HomeMy WebLinkAboutAgreements/Contracts - Public WorksGRANT COUNTY
COMMISSIONERS AGENDA MEETING REQUEST FORM
(Must be submitted to the Clerk of the Board by 1200pm on Thursday)
REQUESTING DEPARTMENT-, PUBLIC WORKS
REQUEST SUBMITTED BY: SHILO NELL.IS
CONTACT PERSON ATTENDING ROUNDTABLE: DAVE BREN
CONFIDENTIAL INFORMATION: OYES ONO
DATE: 08/22/2024
PHONE:509-754-6082
--------------- --
MINE=.-
01
0Agreement / Contract
- -------
CIAP Vouchers
DAppointment / Reappointment
EJARPA Related
0131ids I RFPs,/ Quotes Award
013id Opening Scheduled
OBoards / Committees
El Budget
OCompu Computer Related
DCounty Code
DEmergency Purchase
[]Employee Rel.
n Facilities Related
n Financial
El Funds
[]Hearing
.0 Invoices / Purchase Orders
El Grants — Fed/State/Gounty
OLeases
OMOA / MOU
0 Minutes
00rdinances,
[]Out of State Travel
El Petty Cash
El Policies
0 Proclamations
0 Request for Purchase
[].Resolution
gRecommendation
[]Professional Sery/Consultant
OSuppod Letter
[]Surplus Req.
nTax Levies
OThank You's
DTax Title Property
OWSLCB
E..T L N dENb
V00Wt Wen.W
orrny'ot,'Otc!)
REQUEST FOR BOARD CHAIR TO SIGN ONLINE WITH DAVE BR EN F__0_R (5)
CRAB RAP ROA,D GRANT APPLICATIONS FOR,, W-NE, GRAND COULEE HILL,
- --- ----------- ------
4-NW/NE-, STRATFORD ROAD
I U-NE
If necessary, was thi's document reviewed. ..by accounting? 0 YES 11 NO 11 N/A
- - -----------
LEGAL REVIEW.
lfthh§ document reauires le al review route toletial for revii r to.submission.
If necessary, was this document reviewed by .legal? 0. YES F1 NO F-1 N/A
DATE OF ACTION:
APPROVE- DENIED ABSTAIN
DI
D2:
D3-
DEFERRED OR CONTINUED TO-
4/23/24
Biennium 2025-2027
Region: North East County: Grant
IDENTIFICATION
Project Name: U-NE
Six -Year T.1. P. Priority No:
Total Points: 35.900
Road Road FFC(s) TRC(s) BMP(s) EMP(s) Legislative
Number(s) Name(s) District
a2035 U-NE 07 -Rural Major T3-300,000 to 12.84 15.8 13
Collector 410007000
PROJECT TYPE
*Project Type: 2R - Resurface and Restore
DESCRIPTION OF PROPOSED IMPROVEMENTS - Attach Rating Worksheets
Roadway Structural Section, or Bridge Condition:
Describe structural deficiencies and proposed improvements in keeping with the attached roadway cross
section. (Proposed structural section details may change based on final design.)
xisting roadway shows a significant amount of transverse and longitudinal cracking. Work will include
)verlaying the entire roadway with 0.17' of HMA and placing crushed aggregate on the shoulders.
Horizontal Alignment:
Horizontal alignment meets current standards.
Vertical Alignment:
Vertical alignment meets current standards.
M
Existing roadway is 34' wide. This project will overlay the entire roadway with 0.17' of HMA.
Other: Clear Zone, Slopes, Guardrail, Illumination, signals etc.:
qo deficiencies at this time.
ESTIMATED FUNDING AND TIMING
Phase Est Total Cost RATA Amount Start Year End Year
Design/Prelim.
