HomeMy WebLinkAboutResolution 25-127-CC (002)GRANT COUNTY
COMMISSIONERS AGENDA MEETING REQUEST FORM
(Must be submitted to the Clerk of the Board by 12:00pm on Thursday)
REQUESTING DEPARTMENT: PUBLIC WORKS
REQUEST SUBMITTED BY: UICtOf18 Seim
CONTACT PERSON ATTENDING ROUNDTABLE: John BI"ISSey
CONFIDENTIAL INFORMATION: ❑YES ❑ NO
DArE:12.23.2025
PHONE: 509-754-6082
EMOKG�/��
❑Agreement / Contract ❑AP Vouchers
❑Appointment / Reappointment ❑ARPA Related
❑ Bids / RFPs / Quotes Award ❑ Bid Opening Scheduled
❑ Boards / Committees ❑ Budget
❑Computer Related ❑County Code
El Emergency Purchase ❑Employee Rel.
❑ Facilities Related ❑ Financial
❑ Funds ❑ Hearing
❑ Invoices / Purchase Orders ❑ Grants — Fed/State/County
❑ Leases ❑ MOA / MOU
❑ Minutes ❑ Ordinances
❑ Out of State Travel ❑ Petty Cash
❑ Policies ❑ Proclamations
❑Request for Purchase lil Resolution
❑ Recommendation ❑ Professional Serv/Consultant
❑ Support Letter ❑ Surplus Req.
❑Tax Levies ❑Thank You's
❑Tax Title Property ❑WSLCB
Resolution regarding the annual update of the Public Works engineering services
fees policy. Signatures are needed on the resolution page AND on page 1 of the
attached Grant County Public Works Operational Policy #26-01.
11
If necessary, was this document reviewed by accounting? ❑ YES ❑ NO ❑ N/A
9 n I PON 101 al CZ47A[ :- Y
If necessary, was this document reviewed by legal? ❑ YES ❑ NO
DATE OF ACTION: ,'c� 30 - e)r- DEFERRED OR CONTINUED TO -
D 1:
D.
�f
D3.
4/2 3/24
WITHDRAWN:
■
RECEIVED
21JI)T Ifs
GRANT COUNTY COMMISSIONERS
BOARD OF COUNTY COMMISSIONERS
Grant County, Washington
RESOLUTION FOR ANNUAL RESOLUTION No. 25- -CC
UPDATE OF THE PUBLIC WORKS
ENGINEERING SERVICES FEES
POLICY
WHEREAS, Grant County Department of Public Works as a Services Fees Policy via Resolution 24-018-
CC; and
WHEREAS, Public Works desires to provide annual updates to their fees; and
WHEREAS, Public Works has requested the Board of County Commissioners consider updating the fees
collected by their office and adopting an updated Fee Policy; and
NOW, THEREFORE, BE IT RESOLVED, that Grant County Board of Commissioners approves the
attached update of the Grant County Public Works Engineering Services Fees Policy (PW #26-01).
DATED this day of Deram, _be4e_-- j 2025.
NON r4 0 U N
Yea ay Abstain
a
CC: i icp
Cn
uAl.,
Z C� SO
8/NGT0%
0
ATTEST;
/JYB ara Vasquez, CMC
Clerk of the Board
BOARD OF COUNTY COMMISSIONERS
GRAFT COUNTY, VMSHINGTON
Chair
Cindy +Cart ice Chair
K6vin Burgess - e_,Member
Grant County Public Works
a 0
Operational
Public Works
Engineering Services
Fees
Poll"cy
COUNTY ENGINEER STATEMENT
This policy has been prepared by me or was prepared
under irect supeD4@iC I have examined this
icy, an recornmena th t be approved.
6600n'ty Road Engi er I , Z70 .'
