Loading...
HomeMy WebLinkAboutAgreements/Contracts - Central ServicesWA4- ((-. - '.) /\ GRANT COUNTY COMMISSIONERS AGENDA MEETING REQUEST FORM (Must be submitted to the Clerk of the Board by 12:00pm on Thursday) REQUESTING DEPARTMENT: Administrator REQUEST SUBMITTED BY: Tom Gaines CONTACT PERSON ATTENDING ROUNDTABLE: Tom Gaines CONFIDENTIAL INFORMATION: ❑YES ® NO DATE: 11-10-25 PHONE: 3276 WAgreement / Contract ❑AP Vouchers ❑Appointment / Reappointment ❑ARPA Related ❑ Bids / RFPs / Quotes Award ❑ Bid Opening Scheduled ❑ Boards / Committees ❑ Budget ❑Computer Related El County Code ❑Emergency Purchase El Employee Rel. ❑ Facilities Related ❑ Financial ❑ Funds ❑ Hearing ❑ Invoices / Purchase Orders ❑ Grants — Fed/State/County ❑ Leases ❑ MOA / MOU ❑ Minutes ❑ Ordinances ❑ Out of State Travel ❑ Petty Cash ❑ Policies ❑ Proclamations ❑ Request for Purchase ❑ Resolution ❑ Recommendation ❑ Professional Serv/Consultant ❑Support Letter ❑Surplus Req. ❑Tax Levies ❑Thank You's ❑Tax Title Property ❑WSLCB A signature was required on 11-8-2025 for a planned change order to the Jail contract. Value is $293,985.00 This was a planned landscaping soft cost on the project and while it appears to increase the contract cost the funds are in the Owner Contingency fund built into the project. this item memorializes the prior signature. Qmete a rinanciat P-ceauPsr nrm in If necessary, was this document reviewed by accounting? ❑ YES 0 NO If necessary, was this document reviewed by legal? ❑ YES 0 NO DATE OF ACTION: 10. 215 DEFERRED OR CONTINUED TO: APPROVE: DENIED ABSTAIN D1: K6 D2: D3: 4/8/24 RECENED p10V 10 2025 GRANT COUNTY COMMISSIONERS vim A 1A Document G701° — 2017 Change Order PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: 20063.01 Grant Co. Jail/Judicial Complex Contract For: General Construction Change Order Dumber: 008 Ephrata, WA Bate: Date: 1 1 /05/2025 OWNER: (Name and address) ARCHITECT: dame and address) CONTRACTOR: (Name and address) Grant Co. Board of County Clemons, Rutherford & Associates, Inc. Lydig Construction, Inc. Commissioners P.O. Box 37, Ephrata, Washington 98823 2027 "Thomasville Road, Tallahassee, 11001 E. Montgomery Dr., Spokane Florida 32308 -- - _ Jane , WA. 99206 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to execrated Construction Change Directives) Add Landscaping and Irrigation. Pricing is per PCO 86R.1 and Documents are per RFP-08. Attachments: -AIA Proposal Request, dated 5/23/2025 -Lydig , COP General Contractor Breakdown Summary, dated 10/22/2025 The original Contract Sung was $ 131,5611370.UU The net change by previously authorized Change Orders _ 5,672,64f .00 The Contract Sum prior to this Change Order was $ 1371234 016.00 The Contract Sum will be increased by this Change Order in the amount of 293,985.00 The new Contract Sum including this Change Order will be 137,528,001.00 The Contract Time will be unchanged by Zero (0) days. The new date of Substantial Completion will be NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that bane been authorized by Construction Change .Directive until the cast and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change .Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER Clemons, Ruth Ord & Associates, Inc, AR HI i ante) SIGNATURE Will Rutherford, Pro*ect Architect PRINTED NAME AND TITLE 1 I /05/2025 DATE Lydig Construction, Inc. CONTRACTOR (Firm name) SIGNATURE &' evz' PRINTED NAME AND TITS T� DATE Grant Co. Board of County Commissioners OWNER irm name] S1GNA PRINTED NAME AND T�,."'7 dwa� i� DATE AIA Document G701 -- 2017. Copyright Cd 1979, 1967, 2000, 2001 and 2017. All rights reserved. 