HomeMy WebLinkAboutResolution 24-133-CCBOARD OF COUNTY COMMISSIONERS
Grant County, Washington
RESOLUTION FOR ANNUAL RESOLUTION No. 24- � � 3 -CC
UPDATE OF THE PUBLIC WORKS
ENGINEERING SERVICES FEES
POLICY
WHEREAS, Grant County Department of Public Works has a Services Fees Policy via
Resolution 24-018-CC; AND
WHEREAS, Public Works desires to provide annual updates to their fees; AND
WHEREAS, Public Works has requested the Board of Commissioners consider updating the
fees collected by their office and adopting an updated Fee Policy.
NOW, THEREFORE, BE IT HERESY RESOLVED THAT the Grant County Board of
Commissioners approves the attached update of the Grant County Public Works Engineering Services
Fees Policy (PW #25-01).
BE IT FURTHER RESOLVED that this resolution shall be effective upon adoption.
DATED this day of December, 2024.
BOARD OF COUNTY COMMISSIONERS
t
Yea Nay Abstain ANT OUN Y, WASHINGTON
13/ El El Cindy Caftr, Chair
ATTEST:
� F-1 Danny E. one, Vice Chair
arbara J qu �y
Clerk of th o � ❑ ❑
Rob ember
Grant County Public Works
Operational Policy
# 25=01
C0+�t
Public Works
Engineering Services
Fees Policy
COUNTY ENGINEER STATEMENT
This policy has been prepared by me or was prepared
under ect supervisZi
e examined this
Pat cy, an recomme throved.
ounty Road Engi er
ENGINEERING SERVICES FEES POLICY #25-01
EFFECTIVE 01-01-2025
BOAR110F GRANT COLATY CO , M ISSION E RS
Cind C rter, Cb,ir
i
Danny E. Sty, Vice -Chair
Rob J emfber
PAGE:1
TABLE OF CONTENTS
PURPOSE AND SCOPE
3
ROADWAY PERMIT FEES
3
ROADWAY PETITION FEES
4
BUILDING PERMIT (GRADING AND STORMWATER REVIEW FEES)
5
LAND DEVELOPMENT (ENGINEERING &SURVEYING REVIEW FEES)
6
PAYMENTS
7
REVIEW DEPOSIT REFUNDS
7
PERMIT FEE REFUNDS
7
ANNUAL FEES UPDATES
7
ENGINEERING SERVICES FEES POLICY #25-01
EFFECTIVE 01-01-2025 PAGE:2
w1w
I
Grant County Public Works is dedicated to ensuring Road Standards for both public
and private work within rights -of -way, easements, and properties owned by Grant
County. The following policy ensures that the costs for review, approval, and
inspection of private projects be borne by the private developer. In addition, this
policy provides for revenue and cost tracking of public works services and an annual
fee update.
1, 'PURPOSE AND SCOPE:
The purpose of the fees is to recover the costs of permit processing, petition
processing, engineering plans review,, and construction inspection.
2, ROADWAY PERMIT FEES: Roadway permits provide permission for the use of
the public rights -of -way. Road permits can be processed administratively by
Engineering Staff under the supervision of the County Engineer.
Approach Permit
$100
Right -of -Way Permit
$200
Trail Permit
$200
Dust Control Permit
$0
Oversize/Overweight Permit
$0
Vegetation Maintenance Permit
$ 0 Initial, $50 Reinstatement
Memorial Sign Permit
$750, Includes Sign and Installation
• ONLINE APPLICATIONS: Roadway permit fees are paid by
credit card in the SmartGov permitting portal at time of online
application. Please see the Road Permits page on the Public
Works website for more information.
• PAPER APPLICATIONS: Paper applications can still be
received at the Public Works front counter but require a check
payment with the application. It should be noted that a paper
application will take longer to process, as the permit technician
will need to hand enter the application into the SmartGov
permitting portal.
ENGINEERING SERVICES FEES POLICY #25-01
EFFECTIVE 01-01-2025 PAG E: 3
3. ROADWAY PETITION FEES: Roadway petitions require approval of the Board
of County Commissioners, with an open hearing � -process. Many simple Board
petitions have no charge, however petitions that provide permission for utilities
installation or permanent legal alterations to the public rights -of -way have fees as
follows:
Franchise Agreement
$800 SmartGov Fee to Public Works
$400 SmartGov Fee to Board of
County Commissioners
Right -of -Way Vacation Fees
A $1,500 SmartGov deposit is required
(Consultant Appraisal Costs)
to initiate appraisal consultant services.
