Loading...
HomeMy WebLinkAboutAgreements/Contracts - Public WorksGRANT COUNTY COMMISSIONERS AGENDA MEETING REQUEST FORM (Must be submitted to the Clerk of the Board by 1200pm on Thursday) REQUESTING DEPARTMENT-, PUBLIC WORKS REQUEST SUBMITTED BY: SHILO NELL.IS CONTACT PERSON ATTENDING ROUNDTABLE: DAVE BREN CONFIDENTIAL INFORMATION: OYES ONO DATE: 08/22/2024 PHONE:509-754-6082 --------------- -- MINE=.- 01 0Agreement / Contract - ------- CIAP Vouchers DAppointment / Reappointment EJARPA Related 0131ids I RFPs,/ Quotes Award 013id Opening Scheduled OBoards / Committees El Budget OCompu Computer Related DCounty Code DEmergency Purchase []Employee Rel. n Facilities Related n Financial El Funds []Hearing .0 Invoices / Purchase Orders El Grants — Fed/State/Gounty OLeases OMOA / MOU 0 Minutes 00rdinances, []Out of State Travel El Petty Cash El Policies 0 Proclamations 0 Request for Purchase [].Resolution gRecommendation []Professional Sery/Consultant OSuppod Letter []Surplus Req. nTax Levies OThank You's DTax Title Property OWSLCB E..T L N dENb V00Wt Wen.W orrny'ot,'Otc!) REQUEST FOR BOARD CHAIR TO SIGN ONLINE WITH DAVE BR EN F__0_R (5) CRAB RAP ROA,D GRANT APPLICATIONS FOR,, W-NE, GRAND COULEE HILL, - --- ----------- ------ 4-NW/NE-, STRATFORD ROAD I U-NE If necessary, was thi's document reviewed. ..by accounting? 0 YES 11 NO 11 N/A - - ----------- LEGAL REVIEW. lfthh§ document reauires le al review route toletial for revii r to.submission. If necessary, was this document reviewed by .legal? 0. YES F1 NO F-1 N/A DATE OF ACTION: APPROVE- DENIED ABSTAIN DI D2: D3- DEFERRED OR CONTINUED TO- 4/23/24 Biennium 2025-2027 Region: North East County: Grant IDENTIFICATION Project Name: U-NE Six -Year T.1. P. Priority No: Total Points: 35.900 Road Road FFC(s) TRC(s) BMP(s) EMP(s) Legislative Number(s) Name(s) District a2035 U-NE 07 -Rural Major T3-300,000 to 12.84 15.8 13 Collector 410007000 PROJECT TYPE *Project Type: 2R - Resurface and Restore DESCRIPTION OF PROPOSED IMPROVEMENTS - Attach Rating Worksheets Roadway Structural Section, or Bridge Condition: Describe structural deficiencies and proposed improvements in keeping with the attached roadway cross section. (Proposed structural section details may change based on final design.) xisting roadway shows a significant amount of transverse and longitudinal cracking. Work will include )verlaying the entire roadway with 0.17' of HMA and placing crushed aggregate on the shoulders. Horizontal Alignment: Horizontal alignment meets current standards. Vertical Alignment: Vertical alignment meets current standards. M Existing roadway is 34' wide. This project will overlay the entire roadway with 0.17' of HMA. Other: Clear Zone, Slopes, Guardrail, Illumination, signals etc.: qo deficiencies at this time. ESTIMATED FUNDING AND TIMING Phase Est Total Cost RATA Amount Start Year End Year Design/Prelim. Engineering Right of Way Construction TOTAL $167000.00 $147400.00 March 02, January 04, 2026 2027 $0.00 $0.00 1 190 000.00$170717000.00 March 01, Aril $ p 16, 2027 2027 $172067000.00 $110857400.00 Schedule of CRAB reimbursements for Construction will be or dependent on Project ❑ Wetlands ❑ NIVIFS ❑ R.O.W. ❑ Shorelines ❑ RR ❑ USAC E ❑ WDFW ❑ Cultural (Hist. Arch. Paleo.) PROJECT NARRATIVE ❑ USFWS ❑ BIA ❑ HPA ❑ Tied (Other agency work) ❑ Other U-NE Road is a rural major collector that runs north -south from I-90 to 3-NE and carries considerable Ag and livestock traffic. This road also carries a high percentage of truck traffic. This project will overlay the existing road with 0.17' of HMA and place shoulder rock. LOCAL PROJECT APPROVAL RAP Project Prospectus prepared under the Dam LY a WE Oct 8, 2024 Dave Bren, PE (Oct 8, 2024 