Loading...
HomeMy WebLinkAboutAgreements/Contracts - Central ServicesMAT -A Document G701� 2017 Change Order PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: 20063.01 Grant Co. Jail/Judicial Complex Contract For: General Construction Change Order Number: 0 1 OR Ephrata, WA Date: Date: 5/7/2026 OWNER: (Name and address) ARCHITECT: (Name and address) CONTRACTOR: (Name and address) Grant Co. Board of County Clemons, Rutherford & Associates, Inc. Lydig Construction, Inc. Commissioners P.O. Box 37, Ephrata, Washington 98823 2027 Thomasville Rd, Tallahassee, FL, I loot F. Montgomery Dr., Spokane 32308 Valley, WA 99206 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description oj'the change and, ij'qpj)1icab1e, attach or reference sj.)ecijic exhibits. Also Mclude agreed upon adjustalents attributable to arecuted Construction Change Directives.) This Change Order includes some 26 PCO's. They include metal trim at exterior window/wall interfaces, added power and data outlets for miscellaneous systems and key management, an added 12' fence gate, and a maintenance bond for the City of Ephrata. Also, the addition of a painted floor in the processing area and renovation work at the work release building. It also includes credits for changes to the interior wall panels at the K-9 building, topsoil and hydrosecd modifications and the deletions of LVT flooring in the evidence building. Attachment: -PCO's Description and Cost Breakdown Log The original Contract Sum was $ 131,561,370.00 The net change by previously authorized Change Orders $ 62806)954.00 The Contract Sum prior to this Change Order was $ 138,368,324.00 The Contract Sum will be increased by this Change Order in the amount of $ 57520.00 The new Contract Sum including this Change Order will be $ 138,425,844,00 The Contract *rime will be unchanged by Zero (0) days, The new date of Substantial Completion will be NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Clemons, Rutherford & Associates, Inc. Lydig Construction, hie. -------- ARCHITECT I 11al SZNWTUW Will Rutherford, Project Architect PRINTED NAME AND TITLE 5/7/2026 DATE Grant Co.Board of County Commissioners CONTRACTOR -in n ie) OWNER (Firm name) SIGNATURE SIGNATURE PRINTED NAME AND TOCE PRINTED NAME AND VLE 511411026= �, . DATE DATE AIA Document G701 — 2017. Copyright C)1970, 1987, 2000, 2001 and 2017. All rights reserved, The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 15:30:16 ET on 05t07/2026 under Order No.3104239823 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents"" Terms of Service, To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA4A) PCO'S DESCRIPTION AND COST BREAKDOWN LOG PCOIS Description Amount 83 RFI-451,, Add brake shapes to exposed ends of framed walls at Sheriff department storefront $81258 102 Change Ag Tuff panels to FRP applied over plywood and delete Ag Tuff at Evidence Storage -$241527 148 Credit for Topsoil & Hydroseed throughout site -$24,854 152 Miscellaneous Site grading & drainage issues $3,860 160 RFI-471, Add power/data for teleprompter in Rm 1088 Training $2,996 .161 RFI-457, Revise UPS outlets in all Comm rooms from 50A to 20A -$6,245 163 RFI-493, Add power and data for TV's at secure vestibules under control rooms $33340 166 RFI-491, Add 8th SAM unit at Corridor C1001 s. of door 1075 $6,030 173 RFI-507., Add 12'Gate to F3 fence for maintenance access $4,723 177 RFI-508,. Add camera in Group Hold 1016 $317.17 180 RFI-487.1.. Add handrail to guardrail at SE building stairs $5,132 182 RFI-513, Add power and data drop for Homewave Eqp in Video Visit 1105 $2,464 186 Add filler panel to exercise yard fence gap between building and fence post $2,008 188 Revisions to Food Service Equipment Item 111 in staff break area $1,489 1.89 Delete LVT flooring throughout Storage Evidence building -$-12,691 192 RFI-537, Add output from Kitchen hood to MAU-2 and rebalance for variable air volume $3,563 193 RFI-548 Add camera to padded cell 1005 $3,717 194 RFI-543, Add 30A/208V circuit to SE building for welding machine $3,361 195 RFI-544.. Add power to shrink wrap machines in Room 1011 $5,84 ,t .196 RFI-549,. Add 2 ea power and data drops to C.P.L. room 1104 $7,582 .1-98 Provide Maintenance Bond to City of Ephrata $13 j995 200 Renovations at Grant County Work Release facility $6,92 1. 201 Add roof walkpads to FN-1 and FN-4 $45804 202 RFP-010, Paint floor throughout Intake/Processing area $20,813 203R] Add Fire Alarm Annunciator to Room 1055 $31959 204 Add two (2) WAP's in the Infirmary (one per side) for Homewave system $2,398 205 Add load bank cables to Generator "MGS" for annual testing $1 ,865 206 RFI 492.1; piping changes to TW loop mixing valves at housing pods $3,00 1. TOTAL: $57520 m Dated this day of M,(kc .20 , 0 Board of County Commisrs Grant County, Washington Approve Disapprove Abstain Dist #1 Dist #1 Dist #1 Dist #2 Dist #2 Dist #2 Dist #3 IL7—Dist #3 Dist #3