Loading...
HomeMy WebLinkAboutBudget Transfer - Facilities & MaintenanceGRANT COUNTY COMMISSIONERS AGENDA MEETING REQUEST FORM (Must be submitted to the Clerk of the Board by 12:00pm on Thursday) REQUESTING DEPARTMENT:Facilites and Maintenance REQUEST SUBMITTED BY: Kevin Schmidt DATE:2/22/2024 PHONE: 509-754-2011,3272 CONTACT PERSON ATTENDING ROUNDTABLE..Kevin Schmidt/Tom Gaines CONFIDENTIAL INFORMATION: E]YES ®NO 1009-, I IJAJ I APPROVE: DENIED ABSTAIN D1: D2: D3: CONTRACT THIS CONTRACT ("Contract"), entered by and between GRANT COUNTY, duly organized and operating under and by the Constitution and the laws of the State of Washington ("County"), and Basin Refrigeration and Heating Inc., L No. 600-514-947, a company duly formed and doing business in the State of Washington ("Contractor"). In consideration of the mutual promises and covenants contained herein, the parties hereto agree as follows: 1. Work of Contract/Scope of Work. The Contractor shall do all work and ftimish all tools, materials, equipment, and tbings of every description necessary to complete the tasks mid scope of work as per this contract for the Grant County Compressor Replacement Project, FM2402, "Worle means all or. individually and collectively performed by the Contractor during the prof ect. The Contractor will be responsible for supplying and doing all the work to complete the following: a. Providing all equipment, materials, and labor needed to remove the existing compressor and re-thstall and commission the the replacement compressor, b. Supplying replacement compressor, refrigerants, olds, filters and new contactors. a Any labor and materials to remove or modify duct work or sheet metal to allow space to remove and install compressor and re -connect wiring. d Supply any permits required for this project. e. Ensure technicians on site are certified to handle refrigerants. f Complete cleanup of the area once above completed, including but not limited to recovery and removal of equipment, trash, and debris. g Contractor understands this is a Public Work subject to prevailing wage and the submission of intents, affidavits, and certified payroll as required by the Labor and Industries. 2. Project Site. The work shall be accomplished upon the real property commonly known as the Grant County Courthouse, situated on or about 3 5 C Street NW Ephrata, Washington, or as may be more specifically directed at the sole (fiscretion of the County. I Date of Commencement and Date of Completion. The Contractor shall commenoe the work described herein upon receiving notice to proceed from the County beginning at time X 9 a ime mutually agreed upon by the patties after having obtained all necessary permits/bonds. Substantial completion of the work shalt occur by May 15, 2024, unless delays beyond the control of either party cause the date to be extended. This date will not be extended without approval by the County. 4. Contract Sum and Terms. The agreed Contract sum, except for provisions set forth below FM2402 L Compressor Replacement — Page I in Paragraph 13, and with payment of such Contract Sum subject to provisions set fol-th below in Paragraphs 8 and 11, and anyotherprovision contained within the Contract which may affect such Contract Sum to be paid to Contractor, is as follows: 1F Subtotal $58,890.00 Washington State Sales Tax @ 8.4% $4,946.' 6 Total -1 $63,836.76 Retainage (5% of Subtotal) ------ 1-$2,944.50 a. Retainage: Required for this project. A retainage bond is acceptable and preferred, 5% retainage is required under RCW 60.28.001. The contract is over $35:,000, requiring a notice of completion to be filed and approved before releasing retainage. b. Intents and Affidavits: Statements of intent to pay prevailing wages and affidavits of wages paid are required to be submitted to Washington State Labor and Industries according to RCW 39.12.040, c. payment Interval and Billin& The Contractor shall submit a monthly billing statement and invoice to the C ounty. Such billing statement and invoice shall set out the nature of the work performed, the time and materials involved, or the percentage of work completed as mutually agreed upon by the Contractor and the County, The County will pay such a statement and invoice within thirty (3 0) days of receipt, 5. Performmice and Payment Bonds: Required for this project. 6, Indemnity and Hold Harmless. The Contractor shall defend, indemnify, and hold the Cowty, its officers, officials, employees, and volunteers harmless fi-om any claims, injuries, damages, losses, or suits, including attorney fees, arising out of or in connection with the performance of the contract, except for injuries and damages caused by the sole negligence of the County. It is further specifically and expressly understood that the indemnification provided herein constitutes the Contractor's waiver of immunity under Industrial Insurance, title 51 RCW, solely for indemnification, The parties have mutually negotiated this waiver. The provisions of this section shall survive the eXDiration of termination of this contract. JL 7. Insurance. The Contractor shall procure and maintain, for the duration of this contract, insurance against claims for injiuies to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, its agents, representatives, employees, or subcontractors. The Contractor shall provide a Certification. of Insurance evidencing: a Automobile Liabilitv 'insurance with I imits no less than $1,000,000 combined FM2402 L&J Compressor