HomeMy WebLinkAboutAgreements/Contracts - FairgroundsGRANT COUNTY COMMISSIONERS AGENDA MEETING REQUEST FORM (Must be submitted to the Clerk of the Board by 12:00pm on Thursday) REQUESTING DEPARTMENT: Central Services Fairgrounds 6/30/2026 DATE: REQUEST suBMIrrED BY: Chris Turner 509-237-9824 PHONE: CONTACT PERSON ATTENDING ROUNDTABLE: Chris Turner, Kevin Schmdit CONFIDENTIAL INFORMATION: DYES 50NO Old id;gm 0 IM11 NUN 11,111 --- 11 - --- Agreement 1 Contract ® Bids f RFPs / Quotes Award MAP Vouchers []Bid opening Scheduled IBM !I OAppointment I Reappointment ril DARPA Belated 1=7Cc�m�puter Rebated l�Ce�ar�t � Y ode El wards / Committees l Ernergency Purchase )Budget Facilities related Financial O Fun ds 0 Frnplo ee Rel.0 Y Q Invoices f Purchase Orders Minutes []Grants --- Fed/State/Count � 0 Lees es �Hearing C�11�oA / to Policies C� ordi nances D Proclamations 0 out of ,Mate Travel Petty dash El Recommendation O Professional erv/Consultant 0 request for Purchase u Letter D resolution CTax Leviespport )Thank You's 0Tax Tale Property D Surplus req. OWS LCB This is for the repair to concrete in the Rabbit barn The contract was awarded to Carlile Excavition in the amount of $17,312.00 Paid from capital funds approved for 2026 Brian Miller upgrade Fund balance of $18,210.59 If necessary, was this document reviewed by accounting? C] YES M N4 ❑ N/A If necessary, was this document reviewed blegal? � � W YES 0 NO 0 NSA DATE OF ACTION: 1/1 Zv DEFERRED OR CONTINUEQ TO: APPROVE: DENIED ABSTAIN 131: D2: D3: 4/23/24 WITHDRAWN: CONTRACT THIS CONTRACT ("Contract"), entered by and between QRANT COUNTY, duly organized and operating under and by the Constitution and the laws of the State ofWashington 44COIMV�).� i and Carlile Excavat*on Inc., a company duly formed and 1 doing business in the State of Washington ("Contracto In consideration of the mutual promise s and covenants contained herein,, the parties hereto agree as follows - I. Work. of ContLact/Scom of 4 Work. The Contractor shall do �11 work and famish all equipment., tools, and materials to take out and replace concrete in th! e Rabbitbarn located in the Grant County Fairgrounds 3953Al*rway Drive NE Moses Lake WA. "Wore means all work individually and collectively verformed by the Contractor during the ' project. The Contractor Will be responsible for supplying and doing all the woik to.complete the following: Supply the complete services, labor, materials, and -equipm" ent for removal and pounng concrete according to the specifications inAppendix A attaeheld at the end of the contract. Provide all materials,. equipment, and labor to complete the project. Remove, haul away, and legally dispose of a.11 excess materials a i nd debris. Removal and disposal of all waste generated by the project. Asso'ciated waste disposal costs ,are the responsibility of the contractor. Provide safety barricades, signs, cones any other means to keep,people and vehicles clear of the area while the project is occurring Marking of utilities and underground infrastructure. Provide traffic and pedestrian safety mar ing as n k* eeded. Develop plan with project manager to minimize impact, to County Ousiness during p1701 'ect. Clean up of all areas affected b work related to job, y Coordinate with project manager in regard to time needed to complete project. MSDS are to be provided and available by the contractor upon.dmand and on site for any chemicals brought on site. 2. Praject Site. The work shall be accomplished upon the real property commonly known as the Grant County Fairgrounds situated on about 3953 Airway Drive NE Moses Lake Washington, or as may be more specifically directed at the sole discretion of the County. 3. Date of Commencement and -Date of Com-aletion. The Contrabtor shall commence the work described herein upon receiving notice to proceed from the CoOty beginnuxg at a time mutually agreed upon by the parties after having obtained all necessai 'y permits/bonds. Substantial completion of the work shall occur by August 7,, 2026, unless delays beyond the control of either party cause the date to be extended. This date will fat be extended Without approval by the County, .I. YN e!!6+,!% CSFG 2607 Rabbit ijam concrV.;LV,; contained in this article was mutually negotiated, . Contractor 4. Contract Sum and Term - s. The agreed Contract sum, except for provisions set forth below in Paragraph 14, and with payment of such Contract Sum subject,to provis # ons set forth below inParagraphs8 and 12, and any other rove contained within the Contract w1hichmay affect Contract Sum to be paid to Contractor, is as follows: Subtotal $16,000.00 Washington State Sales Tax 8.2% $15312.00 Total $17312.00 Retainage (5% of Subtotal) NA a Retainage: N/A b. Intents and Affidavits.- Statements ofintentto, •pay prevailing wages and affidavits 0 of wages paid are required to be submitted tc o W Industries according to RCW 39.12-040.. ashington State Labor and Payment Interval and Billing: The Contractor shall submit a monthly billing statement and invoice to the County. Such billing statement and invoice shall set out the nature of the work performed, the time and materials involved or the percentage of work completed as mutually agreed upon by the Contractor and the County. The County will pay such a statement and invoice •within •thirty (30) days ofreceipt. up 5. Perfort-nance and Ppyment Bonds: Required for this project. 