Loading...
HomeMy WebLinkAbout*Other - BOCCGrant PUD Large Electrical Service Application Grant PUD uses this application to determine a scope and study of connection requirements at the customer's service point for electrical service above 500KW. The applicant should attempt to fill in as much of the form as possible. The applicant will receive a preliminary estimate for the utility interface requirements that may be used in calculating the overall project requirements. Failure to accurately complete this fora could result in additional costs and/or delays to the completion of your project. Section 1: CONTACT INFORMATION , „ \\ �, \\\\\, � \, ,,, ,\, ...\\, \, a \\-,A \;a\\,\y,\\\,. \\ „\„ \,. �\ �\,\ ,\a .a,a\ „\�'\y aq•\ \'„\\\\,�\ \.� \. \\:e.��t \, \4,: \„v,>\\\\",..\,: 4�'), ;\„ �: ,,,\,4\ \..\,\\A\... \.�yu\k,\\\\\)a\�\..; '\\\�a,,, U�\4e t ,\\,.,,..\\ \\\�\)y\�\ \ ,,. ,\.4.\\• Company Grant County Current Customer? yEs Mailing Address City Ephrata 35 C Street NW Phone 509-754-6085 Cell County Grant State WA Company Coffman Engineers Mailing Address City Spokane 221 North Wall Street Phone (509) 328-2994 Cell (509) 991-8120 Contact Name Tom Gaines Email tgaines@grantcountywa.gov County Spokane State WA Contact Name Stephen Helms Zip 99201 Email Stephen helms@coffman.com ,,Lontra"11- to \ \ n\ \ Company Lydig Construction Mailing Address 11001 East Montgomery Dr City City of Spokane county Phone (509) 534-0451 Cell (509) 868-1635 Spokane state WA zip 99206 Contact Name Marc Seeburcler Email MSeeburaer(abLvdia.com Additional or secondary contact information: Arc Electric and Lighting Corp. Todd Bro (509) 999-1574 .v. -4 GRANT PUD Lame power Solutions Phone: (509) 766-2517 Email: Lar ePowerSolutions c ud.or :`, E..."' l -Re Rade 1 Section 2: POWER REQUIREMENT Demand Capacity (MW) * Required 3 Will the electrical load be phased in? R YES Prefer Overhead or underground service? ❑ OH Will there be any generation at this facility? 9 YES Average usage (KWH) ❑ NO R UG ❑ NO If "Yes" what kind of interconnection do you intend on using? L1 Open Transition ❑ Closed Transition Start Date for Site Request Date for Power Construction 05/01/2024 'Required 07/15/2024 Describe any power requirements at startup (i.e. commissioning, testing): We need 350KVA around July 15th. October 1 st we will need 1,000 KVA for construction power. September of 2025 we will need the full 3MW. Indicate special requirements for reliability, redundancy of equipment or coordination with UPS systems: Describe power quality issues that may affect Grant PUD equipment, (i.e. large motor loads <100hp, chopped wave loads, harmonics, Installation of capacitors or filters, power factor) VFD equip with input filters Describe the diversity of the load, (i.e. hourly, monthly, and/or seasonally) Seasonal load by heating and cooling requirments. Heat is all electric. Section 3: SITE INFORMATION Grant PUD will allow three -site locations for studies per application. Please provide additional site location information on an attached document. \ \„ \.\\a ,\ AM \ \ • ♦ i • • City Ephrata Parcel # 160866003 State WA Zoning Public Facilities Acres 29.99 Please list any other surveys, assessments, studies, etc. that have been conducted on the property: Ph.1 & 2 environmental, Geo -Tech, Cultural, Traffic, Shrub -Steppe, Boundary Surveys, short plat is in process. Note: At Grant PUD's discretion, large customers may be required to provide property rights for a substation to serve their project either now or in the future. GRANT PUD I Large Power Solutions Phone: (509) 766-251.7 Email: Lar ePowerSolutions c ,ud.or Rev. 10-20.9 — Page 2 SectUon4XBUSINESS INFORMATION Type of Business NA|[S/SIC ~nenuremL Identifier BN / Tax |D Number ��1-6001319 0nact Employee * "� neq"rem Count Cash Payment E) Deposit Options Surety Bond 0 Letter of Credit 0 Note: Deposit is based on an average two-month billing for this address or comparable service and is required before service is activated. Section SXCHECK LIST GJProvide aone-line diagram ofplant electrical facilities and number offeeders requested. Rm Complete projected peak load by month section. If available, provide any additional or detailed load ramp schedule associated tothe project. [] Provide a plot plan for the proposed facility, to scale, in Auto -Cad including water, sewer, storm drain, along with point ofdelivery for power. 