PUD Large Electrical Service Application
Grant PUD uses this application to determine a scope and study of connection requirements at the
customer's service point for electrical service above 500KW. The applicant should attempt to fill in as
much of the form as possible. The applicant will receive a preliminary estimate for the utility interface
requirements that may be used in calculating the overall project requirements. Failure to accurately
complete this fora could result in additional costs and/or delays to the completion of your project.
Section 1: CONTACT INFORMATION
,
„ \\ �, \\\\\, � \, ,,, ,\, ...\\, \, a \\-,A \;a\\,\y,\\\,. \\ „\„ \,. �\ �\,\ ,\a .a,a\ „\�'\y aq•\ \'„\\\\,�\ \.� \. \\:e.��t \, \4,: \„v,>\\\\",..\,: 4�'), ;\„ �: ,,,\,4\ \..\,\\A\... \.�yu\k,\\\\\)a\�\..; '\\\�a,,, U�\4e t ,\\,.,,..\\ \\\�\)y\�\ \ ,,. ,\.4.\\•
Company Grant County Current Customer? yEs
Mailing Address
City Ephrata
35 C Street NW
Phone 509-754-6085
Cell
County Grant State WA
Company Coffman Engineers
Mailing Address
City Spokane
221 North Wall Street
Phone (509) 328-2994
Cell (509) 991-8120
Contact Name Tom Gaines
Email tgaines@grantcountywa.gov
County Spokane State WA
Contact Name Stephen Helms
Zip 99201
Email Stephen helms@coffman.com
,,Lontra"11- to
\ \
n\
\
Company Lydig Construction
Mailing Address 11001 East Montgomery Dr
City City of Spokane county
Phone (509) 534-0451
Cell (509) 868-1635
Spokane state WA zip 99206
Contact Name Marc Seeburcler
Email MSeeburaer(abLvdia.com
Additional or secondary contact information:
Arc Electric and Lighting Corp. Todd Bro (509) 999-1574 .v.
-4
GRANT PUD Lame power Solutions
Phone: (509) 766-2517 Email: Lar ePowerSolutions c ud.or :`, E..."' l
-Re Rade 1
Section 2: POWER REQUIREMENT
Demand Capacity
(MW) * Required 3
Will the electrical load be phased in? R YES
Prefer Overhead or underground service? ❑ OH
Will there be any generation at this facility? 9 YES
Average usage
(KWH)
❑ NO
R UG
❑ NO
If "Yes" what kind of interconnection do you
intend on using? L1 Open Transition ❑ Closed Transition
Start Date for Site Request Date for Power
Construction 05/01/2024 'Required 07/15/2024
Describe any power requirements at startup (i.e. commissioning, testing): We need 350KVA around
July 15th. October 1 st we will need 1,000 KVA for construction power. September of 2025 we will need the full 3MW.
Indicate special requirements for reliability, redundancy of equipment or coordination with UPS
systems:
Describe power quality issues that may affect Grant PUD equipment, (i.e. large motor loads <100hp,
chopped wave loads, harmonics, Installation of capacitors or filters, power factor)
VFD equip with input filters
Describe the diversity of the load, (i.e. hourly, monthly, and/or seasonally)
Seasonal load by heating and cooling requirments. Heat is all electric.
Section 3: SITE INFORMATION
Grant PUD will allow three -site locations for studies per application. Please provide additional site
location information on an attached document.
\ \„
\.\\a ,\
AM
\
\
• ♦ i • •
City Ephrata
Parcel # 160866003
State WA
Zoning Public Facilities Acres 29.99
Please list any other surveys, assessments, studies, etc. that have been conducted on the property:
Ph.1 & 2 environmental, Geo -Tech, Cultural, Traffic, Shrub -Steppe, Boundary Surveys, short plat is in process.
Note: At Grant PUD's discretion, large customers may be required to provide property rights for a substation to
serve their project either now or in the future.
GRANT PUD I Large Power Solutions
Phone: (509) 766-251.7 Email: Lar ePowerSolutions c ,ud.or
Rev. 10-20.9 — Page 2
SectUon4XBUSINESS INFORMATION
Type of Business NA|[S/SIC
~nenuremL Identifier
BN / Tax |D Number ��1-6001319 0nact Employee
* "�
neq"rem Count
Cash Payment E)
Deposit Options
Surety Bond 0 Letter of Credit 0
Note: Deposit is based on an average two-month billing for this address or comparable service and is
required before service is activated.
