HomeMy WebLinkAboutAgreements/Contracts - Central Services (002)GRANT COUNTY
COMMISSIONERS AGENDA MEETING REQUEST FORM
(Must be submitted to the Clerk of the Board by 12:00pm on Thursday)
REQUESTING DEPARTMENT: Central Services
REQUEST SUBMITTED BY. Tom Gaines
CONTACT PERSON ATTENDING ROUNDTABLE: Tom Gaines
CONFIDENTIAL INFORMATION: DYES ®NO
DATE: 3/21/24
PHONE: 3276
r
uo
A.
Y
®Agreement / Contract
❑ Bids / RFPs / Quotes Award
DAP Vouchers
❑ Bid Opening Scheduled
❑Appointment / Reappointment
A A ii
❑ARPA Rel ated
Related
❑Count Code
❑ Boards / Committees
❑ Emergency Purchase
❑ Budgetet❑Computer
❑Employee Rel.
❑ Facilities Related
❑ Financial
❑ Funds
❑ Hearin 9
1:1 Invoices / Purchase Orders
❑ Grants — Fed/State/County
❑ Leases
❑MOA / MOU
❑ Minutes
❑ Ordinances
❑ Out of State Travel
❑ Petty Cash
❑ Policies
❑ Proclamations
❑ Request for Purchase
❑ Resolution
tion
❑ Recommendation
❑ Professional Sery/Consultant
❑ Support Letter
❑ Sur I
p us Req.
[]Tax Levies
❑Thank You's
❑Tax Title Property
❑WSLCB
s
Contract with Basin Heating& Refrigeration for g approved Capital Project CSD-2402fg
Horse Barn Water Upgrades in the amount of $15,989.00
DATE OF ACTION: "`
APPROVE: DENIED ABSTAIN
D1:
D2:
D3:
DEFERRED OR CONTINUED TO:
K14-092
JLX-d(.W
CONTRACT
THIS CONTRACT ("Contract'), entered b and between CY
Y W COUNTY, duly
orgamzed and operating under and by the Constitution and the laws of the State of Washington
("County'), and BASIN REFRIGERATION AND FlEATING INC., a corporation dulfortned
and y
doing business in the State of Washing
�ton"Contractor,,).
In consideration of the mutualpromises and covenants Contained herein, the parties
hereto agree as follows:
Work of Contract/Swo-De Q-f—Work. The, Contractor shall do all work and fulmish all tools
materials, equipine I
nt, and things of every description n ecessary to complete the tasks and scope
of work as per the request for bids ��.p'B) and this ntract for the Horse Barn Water Upgrade
project (CSD2402fg). "'Work" means all work i's co
Contractor during the p ' ndividually and c011ectivelY Performed by the
roject. The RFB is attached as "'Exhibit All).
The Contractor will be responsible for doing all the work to complete the following:
a The contractor 'i's responsible for all the work required to install water in five arcs
and, at a minimum, the following.
• All excavating and backfilling as required.
Installation of isolation valves for each barn.
Installation of Isolation valve to isolate all barns.
Hose -end ball valves at each drop at identified stalls.
• Cush clamps where required or attached to UnistnTt.
• Installation should follow current UPC standards.
Allow for blowdown for Wffiter conditions,
Piping and connection points are to be labeled as non -potable water.
b. COMPlete cleanup of the area once above completed, including but not limited to
recovery and removal of equipment, trash, and debris.
c ContTactor understands this is a Public Work subject to prevailing wage and the
submission of intents, ntents, affidavits, and certified pay -roll as required by the Labor
and Industries.
d Coordination with the fairgrotmds on schedule, timing, areas to be paved, events
nts)
and other projects are critical to this project.
2. PrQL'ect.Site. The 1Arork shall be
qncomplished lapon the re I property MonA
Ythe Giant County Faigunds,situated on or about 3Aiway
k
Dr. NE Moses Lake,Washinto
or as may be more specifically directed at the sole, discretion of the County. gn,
3. date Of COMMencement and Date Of COMPle—tion. The Contractor shall commence the,
work described herein upon receiving notice toproceed from the Cowity beginning at a time
mutually agreed upon by the parties after having obtained all necessary permits/bonds.
Substantial completion of the Work shall occur by June 30, 2024, unless delays beyond the
Basin H&R CSD2402fg-ADA bam water upgrades —Page 1
insurance against claims for injuries topersons or damage to property which may 8xise from, or
in connection with the performance of the, work hereunder by the Contractor, its ragents.,
representatives de 0 -
, employees, or subcontractors. The Contractor shall provi a Certification of
Insurance evidencing:
a Automobile Liabi1
insurance with I'Mits no less than $1 A0,000 combined
single litnit per accident for bodily injury and property damage; and
b. Commercial General Ligh Llity *
_ insurance -written on an occurrence iasis with limits
no less than $ I p0,000 combined single limit per occluTence and $2,000,000
aggregate for personal injury, bodily injury, andproperty damage. Coverage shall
include but not be limited to bfianket contractual; products/completed operations;
broad form propeity damage; exPlosion, collapse, and •underground •(XCU) if
applicable; and employer's liability,
Worker's C
OMDensation insurance at the limits established by the State of
Washington.