Engineering
Right of Way
Construction
TOTAL
$167000.00 $147400.00 March 02, January 04,
2026 2027
$0.00 $0.00
1 190 000.00$170717000.00 March 01, Aril
$ p 16, 2027
2027
$172067000.00 $110857400.00 Schedule of CRAB reimbursements for
Construction will be or dependent on Project
❑ Wetlands ❑ NIVIFS ❑ R.O.W. ❑ Shorelines
❑ RR ❑ USAC E ❑ WDFW ❑ Cultural (Hist. Arch.
Paleo.)
PROJECT NARRATIVE
❑ USFWS
❑
BIA ❑ HPA
❑ Tied (Other agency work)
❑
Other
U-NE Road is a rural major collector that runs north -south from I-90 to 3-NE and carries considerable
Ag and livestock traffic. This road also carries a high percentage of truck traffic. This project will
overlay the existing road with 0.17' of HMA and place shoulder rock.
LOCAL PROJECT APPROVAL
RAP Project Prospectus prepared under the Dam LY a WE Oct 8, 2024
Dave Bren, PE (Oct 8, 2024 09:08 PDT)
supervision of: Signature - County Engineer Date
ivy carte _ Oct 10 2024
Cindy Carter Oct 10, 2024 14:29 PDT)
RAP Project Prospectus submitted to CRAB with the Signature of Chair of the
1 p Board of County
approval of: Commissioners or County Date
Executive
Final ProspectusESig n(l 0438951)2024100811
50
Final Audit Report
2024-10-10
Created: 2024-10-08
By: CrabDocSign@crab.wa.gov CrabDocSign@crab.wa.gov (CrabDocSign@crab.wa.gov)
Status: Signed
Transaction ID: CBJCHBCAABAARTncP839133wtt2VLbkJffnUYzPkfPhS
"Final ProspectusESign (10438951)_202410081150" History
Document created by CrabDocSign@crab.wa.gov CrabDocSign@crab.wa.gov (CrabDocSign@crab.wa.gov)
2024-10-08 - 3:50:42 PM GMT
Document emailed to Dave Bren (dbren@grantcountywa.gov) for signature
2024-10-08 - 3:50:46 PM GMT
Email viewed by Dave Bren (dbren@grantcountywa.gov)
2024-10-08 - 4:07:52 PM GMT
Signer Dave Bren (dbren@grantcountywa.gov) entered name at signing as Dave Bren, PE
2024-10-08 - 4:08:28 PM GMT
Document e-signed by Dave Bren, PE (dbren@grantcountywa.gov)
Signature Date: 2024-10-08 - 4:08:30 PM GMT - Time Source: server
� Document emailed to Cindy Carter (ccarter@grantcountywa.gov) for signature
2024-10-08 - 4:08:31 PM GMT
� Email viewed by Cindy Carter (ccarter@grantcountywa.gov)
2024-10-08 - 926:36 PM GMT
Document e-signed by Cindy Carter (ccarter@grantcountywa.gov)
Signature Date: 2024-10-10 - 9:29:42 PM GMT - Time Source: server
Agreement completed.
2024-10-10 - 9:29:42 PM GMT
AA�iYASHIN; -70N S- TE Powered by
COUNTY ROAD Adobe
ADMINISTRATION BOARD Acrobat Sign
Biennium 2025-2027
Region: North East County: Grant
IDENTIFICATION
Project Name: 4-NW/NE (Dodson Road to Hiawatha Road)
Six -Year T.1. P. Priority No:
Total Points: 44.600
Road Road FFC(s) TRC(s) BMP(s) EMP(s) Legislative
Number(s) Name(s) District
)3004 4-NW/NE 07 -Rural Major T4-100,000 to 0 5.03 13
Collector 3007000
PROJECT TYPE
*Project Type: 2R - Resurface and Restore
DESCRIPTION OF PROPOSED IMPROVEMENTS - Attach Rating Worksheets
Roadway Structural Section, or Bridge Condition:
Describe structural deficiencies and proposed improvements in keeping with the attached roadway cross
section. (Proposed structural section details may change based on final design.)