Section SXCHECK LIST
GJProvide aone-line diagram ofplant electrical facilities and number offeeders requested.
Rm Complete projected peak load by month section. If available, provide any additional or detailed load
ramp schedule associated tothe project.
[] Provide a plot plan for the proposed facility, to scale, in Auto -Cad including water, sewer, storm drain,
along with point ofdelivery for power.
1771 Provide if needed an attachment of two or less additional site locations with information. Needed in
section "Site information"
[] If applicable, indicate a proposed she plan to place a Grant PUD Substation that is accessible and
suitable for construction of electrical facilities. Assume the substation she will require a MINIMUM
of35Ofeet bv35Ofeet, level and well drained. Specific requirements will beprovide upon application
OHave legal land owner sign obligation form. (Required after customer site location confirmed.)
Section 6: FORECAST INFORMATION
GRANT PUD |Large Power Solutions
Additional Comments:
We understand that the fee for substation build out is $150,000 per mega watt with no fee for 2 megawatts or less. We propose the fee being subject to the
amount of power over 2 megawatt only. This would make a 3 megawatt service $150,000 instead of $450,000.
Note: This table will be used by engineering to plan construction and equipment purchases required by
facility based on future load growth. It will also be used for District load forecasting.
Section 7: SIGNATURE
Appficant Signature
Applicant understands the request and authorizes Grant PUD to begin planning for work listed on the
application form. Applicant agrees to pay appropriate application fee.
Base the fee by requested demand load. Some fees only need % upfront payment to hold
position in queue. Customers will be notified for remaining fee.
0.5 M W to 2 M W U p to z0 M W ---------------------------.-----,-.---„---------.--.-.-----.*-----,------------
-------.-..-,---.-------------,---.--�-
$2,500 $15,000 Over 40 MWz1,QQQ
Full Fee/2 Fee Full Fee
Upto 10 MW Up to 40 MW �-,--,,,,,,,-..,,,,,.,,,p„N„�,,,,-�,,,,,,,N,,.,,,,,,,,�a-,,,,,ti,,.,,,,,,,.,H,-„a�,,,,,,,-�.,�-�,,,.
$f 500 $52,000 goes not cover studies � scope.
Fee / Fee tonalo
----------....................._ - ---------- ------------ - °--- - - --- -- - -----------------------= - _ t Adds, t . 3
a £ a .
Evolving Industry? *Required
0 YES, I attest the industry of the requesting company to be on Grant PUD Evolving Industry list. Electrical
service will be under Rate Schedule 17.
[] NO, i attest the industry of the requesting company is not on the Evolving Industry list.
(Please contact Large Power Solutions team for additional information)
Signature acknowledges that the applicant has made best effort to fill and read application.
Printed Name: G , k
Title: �-
Signature: Date: --- 5 -
GRANT
PUD I targe Power Solations
Phone: (509) 706-2517 Email: Lar ePowerSolutions c ud.or Rev. 10--2019 — Page 4
Grant
Property Rights and Obligation
PUD I
This form may be filled out with Large Service Application or filled later after site selection. Please read
carefully and have property owner sign.
Name Grant County WA
Mailing Address
City Ephrata
35 C Street NW
Phone 509-754-6085
County Grant State WA
Representative Tom Gaines
Zip 98823
Public Utility District No. 2 of Grant County (Grant County PUD) will construct electrical facilities on
customer's property, if necessary. In exchange for part of value received, Customer grants Grant County
PUD the right to construct, operate, patrol, maintain and remove overhead and/or underground electrical
distribution lines and associated appurtenances. Customer grants Grant County PUD the right to clear the
area where the distribution equipment and facilities are located on the customer's property and keep the
same clear of brush, trees, timber, structures, improvements and all fire hazards. Customer also grants to
Grant County PUD the right of ingress and egress to and from Grant County PUD distribution electrical
facilities. Customer agrees not to place, construct or maintain any building, structures or other
improvements within a 10 foot area of Grant County PUD electrical facilities. Customer agrees not to
reduce or enlarge the clearances between the ground and any distribution lines within a 10 foot area of
Grant County PUD electrical facilities. Grant County PUD may seek and enforce specific performance of
any activities required of the customer by this section.
Legal Land Owner of Record Signature
Your signature indicates you have read and agree to Conditions stated in the "Rights and Obligations"
section.
Signature:
Date: �,',,;z