Additional deposit may be required for
appraisal consultant fees above the
initial deposit.
Unused deposit amounts shall be
refunded.
ONLINE APPLICATIONS ONLY: Franchise Agreements and
Right -of -Way Vacations must be petitioned for online using the
SmartGov permitting portal. These petitions require credit card
payment to initiate the process. Please see the Road Petitions
page on the Public Works website for more information.
ENGINEERING SERVICES FEES POLICY #25-01
EFFECTIVE 01-01-2025 PAGER
4. IBUILDING PERMITS - GRADING & STORMWATER REVIEW FEES:
Larger buildings typically have 500CY or more of cut/fill site grading and 5,000SF
or more of hard surface areas. These sites have engineered stormwater plans and
grading permit requirements as follows:
Site Grading Permit:
(Volumes outside building envelope only)
Stormwater Site Plan Review:
A $250 SmartGov review deposit for the
first (5) hours of staff review is required
to initiate stormwater review.
Stormwater review rates are $50/hour
after the initial deposit is utilized.
Unused deposit amounts shall be
refunded.
ONLINE APPLICATIONS ONLY: Building permit
applications are processed online using the SmartGov permitting
portal. These applications require credit card payment to initiate
the -process. Please see the Building Services page on the Grant
County website for more information.
ENGINEERING SERVICES FEES POLICY #25-01
EFFECTIVE 01-01-2025 PAGE:5
5. LAND DEVELOPMENT - ENGINEERING & SURVEYING REVIEW FEES:
Major development activities typically require both engineering and surveying
review, so there will be a deposit amount total for both. Major development
includes major plats, planned unit developments, and binding site plats. Small
divisions of land, like short plats, may only require surveying review, so there
would be a deposit amount for one item.
TECHNICAL COMPLETENESS & REVIEW DEPOSIT: The
engineering reviewer will review incoming land development
applications for technical completeness weekly, to determine if
engineered plans and review fees are required for application
completeness. The civil engineering design reviewer will setup a
SmartGov payment window and note the required engineered plans
and deposit for technical completeness of the application.
Short Plat Survey Map Review:
A $250 SmartGov review deposit for
Staff Review & Road Engineer Approval
the first (5) hours of staff review is
required to start.
Survey map review rates are $50/hour
after the initial deposit is utilized.
Unused deposit amounts shall be
refunded.
Major Development Survey Mgp Review:
A $500 SmartGov review deposit for
the first (10) hours of staff review is
Staff Review & Road Engineer Approval
(Major Plats, PUDs, and Binding Site Plans)
required to start.
Survey map review rates are $50/hour
after the initial deposit is utilized.
Unused deposit amounts shall be
refunded.
Development Plans Review:
A $500 SmartGov review deposit for
• Stormwater Plan
the first (10) hours of staff review is
• Grading Plans
required to start.
• Road Plans
Development review rates are $50/hour
after the initial deposit is utilized.
• Traffic Studies
• Construction Inspection
Unused deposit amounts shall be
refunded.
MISC - Private Address Markers
$25 Each
MISC. - Private Road Signs
$250 Each
ENGINEERING SERVICES FEES POLICY #25-01
EFFECTIVE 01-01-2025 PAG E: 6
6. PAYMENTS:
Engineering services fees must be paid prior to staff work being conducted. If the
fees are not paid, the application shall be considered incomplete and rejected
without processing. All fee payments can be made online by credit card through
the SmartGov portal.
7. REVIEW DEPOSIT REFUNDS:
Used review funds are non-refundable, as staff has already conducted the work.
Unused review deposit funds will be refunded when the authorized applicant
cancels the project or automatically after the review process completion.
Reimbursement will be issued in the form of a check in the mail to the applicant of
record.
F611A 41*149'UN" 8 W D1 a 11104 K Oki
Permit fees are Non -Refundable.
9. ANNUAL FEES UPDATE:
Permit and review fees will be updated annually, typically in January of each year.
Fees are set by the County Road Engineer and subject to Board Approval annually.
ENGINEERING SERVICES FEES POLICY #25-01
EFFECTIVE 01-01-2025 PAGE:?