
rebates, trade-ins, adjustments for checks not cashed, and scrap sales).
Not included as both a direct billing and as a component of indirect costs?
Properly classified (e.g., some costs may be incorrectly claimed as a direct cost instead of
being incorporated as part of the indirect cost rate).
Supported by appropriate documentation? (e.g., approved purchase orders, receiving reports,
vendor invoices, canceled checks, and time and attendance records.) Documentation maybe
in an electronic form.
Correctly charged to the proper account code and grant period?
Page 1