HomeMy WebLinkAboutResolution 24-120-CCGRANT COUNTY
COMMISSIONERS AGENDA MEETING REQUEST FORM
(Must be submitted to the Clerk of the Board by 12:00pm on Thursday)
REQUESTING DEPARTMENT: PUBLIC WORKS
REQUEST SUBMITTED BY: SHILO NELLIS
CONTACT PERSON ATTENDING ROUNDTABLE: ®AVE BREN
CONFIDENTIAL INFORMATION: DYES ENO
DATE: 11/13/24
PHONE: 509-754-6082
❑Agreement / Contract
DAP Vouchers
❑Appointment / Reappointment
❑ARPA Related
❑ Bids / RFPs / Quotes Award
❑ Bid Opening Scheduled
❑ Boards / Committees
❑ Budget
❑Computer Related
❑County Code
❑Emergency Purchase
❑Employee Rel.
❑ Facilities Related
❑ Financial
❑ Funds
® Hearing
❑ Invoices / Purchase Orders
❑ Grants — Fed/State/County
❑ Leases
❑ MOA / MOU
❑ Minutes
❑ Ordinances
❑ Out of State Travel
❑ Petty Cash
❑ Policies
❑ Proclamations
❑ Request for Purchase
0 Resolution
El Recommendation
❑Professional Serv/Consultant
❑Support Letter
❑Surplus Req.
[]Tax Levies
❑Thank You's
❑Tax Title Property
❑WSLCB
RESOLUTION FOR ANNUAL UPDATE OF THE PUBLIC WORKS ENGINEERING
SERVICES FEE'S POLICY
If necessary, was this document reviewed by accounting? ❑ YES
LEGA •
If this
w a w w s w s + r wgal for w w
----- -------- - -------
If necessary, was this document reviewed by legal? ❑ YES ❑ NO
DATE OF ACTION: 11. G
APPROVE: DENIED ABSTAIN
D1:
D2:
D3:
4/23/24
❑ N O ❑■ N /A
DEFERRED OR CONTINUED TO:
0 N/A
F-i E 0 1 1 ' E D
NOV 14 2024
r L < ANC NTY� OS S I. N!-.-RSr
ice..... �..�—..,...�...�: .� - —,s,�..=.�«�:�.�...a�,��..,•....n....
BOARD OF COUNTY COMMISSIONERS
Grant County, Washington
RESOLUTION NOTICE OF HEARING RESOLUTION No. 24- -CC
FOR ANNUAL UPDATE OF THE PUBLIC
WORKS ENGINEERING SERVICES
FEES POLICY
WHEREAS, Grant County Department of Public Works has a Services Fees Policy via
Resolution 24-01 S-CC; AND
WHEREAS, Public Works desires to provide annual updates to their fees; AND
WHEREAS, Public Works has requested the Board of Commissioners consider updating the
fees collected by their office and adopting an updated Fee Policy; AND
WHEREAS, A draft Public Works Services Fees Policy follows on attached EXHIBIT A.
NOW, THEREFORE, BE IT HEREBY RESOLVED THAT the Grant County Board of
Commissioners set a Public Hearing on the report and other related matters on December 10, 2024 at
3 : 3 0 pm.
DATED this day of November, 2024.
BOARD OF COUNTY COMMISSIONERS
Yea Nay Abstain ANT COUNT ASHINGTON
y t ,ariaT,
ATTEST: El F-1 F-1
Danny E. Stone, Vice Chair
I -In 7Barbara J. Vasquez � Gam%✓
Clerk of the Board � � F] Rob Jon tuber
Grant County Public Works
Operational Policy
# 25=01
Public Works
Engineering Services
Fees Policy
COUNTY ENGINEER STATEMENT
This policy has been prepared by me or was prepared
under my direct supervision. I have examined this
policy, and I recommend that it be approved.
County Road Engineer
BOARD OF GRANT COUNTY COMMISSIONERS
Cindy Carter, Chair
Danny E. Stone, Vice -Chair
Rob Jones, Member
ENGINEERING SERVICES FEES POLICY #25-01
EFFECTIVE 01-01-2025 PAGE:1
TABLE OF CONTENTS
PURPOSE AND SCOPE
3
ROADWAY PERMIT FEES
3
ROADWAY PETITION FEES
4
BUILDING PERMIT (GRADING AND STORMWATER REVIEW FEES)
5
LAND DEVELOPMENT (ENGINEERING &SURVEYING REVIEW FEES)
6
PAYMENTS
7
REVIEW DEPOSIT REFUNDS
7
PERMIT FEE REFUNDS
7
ANNUAL FEES UPDATES
7
ENGINEERING SERVICES FEES POLICY #25-01
EFFECTIVE 01-01-2025 PAGE:2
GRANT COUNTY PUBLIC WORKS POLICY
PUBLIC WORKS SERVICES FEES
Grant County Public Works is dedicated to ensuring Road Standards for both public
and private work within rights -of -way, easements, and properties owned by Grant
County. The following policy ensures that the costs for review, approval, and
inspection of private projects be borne by the private developer. In addition, this
policy provides for revenue and cost tracking of public works services and an annual
fee update.
1. PURPOSE AND SCOPE:
The purpose of the fees is to recover the costs of permit processing, petition
processing, engineering plans review, and construction inspection.
2. ROADWAY PERMIT FEES: Roadway permits provide permission for the use of
the public rights -of -way. Road permits can be processed administratively by
Engineering Staff under the supervision of the County Engineer.