Replacement — Page 2 single limit per accident for bodily injury and property damage; and b. Commercial General Li insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occutTence and $2,000,000 aggregate for personal injury., bodily injury, anal property damage. Coverage shall include but not be limited to blanket contractual; products/completed operations; broad fom-i property damage; explosion, collapse, and underground (XCU) if applicable; and employer's liability, Worker's CoMRonsation insurance at the limits established by the State of Washington.. Any payment of deductible or self-insured retention shall be the Contractor's sole responsibility, The County shall be named as an additional M'stued on the insurance policy concerning work performed by or on behalf of the Contractor, and a copy of the endorsement naming the county as an additional insured shall be attached, to the Certificate of Insurance, The Contract.Ws insurance shall be die primary 'insurance concerning the County, and the County shall be given thirty (30) days prior written notice of any cancellation, suspension, or material change in coverage, 8. Payments Withheld. The County may withhold or nullify the whole or part of any payment to such extent as may be necessary to protect the County from loss or damage for reasons including but not limited to: a Work not within the Contract. h Reasonable evidence that the work required by the Contract cannot be completed for the unpaid balance of the contract sum. c Worts by the County to correct defective work or complete thework. d. Failure by the Contractor to perform work within this Contract. e. Cost or liability that may occur to the County due to the Contractor's fault, negligent acts, oromissions. PROVIDED: In any case where part or all of a payment is going to be withheld for unsatisfactory performance, the County shall notify the Contractor per RCW 39.76.0 11 (b). Authori*!j of Co Suppose the Contractor fails to perform the work according to the requirements of the Contract Document. In that case, the County shall provide written notice ofthe deficiency to the Contractor, and the Contractor shall have seven days to correct the deficiency in the work. Ifthe Contractor fails to correct the deficiency in the work within the seven days or to take and continue all appropriate steps to initiate the corrections in the event corrections cannot be reasonably completed in the seven days, the County may, without prejudice to other remedies: (a) use County forces, other contractors, or other means to make good the Contnactor's deficiency, FM2402 L&J Compressor Replacement — Page 3 and (b) deduct from or nullify the Contractor's payments the cost of such effort as described in paragraph 8 of this agreement. 9. Warrant of Constniction. In addition to any special warranties provided elsewhere in the Contract Document and companion or applicable documents, the Contractor warrants that all work conforms to the requirements of the Contract and is free of any defect in equipment., material, or design furnished or workmanship performed by the Contractor, Concerning all warranties, express or implied, for work performed or materials fumished according to the Contract and companion or applicable documents, the Contractor shall: a Obtain all warranties that would be given in standard commercial practice. b. Require all warranties to be executed, in writing, for the benefit of the County; and a Enforce all warranties for the benefit of the County, if directed by the County, including any subcontractor's, manufactures, or supplier's warranty that extends beyond the period specified in the Contract. d The obligations under this Section shall survive completion. 10. Stiecessors and AssiRns. The County and Contractor respectively bind themselves, their partners, successors, assigns, and legal representatives to the other party hereto and to partners,, successors, assigns, and legal representatives of such other party regarding covenants, agreements, and obligations contained in the Contract. Neither party shall assign the work without the written consent of the other, If either party attempts to assign without such consent, that party shall remain legally responsible for all obligations outlined in the Contract,. 1.Changes in Work. The County may, at any time and without notice to the Contractor's surety, order additions, deletions, revisions, or other changes in the work. These changes in. the work shalt be 'incorporated into the Contract Document through the execution of Change Orders. Suppose any change in the work ordered by the County ca -uses an ineTease or decrease in the Contract Sum or the perf-onnance time. In that case, an equitable adjustment shall be made, and such adjustments(s) shall be incorporated into a Change Order, If the County desires to order a change in the work, it may request a written Change Order proposal from the Contractor. The contractor shall submit a Change Order proposal within 14 days of the request fi-om the County or within such other period as mutually agreed. The contractor's Change Order proposal shall include total compensation for implementing the proposed change in the work, ilichiding any adjustment M" the contract sum or time of performance, and including compensation for all delays in connection with such change in the or. and for any expense or inconvenience, disruption of schedule, or loss of efficiency or productivity occasioned by the change in the work. Upon receipt of the Change Order proposal or a request for equitable adjustment to the contract sum or time of performance, the County may accept or reject the proposal, req -nest further documentation, or negotiate acceptable terms with the Contractor, F1 2,402 L&J Compressor Replacement — Page 4 Pending agreement on the terms of the Change Order, the County may direct the Contractor to proceed 'immediately with the Change Order work. The contractor shall not proceed with any change in the work until it has obtained the County's approval. All work done under any county - directed change in the work shall be executed per the Contract. 