COMMISSIONERS AGENDA MEETING REQUEST FORM
(Must be submitted to the Clerk of the Board by 12:00pm on Thursday)
REQUESTING DEPARTMENT:Central Services Fairgrounds DATE:05/07/2026
REQUEST SUBMITTED BY: Chris Turner PHONE: 509-237-9824
CONTACT PERSON ATTENDING ROUNDTABLE: Chris TUC11@Y or Kevin Schmidt
CONFIDENTIAL INFORMATION: DYES ONO
RAgreement / Contract
@R Bids / RFPs / Quotes Award
D A---P Vouchers
013id Opening Scheduled
KEN I
OAPPointment / Reappointment
EIARPA Related
OComputer Related
DCounty Code
013oards / Committees
OEmergency Purchase
OBudget
ElFacilities Related
OFinancial
FIFunds
0 Employee Rel.
11 Invoices / Purchase Orders
El Grants — Fed/State/County
01-eases
Ell-learing
a Minutes
OPolicies
00rdinances
[]Out of State Travel
DMOA/MOU
F-1 Petty Cash
[]Recommendation
OProclarnations
n Professional Serv/Consultant
0 Request for Purchase
OSupport Letter
EIResolution
E]Tax Levies
DThank You's
OTax Title Property
Cisurplus Req.
OWSLCB
W%moff
This is for the concrete drive ways and pads at the Brian Miller stage
The contract was awarded to Zion Excavation LLG In the amount of $49,772.00
Paid from capitol funds approved for 2026 Brian Miller upgrades
Fund balance of $76,853.50 Reet 2
If necessary, was this document reviewed by accounting? 0 YES R NO DMA
If necessary, was this document reviewed by legal? R YES 0 NO 1:]N/A
DATE OF ACTION: ----A -/0) -C�)L
df DEFERRED OR CONTINUED TO:
APPROVE: DENIED ABSTAIN
131:
D2:
D3:
4/23/24
WITHDRAWN:
CONTRACT
THIS CONTRACT ("Contract°'), entered by and between, GRANT CgUNTy, duly
organized and operating under and by the Constitution and the laws of the State of Washington
County"). and Zion Excavation LLC, a company duly formed and doing business in the State
of'Washington("Contractor").
In consideration of the mutual promises and covenants contained herein, the parties
hereto agree as follows,
1• Work of Contract/Scope of Work, The Contractor shall do all work and furnish all
equipment, tools, and materials to construct 3500 sq, ft of concrete pads and driveways for the
Bxian Miller Stage area located in the Grant County Fairgrounds 3953AirwayDriveLake U NE Moses
WA, WorV means work individually* and collectively performed bythe Contractor
during the project,
A
The Contractor will be responsible for supplying ana all the work to comp
.doing I I complete the
following:Supply the complete services, labormaterials, and equip Ispment for removal, d* osal,
sloping, dof concrete pads/driveways according t the specificationsgrading, In Appendix A
attached at the end of f the contract.
Provide. all materials,, equipment, and lab r to co- late the p
0
m roject.
Remove, haul away, and legally dispose of all excess materials and,debris.
Removal, and disposal of al(waste generated by the project. Associated waste disposal costs
are the responsibility of the,contractor.
i- 4
Provide safety barricades, si g*ns, cones any other means to keep people and vehicles clear of
the .area while the pro ect is occurring
Marking of utilities and ,underground infrastructure.
Provide traffic and pedestrian. safety markingas needed.
Develop plan with project manager to mi*
nimize impact to County business during project.
Clean up of all areas. affected by work related to "ob.
J
coordinate with project manager in regard to time needed to complete project.
IVISDS are to be provided and available by the contractor upon demand and on site for any
chemicals brought on site,. I
'1 0 1
2, Project Site. The work shall be accomplished upon the real property commonly known as
the Grant County Fairgrounds sitkeded on about 3953 Airway Drive NE Moses Lake Washington, or as
maybe more specifically directed at the sole discretion of the County.
3. Date of Commencement and Date of Completion, The Contractor shall commence the
01 �
work described herein upon receiving notice to proceed from the County beginningp at a time
mutually agreed. upon by the parties after having obtained all necessary permits/bonds.