Approach Permit
$100
Right -of -Way Permit
$200
Trail Permit
$200
Dust Control Permit
$ 0
Oversize/Overweight Permit
$ 0
Vegetation Maintenance Permit
$ 0 Initial, $50 Reinstatement
Memorial Sign Permit
$750, Includes Sign and Installation
• ONLINE APPLICATIONS: Roadway permit fees are paid by
credit card in the SmartGov permitting portal at time of online
application. Please see the Road Permits page on the Public
Works website for more information.
• PAPER APPLICATIONS: Paper applications can still be
received at the Public Works front counter but require a check
payment with the application. It should be noted that a paper
application will take longer to process, as the permit technician
will need to hand enter the application into the SmartGov
permitting portal.
ENGINEERING SERVICES FEES POLICY #25-01
EFFECTIVE 01-01-2025 PAGE:3
3. ROADWAY PETITION FEES: Roadway petitions require approval of the Board
of County Commissioners, with an open hearing process. Many simple Board
petitions have no charge, however petitions that provide permission for utilities
installation or permanent legal alterations to the public rights -of -way have fees as
follows:
Franchise Agreement
$800 SmartGov Fee to Public Works
$400 SmartGov Fee to Board of
County Commissioners
Right -of -Way Vacation Fees
A $1,500 SmartGov deposit is required
(Consultant Appraisal Costs)
to initiate appraisal consultant services.
Additional deposit may be required for
appraisal consultant fees above the
initial deposit.
Unused deposit amounts shall be
refiinded.
• ONLINE APPLICATIONS ONLY: Franchise Agreements and
Right -of -Way Vacations must be petitioned for online using the
SmartGov permitting portal. These petitions require credit card
payment to initiate the process. Please see the Road Petitions
page on the Public Works website for more information.
ENGINEERING SERVICES FEES POLICY #25-01
EFFECTIVE 01-01-2025 PAGER
4. BUILDING PERMITS - GRADING & STORMWATER REVIEW FEES:
Larger buildings typically have 500CY or more of cut/fill site grading and 5,000SF
or more of hard surface areas. These sites have engineered stormwater plans and
grading permit requirements as follows:
Site Grading Permit:
(Volumes outside building envelope only)
- 500CY---o :rLess
• 501 CY to I POCY
$100+ $20 each I OOCY over 500
1,001 CY -to 10,000CY2
-
00+120-eac 1 000Cly, over.. 1k
• 10,001CY to 1009000CY
$380+ $70 each 10,000CY over 10k
•-100,001 CY-or: More:
.'$10i0+.$40.each J00 OOOCY.over 100k,:
Stormwater Site Plan Review:
A $250 SmartGov review deposit for the
first (5) hours of staff review is required
to initiate stormwater review.
Stormwater review rates are,$50/ho-Lir
after the initial deposit is utilized.
Unused deposit amounts shall be
refunded.
ONLINE APPLICATIONS ONLY: Building permit
applications are processed online using the SmartGov permitting
portal. These applications require credit card payment to initiate
the process. Please see the Building Services page on the Grant
County website for more information.
ENGINEERING SERVICES FEES POLICY #25-01
EFFECTIVE 01-01-2025 PAGE:5
5. LAND DEVELOPMENT - ENGINEERING & SURVEYING REVIEW FEES:
Major development activities typically require both engineering and surveying
review, so there will be a deposit amount total for both. Major development
includes major plats, planned unit developments, and binding site plats. Small
divisions of land, like short plats, may only require surveying review, so there
would be a deposit amount for one item.
TECHNICAL COMPLETENESS & REVIEW DEPOSIT: The
engineering reviewer will review incoming land development
applications for technical completeness weekly, to determine if
engineered plans and review fees are required for application
completeness. The civil engineering design reviewer will setup a
SmartGov payment window and note the required engineered plans
and deposit for technical completeness of the application.
Short Plat Survey Map Review:
A $250 SmartGov review deposit for
Staff Review & Road Engineer Approval
the first (5) hours of staff review is
required to start.
Survey map review rates are $ 5 0/hour
after the initial deposit is utilized.
Unused deposit amounts shall be
reffiinded.
Major Development Survey Mgp Review:
A $ 5 00 SmartGov review deposit for
the first (10) hours of staff review is
Staff Review & Road Engineer Approval
(Major Plats, PUDs, and Binding Site Plans)
required to start.
Survey map review rates are $ 5 0/hour
after the initial deposit is utilized.
Unused deposit amounts shall be
refunded.
Development Plans Review:
A $500 SmartGov review deposit for
• Stormwater Plan
the first (10) hours of staff review is
• Grading Plans
required to start.
• Road Plans
Development review rates are $50/hour
after the initial deposit is utilized.
• Traffic Studies
• Construction Inspection
Unused deposit amounts shall be
refunded.
MISC - Private Address Markers
$25 Each
MISC - Private Road Signs
$250 Each
ENGINEERING SERVICES FEES POLICY #25-01
EFFECTIVE 01-01-2025 PAGE:6
6. PAYMENTS:
Engineering services fees must be paid prior to staff work being conducted. If the
fees are not paid, the application shall be considered incomplete and rejected
without processing. All fee payments can be made online by credit card through
the SmartGov portal.
7. REVIEW DEPOSIT REFUNDS:
Used review funds are non-refiindable, as staff has already conducted the work.
Unused review deposit funds will be refunded when the authorized applicant
cancels the project or automatically after the review process completion.
Reimbursement will be issued in the form of a check in the mail to the applicant of
record.
8. PERMIT FEE REFUNDS:
Permit fees are Non -Refundable.
9. ANNUAL FEES UPDATE:
Permit and review fees will be updated annually, typically in January of each year.
Fees are set by the County Road Engineer and subject to Board Approval annually.
ENGINEERING SERVICES FEES POLICY #25-01
EFFECTIVE 01-01-2025 PAGE:7