Loading...
HomeMy WebLinkAboutAgreements/Contracts - RenewGRANT COUNTY COMMISSIONERS AGENDA MEETING REQUEST FORM (Must be submitted to the Clerk of the Board by 12:00pm on Thursday) REQUESTING DEPARTMENT: Renew REQUEST SUBMITTED BY: Pete Wyatt/Kevin Schmidt oare4/11 /2024 PHONE: 509-754-2011, Ext 3272 CONTACT PERSON ATTENDING ROUNDTABLE: Xevin Schmidt/Pete Wyatt CONFIDENTIAL INFORMATION: ❑YES ❑NO --------------- r ■ • • r • ■ ■ • r • r • r ■ • • • r / I % 'i// ����%/� / Basin Refrigeration's • • $161,364.24. budgeted 1 • • capital • • I he new chiller is has a long lead time for delivery and will not be • • until early If necessary, was this document reviewed by accounting? ❑ YES I1 NO If necessary, was this document reviewed by legal? * YES ❑ NO DATE OF ACTION: APPROVE: DENIED ABSTAIN D1: D2: D3: 4/8/24 DEFERRED OR CONTINUED TO: K24-117 CnNTRACT THIS CONTRACT ("Contract"), entered b and be, ,I, 1111V IC 1111�� Y U S�9 duly I organized wid operating under and by the Constitution and the laws of the State of Washington ("County'), and Basin Refrigeration and Heating Inc., UST No. 600..514..947, a company duly formed and doing business in the. State of Washington ("Contractor"). In consideration of the mutual promises and covenants contained herein, the parties hereto agree as follows: 1. Mork, of Contract/Scope of Work. The Contractor shall do all work and furnish all tools materials, equipment, and things of every descript" 5 # ion necessary to complete the tasks and scope of work as per this contract for the Grant County Renew Rooftop Chiller Replacement Project, RM2401, "Vork," means all work individually and collectively performed by the Contractor during the project. The Contractor will be responsible for supplying and doing all the work to complete the following: a Providing all equipment, materials, and labor needed to remove the existing rooftop chiller and re -install and commission the replacement rooftop chiller. b. Supplying replacement chiller unit refrigerants, oils, filters, and new contactors. e, Ally labor and materials to remove or modify supply Wi * nng, roofing, unit supports, or chilled water piping to allow space to remove old and install new chiller and re -connect WM"*ng, d Supply any pen -nits required for this project. e Ensure all technicians on site are certified to handle refrigerants and trained in all relevant safety protocols. f. Complete cleanup of the area once above is completed, •including butnot limited to, recovery and removal of equipment, trash, and debris. Contractor understands this is a Public Work subject to prevailing wage and the submission of intents) affidavits, and certified payroll as required by the Labor and Industries. 2. Project Site. The work shall be accomplished upon the real property commonly known as the Grant County Renew, situated on or about 840 E Plum Street Moses Lake, Washm-gtor4 or as maybe more specifically directed at the sole discretion of the County. 3. Pgke of Commencement and Date Of QMRI—efion. The Contractor shall commence 0 6 a e the work described herein upon receiving notice to proceed from •the County beginn* c mutually agreed upon by the parties after having obtained all necessar mg at a tune *ts/bonds. V Derrm Substantial completion of the work shall occur by April 1, 2025, unless delays beyond the control of either party cause the date to be extended. This date will not be extended without approval by the County. RM 2401 Rooftop Chiller Procurement & Install— Page I 4. Contract Sum and Terms. The agreed Contract sum ' except for provisions set forth below in Paragraph 13, and with payment of such Contract Sum subject to provisions set forth below in Paragraphs 8 and 11, and any other provision contained within the Contract which may affect such Contract Sum to be paid to Contractor, is as follows: Subtotal $148 860,00 Washington State Sales Tax _8.4% $12,504.24 Total $161364.24 Retainage (5% of Subtotal) $7 443.00 a R.etaina. Required for this project. A retainage bond is acceptable and preferred, 5 % retainage is required under RCW 60.28.001. The contract is over $35,000, requiring a notice of completion to be filed and approved before releasing retainage. b. Intents and Affidavits: Statements of intent topay prevailing wages and affidavits, of wages paid are required to be submitted to Washington State Labor and Industries according to RCW 39.12.040. c. Payment Interval and Billing: The Contractor shall submit a monthly billing statement and invoice to the County. Such billing statement and invoice shall set out the nature of the work performed, the time and materials involved, or the percentage of work completed as mutually agreed upon by the Contractor and the County. The County will pay such a statement and invoice within thirty i3 0) days of receipt. 5. Performance and PgMent Bonds: Required for this project. 