'The American Institute of Architects,' 'American Institute of Architects," "AIA," the AIA Lugo, and 'AIA Contract Documents" are trademarks of The Arnedcan Institute of Architects. This document was produced at 16:32:54 ET on 11/0512025 under Order No.3144239823 which expires on 12/31t2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents* Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes; (389ADA49) LYD1G COP General Contractor Breakdown Summary Project Name: Grant County New Jail CRA No. Project NO: 10202 Source Documents!.,- RFP-08 Date 1012-2125 Contractor: RAIR..constructin. Inc. Contractor Ref. No... Description: Per RFP-08 add Irrigation and landscaping to project scope. Also includes mow strip added under K9 training yard fencing, along K9 building and -at lawn area outside Corrections Offer break room. Revised to Include Items added during site walk. See below for added Iterns 1. CRAFT LABOR COSTS Itemize all costs on attached COP Cost Breakdown form. Direct Labor Costs: a. crew (apprentices, Journeymen, & laborers) Fig % DIRECT LABOR SUBTOTAL 2, MATERIAL COSTS a. material costs b, freight costs ......... 3. EQUIPMENT COSTS a. owned equipment (per spec approved source) b. rental equipment (per invoices attached) hum 4. OVERHEAD & PROFIT a. NTE 3.950/6 portion of 1, 2& 3 $ S. SUBCONTRACTORS a. Clearwater Summit ------ $ 241 p200.00 b. Selland Construdtlan ------------- --- $ c. ICI Self -Perform $ 1111,112.00 d. Selland -, I,rd aflon Tap $ 2,902.00 a. CS - Sod at K9- and Q.0 break area 00.00 f. C.S - Credit to delete fabric from Rack areas $ (17,000-00) g. CS - Add Pino -trees to landscape .Lacks t. $ 5,600.00 h. 08 i. Add dryland. Mroseed alona Nat We. $ 16600.00 L CS - Install bass coqrse at SE building $ 43L02,Q0 1. CRAFT LABOR COSTS 14 2. MATERIAL COSTS .$ 3. EQUIPMENT COSTS $ -------- -- ---------- SUBTOTAL I thru 31$ 4. OVERHEAD& PROFIT $ S. SUBCONTRACTORS. $ 2741§14.00 6. OVERHEAD & PROFIT ON SUBCONTRACTORS a. NTE 5.0% of Line 5 $ 13,940.70 6. OVERHEAD & PROFIT ON SUBCONTRACTORS $ 13$940.70 7, B&O Tax a. B&O Tax % of 1-7 $ $ 8. INSURANCE a. builders risk insurance 0.42 % of 1-7 $ 1,229.57 b. general liability Insurance 0.00 % Of `1_7 $ 8. INSURANCE 1,230,00 9. BONES a. bond 9. BOND $ TOTAL COSTI-i$ -------- 293,985,001 8/5/2025 S ELLAND T F.) U Q 11" 1 t,:.] r1l CAR 22 Lyclig Grant County Jail FA Sheet - 14557 - 8/18/2025 Tap For Irrigation Service P4 owd ­14 61�• Forman - Paul Armstrong 2.SO HR 110A 6' $67A/HR $91.41/HR $0,00 ­ $168.53 Operator - Excavator **- Bryan _P, 2.50 HR $66.51/HR S9M6/HR $0.00 $166.28 Laborer - Tyler A, 2.50 HR $57,89/HR I $78.93/H R $0.00 $144.73 Laborer - Alberto S. 2.50 HR $57,89/HR: $78.93/H R $0.00 $144.73' Laborer -Alanso S14 2.52 HR $57,89/HR $78.93/HR $0.00 $14433 3/4 Ton Pickup 2.50 HR $47,84/HR $119,6 . 0 $0.00 I Ton Flatbed 2.50 HR $52.32/HR $130.80 $0.00 238 Excavator 2.50 HR $93,13/HR $232,83 $0,00 Kubota- -KX-.40 -Min! Ex, 0.50 HR $30,12/HR 111111111-1-1--- $15.06 $499,29 $768.98 - - ----------- -- ... jou 6 x2" Saddle& Stara I EA $95.16 $95,16 2" Corp Stop I EA $370.32 $370,32- 2" Stop & Waste 'halve Box Base, Top & Lid EA 1 EA $438.74 $174.52 $438.74 $174.52 2" M1PX CTS QuickJoInt Coo Rtna...,.,.__ EA $99.75 $199.50 2" CTS Quick Joint Stiffener 3 EA $3.26 $9.78 12" CTS Poll-, 20 LF $11323.81 7 1 �.�{�. 1 �!