Existing BST surface is showing distress due to traffic loads. The existing roadway will be ground up,
Nidened and re -compacted, crushed surfacing will be added to improve the load carry capacity, BST
Surface will be applied as the final wearing course and guardrail will be installed as needed.
Horizontal Alignment:
The horizontal alignment meets current standards.
Vertical Alignment:
The vertical alignment meets current standards.
Width:
This project will widen the existing road from 28' to 34'. The existing road consists of 2 - 12' lanes and
2'shoulders. The proposed project will have 2 - 12' lanes with 5' shoulders.
Other: Clear Zone, Slopes, Guardrail, Illumination, signals etc.:
The clear zone will be improved by removing obstructions, providing wider shoulders, and grading
mprovements as appropriate.
ESTIMATED FUNDING AND TIMING
Phase
Est Total Cost
RATA Amount
Start Year End Year
Design/Prelim.
$54)000.00
$481600.00
March 02, October 04,
Engineering
2026 2027
Right of Way
$0.00
$0.00
Construction
$271637000.00
$11 79461700.00
March 06, July 03, 2028
2028
TOTAL
$272177000.00
$119957300.00
Schedule of CRAB reimbursements for
Construction will be or dependent on Proje
OWatlana O NIVIR5 O R.O.W. O Shorelines O U8FW8 O Bk4 O HPA
�uUu��(H�tArch
O RR O US�E O W0� O ' O Tied (Other agency work) O Other
PROJECT NARRATIVE
Road 4-NW/NE is a rural major collector that runs east -west from Dodson road to Westshore Drive and
carries considerable Ag and livestock traffic. This road carries a high percentage of truck traffic and
can be subject to seasonal weight restrictions. This project will resurface the road with a new Class A
BST, add crushed surfacing to improve the load carry capacity and widen the pavement from 28 feet to
34 feet. Project work will include rotomilling, roadway excavation, embankment, crushed surfacing
base and top course, BST surfacing, drainage and permanent signing. Clear zone, side slopes and the
roadside environment will be evaluated for hazard removal/mitigation.
Slope flattening and/or guardrail, Structure and Obstruction removal and beveled approach pipes will
be installed per current design standards.
LOCAL PROJECT APPROVAL
RAP Project Prospectus prepared under the Octe12024
supervision of: S�natue-CountyEngi --------- Date ---
s�������-- Octu\zo24
RAP p 'eotpm�pe�uomubm��dtoC�AB��htheGigna�raofChair ofthe
~ Board of County approval of: Date
Commissioners or County
Final ProspectusESign(l 0438915) 202410
50
Final Audit Report
2024-10-10
Created: 2024-10-08
By: CrabDocSign@crab.wa.gov CrabDocSign@crab.wa.gov (CrabDocSign@crab.wa.gov)
Status: Signed
Transaction ID: CBJCHBCAABAArfzfCmmyD4jZSHKT6vil7tOvhg90ShU6
"Final ProspectusESign (10438915)_202410081150" History
u,e Document created by CrabDocSign@crab.wa.gov CrabDocSign@crab.wa.gov (CrabDocSign@crab.wa.gov)
2024-10-08 - 3:50:40 PM GMT
04 Document emailed to Dave Bren (dbren@grantcountywa.gov) for signature
2024-10-08 - 3:50:44 PM GMT
Email viewed by Dave Bren (dbren@grantcount)(wa.gov)
2024-10-08 - 3:52:25 PM GMT
Signer Dave Bren (dbren@grantcountywa.gov) entered name at signing as Dave Bren, PE
2024-10-08 - 4:06:52 PM GMT
Document e-signed by Dave Bren, PE (dbren@grantcountywa.gov)
Signature Date: 2024-10-08 - 4:06:54 PM GMT - Time Source: server
,` 14 Document emailed to Cindy Carter (ccarter@grantcountywa.gov) for signature
2024-10-08 - 4:06:57 PM GMT
Email viewed by Cindy Carter (ccarter@grantcountywa.gov)
2024-10-10 - 9:27:08 PM GMT
Document e-signed by Cindy Carter (ccarter@grantcountywa.gov)
Signature Date: 2024-10-10 - 9:28:37 PM GMT - Time Source: server
Q Agreement completed.