Any payment of deductible or self-insured retention shall be the Contractor's sole res ons "bility.
The County shall be named as an additional instwed, on the insurance policy concerningl work
performed by or on behalf of the Contractor, and a copy of the endorsement naming the cotmty
as an additional insured shall be attached to the Certificate of Insurance. The Contractor's
insurance shall be the Primai-y insurance conceming the •County, and the County shall be given
thirty (30) days prior written notice of any cancellation, suspension, or material change in
coverage.
8, Payments Withheld. The County may withhold or nullify the whole or part of any
payment to such extent as may be necessary to protect the County from loss or damage for
reasons including but not limited to:
a. Work not within the Contract or agreed to M' the RFB(Attached as "Exhibit A").
b. Reasonable evidence that the work required by the Contract cannot be completed
for the unpaid balance of the contract scan..
a Work by the County to correct defective work or complete thework.
d Failure by the Contractor toPerform work within thi's Contract.
e.. Cost or liability that may occur to theCounty due to the Contractor's fault
negligent acts, oromissions.
PROVIDED.- In any case where part or all of apayment is going to be Withheld for
unsatisfactory performance, the County shall notify the Contractorper RST 39.76.011 (b),
Authority of County. Suppose the Contractor fails toporform •the work according to the
requirements of the Contract Document, In that case, the County shall provide written notice of the
deficiency to the Contractor, and the Contractor shall have seven days to correct the deficiency in the
Basin IUR CSD2402fg-ADA barn water upgrades — Page 3
productivity occasioned by the change in the woric. Upon receipt of the Change Orderroosal
ora request for equitable adjustment to the contrapp
contract sum or time of performance, the Coun
may accept or reject the proposal, request further documentationty
, or negotiate acceptable terms
with- die Contractor.
Pending agreement on the terms of the Change Order, the County may direct the Contractor to
proceed inm-iediately with the Change Order work. The contractor shall not proceed " n
change in the work until it has obtained the County's approval w1th a y
- All work done under anycounty.
directed change in the work shall be executed per the Contract,
12. No Agency Relationshit). Neither the Contract nor any agreement implied therefrom
constitutes the Contractor as an agent or legal representative of the County for any purp s
whatsoever, and the Contractor's relationship to the Coun ' o e
ty bcca-use of the Contract Document
shall be that of an independent contractor. TheContractor is not granted any express or implied
right or authority to assume or create any obligation or responsibility on behalf of or in the name
ofthe County or to bind the Count y *
in any manner or th ffig whatsoever.
13. dean The contractor shall always keep the project site including haul*
infrastructures,, utilities, and storage areas ing routes,
, free from accumulations of waste materials. Before
completing the work, the Contractor shall remove its •rubbish, •tools, scaffolding, equipment, and
materials from the premises, UPOn collapleting the Work, the Contractor shall leave theProject
site in a clean, neat, and orderly condition that is satisfactorY to the County. If the Contractor
fails to clean -up as provided herein, aad after reasonable •notice from the Coillity, the County
may do so, and the cost thereof shall be charged to the Contractor.
14. Swvival. If any clause or provision of this Contract shall be invalid, the remaining classesand provisions shall nevertheless be and remain in full force and effect.
15. Entire Agreement. The Contract einbodies the entire agreement between thearties• all
other agreements, oral or written., are now p ;
merged and superseded by the Contract. There are no
other agreements which modify or affect the terms hereof, No amendment hereto shall be
binding unless the terms thereof are in writing and signed by both parties. Time is of the essence,
No verbal or other agreements modify or affect theContract.
16. Explanation of DocLiments. The Contractor has thoroughly reviewed the Contract. The
Contractor has had the opportunity to colisL11t with legal counsel as to the lel effect of tile
Contract. al
17. Notices. All not* #
ices required under theterms hereof are to be in writing and delivered
personally to the party to receive the same or mailed by regular mai•
l, postage prepaid to the
address speciffied adjacent to the parties, signatures. All notices shall be deemed served upon
delivery thereof ortbree (3) days following deposit of the notice in the U.S. mail asrequi-redhe *
rein.
Headjus,,-, COnstruQtion, The headings of the sections and para, are inserted solely for the
I 1 1
4&R CSD2402fg-ADA barn water upgrades — Page 5
Basin I i R
convenience of the part"es, They are nota part of and are not "D,tended to govern, lim " t or aid i
CONT
Basin e i erat' 'Heating INC.
��z�e r I
Lice - e No. BASINRI1792NG
UNo. 600 514 947
Dated the H of March --72024.
ST:
B,rara .Vasquez,
C rk o the Board
V
Approved as to form:
B
Barbara G. Duerbeck, WS -BA # 53946
Deputy Prosecuting Attomey
Date:
Basin H&R CSD2402fg-ADA Darn water upgraics — Page 7
BOARD OF COUNTY COMAUSSIONERS
' I T COUNT W
SHINGTON
Cindylarte hair
. . ................
0 -k &AILD
Danny Stone, Vice -Chair
Rob- rl &i a
94 V'0 e r