�V _xo ".c t Working Days Required by Change-, 0,00 $0,00 0.00 $D.00 om $0,00 Eq. Subtotal Eq. Markup 12% $498.29- $59.79 Eq. incl. Markup $558.08 ­7 Labor Subtotal Labor Markup:L2% $768.98 $92.28 ------ La-bori-nc-l',.Markup $961.25 Mat. Subtotal Mat. Markup 12% $1#323.82 be $1SB.06 Mat. incl. Markup $ii482.68 Sub. Eq. Subtotal $0.00 Sub. Labor Subtotal $0.00 Sub. Markup 7% Sub. incl. Markup Total Incl. Markup 1285 S. Wenatchee Ave. Post Office Box 119 Wenatchee, Washftwn 98807 (509) 662-7119 Fax: (509) 662-6380 \1 SO 14557 ------ ----------- - - - - . . . ... ...... .. .. ... Time Worked Record Woftrs Andfor Equipm*nt Occupadon of Workers or Worked ftg. O.T. Roo. O.T. Workl .... .. . ESMIgment Size Elite t Amount ------ 2 A.0 3, 4 lirll-to� -------- ------- 7 8 J 91 12 - ----- --- -- - 13 jo, 14 4P4 15 16 J, /4- 17 '7 18 IM 20 - ------------------- Is Calculaw %wh By Md Date ChecBy X Date U --------------- 0- _1_' 1 1_1,L. Total Inspector's Signature Contractor's ReOresentative Signature ThIs Ae WHITE - SCI OFFICE YELLOW - SUPERVISOR PINK - INSPECTOR C L E A 8 W ATER SUMMIT GBOVP INCR 9/29/2025 Landscapet Design, Construction, & Maintenance Proposal for: Grant County Jail Complex 1119: Sod Alternate In fleu of seed ot-A * Install in sod lieu of seed in k-9 area and break area on north side of building # Number provided encompasses deduct for hydroseed in these areas. # Number provided does not Include fine grading as this was already accounted for in base number * Number provided does not include maintenance after install as this was part of base bid 1, Owner will need to allow sod in k-9 area to root in prior to allowing dogs onto the new sod. Sit 'A Includes Idaho use tax if applicable. • Gisi eral;Excluill S6. Traffic Control • Sales taxes, bonds., permits, and testing fees except as noted above, All asphalt and concrete cut, patch and caring. ■ Demolition, grubbing, topsoil strip and stockpile, sub -grade prep +/-.11, 1i0V electrical service to Irrigation controller, Water tap, tapping fees., water meter, water meter vault. • Indoor Plumbing Rock excavation Decompaction of subgrades ■ Swale percolation testing Tree Protection Measures v Apprenticeship Utilization Hours - No state certified programs exist for our trade *This Proposal is to become part of sub contract *This proposal will be honored for 30 days from date listed above Prepared by: Carlos Lima �jlm ,,-a.@.c..Ie-ar.w.a.tersurnm"I tizrotjp..,Com 208-818-4073 ---------- 19208 E Broadway Ave, Spokane Valley, WA 99016: Phone 509.482.2722 : Fax 509..484.2343 WA Contractors ID #: CLEARSG.00OKN / Idaho Contractors License # RCE-1393 / Idaho Public Works #,, 10022-A-4(25039o47) N�U5VA\C5NTAAL FIZ\Praiocts current - cummarcla SUM -MIT ZIM IV, CLEARWATE-11 SUM -MIT GROUP INC, 9/29/2025 Landscape Design, Construotion, 84MaIntenanqe Proposal for: Grant County Jail Complex RE: Fabric deduct includes Idaho use tax If applicable, "This Proposal Is to become part of sub contract *This proposal will be honored for 30 days from date listed above Traffic Control Sales taxes, bonds, permits, and testing fees except as noted above. All asphalt and concrete cut, patch and coring. • Demolition, grubbing, topsoil strip ind stockpile, sub -grade prep +1-X, 110V electrical service to Irrigation controller. Water tap, tapping fees, water Meter, water meter vault, Indoor Plumbing • Rock excavation Decompaction of subgrades a Swale Percolation testing a Tres protection Measures a Appeenticeship Utilization Hours - No state certified programs exist for our trade ,Oared by: Carlos Lima Ciro arwa-tersummitgroupcom 208-818-4073 ------------ 19208 E Broadway Ave, Spokane Valley, WA 99016: Phone 509.482.2722 : Fax S09.484.2343 WA Contractors ID M CLEAKSGOOM / Idaho Contractors License # RCE-1393 / Idaho Public Works #., 10022-A-4(25j39,47) FAUSERWE NTRAL F1 L S\Pipjac ts CUF Not - COMMefd;l 0. C t E A A T E 6 MIT 0 IN OU P INC. 5/29/2025 Lsndsoepe Design, Construction, Maintenance Proposal for., Grant County .fail Complex RE: Added Pine Trees * Provide and install 8 ad•ditlonal ponderosa pine trees along west road Frontage Includes separate irrigation for trees due to them being planted in non -irrigated grass area ,, •ti : ':.. : ^,•; .:,: :� . •'ter .