09:08 PDT) supervision of: Signature - County Engineer Date ivy carte _ Oct 10 2024 Cindy Carter Oct 10, 2024 14:29 PDT) RAP Project Prospectus submitted to CRAB with the Signature of Chair of the 1 p Board of County approval of: Commissioners or County Date Executive Final ProspectusESig n(l 0438951)2024100811 50 Final Audit Report 2024-10-10 Created: 2024-10-08 By: CrabDocSign@crab.wa.gov CrabDocSign@crab.wa.gov (CrabDocSign@crab.wa.gov) Status: Signed Transaction ID: CBJCHBCAABAARTncP839133wtt2VLbkJffnUYzPkfPhS "Final ProspectusESign (10438951)_202410081150" History Document created by CrabDocSign@crab.wa.gov CrabDocSign@crab.wa.gov (CrabDocSign@crab.wa.gov) 2024-10-08 - 3:50:42 PM GMT Document emailed to Dave Bren (dbren@grantcountywa.gov) for signature 2024-10-08 - 3:50:46 PM GMT Email viewed by Dave Bren (dbren@grantcountywa.gov) 2024-10-08 - 4:07:52 PM GMT Signer Dave Bren (dbren@grantcountywa.gov) entered name at signing as Dave Bren, PE 2024-10-08 - 4:08:28 PM GMT Document e-signed by Dave Bren, PE (dbren@grantcountywa.gov) Signature Date: 2024-10-08 - 4:08:30 PM GMT - Time Source: server � Document emailed to Cindy Carter (ccarter@grantcountywa.gov) for signature 2024-10-08 - 4:08:31 PM GMT � Email viewed by Cindy Carter (ccarter@grantcountywa.gov) 2024-10-08 - 926:36 PM GMT Document e-signed by Cindy Carter (ccarter@grantcountywa.gov) Signature Date: 2024-10-10 - 9:29:42 PM GMT - Time Source: server Agreement completed. 2024-10-10 - 9:29:42 PM GMT AA�iYASHIN; -70N S- TE Powered by COUNTY ROAD Adobe ADMINISTRATION BOARD Acrobat Sign Biennium 2025-2027 Region: North East County: Grant IDENTIFICATION Project Name: 4-NW/NE (Dodson Road to Hiawatha Road) Six -Year T.1. P. Priority No: Total Points: 44.600 Road Road FFC(s) TRC(s) BMP(s) EMP(s) Legislative Number(s) Name(s) District )3004 4-NW/NE 07 -Rural Major T4-100,000 to 0 5.03 13 Collector 3007000 PROJECT TYPE *Project Type: 2R - Resurface and Restore DESCRIPTION OF PROPOSED IMPROVEMENTS - Attach Rating Worksheets Roadway Structural Section, or Bridge Condition: Describe structural deficiencies and proposed improvements in keeping with the attached roadway cross section. (Proposed structural section details may change based on final design.) Existing BST surface is showing distress due to traffic loads. The existing roadway will be ground up, Nidened and re -compacted, crushed surfacing will be added to improve the load carry capacity, BST Surface will be applied as the final wearing course and guardrail will be installed as needed. Horizontal Alignment: The horizontal alignment meets current standards. Vertical Alignment: The vertical alignment meets current standards. Width: This project will widen the existing road from 28' to 34'. The existing road consists of 2 - 12' lanes and 2'shoulders. The proposed project will have 2 - 12' lanes with 5' shoulders. Other: Clear Zone, Slopes, Guardrail, Illumination, signals etc.: The clear zone will be improved by removing obstructions, providing wider shoulders, and grading mprovements as appropriate. ESTIMATED FUNDING AND TIMING Phase Est Total Cost RATA Amount Start Year End Year Design/Prelim. $54)000.00 $481600.00 March 02, October 04, Engineering 2026 2027 Right of Way $0.00 $0.00 Construction $271637000.00 $11 79461700.00 March 06, July 03, 2028 2028 TOTAL $272177000.00 $119957300.00 Schedule of CRAB reimbursements for Construction will be or dependent on Proje OWatlana O NIVIR5 O R.O.W. O Shorelines O U8FW8 O Bk4 O HPA �uUu��(H�tArch O RR O US�E O W0� O ' O Tied (Other agency work) O Other PROJECT NARRATIVE Road 4-NW/NE is a rural major collector that runs east -west from Dodson road to Westshore Drive and carries considerable Ag and livestock