HomeMy WebLinkAboutAgreements/Contracts - Central ServicesGRANT COUNTY
COMMISSIONERS AGENDA MEETING REQUEST FORM
(Must be submitted to the Clerk of the Board by 12:00pm on Thursday)
REQUESTING DEPARTMENT: Central Services
REQUEST SUBMITTED BY: Tom Gaines
CONTACT PERSON ATTENDING ROUNDTABLE: Tom Gaines
CONFIDENTIAL INFORMATION: ❑YES ®NO
DATE: 03-31-2025
PHONE:3276
7 /��% _ �� „�/ /�/ /� %/% ,: /%///l./%,////////%/%��/%/// // // // /////i//ilk/ram/////% ////i///ii///i/////i /i ✓ / ii / � _
.,� �� - �.�� .� � ;. � ,,,.., ,: _, .-.„.,&.T �,, - _ �, sue., �, .,1, � �!//✓,r.�i/�iii/� ii�i.- lii���yi
�'✓i-//�//��//%�� �� / /may y -. _ :.,,f . sc < f`s% / /yg
*Agreement / Contract
❑AP Vouchers
❑Appointment / Reappointment
❑ARPA Related
❑ Bids / RFPs / Quotes Award
❑ Bid Opening Scheduled
❑ Boards / Committees
❑ Budget
❑Computer Related
❑County Code
❑Emergency Purchase
❑Employee Rel.
Facilities Related
❑ Financial
❑ Funds
❑ Hearing
❑ Invoices / Purchase Orders
❑ Grants — Fed/State/County
❑ Leases
❑ MOA / MOU
❑Minutes
❑Ordinances
❑Out of State Travel
❑Petty Cash
❑ Policies
❑ Proclamations
❑ Request for Purchase
❑ Resolution
El Recommendation
❑Professional Serv/Consultant
❑Support Letter
❑Surplus Req.
❑Tax Levies
❑Thank You's
❑Tax Title Property
❑WSLCB
iii
/ ��
/i/i�i//i//�i�����///i/iy/%ice
Contract between Grant County and Stans Construction and Son. Value: $36,519.66
For project CSD2504fg Horse Barn Water Upgrades.
This has been reviewed by both the PAO and for Insurance.
If necessary, was this document reviewed by accounting? ❑ YES 0 NO
If necessary, was this document reviewed by legal? 0 YES ❑ NO
DATE OF ACTION: �j�
APPROVE: DENIED ABSTAIN
D1:
D2:
D3:
DEFERRED OR CONTINUED TO:
4/8/24
K25-055
THIS CONTRACT ("Contract"), entered by and between GRANT COUNTY, duly
organized and operating under and by the Constitution and the laws of the State of Washington
("County"). and STANS CONSTRUCTION AND SON, LLC., a limited liability corporation
duly formed and doing business in the State of Washington ("Contractor").
In consideration of the mutual promises and covenants contained herein, the parties
hereto agree as follows:
1. Work of Contract/Scope of Work. The Contractor shall perform all work and furnish all
necessary tools, materials, equipment, and other items required to complete the tasks and scope
of work as outlined in the Request for Bids (RFB) and this contract for the Horse Barn Water
Addition project (CSD2504fg). "Work" refers to all work, both individually and collectively-,
performed by the Contractor during the project. The RFB is attached as "Exhibit A").
The Contractor will be responsible for doing all the work to complete the following:
a The contractor is responsible for all work required to install water in five barns and
at a m * n *mum, the following:
All excavating and backfilling as required.
Installation of isolation valves for each barn.
Installation of Isolation valve to isolate all barns.
Hose -end ball valves at each drop at identified stalls.
Cush clamps where required or attached to Unistrut.
Installation should follow current UPC standards.
Allow for blowdown for winter conditions.
• Piping and connection points are to be labeled as non -potable water.