•.�: � ..�:5••" •'' ,..►'•: •' '" - . Includes Idaho use tax if applicable, * Traffic Control Sales taxes, bonds, permits, and testing fees except as noted above, All asphalt and concrete cut, patch and coring. Demolition, grubbing, topsoil strip and stockpile, .sub -grade peep 110V electrical service to Irrigation controller. - ! Water taps, tapping fees, water meter, water meter Vault. Indoor Plumbing Rock excavation Decampaction of subgr^addes Swale percolation testlhg Tree Protection -Measures Apprenticeship Utilization Hours - No state certified programs exist for our trade *This proposal Is to become part of sub contract *'This proposal will be honored far 30 days from doe listed above Prepared by:. ,.,Carlos lima gE,ima@Cl-eat atersummitgrouD.co.m- 208-818-4073 ------------ 19208 E Broadway Ave, 5polkan.e Valley, WA 99016 : Phone 509,482,2722 : Fax 509.484.2343 WA Contractors ID #I, CLEARSGOOOKM J Idaho Contractors License # RCE-1393 f Idaho Public Works ##, 10022-A-4(25,39,47) f:�U5ER\CENBAi FILESVroJt:cts c urrent - Commircia CLEARWATER SUMMIT GROOF I N C 9129/2025 Lantisoape Design, CansLruotlun, & Maintenance Proposal for: Grant County Jail Complex RE: Added dryland grass area T, a Provide non -irrigated dryland grass along west road frontage that was not originally shown on bid documents v After site visit.. 9/17 It was decided that the area would be topsoiled by civil contractor and CSGI would provide dryland hydroseed • Number Includes a fine grade of area prior to seeding • Includes initial establishment relative to establishment of irrigated turf that Is part of base bid. (2 fertilizer apps, I broadleaf weed spray, 3 mowings) I sit'" 0 Includes Idaho use tax If applicable. Traffic Control Sales taxes, bonds, permits, and testing fees except as noted above. ■ All asphalt and concrete cot, patch and coring. Demolition, grubbing, topsoil strip and stockpile, sub -grade prep +/-.1'. • 110V electrical service to irrigation controller. A Water tap.. tapping fees, water meter, water meter vault. Indoor Plumbing f• Rack excavation t Decompactlon of subgrades ■ Swale percolation testing ■ Tree Protection Measures Apprenticeship Utilization Hours - No state certified programs exist for our trade *This Proposal is to become part of sub contract *This proposal will be honored for 30 days from date 111rated above Prepared key: Carlos Lima Clama@c1earwatersum M1tgroup.co.m 208-818-4073 19208 E Broadway Ave, Spokane Valley, WA 99016: Phone 509.482.2727. : Fax 5()9.484.2343 WA Contractors ID 4: CLEARSGOOOK.N / Idaho contractors License # RCE-1393 / Idaho Public Works #: 10022-A-4(25j39,,47) r-.W$ER\CrATftAL F1kFj\Frajaaj& Current - Guniniarda C L I A R W A T E R SUMMIT GROUP INC, 10/1012025 Larlds(we Veslam, Constructiori, & mainteriance Proposal for: Grant County Jail Complex RE: Added Base Course In Bump Out Areas @ Evidence Building 4" 14 D. s:1 E-lid u**s a ns ant Includes Idaho use tax If applicable, Traffic Control Sales taxes, bonds, permits, and testing fees except as noted above. All asphalt and concrete cut, patch and coring, Demolition, grubbing, topsoil strip and stockpile, sub -grade prep +/—.11. 