6. Indemni1y - and Hold Harmless. The Contractor shall defend, indemnify, and hold the County, its officers, officials, employees, and volunteers harmless from any claims, injuries, damages, losses, or suits, including attorney fees, arising out of or in connection wi• th the performance of the contract provided that such claims, damages, losses or expenses arecaused in whole or in part by any negligent or wrongful act or Omission, including passive or active negligence, of Contractor or its subcontractors, any of their agents or employees or anyone for whose acts any of them may be liable, except to the extent that the same results from County"s negligent or wrongful act or omission. It is further specifically and expressly understood that the indemnification provided herein constitutes the Contractor's waiver of immunity under Industrial Insurance, title 5 1 RCW, solely for indemnification. The parties have mutually negotiated this waiver. The provisions of thi , s section shall survive the expiration of termination of this contract. R so *4-"Me n .V 1,11 a ng below, the %,ounty and contractor certifv that the wnivpr n-FiMM1111"N* 11-Y County KR-6 CSFG 2607 Rabbit Barn concrete 7. Insurance. The Contractor shall procure and maintain, for the duration of this contract,, insurance against claims forinjuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, its aaents, representatives, employees, or subcontractors. The Contractor shall provide a Certification of Insurance evideem g: *1 �Automob v a ig�L-insurEmce with limitsno less than $11000,00 combined single limit per accident for bodily injury and property damage; and b. cgmmercial.General Lighdhty- insurance written on an occurrence basis with I1 *mits no less than $L000,000 comb* ined single limit per occurrence and $2.,000,000 aggregate for personal injury, bodily inj 0 ur . y, and vrovertv damage. Coverage shall include but not be limited to blanket co ntractual*5 Products/completed operations,, broad form Property damage, explosincollapse, and underground (XCU) 'if .applicable, and employer's liability. c. Worker's Compensation insurance at the limits established by the State of Washington. Any payment of deductible or self -insured retention shall be the Contractor's sole responsibility, The County shall be named as an additional insured on the * 0 a - in po ley concerning or le Per.formed by or on behalf of the Contractor, and a copy of the endorsement naming the county as an additional Insured shall be attached to the Certificate of Insurance. The Contractor's 0 insurance. shall be the Primary insurance concerning the County, and the County shall be iven thirty (30) days prior written notice of any cancellation, •su�pension coverage, or material change in Pa entsithh -.-YM Weld, The County may withhold or nullify the whole or part of any payment to such extent as may be necessary to protect the County from loss or damage for reasons including but not limited to: a. Work not within the Contract. b., Reasonable evidence that the, work required by the Contract cannot be completed for the unpaid balance of the contract sum.. Work by the County to correct defective work or complete the work. d Failure by the Contractor to perform work Within this Contract. c Cost or liability that may occur to the County due to the Contractor's fault, negligent acts,, or omiss t*ons, PROVIDED: In any case where part or all of a payment is going to be w* unsatisfactory performance, the County shall notify � w ithheld for the Contractor per RCW 3 9.76.011 (b). CSF G 2607 Rabbit Barn concrete .90 Authoritv of Count� z .. Suppose the •Contractor fails to perform the work according tothe requirements of the Contract Document, In that case, the County shall provide written notice of the deficiency to the Contractor, and the Contractor shall have seven dqudefcenc0 `,�s tocorrect the in the wor. Ifthe Contrctor fails to coct the deficiency in the work within the seven da• ys or to take and continue all appropriate steps to initi ate the corrections in the event corrections cannot be reasonably completed in the seven days, the County may, without prejudice to other remedies: (a) use County forces, other contractors, or other means to make good the Contractor's deficiency, and (b) deduct from or nullify the Contractor's payments the cost of �such effort as described in paragraph 8 of this agreement, 100 0 Barran tv of Construction. In addition to any •special warranties provided elsewhere *in the Contract Document and Companion or applicable documents,, the Contractor warrants that all work conforms to the requirements of the Contract and is free of any defect in equipment, material, or design furnished or workmanship performed by the Contractor. 10 . n-1*ItConcerning all warranties, express o•r piiect, for work performed or materials furnished according to the Contract and companion or applicable documents, the Contractor shall: a Obtain all warranties that would be given in standard commercial, practice, b. Require all warranties to be executedin writing, for the benefit of the County; and C. Enforce all warranties for the benefit of the County, if directed by the County, a ilk including any subcontractor's, manufacturer's, or supplier's warranty that extends beyond the period specified in the Contract, d The ob ligations under this Section shall survive completion. Successors and Assigns. The County and Contractor respectively bind themselves, their partners, successors, assigns, and legal representatives to the other vartv hereto and to partners. - successors, assigns, and legal representatives of such other party regarding covenants!, agreements, and obl*gat* nt d On the Contract. Neither party shall the work i ions co aine i assign without the written consent of the other. If either party attempts to assign without such consent, that party shall remain legally responsible for all obligations outlined in the contract. 