6. Indemnity and Hold Harmless. The Contractor shall defend. ., indemnify; and hold the County, its officers, officials, employees, and volunteers harmless from any claims, injuries, damages, losses, or suits, including attorney fees, arising out of or in connection with the performance of the contract, except for injuries and damages caused by the sole negli'gence of the County. It is further specifically and expressly understood that the indemnification •provided herein constitutes the Contractor's waiver of immunity under Industrial Insurance, tide 5 1 RCW, solely for indemnification. The parties have mutually negotiated this waiver. The provisions of this section shall survive the expiration of tennination of this contract. 7. Insurance. The Contractor shall procure and maintain, for theduration of this contract,, insurance against claims for injuries to persons or damage to proper y •which may arise from or t ri fr in connection with the performance of the work hereunder by the Contractor, its agents, representatives, employees, or sub contractors. The Contractor shall provide a Certification of Insurance evidencing: RM 2401 Rooftop Chiller Procurement & Install— Page 2 a Automobile Liability insurance with limits no less than $ 1 $1, ANO •NO •combined bL single limit per accident for bodily injury and property damage- and Commercial GenqLLI Liability insurance written •on an occurrence'basis with limits no less than $1000,000• combined single limit per occurrence and $2,000,000 aggregate for personal injury, bodily injury, and property damage. Coverage shall include but not be limited to blanket contractual; products/completed operations; broad form property damage; explosion, collapse, and underground (XCU) if applicable; and employer's liability. Worker's Compensation insurance at the limits established by the State of Washington. I Any payment of deductible or self-insured retenflon shall be the Contractor's s ole responsibility. The County shall be named as an additional insured on the insurancepolic concerning work performed by or on behalf of the CoCntractor, and a copy of the endorsement naming the county as an additional insured shall be attached to the Certificate of Insurance. The Contractor's insurance shall be the primary insurance concerni• ng the County, and the County shall be given thirty (30) days prior written notice of any cancellation, suspension, or material change in coverage, & PaMents Withheld The County may wiffihold or nullify the whole or part of anypayment to such extent as may be necessary to protect the County from loss or damage for reaso including but not limited to: ns a Work not within the Contract. Reasonable evidence that the work required by the Contract cannot be completed for the unpaid balance of the contract sum. a Work by the County to correct defective work or complete the work. d Failure by the Contractor to perform work within this Contract. e Cost or liability that may occur to the Count due a to the Contractorls fault, a negligent acts, oromissions, PROVIDED: In any case where part or all of a payment is going to be withheld for unsatisfactory performance, the County shall notify the Contractor per RCS 3 9.76.011 (b). 0 d-4 Authority gLLpIMIX v. Suppose the Contractor fails toperform the work according to the requirements of the Contract Document. In that case the County shall provide written notice ofthe deficiency to the Contractor, and the Contractor shall ' have seven days to correct the deficiency in the work. Ifthe Contractor fails to correct the deficiency in the work within the seven days or to take and continue all appropriate steps to initiate the corrections * the event corrections cannot be in reasonably completed in the seven days, the County may, without prejudice to other remedies: (a) RM 2401 Rooftop Chiller Procurement & Install— Page 3 use County forces, other contractors, or other means to makegood the Contractor's deficiency, and (b) deduct from or nullify the Contractor's payments the cost of such effort as described in paragraph 8 of this agreement. 9. Warranty I e of Construction. In addition to any special warranties provided els where in the Contract Document and companion or applicable documents, the Contractor warrants that all work conforms to the requirements of the Contract and is free of any defect in equipment, material, or design ftimished or work-manship performed by the Contractor. Concerning all warranties, express or implied,' for work performed or materials famished according to the Contract and companion or applicable documents, the Contractor shall., a Obtain all warranties that would be given in standard commercialpractice. h Require A warranties to be executed, in writing, for the benefit of the •County; and a Enforce all warranties for the benefit of the County, if directed by the County, including any subcontractor's, manufacturer's, or supplier's warrant that extends beyond the period specified in the Contract. d The obligations under this Section shall survive completion. 