110V electrical service to irrigation controller. Water tap, t8pplhg fees, water meter, water meter vault. Indoor Plumbing a Rack excavation - Decompaction of subgrades a Swale percolation besting x Tree Protection Measures Apprenticeship Utilization Hours No state certified programs exist for our trade *This Proposal is to become part of sub contract 'This proposal will be honored for 30 days from date listed above .......... Prepared by.: Carlos Lima Crlma@clear --water-sUMmitgroup.com 208-818-4073 MIN, ...... --------- 19208 E Broadway Ave, Spokane Valley, WA 99016: Phone 509.482.2722 : Fax 509.484.2343 WA Contractors ID #: CLEARSGOOOKN / Idaho Contractors License # RCE-1393 / Idaho Public Works M, 10022-A-4(25,39,47) F.\USr-R\CENTM CMrant - Cummorcla A.CA Document G701 2011 Change Order PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: 20063.01 Grant Co. Jail/Judicial Complex Contract For: General Construction Change Order Number: 008 Ephrata, VGA Date: Date: 11 /05/2025 OWNER: (Name and address) ARCHITECT;(Name and address) CONTRACTOR: (Name and address) Grant Co, Board of County Clemons, Rutherford & Associates, Inc. Lydig Construction, Inc. Commissioners P.U. Boas 37, Ephrata, Washington 98823 2027 Thomasville Road, Tallahassee;, 11001 E. Montgomery Dr., Spokane Florida 323Q galley, WA 99206 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference speck exhibits. Also include agreed upon adjustments attributable to executed Constmct on Change Directives) Add Landscaping and Irrigation. Pricing is per PCO 86R1 and Documents are per RFP-08. Attachments: -AIA Proposal Request, dated 5/23/2025 -Lydig •- COP Gen.erai Contractor Breakdown Surnmary, dated 10/22/2025 The original Contract Sum was 131,56113'10.00 The net change by previously authorized Change Orders s _.__ 5, 72#646.0Q The Contract Sum prior to this Change Order was 137,234,016.00 The Contract Sum will be increased by this Change Carder in the amount of 293,985.0E The new Contract Sure including this Change Order will be N 137,528,001.40 The Contract Time will be unchanged by Zero (0) days, The new date of Substantial Completion will be NOTE: This Change Carder does not include adjustments to the Contract Sum or Cua:ranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been: agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Clemons, Ruthgrford & Associates, Inc, Lydig Construction, Inc, grant Co. Board of County Commissioners AR H sir ame) CONTRACTOR (Firm name) OWNER (Firm name) SIGNATURE SIGNATURE SIGNATURE Will Rutherford Project Architect P- Al I� PRINTED NAME AND TITLE PRINTED NAME AND TIT PRINTED NAME AND TITLE �. 11 /05/2025/2,spw, DATE DATE DATE AIA Document G701— 2017. Copyright ©1979, 1987, 2000 , 2001 and 2017. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA logo, and "AIA Contract Documents" are trademarks of The American lnstituta of Architects. This document was produced at 16:32:54 ET an 11/0512025 under Order No.3104239823 which expires on 12/3112025, is not for resale, is licensed for fine -time use only, and may only be used in accordance with the AIA Contract DocumentO Terms of Service.. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (389ADA49) LYDIG COP General Contractor Breakdown Summary Project Name: Grant county Now Jail CRA No. Project No: 10202 Source Documents: RFP-08 Date 10122125 Contractor: L diq 2onstructlon,, Inc. Contractor ReL No. PCO 086RI Description: Per RFP-08 add Irrigation and landscapIng to project scapa. Also Includes mow strip add ad under K9- training Y.8rd fanning, along K9 building and at lawn area- outside Correctlons Officer break roam. Revised to Include Items. added during site walk. See below for added Iterns 1 CRAFT LABOR COSTS Itemizo all costs on attached COP Cost Breakdown form. Dfireot Labor Costs: a. crew (apprentices, Journeymen, & laborers) $ DIRECT LABOR SUBTOTAL $ 1. CRAFT LABOR COSTS 2. MATERIAL COSTS a. material costs b. frisight costs 2. MATERIAL COSTS 3. EQUIPMENT COSTS a. owned equipment (per spec approved source) $ h, rental equipment (per invoices attached) 3. EQUIPMENT COSTS $ b -- 0- — SUBTOTAL I thru 31 $ 1 4. OVERHEAD & PROFIT a. NTE 3.95% portion of 1, 2& 3 4. OVERHEAD &PROFIT S. SUBCONTRACTORS a, w Clearater Summit ...1. , $ 241j200.00 b. Sella nd Construction 0,500.00 c. LCI Self-PsrfiDrm d. Selland -Irriganon T 21 02,00 e. ..CS - Sad at K9 and CO break area 8,500.00 f. 08 - Credit to delete fabric from Rook areas (1 7v000.001 11- g. CS -Add Phe tres's lo landscap $ .§1500.-00 h. CS v Add t .yland hV zskeO along. Nat Wa $ 15600.00 i. CS -Install biaso course at SP_ Ild ILu' Ing. P $ 41600.00 5. SUBCONTRACTORS $ 278,814-00 6. OVERHEAD & PROFIT ON SUBCONTRACTORS a. NTE &0% of Lino 5 $ 13s940.70 6. OVERHEAD & PROFIT ON SUBCONTRACTORS $ 13,940.70 7. B&O Tax A. S&O Tax 0 % of 1-7 $ $ S. INSURANCE a. builders risk Insurance 0.42 % of 1-7 $ 11229.57 b. general liability Insurance 0.00 % Of 1-7 $ B. INSURANCE $ 9. BOND a. bond 0.00 % of 1.8 $ 9. BOND $ TOTAL COST 293., $ 98 E-:�. 9 91 8/5/2025 Lydig Grant County Jail SELLAD r; I I �I I.J Q TNi cl m FA Sheet - 14557 - 8/18/2025 Tap For Irrixation Service fl :0 Forman - Paul Armstrong H-R $67.41/HR $91.41/HR- I $-0.00 $168.53 I Operator - Excavator - Bryan P, 2.50 HR $66,51/HR $90,06/H R $0.00 $166.28 Laborer - lyier A. ------ ---- 2,50 HR $57-89/HR $78,93/1-1 R $0.00 $144.73 Laborer - Alberto S, 2.50 HR 57.89/1111 $78,93/HR $0.00 $144.73 Laborer -Alanso S. 2.50 HR $57,89/HR $78,93/HR $0.00 $144-73 3/4'ron Pickup 2.50 HR $47,84/HR $119.60 $0.00 I Ton Flatbed 2.50 HR $.52.32/HR $130.80 $0.00 238 Excavator --------- 2,50 HR $93.13/HR $232.83 $0,00 Kubota KX-40 Mini. Ex. 030 HR ------------- $,90.12/H R $15.06 - $0.00 $4 I $768.9 o 6 x2" Saddle &_Strap - - - I EA $95.16 A95,16 2" Corp Stop 1 I EA $370.32 f, P $370.32 2!,S Uo,& Waste ......... I EA $438.74 $438.74 Valve BoxgasesLOp & Lid EA $174.52 $174.52 2" M IP X CTS Quick Joint Coupling 2 EA $99.75 $199.50 f i 2--CTs 9mick Joint Stiffener 3 EA ..... ... $3.26 ------ - $9.78- 2" ITS Po20 LFly ........... $L323.82 Working Days Required by Change: Eq. Subtotal Eq. Markup 12% $498.29 $59.79 Eq. incl. Markup...... $558.08 Labor Subtotal Labor Markup 12% $768.98 $92.28 Labor incl, Markup $861.25 Mat. Subtotal Mat. Markup 12% $IJ323,82 $158.86 Mat. incl. Markup $10482..68 sub - E, Sub. Labor Subtotal Sub. Markup 7% $0.00" $0.00 $0.00 Sub. incl. Markup $0.00 E, Total incl. Markup $2,902.011 1285 S. Wenatchee Ave, Post Office Box 119 Wenatchee, Washhjton 98807 (509) 662-7119 Fax: (509) 662-6380 --- WA 0MIX., 01 1 -1111 1 1-10,81N 1.110' s, get 01 10.110"'aft 0- NIP, M I MM110-1 1 9 M-1 Job Number Date Rom Number horn Nam ..... ....... . ..... Job Name Subcontractor 1 Lower Tier Subcontractor Line / :Station DescOpgon of Work Performed r CIA, Time-Warkod Record Woftrs &mVcw Equipmnt Occupadon of Workers or Hours Worked Rog. O.T. Amount Working Equigment Sin R*V% 0.TM own. SM.M.46M wax"N"W""No"N" ap"MMOW090"S" OMMOMM""W"" I I MIBM io 00 IV, 12 .Wh 3 7- ".i �r `�`.' G" .,nr .'6.^ �!`�R9.an'' ..'�`.�' ,N�p; '..YP F 3'" }' �F.o+-'k'�~ '�k * or 9n�M1r 4 7 W -- ---- ----- - e 7 01161- '°'v:.