traffic. This road carries a high percentage of truck traffic and can be subject to seasonal weight restrictions. This project will resurface the road with a new Class A BST, add crushed surfacing to improve the load carry capacity and widen the pavement from 28 feet to 34 feet. Project work will include rotomilling, roadway excavation, embankment, crushed surfacing base and top course, BST surfacing, drainage and permanent signing. Clear zone, side slopes and the roadside environment will be evaluated for hazard removal/mitigation. Slope flattening and/or guardrail, Structure and Obstruction removal and beveled approach pipes will be installed per current design standards. LOCAL PROJECT APPROVAL RAP Project Prospectus prepared under the Octe12024 supervision of: S�natue-CountyEngi --------- Date --- s�������-- Octu\zo24 RAP p 'eotpm�pe�uomubm��dtoC�AB��htheGigna�raofChair ofthe ~ Board of County approval of: Date Commissioners or County Final ProspectusESign(l 0438915) 202410 50 Final Audit Report 2024-10-10 Created: 2024-10-08 By: CrabDocSign@crab.wa.gov CrabDocSign@crab.wa.gov (CrabDocSign@crab.wa.gov) Status: Signed Transaction ID: CBJCHBCAABAArfzfCmmyD4jZSHKT6vil7tOvhg90ShU6 "Final ProspectusESign (10438915)_202410081150" History u,e Document created by CrabDocSign@crab.wa.gov CrabDocSign@crab.wa.gov (CrabDocSign@crab.wa.gov) 2024-10-08 - 3:50:40 PM GMT 04 Document emailed to Dave Bren (dbren@grantcountywa.gov) for signature 2024-10-08 - 3:50:44 PM GMT Email viewed by Dave Bren (dbren@grantcount)(wa.gov) 2024-10-08 - 3:52:25 PM GMT Signer Dave Bren (dbren@grantcountywa.gov) entered name at signing as Dave Bren, PE 2024-10-08 - 4:06:52 PM GMT Document e-signed by Dave Bren, PE (dbren@grantcountywa.gov) Signature Date: 2024-10-08 - 4:06:54 PM GMT - Time Source: server ,` 14 Document emailed to Cindy Carter (ccarter@grantcountywa.gov) for signature 2024-10-08 - 4:06:57 PM GMT Email viewed by Cindy Carter (ccarter@grantcountywa.gov) 2024-10-10 - 9:27:08 PM GMT Document e-signed by Cindy Carter (ccarter@grantcountywa.gov) Signature Date: 2024-10-10 - 9:28:37 PM GMT - Time Source: server Q Agreement completed. 2024-10-10 - 9:2837 PM GMT rr' +FtINQ N s�.a Powered by COUNTY ROAD Adobe ADMINISTRATION BOARD Acrobat Sign Biennium 2025-2027 Region: North East County: Grant IDENTIFICATION Project Name: W NE Six -Year T. I. P. Priority No: Total Points: 54.000 Road Road FFC(s) TRC(s) BMP(s) EMP(s) Legislative Number(s) Name(s) District )5035 w-ne 07 -Rural Major T5-20,000 in 60 16.74 19.33 13 Collector days PROJECT TYPE `Project Type: 3R - Rehabilitate, Resurface, Restore DESCRIPTION OF PROPOSED IMPROVEMENTS - Attach Rating Worksheets Roadway Structural Section, or Bridge Condition: Describe structural deficiencies and proposed improvements in keeping with the attached roadway cross section. (Proposed structural section details may change based on final design.) xisting BST surface is showing distress due to traffic loads. The existing roadway will be ground up, ividened and re -compacted, crushed surfacing will be added to improve the load carry capacity, BST Surface will be applied as the final wearing course and guardrail will be installed as needed. Horizontal Alignment: Several horizontal curves in the project area are below the minimum design speed standards and will oe improved and guardrail added where required. Vertical Alignment: Minor Changes in vertical alignment is anticipated. Width: This project will widen the existing road from 22' to 30'. The existing road consists of 2 - 11' lanes. The Droposed project will have 2 - 12' lanes with 3' shoulders. Other: Clear Zone, Slopes, Guardrail, Illumination, signals etc.: The clear zone will be