6 l2, Charxaes in Work. The Coun�ma y,at any time and and notice to the Contractor's surety, order additions, deletions, revisions,, or other changes In the work. These changes In the work shall be 'incorporated into the Contract Document through the execution of Change Orders. Suppose any change in the work, ordered 'by the County causes an increase or decrease in the Contract Sum or the performance time. In that case, an equitable adjustment shall be made, and such adjustments(s) shall be 'incorporated into a Change Order, If the County desires to order a change in the work, it may request a written Change Order proposal from the Contractor. The contractor shall submit a Change Order proposal within 14 days of the request fromtheCounty or within such other period as mutually agreed. The contractor's Change Order proposal shall "include total compensation for implementing the CSFG 2607 Rabbit Barn concrete proposed change in the work including any adjustment in the contract sum or time of performance, and including compensation for all delays in connection with such change in the work and for any expense or inconvenience) disruption of schedule, or loss of efficiency or productivity occasioned by the change in the work. Upon receipt of the o Change Order Dr C�_ proposal al or a request for equitable adjustment to the contract sum or time of performance, the County may accept or reject the proposal, request further. documentation, or negotiate acceptable terms with the Contractor. Pending agreement on the terms of the Change Order, the County may direct the Contractor to proceed immediately with the Change Order work. The contractor 'shall not proceed with any change in the work until it has obtained the County's approval. All work done under any county - directed change in the work shall be executed per the Contract, 13. No AggnOy Relationship.Neither the Contract nor any agreement implied therefrom constitutes the Contractor as an agent or legal. re -Presentative of the County for any purpose whatsoever, and the Contractor's - e relationship to the County because of the Contract Document shall be that of an independent contractor. The Contractor is not granted any express or implied right or authority t ,.o assume or create any obligation orresponsi responsibility on behalf of or inthe name b ofthe County or to bind the County in any manner or thing whatsoever, 14, Cl gan-U . The contractor shall always keep the project site, includinMg hauling routes :I infrastructures, utilities, and storage areas, free from accumulations of wast 0 l . Before e materi completing the work, the Contractor shall remove its rubbish, tools, scaffolding, equipment, and materials from the premises. Upon completing the Work, the Contractor shall lea v*e the project site *in a clean, neat, and orderly condition that is satisfactory to the County. If the Contractor fails to clean up as provided herein, and after reasonable notice from the County, the County may do so, and the cost thereof shall be charged to the Contractor, 15. Survival. If any clause or provision of this Contract shall be invalid, ' the remaining clauses and provisions shall nevertheless be and remain in full force and effect. 16. Entire- Agreement, The Contract embodies the entire agreement between the parties; all other agreements, oral or written, are now merged and superseded by the Contract. There are no other agreements which modify or affect the terms hereof.No amendment hereto half. be binding unless the terms thereof are in writing and signed by both, parties,, Time is ofthe essence, N verbal or Other agreements modify or affect the Co ntract* 17. EXDlanation of Documents. The Contractor has 'thoroughly reviewed the Contract, The Contractor has had the opportunity to consult with legal counsel as to the legal effect of the Contract. CSFG 2607 Rabbit Barn concrete 18. Notices. All notices required under the terms hereof are to be in writing and delivered personally to the party to receive the same or mailed by regular mail, postage 4" prepaid to the address specified adjacent to the parties' signatures. All notices shall be deemed served upon delivery thereof or three (3) days following deposit of the noticein the U.S. mail as required herein, 19. Headings,.Construction. The headings of the sections and paragraphs are inserted solely for the convenience of the parties. They are not a part of and are not * or aid 'in construct* .0 0 T intended. -to govern, limit, 16 ing any term or provision hereof In cons,t uing the part -lest intent regarding this contract,, no more significant or stricter construction of any term or provision hereof shall be asserted against the county as drafter. 20. Governiri Law Venue. The performance and interpretation of the Contract. Document shall be governed and interpreted by the laws of the State of Washington. Anylifigation arising from or in connection With this Contract shall be conducted in Grant County, Washington. CSFG 2607 Rabbit Barn. concrete 1 CONTRACTOR: Carl He Excavation Inc. Acccpted Seth Carlile License No. Car1ie1844DJ UBI: 603-538-033 Dated the JU Al t.af 2026. ATrEST: ------ Z�Z, Caitlin It. Manell erk of the Board Approved as By Tro or r Bevier Prosecuting Attorney BOARD OF COUNTY COMMI[SSION]ERS GRANT COUNTY9 WASHINGTON Kevin Burg I es, air CSFG 2607 Rabbit Barn concrete AP.Pendix A 1. Remove and replace 17x44 feet of concrete on east end of the barn 2. Remove asphalt apron on west end of barn ..Pour 2 new concrete aprons on west end of barn 4. Concrete is 4 inches thick with #3bar on 24(JC square pattern. 5. Sub grade is 2inches of gravel compacted 6. Grind down or patch trip hazards. Painted yellow 7. Haul off all concrete and asphalt. Clean dirt can be dumped on site. CSFG 2607 Rabbit Barn concrete