10, &Lcessors and As. The County and Contractor respectively bind themselves, their partners, successors, assigns, and legal representatives to the other party hereto and to partners, successors, assigns, and legal representatives of such other party regarding covenants agreements, and obligations contained in the Contract. Neither party shall assign the woTk' without the written consent of the other. If either party attempts to assign without such consent, that party shall remain legally responsible for all obligations outlined in the Contract. Chances in Work. The County may, at any time and without notice tothe Contractor's surety, order additions, deletions, revisions, or other changes in the work. Thesechanges i the work shall be incorporated into the Contract Document through the execution of Change Orders. Suppose any change in the work ordered by the County causes an increase or decrease in the Contract Sum or the performance time. In that case, ane adjustment shall be made, and such adjustments(s) shall be incorporated M*to a Change Order. If the County desires to order a change in the work, it may request a written Change Order proposal from the Contractor. The contractor shall submit a Change Order proposal within 14 days of the request from the County or * within such other period as mutually agreed. The contractor's Change Order proposal shall include total compensation for implementing the proposed change in the work, including any adjustment in the contract sum or time of performance, and including compensation for all delays in connection with such change in the work and for any expense or inconvenience, disruption of schedule, or loss of efficiency or productivity occasioned by the change in the work. Upon receipt of the Change Order proposal or a request for equitable adjustment to the contract sum or time of performance, the County may accept or reject the proposal, request further documentation, or negotiate RM 2401 Rooftop chiller Procurement & I nstall— Page 4 acceptable terms with the Contractor. Pending agreement on the tenus of the Change Order, •the County may direct the Contractor to proceed inu-nediately With the Change Order work. The contractor shall not proceed with any Change in the work until it has obtained the County I s ap roval. All work done under M county -directed cY change in the work shall be executed per the Contract. 12. No Aizene•v IR-elationship. Neither the Contract •nor any agreement implied therefrom constitutes the Contractor as an agent or legal representative of the County for any purpose whatsoever, and the Contractor's relationship to the County because of the Contract Document shall be that of an independent contractor. The Contractor is not granted any express or imphed right or authority to assume or create any obligation or responsibility on behalf of or in the name ofthe County or to bind the County in any manner or tbingwhatsoever, 13. Clean A The contractor shall always keep the project s*te, including hauling routes, infrastructures, utilities, and storage areas, free from accurnul I ations of waste materials. Before completing the work, the Contractor shall remove its rubbish, •tools, scaffolding, equipment, and ' materials from the premises. Upon completing the Work, the Contractor shall leave the project site in a clean, neat, and orderly condition that is s l' atisfactory to the County. If the Contractor fails to clean up as provided herein, and after reasonable notice from the County, the County may do so, and the cost thereof shall be charged to the Contractor. 14. Survival. If any clause or provision of this Contract shall be invalid, the remaininLy clauses an provisions shall nevertheless be and remain in full force and effect. C31 15. The Contract embodies the entire agreement between the parties; all other agreements, oral or written, are now merged and superseded by the Contract. There are no other agreements Wbich modify or affect the terms hereof No amendment hereto ;Shall be binding unless the terms thereof care in writing and signed by both Parties, Time - verbal or other agreements modify or affect theContract. is of the essence. No 16. Exvlanatioln of Documents. The Contractor has thoroughly reviewed the Contract, The Contractor has had the opportunity to consult with legal counsel as to the legal effect of the Contract. 17. Notices. All notices required under the termshereof are to be in writing and delivered personally to the party to receive the same or mailed by regular mail, postage prepaid to the address specified adjacent to the parties, signatures. All notices shall be deemed served upo delivery thereof or three (3) days following deposin t of the notice in the U.S. mail as required herein. Headins. Construction. The headings of the sections and •paragraph are In s e s * serted solel for the convenience of the parties. They are not apart of and are not intended to govem, lirnit, or aid in constructing any term or provision hereof. In construing the partiest intent •regarding In this contract, no more significant or stricter construction of any terns. or • provision hereof shall RM 2401 Rooftop chiller Procurement & Install— Page 5 be asserted against the county as drafter. 