Loading...
HomeMy WebLinkAboutAgreements/Contracts - Public WorkswrWashington State o Department of Transportation Supplemental Agreement Organization and Address -Number 2 Universal Field Services, Inc. I I I Win Street Suite 1.05 Original Agreement Number Edmonds, WA 98020 Phone: Project Number Execution Date Completion Date Aup-tist 26. 2025 January 30. 2026 Project Title --A New Maximum Amount Payable Westshore Drive Reconstruction Project S71,732.40 Description of Work Right of way services to secure temporary easement for 70 driveway reconnections on the Westshore Drive Reconstruction Project. The Local Agency of Grant County desires to supplement the agreement entered in to with Universal Field Services and executed on _August 26, 20275 and identified as Agreement No. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: Addition of in -person personal contacts with the property owners to get temporary construction permits and and to complete appraisal waivers to make sure the compensation was accurate. It became necessary to complete additional waivers and make additional contacts with the owner due the need for the agent to get agreements signed before the contractor started. Section IV, TIME, FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read- N/A III Section V, PAYMENT, shall be amended as follows: The aniount of 536,049.64 is added to the previous budget of S35,682.76 as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By: Universal Field Services 0A 5 Consult (nt ignature By: Kevin R. Burgess, Chair ApKving Authority Signature Date DOT Form 140-063 Revised 09/2005 Exhibit "A" Summary of Payments Bas*]G Agreement Supplement.#1 I Total Direct Salary Cost $15,594.30 179401.94 $18,996.24 Overhead (including Payroll Additives) $93,960.37 11,114.62 $21�074.99 Direct Non -Salary Costs $5450.00 2,312.50 $7762.50 Fixed Fee $4,678.09 5,220.58 $%898.58 Total $35fi82.76 1 369049.64 $71,732.40 - DOT Form 140-063 Revised 09/2005 EXHIBIT D March 13, 2026 Fee Estimate Westshore Drive Reconstruction DIRECT SALARY COSTS (DSC Universal Field Services, Inc. Personnel Hours Rate 1 ROW Oversight 4.0 X $94.96 = $ .2 Lead Sr. Acquisition Specialist 130.0 X $53.61 = $ 3 Sr. Agent 160.0 X $51.50 = $ .4 R/W Specialist 40.0 X $45.32 $ Total Hours 334.0 Subtotal Direct Salary Costs (DSC) $ Overhead (01-11) 63-87% $ Fixed Fee (FF) 30% Cost 379.84 6,969.30 8,240.00 V12,80 17,401.94 11,114.62 5,220.58 TOTAL VSC -= $ 33,737.14 DIRECT NONSALARY COSTS -MINISC Mileage 2500 miles @ $ 0.725 $ 1,812.50 Postage - I st class & return postage 20 each 25 $ 500.00 TOTAL {DNS C)= $ 2,312.50 SUBCONSULTANTS TOTAL SUBCONSULTANT FEES ® $ - TOTAL IESTI MATE 'AMOU NT = $ 36,049 Notes: 1.) Universal reserves the right to re -negotiate estimate total if Notice to Proceed not provided within 180 days from the date of this estimate. 2.) Mileage to be billed at $0.725/mile or the approved IRS rate at the time mileage is incurred. 3.) Reimbursab.le miscellaneous expenses including but not limited to: postage, parking, road tolls, printing, etc., at cost - no markup. 1 Of 1