Any piping exposed to sunlight will be protected from UV exposure.
b. Complete cleanup of the area once above completed, including but not limited to
recovery and removal of equipment, trash, and debris.
c. Contractor understands this is a Public Work subject to prevailing wage and the
submission of intents, affidavits, and certified payroll as required by the Labor
and Industries.
d Coordination with the fairgrounds on schedule, timing, areas to be paved., events,
and other projects are critical to this project.
2. Project Site. The work shall. be performed on the real property commonly known as the
Grant County Fairgrounds, located at approximately 3953 Airway Drive NE, Moses Lake,
Washington.
&tans Construction & Son barn water upgrades CSD 2504fg — Page 1
3. Dates of Commencement and Completion. The Contractor shall commence the work
described herein upon receiving notice to proceed from the County at a time mutually agreed
upon by the parties after obtaining all necessary permits and bonds. Substantial completion of
the work shall occur by June 3 )0, 2025, unless delays beyond the control of either party
necessitate an extension of the date. This date will not be extended without approval by the
County.
4. Contract Sum and Terms. The agreed Contract sum, except for provisions set forth below
in Paragraph 13, and with payment of such Contract Sum subject to provisions set forth below
in Paragraphs 8 and 11, and any other provision contained within the Contract which may affect such
Contract Sum to be paid to Contractor, is as follows:
Subtotal
$331752
Washington State Sales Tax @ 8.2%
$2,767.66
Total
$369519.66
Retainage (5% of Subtotal)
$1 fi87,60
a Retaina e: Required for this project. A retainage bond is acceptable and preferred.
5% retainage is required under RCW 60.28.001. The contract is -under $35,000
and does not require a notice of completion to be filed and approved before
releasing retainage. Retainage will be released upon project acceptance.
b. Intents and Affidavits: Statements of intent to pay prevailing wages and affidavits
of wages paid must be submitted to Washington State Labor and Industries
according to RCW 39.12.040.
c. Payment Interval and Billing: The Contractor may submit a lump sum payment
upon completion or provide amonthly billing statement and invoice to the County.
Such billing statement and invoice shall set out the nature of the work performed,
the time and materials involved, or the percentage of work completed as mutually
agreed upon by the Contractor and the County. The County will pay such a
statement and invoice within thirty (30) days of receipt.
5. Performance and Payment Bonds: waived for this project.
6. Indemnity and Hold Harmless. The Contractor shall defend, indemnify, and hold the
County, its officers-, officials, employees, and volunteers harmless from any claims, injuries,
damages, losses, or suits, including attorney fees, arising out of or in connection with the
performance of the contract, except for inju n-*es and damages caused by the sole negligence of
the County.
It is further specifically and expressly understood that the indemnification provided herein
constitutes the Contractor's waiver of R'=Umty -under Industrial Insurance, Title 51 RCW, solely
Stans Construction & Son barn water upgrades CSD 2504fg — Page 2
for the purpose of indemnification. The parties have mutually negotiated this waiver. The
provisions of this section shall survive the expiration of termination of this contract.
7. Insurance. The Contractor shall procure and maintain, for the duration of this contract,
insurance against claims for injuries to persons or damage to property which may arise from or
in connection with the performance of the work hereunder by the Contractor, its agents,
representatives, employees-, or subcontractors. The Contractor shall provide a Certification of
Insurance evidencing:
a Automobile Liability insurance with limits no less than $1,000,000 combined
single limit per accident for bodily injury and property damage; and
b. Commercial General Liability insurance written on an occurrence basis with limits
no less than $1,000,000 combined single limit per occurrence and $2,000,000
aggregate for personal injury, bodily injury, and .property damage. Coverage shall
include, but not be limited to, blanket contractual, products/completed
operations,, broad form property damage, explosion, collapse, and underground
(XCU) coverage, if applicable, and employer's liability.
C Worker's Compensation insurance at the limits established by the State of
Washington.
Any payment, of deductible or self -insured retention shall be the Contractor's sole responsibility.
