Loading...
HomeMy WebLinkAboutBid Opening - Public WorksGRANT COUNTY COMMISSIONERS AGENDA MEETING REQUEST FORM (Must be submitted to the Clerk of the Board by 12:00pm on Thursday) REQUESTING DEPARTMENT: PUBLIC WORKS REQUEST SUBMITTED BY: SHILO NELLIS CONTACT PERSON ATTENDING ROUNDTABLE: DAVE BREN CONFIDENTIAL INFORMATION: ❑YES ® NO DATE: 1 2/04/24 PHONE: 509-754-6082 �TYPE(S) OF DOCUMENTS SUBMITTED: (CHECK ALL THAT APPLY) []Agreement / Contract ❑AP Vouchers ❑Appointment / Reappointment ❑ARPA Related ❑ Bids / RFPs / Quotes Award ® Bid Opening Scheduled ❑ Boards / Committees ❑ Budget ❑Computer Related ❑County Code ❑Emergency Purchase El Employee Rel. ❑ Facilities Related ❑ Financial ❑ Funds ❑ Hearing ❑ Invoices / Purchase Orders ❑ Grants — Fed/State/County Ell -eases ❑ MOA / MOU ❑Minutes ❑Ordinances ❑Out of State Travel El Petty Cash ❑ Policies ❑ Proclamations ❑ Request for Purchase ❑ Resolution ❑ Recommendation ❑ Professional Serv/Consultant ❑Support Letter ❑Surplus Req. ❑Tax Levies ❑Thank You's ❑Tax Title Property ❑WSLCB SUGGESTED WORDING FOR AGENDA: {Who, What, When, Wh , Term, cost, etc.} AUTHORIZATION TO CALL FOR BIDS FOR THE EPHRATA LANDFILL PHASE 4 CONSTRUCTION PROJECT. BID OPENING SCHEDULED FOR JANUARY 9TH)2025 If necessary, was this document reviewed by accounting? ❑ YES ❑ NO 0 N/A If necessary, was this document reviewed by legal? ❑ YES ❑ NO 0 N/A DATE OF ACTION: I Z--` L&�'(-j APPROVE: DENIED ABSTAIN D2: �G D3: f� j DEFERRED OR CONTINUED TO: JS ' EC 0 5 2024 ,I 4/23/24 AUTHORIZATION TO CALL FOR BIDS Authorization given: December 10, 2024 to CALL FOR BIDS by the Department of Public Works for: Ephrata landfill Phase 4 Construction Bid opening date to be January 9, 2025 at 1:00 P.M. at the Grant County Public Works Department, 124 Enterprise St. S.E., Ephrata, WA 98823 BOARD OF COUNTY COMMISSIONERS GRANT COUNTY, WASHINGTON Yea Nay Abstain 0 El pp rr Cindy Carter, Chair Id ❑ ❑ Danny E tone, Vice - Chair E�/ ❑ ❑ Rob Jo(ne a er Approved: ATTEST: Interim Public Works Director Clerk of the Board 7 2025 Ephrata Landfill Phase 4 Construction Project Description The proposed construction includes the construction of a bottom lining and leachate collection system for the Phase 4 Development landfill area (approximately 14 acres) and double bottom -lining for the leachate pond. The project includes installation of a geosynthetic clay liner (GCL), installation of a 60-mil HDPE geomembrane liner, placement of a geotextile cushion layer, placement of 18 inches of leachate collection layer, landfill gas system piping, and other incidental work for the landfill. For the landfill gas system, includes a buried, perimeter manifold that connects to the existing flare facility, aboveground lateral pipes, connection to the existing horizontal gas trenches and leachate cleanouts. 2025 Ephrata Landfill Phase 4 Construction Form 05-PD-189/Rev. 06/2024 Engineer's Opinion (Estimate) of Probable Cost Project Name Ephrata Landfill Phase 4 Development Location G ra my County, WA Owner Grant County Public Works Department Estimated By: CYP Date: 10/11/2024 ITEM I SPEC NO. SECTION DESCRIPTION 1 N/A Mobilization 2 1-05.5(4) Surveying 3 1-07.28(4) Site Health and Safety 4 2-11.5 Trimming and Cleanup 5 2-03.5 Crushed Surfacing (In -Place) 6 2-03.5 Excavation, Haul, and Stockpile 7 2-03.5 Embankment and Compaction 8 2-03.5 GCL Bedding Layer from Offsite Borrow Area (In -Place) 9 2-03.5 Leachate Collection Layer from Offsite Borrow Area (In -Place) 10 2-03.5 Stormwater Ditch (In -Place) 11 7-06.6 6-inch HDPE Solid Wall Leachate Pipe 12 7-06.6 6-inch HDPE Perforated Leachate Pipe 13 7-10.6 4-inch HDPE Solid Wall LFG Pipe 14 7-10.6 6-inch HDPE Solid Wall LFG Pipe 15 7-10.6 8-inch HDPE Solid Wall LFG Pipe 16 7-10.6 LFG Wellheads 17 8-05.9 Geosynthetic Clay Liner (GCL) (In -Place) 18 8-05.9 60-mil HDPE Geomembrane (In -Place) 19 8-05.9 Geocomposite Drainage Layer (In -Place) 20 8-05.9 jStormwater Berm (In -Place) 21 8-05.9 Geomembrane Pipe Penetration Project No. 555-3746-00109.08 Date October 23, 2024 Checked By: DON Date: 10/23/2024 Approved By: Date: QTY UNIT UNIT PRICE TOTAL COST 1 LS $300,000.00 $300,000.00 1 LS $60,000.00 $60,000.00 1 LS $6,000.00 $6,000.00 1 LS $2,000.00 $2,000.00 900 CY $31.00 $27,900.00 27,000 CY $5.00 $135,000.00 14,000 CY $5.00 $70,000.00 8,000 CY $15.00 $120,000.00 24,000 CY $25.00 $600,000.00 2,000 LF $7.00 $14,000.00 370 LF $34.00 $12,580.00 1,500 LF $34.00 $51,000.00 1,300 LF $25.00 $32,500.00 560 LF $34.00 $19,040.00 1,600 LF $89.00 $142,400.00 11 EA $11,200.00 $123,200.00 48,000 SY $15.00 $720,000.00 48,000 SY $11.00 $528,000.00 48,000 SY $11.00 $528,000.00 1,500 LF $36.00 $54,000.00 2 EA $632.00 $1,264.00 Subtotal Project Cost $3,546,884 Sales Tax 8.2% $290,844 TOTAL PROJECT COST $3,837,728 Page 1 of 1