improved by removing obstructions, providing wider shoulders, and grading mprovements as appropriate. ESTIMATED FUNDING AND TIMING Phase Est Total Cost RATA Amount Start Year End Year Design/Prelim. $49,000.00 $447100.00 June 02, January 05, Engineering2025 2026 Right of Way $0.00 $0.00 Construction $172177000.00 $1,095,300.00 March 02, July 06, 2026 2026 TOTAL $172667000.00 $111397400.00 Schedule of CRAB reimbursements for I Construction will be or dependent on Project r-1 Wetlands F1 NIVIFS F-i R.O.W. R Shorelines R USFWS Ej BIA E] HPA F1 RR E] USACE E] WDFW F1 Cultural (Hist. Arch. F-I Tied (Other agency work ) Fi Other Paleo.) PROJECT NARRATIVE This is a rural major collector road with significant horizontal and vertical deficiencies. This project will widen the existing road from 22 feet to 30, update both horizontal and vertical curves to meet current standards, add crushed surfacing to improve the subgrade, upgrade drainage structures and then BST the surface. Also, flatten slopes and add guardrail as needed. LOCAL PROJECT APPROVAL I.:MM 6i"o RAP Project Prospectus prepared under the Oct 11, 2024 Pave amn. Pr. (Oct ')9:" `6ii supervision of: Signature - County Engineer Date -,Q '1'- 14 r Oct 14,2024 t110 14. 1�1.29 P�OT RAP Project Prospectus submitted to CRAB with the Signature of Chair of the approval of: Board of County Date Commissioners or County Executive i nal Prospectus ES'ig n (10439029) 2024101112 55 Final Audit Report 2024-10-14 Created: 2024-10-11 By: CrabDocSign@crab.wa.gov CrabDocSign@crab.wa.gov (CrabDocSign@crab.wa.gov) Status: Signed Transaction ID: CBJCHBCAABAA1 o_gfrE4X9qKKnnyYfN2p48tqcnxWZeu "FinalProspectusESign(10439029) 202410111255" History Document created by CrabDocSign@crab.wa.gov CrabDocSign@crab.wa.gov (CrabDocSign@crab.wa.gov) 2024-10-11 - 4:55:45 PM GMT Document emailed to Dave Bren (dbren@grantcountywa.gov) for signature 2024-10-11 - 4:55:49 PM GMT Email viewed by Dave Bren (dbren@grantcountywa.gov) 2024-10-11 - 4:58:13 PM GMT Signer Dave Bren (dbren@grantcountywa.gov) entered name at signing as Dave Bren, PE 2024-10-11 - 4:58:31 PM GMT 05!,� Document e-signed by Dave Bren, PE (dbren@grantcountywa.gov) Signature Date: 2024-10-11 - 4:58:33 PM GMT - Time Source: server Document emailed to Cindy Carter (ccarter@grantcountywa.gov) for signature 2024-10-11 - 4:58:35 PM GMT Email viewed by Cindy Carter (ccarter@grantcountywa.gov) 2024-10-14 - 8:28:39 PM GMT Document e-signed by Cindy Carter (ccarter@grantcountywa.gov) Signature Date: 2024-10-14 - 8:29:03 PM GMT - Time Source: server Agreement completed. 2024-10-14 - 8:29:03 PM GMT 'hVASH1N*i3Tr-1N 57ATE Powered by COLINTY ROAD Adobe ADMINISTRATION BOARD Atrobat Sign Biennium 2025-2027 Region: North East County: Grant IDENTIFICATION Project Name: Grand Coulee Hill Road Six -Year T. I. P. Priority No: Total Points: 64.000 Road Road Name(s) FFC(s) TRC(s) BMP(s) EMP(s) Legislative Number(s) District Grand Coulee 07 -Rural Major Non Truck �5039 Hill Collector Route 0 2.89 13 PROJECT TYPE *Project Type: 3R - Rehabilitate, Resurface, Restore DESCRIPTION OF PROPOSED IMPROVEMENTS - Attach Rating Worksheets Roadway Structural Section, or Bridge Condition: Describe structural deficiencies and proposed improvements in keeping with the attached roadway cross section. (Proposed structural section details may change based on final design.) existing BST surface is showing distress due to traffic loads. The existing roadway will be ground up, ividened and re -compacted, crushed surfacing will be added to improve the load carry capacity, BST surface will be applied as the final wearing course and guardrail will be installed as needed. Horizontal Alignment: several horizontal curves in