Substantial completion of the work shall occur by July 17, 2026, unless delays beyond the
control of either party cause the date to be extended. This date will 'not be extended without
approval by the County.
CSFG 2604 Brian Miller Concrete
4* Contract Sum and Terms. The agreed Contract sum, except for provisions set forth below
in Paragraph 14, and, with payment of such Contract Sum subject to provis
ions set forth below
inFaragraphs 8-and 12,andanyotherprovisioncontained withinthe Contract whichm4y affect such
Contract Sum to be paid to Contractax,
is as follows:
Subtotal
Washington State Sales Tax 8.2% $3,7ry2 ap
Total $49,772.Ot}Retainage (5% of Subtotal) 2300,00
a Retainage: Required. for this. project. A retainage, bond isand d preferred.
5% retainage is required under- RCW 6Q.28.4QL The contract is over $35,000,
requiring a notice of completion to be fled and approved before releasing
n
retainage,
b. Intents and Affidavits: Statements Ofintent to pay prevailing wages and affidavit,,0
of -wages paid are required to be submitted to Washington State Labor and
Industries. according toRCW 39.12.04Q,
c. Payment Interval and Billing., The Contractor shall submit a monthly biding
statement and 'Invoice to the County, Such billing statement and invoice shall.set
out ' the nature of the work performed, the time and materials involved, or the
percentage ofwork, completed as mutually agreed on by the Contractor and
'UP the
County. The County Will pay such a statement and *I
invoice within thirty (3 0) days
ofreceipt,
5. Performance and Payment Bands:.Required tor this project.
6. Indemnity and Hold Harmless. The Contractor shall defend, indemnify, and hold the
County, its officers, officials, employees, and -volunteers harmless from any claims injuries,
damages, losses, or suits, including attorney fees, arising- out of or in connection with the
performance o, f the contract, provided that such claims., damages, losses or expenses are caused
zn whole or in part by any negligent or wrongful I act or omission, including passive or active
negligence
of Contractor or its subcontractors, any of their agents or employees or anyone for
whose acts any of them. maybe liable, except to the extent that the same results from County's
negligent or'wrongful act or omission,.
It is further specifically and expressly understood that the indemnification provided herein
constitutes the Contractor's waiver of immunity under Industrial Insurance, title 51 RCW,, solely
V.
for indemnification. The parties have mutually negotiated this waiver. The provisions of this
section shall survive the expiration of termination of this contract.
CSFG 2604 Brian Miller Concrete
By initialing below, the County and Contractor certify that the waiver of immunity
contained in this article was mutually negotiated,
Contractor
County KEL-5
7.1 Insurance., The Contractor -shall procure and maintain,
maain, for the duration of this contract,
claims
insurance against fox injuries to persons or darnaae to propertywnieft may arise ftorn or
in connectionith the performance ofWithe work hereunder by the Contractor,
its Agents
rePresentatives, .employees, or Subcontractors. The contractor shall Provide a Certification of
Insurance evidencing:
a Automobile Liability0 insurance with limits no less than $1,040,Q00 combined
single limit per accident for bodily injury and property damage;
and
b. Commercial General Liabi
lity insurance written on an occurrence basis with limits
10
no less than �$1,OOp,00t� combined single limit per occurrence and $2,OU(l,!?OQ
aggregate for personal injury, bodily injury., and property damage. Coverage0 shall.
include but not be limited too. blanket contractual; products/comp
broad firm property damage; ex leted operations '
Plosion, collapse, and underground if
I- d
applicable; and employer's liability.
Worker's Compensation insurance at the limits -established by the State of
'Washington.
Any payment of deductible or self insured retention shall be the Contractor`s sole responsibility.
The , County shall be named as an additional insured on the insurance policy Concerning work
performed by or on behalf of the Cantractor, and a copy of the endorsement naming the county
,as an additional insured shall -of Insurance. The Contract+�r's
be attached to the Certificate
insurance shall be the primary *insurance concerning the County, and the County shall be .given
thirty (30) days prior written notice of any cancellation
suspension, or material change in
coverage.