2024-10-10 - 9:2837 PM GMT
rr' +FtINQ N s�.a Powered by
COUNTY ROAD Adobe
ADMINISTRATION BOARD Acrobat Sign
Biennium 2025-2027
Region: North East County: Grant
IDENTIFICATION
Project Name: W NE
Six -Year T. I. P. Priority No:
Total Points: 54.000
Road Road FFC(s) TRC(s) BMP(s) EMP(s) Legislative
Number(s) Name(s) District
)5035 w-ne 07 -Rural Major T5-20,000 in 60 16.74 19.33 13
Collector days
PROJECT TYPE
`Project Type: 3R - Rehabilitate, Resurface, Restore
DESCRIPTION OF PROPOSED IMPROVEMENTS - Attach Rating Worksheets
Roadway Structural Section, or Bridge Condition:
Describe structural deficiencies and proposed improvements in keeping with the attached roadway cross
section. (Proposed structural section details may change based on final design.)
xisting BST surface is showing distress due to traffic loads. The existing roadway will be ground up,
ividened and re -compacted, crushed surfacing will be added to improve the load carry capacity, BST
Surface will be applied as the final wearing course and guardrail will be installed as needed.
Horizontal Alignment:
Several horizontal curves in the project area are below the minimum design speed standards and will
oe improved and guardrail added where required.
Vertical Alignment:
Minor Changes in vertical alignment is anticipated.
Width:
This project will widen the existing road from 22' to 30'. The existing road consists of 2 - 11' lanes. The
Droposed project will have 2 - 12' lanes with 3' shoulders.
Other: Clear Zone, Slopes, Guardrail, Illumination, signals etc.:
The clear zone will be improved by removing obstructions, providing wider shoulders, and grading
mprovements as appropriate.
ESTIMATED FUNDING AND TIMING
Phase
Est Total Cost
RATA Amount
Start Year End Year
Design/Prelim.
$49,000.00
$447100.00
June 02, January 05,
Engineering2025
2026
Right of Way
$0.00
$0.00
Construction
$172177000.00
$1,095,300.00
March 02, July 06, 2026
2026
TOTAL
$172667000.00
$111397400.00
Schedule of CRAB reimbursements for
I
Construction will be or dependent on Project
r-1 Wetlands F1 NIVIFS F-i R.O.W. R Shorelines R USFWS Ej BIA E] HPA
F1 RR E] USACE E] WDFW F1 Cultural (Hist. Arch. F-I Tied (Other agency work ) Fi Other
Paleo.)
PROJECT NARRATIVE
This is a rural major collector road with significant horizontal and vertical deficiencies. This project will
widen the existing road from 22 feet to 30, update both horizontal and vertical curves to meet current
standards, add crushed surfacing to improve the subgrade, upgrade drainage structures and then BST
the surface. Also, flatten slopes and add guardrail as needed.