<:.W*' 5 kn,a.P xe . �'# " ,�, Ak' yf^ y 'ke .id \ `i. 9 4� lop 10 -- -------- 1 t 12 13 - -- ----- - --- 14 16 17 18 ".j 20 A Calculated By Dote Checked By t �; �` ����� � �`: Date ----------- Total Inspedoes Signature Coritractoes Reoresentative Signature Title I oe' rl.11 L WHITE - SCI OFFICE YELLOW - SUPERVISOR PINK - INSPECTOR SUMMIT lu CLEARWATER ' SUMMIT GROUP INC. 9/29/2025 Landscape Design, Construction, & MtAintenance Proposal for: Grant County Jail Complex RE: Sod Alternate In lieu of seed $ 0 - -91 * Install In sod lieu of seed In k-9 area and break area ©n north side of building o (dumber provided encompasses deduct for hydroseed In these areas, * Number provided does not Include fine grading as this was already accounted for in base number a Number provided does not include maintenance after Install as this was part of base bid a Owner will need to allow sod in k-9 area to root in prior to allowing dogs onto the new sod, Sfte *qc1flic Ei a- includes Idaho use tax If appllcablov. i��e�i�u�.al���cc�.u�i�rrs������ ���� *This Proposal Is to bocome part of sub contract *This proposal will be honored for 30 days from data listed above Prepared -by: Carlos Lima 208-818-4073 * Traffic Control 9 Sales taxes, bonds, permits, and testing fees except as noted above. a All asphalt and concrete cut, patch and coring, a Demolition, grubbing, topsoil strip and stockpile, sub -grade prep a 110V electrical service to Irrigation controller, • Water tap, tapping fees, water meter, water meter vault. Indoor Plumbing • Rock excavation • Decompaction of subgrades. • Swale percolation testing P Tree Protection Measures & Apprenticeship Utilization Hours - No state certified programs exist for our trade 197-08 E Broadway Ave, Spokane Valley, WA 99016: Phone S09.482.2722 : Fax 509.484.2343 WA Contractors ID #,, CLEARSGOOOKN / Idaho Contractors License # RCE-1393 / Idaho Public Works M. 10022-A-4(25,39,47) F:\USEA\CENTRAL FJLEStiPruj ",tv Cuf rent - Caninierda rrr�' CLEARWATER SUMMIT GRIP INC. 9/29 f 2025 Landscape Design, Construction, & maintenance Proposal for: Grant County Mail Complex E; Fabric deduct 4. Includes Idaho use tax If applicable. *This Proposal Is to b000me part of sub contract *This proposal will be honorbd •for 30 days from date listed above : " ared by: �vCarlos Lima Clima@.clearwa,te,rsurmftgMug,,.com 208-918-4073 Traffic Control • sales taxes, bonds, permits, and testing fees except as noted above. All asphalt and concrete cat, patch and coring. • Demolition, grubbing, topsoil strip End stockpile, sub -grade prep * j- X. 110V electrical service to Irrigation controller, Dater tap, tapping fees, water Meter, water meter vault. • Indoor Plumbing Rock excavation aecompaction of subgrades • Swale percolation testing ' Tree Protection Measures Apprenticeship Utilization Hours - No state certified programs exist for our trade 19208 E Broadway Ave, Spokane Valley, WA 99016 : Phone 509.482.,2722 : Fax 509.4-84.2343 WA Contractors ID #; CLEARSGOOOKN / Idaho Contractors License # RCE-1393 f Idaho Public works ##: 10022-A•4(25439,47) F:1115ER\CENTRAL FILEAProjects Currant - Ccmmerda C L E A 0 W A T E 8 SUMMIT GROOP INC,, 5/29/2025 Landscape Design, Construction,, & Mallitenance Pimp oral fob# Grant County Jail Complex RE: Added Pine Trees Includes Idaho use tax If applicable, *This Proposal Is to become part of sub contract *This proposal will be honored for 30 days from date listed abovo Traffic Control Sales taxes, bonds, permlts, end testing fees except. as noted above. * All asphalt and concrete cut, patch and coring. & Demolition, grubbIng, topsoil strip and stockpile, sub -grade prep +/- a 110V electrical service to Irrigation