8. Payments Withheld, The County may withhold or nullify the whole or part of any
payment to such extent as may be necessary to protect the County from loss or damage for
reasons including but not limited to:
a Work not within the Contract,
b. Reasonable evidence that the work required by the Contract cannot be completed
fax the unpaid balance of the contract sum,
a Work by the County to correct defective work or complete thework.
d Failure by the Contractor to perform work within this Contract,
c. Cost or liability that may occur to the County due to the Contractor's fault,
CSFG 2604 Brian Miller Concrete
,Iigant acts, or omissions,
]PROVIDED: In any case where part or all of a payment is going to be withheld for
unsatisfactory performance, the County shall notify the Contractor per RCW 39.76.011(b).
9, Authority of County. Suppose the Contractor fails to perform the work according to the
requirements of the Contract Document. In that case, the County shall provide written notice of
the deficiency to the Contractor, and the C
ontractor shall have seven days to correct the deficiency
in the work. Ifthe Contractor fails to correct the deficiency in the work
within the seven days or
to take and continue all appropriate ate stepsto initiate the corrections In the event corrections cannot
be reasonably completed in the seven
days, the County may, without prejudice to other
remedies: (a) use County forces,, other ontr c actors, or other means to make gpodthe- Contractor's
deficiency, and (b) deduct from or nullify
the Contractor's payments the cost of Such effort
described in paragraph .8 of this agreement.
10. 'Warranty of Construction. In addition to any special warranties provided elsewhere in
the Contract Document and companion or applicable documents, the Contractor warrants that all
work conforms to the requirements of the Contract and is free of any defect, in equipment,
material, or design furnished or workmanship performed by the Contractor.
Concerning all warranties,. express . or implied, for work Performed or materials furnished
according to the Contract and coan mp ion or applicable documents, the Contractor. shall:
Obtain all warranties that would be given in. standard commercial. practice,
b Require all warranties too be executed, zn wri iting, for the benefit of the County; and
c. Enforce all w benefit of the County, if directed by the County,,arranties for the
including any subcontractors., manufacturer's, or supplier's warranty that extends beyond
the period specified in'the Contract.
d The obligations under this Section shall
survive completion.
11. Successors and 'Assigns. The County and Contractor erespec "ve y bind thems Ives, their
U I
.partners, successors,, assigns, and legal representatives to the other party hereto and to partners',
assigns, and legal representatives of such other party regarding covenants,
.s1
aL_
,,
agreements, and obligations contained 'in the Contract. Neither party shall assign the work
rk
without the written consent of the other. Ifeither party attempts to assign without Such consent
that party shall remain legally responsible for all obligations outlined in the Contract,
12. Changes in Work. The County may, at any time and without notice to the Contractor's
surety, order additions, deletions, revisions, or other changes in the work. These changes in the
,
work shall be incorporated into the Contract Document through the execution of Change Orders.
Suppose any change in the work ordered by the County causes an increase or decrease in the
Contract Sum or the performance time. In that case, an equitable adjustment shall be made, and
such adjustments(s) shall be incorporated into a Change Order.
CSFG 2604 Brian Miller Concrete
If the County desires to order a change in the work, it may request a written Change Order
I ^
proposal from the Contractor. The contractor shalt submit a Change Order proposal within 14
days of the request from the .County or wxithin such other period as mutually agreed. The
contractor's Change Order proposal shall include total compensation for implementing the
proposed change in the work, including any adjustment in the contract sum or time of
performance, and including conlpensatian for all delays �� connection with such change in the
work and for any expense or inconvenience, dsrupfiion of schedule, or loss of efficiency or
productivity occasioned ley the change in the work. Upon receipt of the Change Orderproposal
4r a request for equitable aCl]USl'T11erit to -the COriiraCt SUITI or time Of peTFprriaiiCB, the County
may accept or reject the proposal, request further documentation, oar negotiate acceptable terms
with the Contractor,,
Pending agreement an the terms of the Change Order,, the County may direct the Contractor to
proceed immediately with the Change Order work,, The contractor shall not proceed with any
change in the work until it has obtained the County's approval. All work done under any county-
directed change in the work shall be executed per the contract.