ENGINEERING SERVICES FEES POLICY #26-01
EFFECTIVE 01-01-2026
BOARD OF GRANT COUNTY COMMISSIONERS
Rob Jo s air
h
Y=�,� u rgess,
Cindy Carter,
PAGE A
TABLE OF CONTENTS
PURPOSE AND SCOPE
3
ROADWAY PERMIT FEES
3
ROADWAY PETITION 1U, EES
4
BUILDING PERMIT (GRADING .AND STDRMWATER REVIEW FEES)
5
LAND DEVEEOP ENT (ENGINEERING & SURVEYING REVIEW FEES)
6
PAYMENTS
7
REVIEW DEPOSIT REFUNDS
7
PERMIT FEE REFUNDS
7
ANNUAL FEES UPDATES
7
ENGINEERING SERVICES FEES POLICY #26.01
EFFECTIVE01-01-2026 PAGE:2
I M b L
1111111 Uzy MAUR!, XW61
1
11 4 U -003 0 1 QUAND
Grant County Public Works, is dedicated to ensuring Road Standards for both public
and private work within rights -of -way, casements, and properties owned by Grant
County. The following policy ensures that the costs for review, approval, and
inspection of private projects be borne by the private developer. In addition, this
policy provides for revenue and cost tracking of public works services and an annual
fee update.
1 PURPOSE AND SCOPE:
The purpose of the fees is to recover the costs of permit processing, petition
1$
processing, engineering plans review, and construction inspection.
z ROADWAY PERMIT FEES: Roadway permits provide permission for the use of
the public rights -of -way. Road permits can be processed administratively by
Engineering Staff under the supervision of the County Engineer.
Approach Permit
$I00
Right -of -Way Permit
$200
Trail permit
$200
Dust Control Permit
$0
Oversize/Overweight Permit
$0
Vegetation Maintenance Permit
$ 0 Initial, $50 Reinstatement
Mernonai I Sign Permit
$750, Includes Sign and Installation
10
ONLINE APPLICATIONS: Roadway permit fees are paid by
credit card in the SmartGov permitting portal at time of online
application. Please see the Road Permits page on the Public
Works website for more information.
PAPER APPLICATIONS: Paper applications can still be
received at the Public Works front counter but require a check
payment with the application, It should be noted that a paper
application will take longer to process, as the pennit technician
d'i
wi - it need to hand enter the application into the SmartGov
pennitting portal,
ENGINEERING SERVICES FEES POLICY #26-01
EFFECTIVE 01-01-2026 PAGE:3
36 ROADWAY PETITION FEES: Roadway petitions require approval of the Board
of County Commissioners, with an open hearing process. Many simple Board
petitions have no charge, however petitions that provide permission for utilities
installation or peiTnanent legal alterations to the public rights -of -way have fees as
follows:
Franchise Agreement
$Soo SmartGov Fee to Public Works
$400 SmartGov Fee to Board of
County Commissioners
Right -of -Way Vacation Fees
A $1,500 SmartGov deposit is required
(Consultant Appraisal Costs)
to initiate appraisal consultant services,
Additional deposit may be required for
appraisal consultant fees above the
Initial deposit.
Unused deposit amounts shall be
refunded.
Road Improvement District
A $1 500 deposit is required when the
petition is submitted to initiate the Road
Improvement District process.
Additional deposit may be required as
petitioners are responsible for any and
all preliminary costs and expenses
incurred by the County in preparing for
the formation of the RID should the
RID be cancelled.
Unused deposit amounts shall be
refunded.
ONLINE APPLICATIONS ONLY: Franchise Agreements and
Right -of -Way Vacations must be petitioned for online using the
SmartGov permitting portal. These petitions require credit card
payment to initiate the process. Please see the Road Petitions
page on the Public Works website for more information.