1771 Provide if needed an attachment of two or less additional site locations with information. Needed in section "Site information" [] If applicable, indicate a proposed she plan to place a Grant PUD Substation that is accessible and suitable for construction of electrical facilities. Assume the substation she will require a MINIMUM of35Ofeet bv35Ofeet, level and well drained. Specific requirements will beprovide upon application OHave legal land owner sign obligation form. (Required after customer site location confirmed.) Section 6: FORECAST INFORMATION GRANT PUD |Large Power Solutions Additional Comments: We understand that the fee for substation build out is $150,000 per mega watt with no fee for 2 megawatts or less. We propose the fee being subject to the amount of power over 2 megawatt only. This would make a 3 megawatt service $150,000 instead of $450,000. Note: This table will be used by engineering to plan construction and equipment purchases required by facility based on future load growth. It will also be used for District load forecasting. Section 7: SIGNATURE Appficant Signature Applicant understands the request and authorizes Grant PUD to begin planning for work listed on the application form. Applicant agrees to pay appropriate application fee. Base the fee by requested demand load. Some fees only need % upfront payment to hold position in queue. Customers will be notified for remaining fee. 0.5 M W to 2 M W U p to z0 M W ---------------------------.-----,-.---„---------.--.-.-----.*-----,------------ -------.-..-,---.-------------,---.--�- $2,500 $15,000 Over 40 MWz1,QQQ Full Fee/2 Fee Full Fee Upto 10 MW Up to 40 MW �-,--,,,,,,,-..,,,,,.,,,p„N„�,,,,-�,,,,,,,N,,.,,,,,,,,�a-,,,,,ti,,.,,,,,,,.,H,-„a�,,,,,,,-�.,�-�,,,. $f 500 $52,000 goes not cover studies � scope. Fee / Fee tonalo ----------....................._ - ---------- ------------ - °--- - - --- -- - -----------------------= - _ t Adds, t . 3 a £ a . Evolving Industry? *Required 0 YES, I attest the industry of the requesting company to be on Grant PUD Evolving Industry list. Electrical service will be under Rate Schedule 17. [] NO, i attest the industry of the requesting company is not on the Evolving Industry list. (Please contact Large Power Solutions team for additional information) Signature acknowledges that the applicant has made best effort to fill and read application. Printed Name: G , k Title: �- Signature: Date: --- 5 - GRANT PUD I targe Power Solations Phone: (509) 706-2517 Email: Lar ePowerSolutions c ud.or Rev. 10--2019 — Page 4 Grant Property Rights and Obligation PUD I This form may be filled out with Large Service Application or filled later after site selection. Please read carefully and have property owner sign. Name Grant County WA Mailing Address City Ephrata 35 C Street NW Phone 509-754-6085 County Grant State WA Representative Tom Gaines Zip 98823 Public Utility District No. 2 of Grant County (Grant County PUD) will construct electrical facilities on customer's property, if necessary. In exchange for part of value received, Customer grants Grant County PUD the right to construct, operate, patrol, maintain and remove overhead and/or underground electrical distribution lines and associated appurtenances. Customer grants Grant County PUD the right to clear the area where the distribution equipment and facilities are located on the customer's property and keep the same clear of brush, trees, timber, structures, improvements and all fire hazards. Customer also grants to Grant County PUD the right of ingress and egress to and from Grant County PUD distribution electrical facilities. Customer agrees not to place, construct or maintain any building, structures or other improvements within a 10 foot area of Grant County PUD electrical facilities. Customer agrees not to reduce or enlarge the clearances between the ground and any distribution lines within a 10 foot area of Grant County PUD electrical facilities. Grant County PUD may seek and enforce specific performance of any activities required of the customer by this section. Legal Land Owner of Record Signature Your signature indicates you have read and agree to Conditions stated in the "Rights and Obligations" section. Signature: Date: �,',,;z GRANT PUD i Urge Power Solutions Phone: (509) 700-2517 Email: Lar ePowerSolutions c .ud.or Rev. 10--2019 - Page 1