the project area are below the minimum design speed standards and will )e improved and guardrail added where required. Vertical Alignment: Minor Changes in vertical alignment is anticipated. Width: this project will widen the existing road from 20' to 30'. The existing road consists of 2 - 10' lanes. The )roposed project will have 2 - 12' lanes with 3' shoulders. Other: Clear Zone, Slopes, Guardrail, Illumination, signals etc.: the clear zone will be improved by removing obstructions, providing wider shoulders, and grading mprovements as appropriate. ESTIMATED FUNDING AND TIMING Phase Est Total Cost RATA Amount Start Year End Year Design/Prelim. $61,000.00 $547900.00 January 01 7 March 01, 2027 Engineering2026 Right of Way $0.00 $0.00 Construction $172177000.00 $170957300.00 March 01, December 31, 2027 2027 TOTAL $1,278,000.00 $171507200.00 Schedule of CRAB reimbursements for I Construction will be or dependent on Project n Wetlands F1 NIVIFS ri R.O.W. F1 Shorelines E] US FWS E] BIA Ej HPA n RR ❑ U SAC E E] WD FW E] Cultural (Hist. Arch. F1 Tied (Other agency work ) E] Other Paleo.) PROJECT NARRATIVE This is a rural major collector road with significant horizontal and vertical deficiencies. This project will widen the existing road from 20 feet to 30, update both horizontal and vertical curves to meet current standards, add crushed surfacing to improve the subgrade, upgrade drainage structures and then BST the surface. Also, flatten slopes and add guardrail as needed. LOCAL PROJECT APPROVAL RAP Project Prospectus prepared under the Oct 11) 2024 have Brorl. Pr. (Oct J ' 1. 2014 09;57 I'DT) supervision of: Signature - County Engineer Date Oct14 2024 Clndy�l Cl �11111 11, 11 �2� 13:29 �IIDT) RAP Project Prospectus submitted to CRAB with the Signature of Chair of the approval of: Board of County Date Commissioners or County Executive F'InalProspectusES"ign(l _2024101112 55 Final Audit Report 2024-10-14 Created: 2024-10-11 By: CrabDocSign@crab.wa.gov CrabDocSign@crab.wa.gov (CrabDocSign@crab.wa.gov) Status: Signed Transaction ID: CBJCHBCAABAAVQAtMPZ1IaxUee_95713H3xRRwaB7ZA4 " Final Prospectus ESign (10438965)_202410111255" History Document created by CrabDocSign@crab.wa.gov CrabDocSign@crab.wa.gov (CrabDocSign@crab.wa.gov) 2024-10-11 - 4:55:49 PM GMT + Document emailed to Dave Bren (dbren@grantcountywa.gov) for signature 2024-10-11 - 4:55:53 PM GMT Email viewed by Dave Bren (dbren@grantcountywa.gov) 2024-10-11 - 4:57:27 PM GMT Signer Dave Bren (dbren@grantcountywa.gov) entered name at signing as Dave Bren, PE 2024-10-11 - 4:57:47 PM GMT Document e-signed by Dave Bren, PE (dbren@grantcount)(wa.gov) Signature Date: 2024-10-11 - 4:57:49 PM GMT - Time Source: server Document emailed to Cindy Carter (ccarter@grantcountywa.gov) for signature 2024-10-11 - 4:57:52 PM GMT Email viewed by Cindy Carter (ccarter@grantcountywa.gov) 2024-10-14 - 8:29:36 PM GMT 0 Document e-signed by Cindy Carter (ccarter@grantcountywa.gov) Signature Date: 2024-10-14 - 8:29:53 PM GMT - Time Source: server fj Agreement completed. 2024-10-14 - 8:29:53 PM GMT '%%,A`aNIP +`air; It-J 57ATE POW4ered by CAMUl' TY ROAD Adobe ADMINISTRATION BOARD ,acrobat Sign Biennium 2025-2027 Region: North East County: Grant IDENTIFICATION Project Name: Stratford Road - Phase 2 Six -Year T.I. P. Priority No: 17 Total Points: 43.190 Road Road FFC(s) TRC(s) BMP(s) EMP(s) Legislative Number(s) Name(s) District Stratford 07 -Rural Major T4-100,000 to a4025 Road Collector 3001000 13.24 17.24 13 PROJECT TYPE *Project Type: 2R - Resurface and Restore DESCRIPTION OF PROPOSED IMPROVEMENTS - Attach Rating Worksheets Roadway Structural Section, or Bridge Condition: Describe structural deficiencies and proposed