ENGINEERING SERVICES FEES POLICY #26-01
EFFECTIVE 01-01-2026 PAGER
4 BUILDING PERMITS - GRADING & STORMWATER REVIEW FEES:
Larger buildings typically have 500CY or more of cut/fill site grading and 5,OOOSF
or more of hard surface areas. These sites have engineered stormwater plans and
grading permit requirements as follows:
Site Grading Permit:
(Volumes outside building envelope only)
500CY or Less
501 CY to 1,000cy
1.00-1 CY to I %000cy
0 10,001 CY to I 00,000cy
* 100,001 CY or Hoke .
Stormwater Site Plan Review:
N/A
$100+ $20 each 100CY over 500
$2U4+ $20 each 1,000CY over. Ik
$380+ $70 each I O,OOOCY over 1 Ok
$1010+ $40. each 1 00,OOOCY over 1 00k
A $250 SmartGov review deposit for the
first (5) hours of staff review is required
to initiate stormwater review,
Stormwater review rates are $50/bour
after the initial deposit is utilized.
Unused deposit amounts shall be
reftmded,
off LINE APPLICATIONS ONLY: Building permit
applications are processed online using the SmartGov perniftfing
portal. These applications require crecht card payment to initiate
the process. Please see the Building Services page on the Grant
County website for more inforination.
ENGINEERING SERVICES FEES POLICY #26-01
EFFECTIVE 01-0112026 PAGE:5
LAND DEVELOPMENT - ENGINEERING & SURVEYING REVIEW FEES*
Major development activities typically require both engineering and surveying
review, so there will be a deposit ainount total for both. Major development
includes major plats, planned unit developments, and binding site plats. Small
1p 10
divisions of land, like short plats, may only require surveying review, so there
would be a deposit amount for one item,
TECHNICAL COMPLETENESS & REVIEW DEPOSITP The
engineering reviewer will review incoming land development
applications for technical completeness weekly, to determine if
engineered plans and review fees are required for application
completeness. The civil engineering design reviewer will setup a
SinartGov payment window and note the required engineered plans
and deposit for technical completeness of the application,
Short Plat Survey Map Review:
A $250 SmartGov review deposit for
Staff Review & Road Engineer Approval
the first (5) hours of staff review is
required to start.
Survey inap review rates are $50/hour
after the initial deposit is utilized.
Unused deposit amounts shall be
reffinded.
Major D evelopRient Survey Map Review:
A $500 SmartGov review deposit for
the first (10) hours of staff review is
Staff Review & Road Engineer Approval
(Major Plats, PUDs, and Binding Site Plans)
required to start.
Survey map review rates are $50/11our
after the initial deposit is utilized.
Unused deposit amounts shall be
refunded,
Develoment Plans Review,
A $500 SmartGov review deposit for
a Storinwater Plan
the first (10) hours of staff review is
a Grading Plans
required t6 start.
Road Plans
Development review rates are $ 5 0/hour
after the initial deposit is utilized,
Traffic Studies
Construction Inspection
Unused deposit amounts shall be
r% It
reranaed.
MISC - Private Address Markers
$25 Each
MIS C - Private Road Signs
$250 Each
ENGINEERING SERVICES FEES POLICY #26-01
EFFECTIVE 01-01-2026 PAGE:6
& PAYMEi NTS:
Engineering services fees must be paid prior to staff work being conducted. If the
fees are not paid, the application shall be considered incoluplete and rejected
without processing. All fee payments can be made online by credit card through
the SmartGov portal.,
I IRE, VIEW DEPOSIT REFUNDS:
Used review funds are non-refundable, as staff has already conducted the work.
Unused review deposit funds will be refunded when the authorized applicant
cancels the project or automatically after the review process completion.
Reimbursement will be issued in the form of a check in the mail to the applicant of
record,
PERMIT FEE REFUNDS:
Permit fees are Non -Refundable,
9. ANNUAL FEES UPDATE:
Permit and review fees Nvill be updated annually, typically in January of each year.
Fees are set by the County Road Engineer and subject to Board Approval annually.
ENGINEERING SERVICES FEES POLICY #26-01
EFFECTIVE 01-01-2026 PAGE-1