LOCAL PROJECT APPROVAL
I.:MM 6i"o
RAP Project Prospectus prepared under the Oct 11, 2024
Pave amn. Pr. (Oct ')9:" `6ii
supervision of: Signature - County Engineer Date
-,Q
'1'- 14 r Oct 14,2024
t110 14. 1�1.29 P�OT
RAP Project Prospectus submitted to CRAB with the Signature of Chair of the
approval of: Board of County Date
Commissioners or County
Executive
i nal Prospectus ES'ig n (10439029) 2024101112
55
Final Audit Report 2024-10-14
Created: 2024-10-11
By: CrabDocSign@crab.wa.gov CrabDocSign@crab.wa.gov (CrabDocSign@crab.wa.gov)
Status: Signed
Transaction ID: CBJCHBCAABAA1 o_gfrE4X9qKKnnyYfN2p48tqcnxWZeu
"FinalProspectusESign(10439029) 202410111255" History
Document created by CrabDocSign@crab.wa.gov CrabDocSign@crab.wa.gov (CrabDocSign@crab.wa.gov)
2024-10-11 - 4:55:45 PM GMT
Document emailed to Dave Bren (dbren@grantcountywa.gov) for signature
2024-10-11 - 4:55:49 PM GMT
Email viewed by Dave Bren (dbren@grantcountywa.gov)
2024-10-11 - 4:58:13 PM GMT
Signer Dave Bren (dbren@grantcountywa.gov) entered name at signing as Dave Bren, PE
2024-10-11 - 4:58:31 PM GMT
05!,� Document e-signed by Dave Bren, PE (dbren@grantcountywa.gov)
Signature Date: 2024-10-11 - 4:58:33 PM GMT - Time Source: server
Document emailed to Cindy Carter (ccarter@grantcountywa.gov) for signature
2024-10-11 - 4:58:35 PM GMT
Email viewed by Cindy Carter (ccarter@grantcountywa.gov)
2024-10-14 - 8:28:39 PM GMT
Document e-signed by Cindy Carter (ccarter@grantcountywa.gov)
Signature Date: 2024-10-14 - 8:29:03 PM GMT - Time Source: server
Agreement completed.
2024-10-14 - 8:29:03 PM GMT
'hVASH1N*i3Tr-1N 57ATE Powered by
COLINTY ROAD Adobe
ADMINISTRATION BOARD Atrobat Sign
Biennium 2025-2027
Region: North East County: Grant
IDENTIFICATION
Project Name: Grand Coulee Hill Road
Six -Year T. I. P. Priority No:
Total Points: 64.000
Road Road Name(s) FFC(s) TRC(s) BMP(s) EMP(s) Legislative
Number(s) District
Grand Coulee 07 -Rural Major Non Truck
�5039 Hill Collector Route 0 2.89 13
PROJECT TYPE
*Project Type: 3R - Rehabilitate, Resurface, Restore
DESCRIPTION OF PROPOSED IMPROVEMENTS - Attach Rating Worksheets
Roadway Structural Section, or Bridge Condition:
Describe structural deficiencies and proposed improvements in keeping with the attached roadway cross
section. (Proposed structural section details may change based on final design.)
existing BST surface is showing distress due to traffic loads. The existing roadway will be ground up,
ividened and re -compacted, crushed surfacing will be added to improve the load carry capacity, BST
surface will be applied as the final wearing course and guardrail will be installed as needed.
Horizontal Alignment:
several horizontal curves in the project area are below the minimum design speed standards and will
)e improved and guardrail added where required.
Vertical Alignment:
Minor Changes in vertical alignment is anticipated.
Width:
this project will widen the existing road from 20' to 30'. The existing road consists of 2 - 10' lanes. The
)roposed project will have 2 - 12' lanes with 3' shoulders.
Other: Clear Zone, Slopes, Guardrail, Illumination, signals etc.:
the clear zone will be improved by removing obstructions, providing wider shoulders, and grading
mprovements as appropriate.
ESTIMATED FUNDING AND TIMING
Phase
Est Total Cost
RATA Amount
Start Year End Year
Design/Prelim.
$61,000.00
$547900.00
January 01 7 March 01, 2027
Engineering2026
Right of Way
$0.00
$0.00
Construction
$172177000.00
$170957300.00
March 01, December 31,
2027 2027
TOTAL
$1,278,000.00
$171507200.00
Schedule of CRAB reimbursements for
I
Construction will be or dependent on Project
n Wetlands F1 NIVIFS ri R.O.W. F1 Shorelines E] US FWS E] BIA Ej HPA
n RR ❑ U SAC E E] WD FW E] Cultural (Hist. Arch. F1 Tied (Other agency work ) E] Other
Paleo.)