The County shall be named as an additional insured on the insurance policy concerning work
performed by or on behalf of the Contractor, and a copy of the endorsement naming the county
as an additional insured shall be attached to the Certificate of Insurance. The Contractor's
insurance shall. be the primary insurance concerning the County, and the County shall be given
thirty (3 )0) days prior written notice of any cancellation, suspension, or material change in
coverage.
8. Payments Withheld, The County may withhold or nullify the whole or part of any
payment to such extent as may be necessary to protect the County from loss or damage for
reasons including but not limited to:
a Work not specified in the Contract or agreed upon in the RFB (Attached as "Exhibit
X)).
b. Reasonable evidence that the work required by the Contract cannot be completed
for the unpaid balance of the contract sum.
a Work by the County to correct defective work or complete thework.
d. Failure by the Contractor to perform, work within this Contract.
a Costs or liabilities that may arise to the County due to the Contractor's
fault, negligent acts, oromissions.
PROVIDED: In any case where part or all. of a payment is to be withheld due to unsatisfactory
Stans Construction & Son barn water upgrades CSD 2504% — Page 3
performance, the County shall notify the Contractor in accordance with RCW 39.76.011(b).
Authority of County. Suppose the Contractor fails to perform the work in accordance with the
requirements of the Contract Document. In that case, the County shall provide the Contractor with
written notice of the deficiency, and the Contractor shall have seven days to correct the deficiency in
the work. If the Contractor fails to correct the deficiency in the work within the seven days or to
take and continue all appropriate steps to initiate the corrections in the event corrections cannot be
reasonably completed in the seven days, the County may, without prejudice to other remedies: (a)
use County forces, other contractors, or other means to make good the Contractor's deficiency,
and (b) deduct from or nullify the Contractor's payments the cost of such effort as described in
paragraph 8 of this agreement.
9. Warranty of Construction. In addition to any special warranties provided elsewhere in
the Contract Document and its companion or applicable documents, the Contractor warrants that
all work conforms to the requirements of the Contract and is free from any defects in equipment,
materials, or design ftu-nished, as well as any defects in workmanship performed by the
Contractor.
Concerning all warranties, express or implied, for work performed or materials furnished
according to the Contract and companion or applicable documents, the Contractor shall:
a Obtain all warranties that would be given in standard commercial practice.
b. Require all warranties to be executed, in writing, for the benefit of the County; and
c. Enforce all warranties on behalf of the County, if directed by the County, including
any warranties from subcontractors, manufacturers, or suppliers that extend beyond the
period specified in. the Contract.
d The obligations under this Section shall survive completion.
10. Successors and Assigns. The County and the Contractor, respectively, bind themselves,
their partners, successors, assigns, and legal representatives to the other party hereto, as well as
to the partners,, successors, assigns, and legal representatives of such other party,,, regarding the
covenants, agreements, and obligations contained in the Contract. Neither party shall assign the
work without the other party's written consent. If either party attempts to assign without such
consent., that party shall remain legally responsible for all obligations outlined in the Contract.
11. Changes in Work. The County may, at any time and without notice to the Contractor's
surety, order additions, deletions, revisions, or other changes in the work. These changes in the
work shall be *incorporated into the Contract Document through the execution of Change Orders.
Suppose any change in the work ordered by the County causes an increase or decrease in the
Contract Sum or the performance time. In that case, an equitable adjustment shall be made, and
such adjustments(s) shall be incorporated into a Change Order.
Stans Construction & Son barn water upgrades CSD 2504fg — Page 4
If the County wishes to request a change in the work, it may submit a written Change Order
proposal to the Contractor. The contractor shall submit a Change Order proposal within 14 days
of the County's request or within such other period as mutually agreed upon. The contractor's
Change Order proposal shall include total compensation for implementing the proposed change
in the work., including any adjustment in the contract sum or time of performance, and including
compensation for all delays in connection with such change in the work and for any expense or
inconvenience, disruption of schedule, or loss of efficiency or productivity occasioned by the
change in the work. Upon receipt of the Change Order proposal or a request for equitable
adjustment to the contract sum or time of performance, the County may accept or reject the
proposal, request further documentation, or negotiate acceptable terms with the Contractor.