13. No Agency Relationship.. Neither the Contract nor any agreement implied therefrom
constitutes the Contractor as an agent or le
gal representative of the County, for -any purpose
whatsoever, and the Contractor's relationship to the County because of the Contract Document
shall be that of an independent contractor. The Contractor is not granted any express -or implied
right or authority to assume or create any obligation or responsibility on behalf of or in the name
vfthe County or to bind the County in any manner or thing whatsoever.
14. Clean Up. The contractor shall alwayskeep the groject site, including haul
ing routes,
infrastructures, utilities, and storage areas, free from accumulations of waste materials. Before
completing the work, the contractor shall remove its rubbish, tools, scaffolding, :equipment, and
materials from the premises. Upon completingtheWork, the Contractor shall leave the project
site in a clean, neat, and orderly condition that is satisfactory to the County. If -the Contractor
fails to clean up as provided herein, and after reasonable notice from the County, the County
may do so, and the cast thereof shall be charged to the Contractor.
15, Survival. If any clause or provision of this Contract shall be invalid, the remaining clauses
and provisions shill nevertheless be andremain in full force and effect.
16. Entire Agreement. The Contract embodies the entire agreement between the parties; all
other agreements, Aral or written, are .now merged and superseded by the Contract. There are no
other agreements which modify or affect the terms hereof, No amendment hereto shall be
binding unless the terms thereof are in writing and signed by both parties. Time is ofthe essence.
No verbal, or other agreements modify or affect the Gantract.
17. Explanation of Documents. The Contractorhas thoroughly reviewed the Contract. The
Contractor has had the opportunity to consult with legal counsel as to the legal effect of the
Contract.
CSFG 2604 Brian Miller Concrete
18. Notices. All notices required under the terms hereof are to be in writing and delivered
personally to the -party to receive the same or m R, postage ailed by regular mail, Prepaid to the
address specified adjacent to the parties' signatures. All notices shall
A .0 # -es be deemed served upon
aeuvery thereof or three (3) days following deposit of the notice in the US mail as required herein,
19. Heading's, Construction. The headings of the sections and paragraphs are inserted solely
for the convenience of the parties. They are not a part of and are not intended to govern, limit,
or aid in constructing any term or provision hereof. In con* struing the parties' intent regarding
this contract; no more significant or stricter construction of any t""
be asserted against the county as drafter. or provision hereof shall
2U. Groverning Law, Venue, The performance and interpretation of the Contract Document
shall be governed and interpreted by the laws of the
State Of Washington. Anylitigation arising
from or in connection with this Contract shall be conducted in Grant Countv, Washington,
CSFG 2604 Brian Miller Concrete
Ap.pendix
A�
PART I — GENERAL
lA DESCRIPTION
A. This wor k includes all labor, materials, and equipment necessary to furnish and install concrete
Pads.
B. Included is haul off all old concrete and waste'material,
A ^
C. Clean dirt can be disposed off' on -site per Manager.
D. Ground. will be leveled. to new pad so to have no trip hazards,,
PART 2 - PRODUCTS%
2*1 GENERAL
Concrete Pads will be 6 inches thick with 5/8 rebar on 2-foot square pattern,
wi
ll w11 provide 5/8 rebar,
Concrete shall be a Six sack mix and sloped for drainage,.
Pad preparation shall be dug out to fit grade and have 2 inches of 5/8 min
us gravel compacted
CSFG 2604 Arian Miller Concrete
CONTRACTOR Zoii Ex4c-avatioti LLB-.
Accepted
Daryl O'\eal
License No. ZIONEEL764PQ
UBI: 605-602-571
Dated the of 1016
4e- q1— - 1 aw 6. 0
BOARD OF COUNTY COMMISSION17ERS
GRANT COUNTY, WASHINGTON
Kew-n Burgcgi�/Chair
Cindy Carter, Membcr
ATTEST:
2
6d'. Manell
of the Board
A Approved as t
pp
Trevo eViel.
Dcp Prosecuti Attornev
CS FG ' " ).604 Brian Miller Concrete