PROJECT NARRATIVE
This is a rural major collector road with significant horizontal and vertical deficiencies. This project will
widen the existing road from 20 feet to 30, update both horizontal and vertical curves to meet current
standards, add crushed surfacing to improve the subgrade, upgrade drainage structures and then BST
the surface. Also, flatten slopes and add guardrail as needed.
LOCAL PROJECT APPROVAL
RAP Project Prospectus prepared under the Oct 11) 2024
have Brorl. Pr. (Oct J ' 1. 2014 09;57 I'DT)
supervision of: Signature - County Engineer Date
Oct14 2024
Clndy�l Cl �11111 11, 11 �2� 13:29 �IIDT)
RAP Project Prospectus submitted to CRAB with the Signature of Chair of the
approval of: Board of County Date
Commissioners or County
Executive
F'InalProspectusES"ign(l _2024101112
55
Final Audit Report 2024-10-14
Created: 2024-10-11
By: CrabDocSign@crab.wa.gov CrabDocSign@crab.wa.gov (CrabDocSign@crab.wa.gov)
Status: Signed
Transaction ID: CBJCHBCAABAAVQAtMPZ1IaxUee_95713H3xRRwaB7ZA4
" Final Prospectus ESign (10438965)_202410111255" History
Document created by CrabDocSign@crab.wa.gov CrabDocSign@crab.wa.gov (CrabDocSign@crab.wa.gov)
2024-10-11 - 4:55:49 PM GMT
+ Document emailed to Dave Bren (dbren@grantcountywa.gov) for signature
2024-10-11 - 4:55:53 PM GMT
Email viewed by Dave Bren (dbren@grantcountywa.gov)
2024-10-11 - 4:57:27 PM GMT
Signer Dave Bren (dbren@grantcountywa.gov) entered name at signing as Dave Bren, PE
2024-10-11 - 4:57:47 PM GMT
Document e-signed by Dave Bren, PE (dbren@grantcount)(wa.gov)
Signature Date: 2024-10-11 - 4:57:49 PM GMT - Time Source: server
Document emailed to Cindy Carter (ccarter@grantcountywa.gov) for signature
2024-10-11 - 4:57:52 PM GMT
Email viewed by Cindy Carter (ccarter@grantcountywa.gov)
2024-10-14 - 8:29:36 PM GMT
0 Document e-signed by Cindy Carter (ccarter@grantcountywa.gov)
Signature Date: 2024-10-14 - 8:29:53 PM GMT - Time Source: server
fj Agreement completed.
2024-10-14 - 8:29:53 PM GMT
'%%,A`aNIP +`air; It-J 57ATE POW4ered by
CAMUl' TY ROAD Adobe
ADMINISTRATION BOARD ,acrobat Sign
Biennium 2025-2027
Region: North East County: Grant
IDENTIFICATION
Project Name: Stratford Road - Phase 2
Six -Year T.I. P. Priority No: 17
Total Points: 43.190
Road Road FFC(s) TRC(s) BMP(s) EMP(s) Legislative
Number(s) Name(s) District
Stratford 07 -Rural Major T4-100,000 to
a4025 Road Collector 3001000 13.24 17.24 13
PROJECT TYPE
*Project Type: 2R - Resurface and Restore
DESCRIPTION OF PROPOSED IMPROVEMENTS - Attach Rating Worksheets
Roadway Structural Section, or Bridge Condition:
Describe structural deficiencies and proposed improvements in keeping with the attached roadway cross
section. (Proposed structural section details may change based on final design.)
Existing surface will be ground up and re -compacted for subgrade material, crushed surfacing will be
added to improve the load carry capacity. BST surfacing will be applied using County forces, as the
final wearing course.
Horizontal Alignment:
-lorizontal alignment meets current standards.
Vertical Alignment:
The vertical alignment meets current standards.
Width:
Fhe existing 30 foot roadway will be widened to 34 feet, comprised of 2 —12 foot lanes and 5 foot
ahoulders.