controller. a Water tap,, tapping fees, water meter, water meter vault. x Indoor Plumbing n Rack excavation Decompaction of subgrddes Swale percolation teStfhg Tree Protection -Measures Apprenticeship Utilization Hours - No state certified programs exist for our trade Prepared by,,. Carlos Lima A glimq@ clearwatersummitOLOUP'Col-A 208-8-18-4073 -------------- 19208 E Broadway Ave, Spokane Valley., WA 99016: Phone S09.482.2722 a, Fax S09.484.2343 WA Contractors ID #: CLEARSGOOOKN / Idaho Contractors License # RCE-139.9 / Idaho Public Wa;ks #: 10022-A-4(25i39,47) FAUSEACENTRAL FILEAP16jWs I-Vrent - Commorda CLEARWATER SUMMIT GROUP INCz 9/29/202S Landscape Design, Construotion, maintenance Proposal for: Groat County Jail Complex RE: Added dryland grass area ------------------------ • Provide non -irrigated dryland grass along west road frontage that was not originally shown on bid documents a After site visit, 9/17 it was decided that the area would be topsoiled by civil contractor and CSGI would provide dryland hydroseed • Number Includes a fine grade of area prior•to seeding Includes initial establishment relative to establishment of irrigated turf that is part of base bid. (2 fertilizer appsr 1 broadleaf weed spray, 3 mowings) ::.,.1. . • Includes Idaho use tax if aipplicabie. Traffic Control Sales taxes, barns, permits, and testing fees except as noted above. i • All asphalt and concrete Gut, patch and coring. • Demolition, grubbing, topsoil strip and stoftile, sub -grade prep • 110V electrical service to irrigation controller. ■ water tap, tapping fees, water meter, water meter vault. Indoor Plumbing • Rock excavation Decompaction of subgrades Swale percolation testing • Tree Protection Measures d Apprenticeship Utilization }lours - No state certified prograMs exist for our trade *This Proposal is to became part of sub contract. *This proposal will be honored for 30 days from date listed above Prepared by: Carlos Lima Clima@clearwatersurnmitgrpu..com 208-818-4073 19208 E Broadway Ave, Spokane Valley, WA 99016 : Phone 509.482.2722 : Fax 509.484.2343 WA Contractors ID #: CLEARSGOODI(N 1 Idaho Contractors License ## RCE-1393 j Idaho Public Forks #: 10022-A-4(25,390471 MU5MUNTAAL ME%\Projects current Gummerda C L E A 0 W A T E R SUMMIT GROUP INC, 10/10/2025 Lar),Usoape Design, Construction, � mt4intensrice Proposal for: Grant County Jail Complex RE: Added Base Course In Bump Out Areas @ Evidence Building Ar -------------- ­ * Provide and Install base course in bump out -areas along north and south sides of evidence building * Compact base course after installed Vic.... Includes Idaho use tax if applicaNe. *This Proposal is to become part of sub contract *This proposal will be honored for 30 days from date listed above Prepared by: Carlos Lima Clima@cleaL.wg.tg!LS!A.M.M—itRro.tip.com 208-818-4073 * Traffic Control * Sales taxes, bonds, permits, and testing fees except as noted above. * All asphalt and concrete cut, patch and coring. a Demolitfan, grubbing, topsoil strip and stockpile, sub -grade prep +/-.I'. a 11©V electrical service to Irrigation controller. Water tap, tapping fees, water meter, water meter vault. Indoor Plumbing lk Rack excavation Decompaction o ' f subgrades Swale percolation testing ■ Tree Protection Measures Apprenticeship Utilization Hours - No state certified programs exist for our trade 19208 E Broadway Ave, Spokane Valley, WA 99016: Phone 509.482.2722 : Fax 509.484.2343 WA Contractors ID #-. CLEARSGOOOKN / Idaho Contractors License # RCE-1393 / Idaho Public Works 10022-A-4(25,39,47) FMSFACENTRAC RU.S\Projects Current - Conimerda