Pending agreement on the terms of the Change Order, the County may direct the Contractor to
proceed immediatelywith the work outlined in the Change Order. The contractor shall not proceed
with any change in the work until it has obtained the County's approval. All work done under
any county -directed change in the work shall be executed per the Contract.
12. No Agency Relationship. Neither the Contract nor any agreement implied thereby
constitutes the Contractor as an agent or legal representative of the County for any purpose
whatsoever, and the Contractor's relationship to the County under the Contract Document shall
be that of an independent contractor. The Contractor is not granted any express or implied right or
authority to assume or create any obligation or responsibility on behalf of or in the name of the
County or to bind the County in any manner or thing whatsoever.
13. Clean U 9), including
.The contractor shall maintain a clean and orderly project site, ' clud
hauling routes, infrastructure, utilities, and storage areas, free from accumulations of waste
materials. Before the project is accepted, the Contractor shall remove all rubbish, tools,
scaffolding, equipment, and materials from the premises. Upon completing the Work, the
Contractor shall leave the project site in a clean.,, neat, and orderly condition that is satisfactory
to the County. If the Contractor fails to clean up as provided herein and after receiving
reasonable notice from the County, the County may do so; the cost thereof shall be charged to
the Contractor.
14. Survival. If any clause or provision of this Contract is invalid, the remaining clauses and
provisions shall nevertheless remain in full force and effect.
15. Entire Agreement. The Contract embodies the entire agreement between the parties; all
other agreements, oral or written, are now merged and superseded by the Contract. There are no
other agreements that modify or affect the terms of this agreement. No amendment to this
agreement shall be binding unless the terms thereof are in writing and signed by both parties.
Time is of the essence. No verbal or other agreements modify or affect the Contract.
16. Exp
lanation of Documents. The Contractor has thoroughly reviewed the Contract. The
Contractor has had the opportunity to consult with legal counsel as to the legal effect of the
Contract.
Stans Construction & Son barn water upgrades CSD 2504fg - Page 5
17. Notices. All notices required under the terms of this agreement must be in writing and
delivered personally to the party to receive them or mailed by regular mail, prepaid postage, to
the address specified adjacent to the party's signatures. All notices shall be deemed served upon
delivery or three (3) days following deposit in the U.S. mail, as required herein.
Headings, Construction. The headings of the sections and paragraphs are inserted solely for the
convenience of the parties. They are not a part of and are not intended to govern, limit, or aid in the
construction of any term or provision hereof. In construing the parties' intent regarding
In this contract, no more significant or stricter construction of any term or provision hereof shall
be asserted against the county as drafter.
18. Governing Law, Venue. The performance and interpretation of the Contract Document
shall be governed by and 'interpreted in accordance with the laws of the State of Washington.
Any litigation arising from or in connection with this Contract shall be conducted in Grant
County, Washington.
Stans Construction & Son barn water upgrades CSD 2504fg — Page 6
CONTRALTO
Stns Cons 9 I:
�o
n, LLC.
By: evC5
David lfffmozov, Manager
License No. STANSCS841DA
UBI No. 603-566-918
Dated the of )2025.
go U N T
0,
Q Y
dWW
: Cf)
men
= ca: •amp
Now : EAL : dm� AMrl
mmo
S UA a... a• : 0 -aft
""86
cogto•
4 fS H1 I V GT
#00
ATT,b.ST-
A /Z
Barbara J. Vasquez,
Clerk of the Board
Approved as to form-,
LIZ
Barbara G. Duerbeck, WSBA # 53946
Deputy Prosecuting Attorney
Date:
BOARD OF COUNTY COMMISSIONERS
GRANT COUNTY;WASHINGTON
Roes" Chaj
Ciffiy'Cart*, Vice-C
Kevin Burgess, Mefnoober
Stans Construction & Son barn water upgrades CSD 2504fg — Page 7