18. Governing Law,Venue, The Performance and interpretation of the Contract Document shall be governed and interpreted by the laws of the State of Washington. Any litigation arising from or in connection with this Contract shall be conducted in Grant County, Washington. fff RM 2401 Rooftop Chiller Procurement & Install— Page 6 CONTRACTOR: Basin Refq:keration and/ ,Heating, Inc. M Liceas,dNo. �asfinRH163KM uBr'No. 600-5 1 4-947 sgienks a,jamail.com Dated the t of 2023. TEST: 7 A 2 Ba6a4 J. Vasquez, Clk- the Board V Approved as to form: M Barbara 0. Duerbeck, WSBA # 53946 Deputy Prosecuting Attorney Date: RM 2401 Rooftop Chiller Procurement & Install— Page 7 BOARD OF CO Danny Stone, Vice-Chair­�' Ro 0. er Brittany E. Lutz From: Tom Gaines Sent: Thursday, April 11, 2024 2:03 PM To: Kevin Schmidt Subject: RE: RM2401 Rooftop Chiller I have reviewed this, and it is good to go. Tom Gaines Director, Grant County, WA Central Services Department tgaines@grantcountywa.gov 509-754-2011 Ext 3276 Serve the Public, Be Exceptional, Enjoy Life From: Kevin Schmidt <kschmidt@grantcountywa.gov> Sent: Thursday, April 11, 2024 1:57 PM To: Tom Gaines <tgaines@grantcountywa.gov> Subject: FW: RM2401 Rooftop Chiller Insurance is 1 and 2. If that can be approved we will get this on consent. It was signed b Basin a month ago in the transition for insurance approvals. g y Kevin Schmidt Facilities and Maintenance Manager Grant County, Wa Phone: 509-754 2011 ext: 3272 Mobile: 509-237-4081 Email: kschmidt rantcount wa. ov From: Kevin Schmidt <kschmidt rantcount wa. ov> wommoo— Sent: Friday, March 8, 2024 11:07 AM To: Pete Wyatt < w att rantcount wa. ov>; Barbara G. Duerbeck <b duerbeck rantcoun gd t wa . ov> Subject: FW: RM2401 Rooftop Chiller Ba rb, Here is a contract to replace the chiller on the roof of the main building for RENEW in Moses Lake for your review. Please let me know when you have finished, and I will pick it up and deliver it for consent. Thank you. Kevin Schmidt Facilities and Maintenance Manager Grant County, Wa Phone: 509-754 2011 ext: 3272 Mobile: 509-237-4081 Email: kschmidt grantcountywa. ov From: Pete Wyatt < w att rantcount wa, ov> Sent: Friday, March 8, 2024 8:19 AM To: Kevin Schmidt <kschmidt rantcounfi wa. ov>; Dell A. Anderson <daandersonrantcounfi wa >• ov , Linze Greenwalt <-IgreenAgItffl, grantcountywa.gov> Subject: FW: RM2401 Rooftop Chiller ;ve&z 5. ?Ova&,, 575f S7-,,,4SvP7ff w4eq& SaAl�,� 840 E Plum ST Moses Lake, WA 98837 Cell: (509)237-8832 Desk: (509)765-9239 x 5457 F r i From: Erin D cerin@basinservice.cam> Sent: Thursday, March 7, 2024 2:11 PM To: Pete Wyatt <pwvatt@grantcountywa ov> Subject: RM2401 Rooftop Chiller Hello, Please see the attached signed contract. Thank you, Erin Dupea Basin Refrigeration & Heating 509) 765-7138 Fx1 Brittany E. Lutz From: Barbara G. Duerbeck Sent: Monday, March 11, 2024 1:27 PM To: Kevin Schmidt; Pete Wyatt Subject: RE: RM2401 Rooftop Chiller This has my electronic approval. I am not back in office full time yet so we are still using digital aov al via email submitted with the contract to the BOCC to show approvalpp. Thank you, Barbara G. Duerbeck Deputy Prosecuting Attorney Grant County Prosecuting Attorney's Office Civil/Appellate Division 509-754-2011 Extension 3912 baduerbeck@vrantcountvwa.gov The contents of this e-mail message, including any attachments, are intended solely for the use of the person or entity to whom the e-mail was addressed. It contains information that may be protected by attorney-client privilege, work -product, or other privileges, and may be restricted from disclosure by applicable state and federal law. If you are not the intended recipient of this message, be advised that any dissemination, distribution, or use of the contents of this message is strictly prohibited. If you received this message in error, please contact the sender by reply e-mail. Please also permanently delete all copies of the original e-mail and any attached documentation. Please be advised that any reply to this email may be considered a public record and be subject to disclosure upon request. Thank you. From: Kevin Schmidt <kschmidt@grantcountywa.gov> Sent: Friday, March 8.,2024 11:07 AM To: Pete Wyatt <pwyatt@grantcountywa-gov>; Barbara G. Duerbeck <bgduerbeck@grantcountywa.gov> Subject: FW: RM2401 Rooftop Chiller Barb., Here is a contract to replace the chiller on the roof of the main building for RENEW in Moses Lake for your review. Please let me know when you have finished, and I will pick it up and deliver it for consent. Thank you. Kevin Schmidt Facilities and Maintenance Manager Grant County, Wa Phone: 509-754 2011 ext: 3272 Mobile: 509-237-4081 Email:kschmid wa.ggov From: ete Wyatt <Pwyatt(@grantcoun wa.gov> Sent: Friday, March 8, 2024 8:19 AM To: Kevin Schmidt <.kschmi Itywa. >; Dell A. Anderson <daan derson rantcountywa.grov>; Linze Greenwalt <Igreenwalt@grantcountvwa.gov> Subject: FW: RM2401 Rooftop Chiller ;De&4 5, sus, s7-�s*PIn 'Wa4w"e-e s aAl��ISqe# s���n 840 E Plum ST Moses Lake, WA 98837 Cell: (509)237-8832 Desk: (509)765-9239 x 5457 STS From: Erin D <erin@basinservice.com> Sent: Thursday, March 7, 2024 2:11 PM To: Pete Wyatt <PwvattPgrantcountywa.gov> Subject: RM2401 Rooftop Chiller Hello., Please see the attached signed contract. Thank you., Erin Dupea Basin Refrigeration & Heating (509)_ 765-7138 Fx] N