improvements in keeping with the attached roadway cross section. (Proposed structural section details may change based on final design.) Existing surface will be ground up and re -compacted for subgrade material, crushed surfacing will be added to improve the load carry capacity. BST surfacing will be applied using County forces, as the final wearing course. Horizontal Alignment: -lorizontal alignment meets current standards. Vertical Alignment: The vertical alignment meets current standards. Width: Fhe existing 30 foot roadway will be widened to 34 feet, comprised of 2 —12 foot lanes and 5 foot ahoulders. Other: Clear Zone, Slopes, Guardrail, Illumination, signals etc.: fhe Clear Zone will be improved by Slope flatting and/or guardrail and hazard removal per the Design clear Zone Inventory. ESTIMATED FUNDING AND TIMING Phase Est Total Cost RATA Amount Start Year End Year Design/Prelim. $1081000.00 $97, 200.00Engineering2025 May 01, February 02, 2026 Wa of Right$0.00 g Y August 04, February 02, 2025 2026 Construction $17190)000.00 $170711000.00 -.July 06, October 12, 2026 2026 TOTAL $1)298)000.00 $17168;200.00 Schedule of CRAB reimbursements for Construction will be or dependent on Project ❑ Wetlands ❑ NMFS ❑ R.O.W. ❑ Shorelines ❑ USFWS ❑ BIA ❑ HPA ❑ RR ❑ USACE ❑ WDFW ❑ Cultural (Hist. Arch. ❑ Tied agency Other a Paleo. ( 9 Y work) ❑Other PROJECT NARRATIVE Stratford Road is a rural major collector that runs north -south from Moses Lake (State Route 17) to State Route 28 and carries considerable Ag and livestock traffic. This road carries a high percentage of truck traffic and can be subject to seasonal weight restrictions. This project will resurface the road with a new Class A BST, add crushed surfacing to improve the load carry capacity and widen the pavement from 29 feet to 34 feet. Project work will include rotomilling, roadway excavation, embankment, crushed surfacing base and top course, BST surfacing, drainage and permanent signing. Clear zone, side slopes and the roadside environment will be evaluated for hazard removal/mitigation. LOCAL PROJECT APPROVAL RAP Project Prospectus prepared under the h L Oct 11)2024 Dave Bam. PE (Oct 11, 7.6:.4 10:34 IIDT) supervision of: Signature - County Engineer Date t.(nJ; i:nreei Oct la, ;'tZa 1.'a•:ba IUT)� Oct 14, 2024 RAP Project Prospectus submitted to CRAB with the Signature of Chair of the Board of County approval of: Commissioners or County Date Executive F'InalProspectusES'ign(l 00 Final Audit Report 2024-10-14 Created: 2024-10-11 By: CrabDocSign@crab.wa.gov CrabDocSign@crab.wa.gov (CrabDocSign@crab.wa.gov) Status: Signed Transaction ID: CBJCHBCAABAAWL29nAW3Hy2i_QRdJ-OabRgWd6L86J8F "Final ProspectusESign (10438792)_202410111300" History Document created by CrabDocSign@crab.wa.gov CrabDocSign@crab.wa.gov (CrabDocSign@crab.wa.gov) 2024-10-11 - 5:00:44 PM GMT Document emailed to Dave Bren (dbren@grantcountywa.gov) for signature 2024-10-11 - 5:00:48 PM GMT Email viewed by Dave Bren (dbren@grantcountywa.gov) 2024-10-11 - 5:34:19 PM GMT Signer Dave Bren (dbren@grantcountywa.gov) entered name at signing as Dave Bren, PE 2024-10-11 - 5:34:35 PM GMT 6%,-Document e-signed by Dave Bren, PE (dbren@grantcountywa.gov) Signature Date: 2024-10-11 - 5:34:37 PM GMT - Time Source: server Document emailed to Cindy Carter (ccarter@grantcountywa.gov) for signature 2024-10-11 - 5:34:38 PM GMT Email viewed by Cindy Carter (ccarter@grantcountywa.gov) 2024-10-14 - 8:44:09 PM GMT Document e-signed by Cindy Carter (ccarter@grantcountywa.gov) Signature Date: 2024-10-14 - 8:44:27 PM GMT - Time Source: server Agreement completed. 2024-10-14 - 8:44:27 PM GMT %VASHINGTON 5-AM Powered by COUNTYROAD Adobe ADMINISTRATION BOARD Acrobat Sign