Other: Clear Zone, Slopes, Guardrail, Illumination, signals etc.:
fhe Clear Zone will be improved by Slope flatting and/or guardrail and hazard removal per the Design
clear Zone Inventory.
ESTIMATED FUNDING AND TIMING
Phase
Est Total Cost
RATA Amount
Start Year
End Year
Design/Prelim.
$1081000.00
$97, 200.00Engineering2025
May 01,
February 02,
2026
Wa of Right$0.00
g Y
August 04,
February 02,
2025
2026
Construction
$17190)000.00
$170711000.00
-.July 06,
October 12,
2026
2026
TOTAL
$1)298)000.00
$17168;200.00
Schedule of CRAB reimbursements
for
Construction will be or dependent on Project
❑ Wetlands ❑ NMFS ❑ R.O.W. ❑ Shorelines ❑ USFWS ❑ BIA ❑ HPA
❑ RR ❑ USACE ❑ WDFW ❑ Cultural (Hist. Arch. ❑ Tied agency Other a
Paleo. ( 9 Y work) ❑Other
PROJECT NARRATIVE
Stratford Road is a rural major collector that runs north -south from Moses Lake (State Route 17) to
State Route 28 and carries considerable Ag and livestock traffic. This road carries a high percentage of
truck traffic and can be subject to seasonal weight restrictions. This project will resurface the road with
a new Class A BST, add crushed surfacing to improve the load carry capacity and widen the pavement
from 29 feet to 34 feet. Project work will include rotomilling, roadway excavation, embankment,
crushed surfacing base and top course, BST surfacing, drainage and permanent signing. Clear zone,
side slopes and the roadside environment will be evaluated for hazard removal/mitigation.
LOCAL PROJECT APPROVAL
RAP Project Prospectus prepared under the h L Oct 11)2024
Dave Bam. PE (Oct 11, 7.6:.4 10:34 IIDT)
supervision of: Signature - County Engineer Date
t.(nJ; i:nreei Oct la, ;'tZa 1.'a•:ba IUT)�
Oct 14, 2024
RAP Project Prospectus submitted to CRAB with the Signature of Chair of the
Board of County
approval of: Commissioners or County Date
Executive
F'InalProspectusES'ign(l
00
Final Audit Report
2024-10-14
Created: 2024-10-11
By: CrabDocSign@crab.wa.gov CrabDocSign@crab.wa.gov (CrabDocSign@crab.wa.gov)
Status: Signed
Transaction ID: CBJCHBCAABAAWL29nAW3Hy2i_QRdJ-OabRgWd6L86J8F
"Final ProspectusESign (10438792)_202410111300" History
Document created by CrabDocSign@crab.wa.gov CrabDocSign@crab.wa.gov (CrabDocSign@crab.wa.gov)
2024-10-11 - 5:00:44 PM GMT
Document emailed to Dave Bren (dbren@grantcountywa.gov) for signature
2024-10-11 - 5:00:48 PM GMT
Email viewed by Dave Bren (dbren@grantcountywa.gov)
2024-10-11 - 5:34:19 PM GMT
Signer Dave Bren (dbren@grantcountywa.gov) entered name at signing as Dave Bren, PE
2024-10-11 - 5:34:35 PM GMT
6%,-Document e-signed by Dave Bren, PE (dbren@grantcountywa.gov)
Signature Date: 2024-10-11 - 5:34:37 PM GMT - Time Source: server
Document emailed to Cindy Carter (ccarter@grantcountywa.gov) for signature
2024-10-11 - 5:34:38 PM GMT
Email viewed by Cindy Carter (ccarter@grantcountywa.gov)
2024-10-14 - 8:44:09 PM GMT
Document e-signed by Cindy Carter (ccarter@grantcountywa.gov)
Signature Date: 2024-10-14 - 8:44:27 PM GMT - Time Source: server
Agreement completed.
2024-10-14 - 8:44:27 PM GMT
%VASHINGTON 5-AM Powered by
COUNTYROAD Adobe
ADMINISTRATION BOARD Acrobat Sign