1Z No Menev Relationship. Neither the Contract nor any agreement implied therefrom constitutes the Contractor as an agent or legal representative of the County for any purpose whatsoever, and the Contractor's relationship to the County because of the Contract Document shall be that of an independent contractor. The Contractor is not granted any express or implied right or authority to ass-ume or create any obligation or responsibility on behalf of or in the name ofthe County or to bind the County in any mmner or thing hats o ever. 13. CIO The contractor shall always keep the project site, including hauling routes, infrastructures. utilities, and storage areas, free fi-om accumulations of waste materials. Before completing the work, the Contractor shall remove its rubbish, tools, scaffolding, equipment, and materials from the prerm"ses. Upon completing the Work, the Contractor shall leave the project site in a clean, neat, and orderly condition that is satisfactory to the Coimty. If the Contractor Fails to clean up as provided herein, and after reasonable notice from the County, the County may do so, and the cost thereof shall be charged to the Contractor. 14. Survival, If any clause or provision of this Contract shall be invalid, the remaining clauses and provisions shall -nevertheless be and remain in fall force and effect. 15, Entire Areement, The Contract embodies the entire agreement between the -parties.; all other agreements, oral or written, are now merged and superseded by the Contract. There are no other agreements which modify or affect the terms hereof. No amendment hereto shall be binding unless the terms thereof are in writing mid signed by both parties. Time is of the essence. No verbal or other agreements modify or affect theContract, 16. Explanation of Documents. The Contractor has thoroughly reviewed the Contract. The Contractor has had the opportunity to consult with legal counsel as to the legal effect of the Contract. 17. Notices. All notices required under the terms hereof are to be M' writing and delivered personally to the party to receive the same or mailed by regular mail, postage prepaid to the address specified adjacent to the parties' signatures. All notices shall be deemed served upon deliver,xr therpeo for three (3)days Lollowingr deposit ofthe notice in the U.S. mail, as required. herein. k --Cp Headin on.stru.ction. The headings of the sections and paragraphs are inserted solely for the convenience of the parties. They are not a part of and are not intended to govern, limit, or aid in constructing any term or provision hereof. In construing the parties' intent regarding In this contract, no more significant or stricter construction of any term or provision hereof shall be asserted against the county as drafter. F1` 2402 L&J Compressor Replacement —1 age 5 18. GoverninLaw, Venue. The perfortnwice and interpretation of the Contract Document shall be govemed and interpreted by the laws of the State of Washington, Any litigation arising from or in connection with this Contract shall be conducted in Grant Cotmty, Washington, FM2402 L&J Compressor Replacement -- Page 6 CONTRACTOR: Basin R an ,Oeating, Inc. z io-mf'se No. C Bis inRH163KM UBI No. 600-, 14-947 scjen1(s@,gm,aRxorn. Dated the�of 204. BOARD OF COUNTY COMMISSIONERS GRANT COUNTY9 WASHINGTON Cindy Cwter, Chair ' hr S ny Danne, Vice;;�C-' -"ly 0 *"�, n r Rom J�ne ember ATTEST: Approved as to foie: M Barbara G. Duerbeek, WSBA # 53946 Deputy Prosecuting Attomey Date: FM2402 L&J Compressor Replacement — Page 7 Kevin Schmidt From: Barbara G. Duerbeck Sent: Thursday, February 22, 2024 4:09 PM To: Kevin Schmidt Subject: RE: Grant County Chiller Compressor Signed Contract.pdf This has my approval. I have been WFH most of the time due to morning sickness and people have been able to attach my emailed approval to documents submitted to the BOCC without issue. I may be in tomorrow but cannot predict when I will be in so I think that is the best path forward right now. Thank you, Barbara G. Duerbeck Deputy Prosecuting Attorney Grant County Prosecuting Attorney's Office Civil/Appellate Division 509-754-2011 Extension 3912 b�duerbeck@arantcountywa.gov The contents of this e-mail message, including any attachments, are intended solely for the use of the person or entity to whom the e-mail was addressed. It contains information that may be protected by attorney-client privilege, work -product, or other privileges, and may be restricted from disclosure by applicable state and federal law. If you are not the intended recipient of this message, be advised that any dissemination, distribution, or use of the contents of this message is strictly prohibited. If you received this message in error, please contact the sender by reply e-mail. Please also permanently delete all copies of the original e-mail and any attached documentation. Please be advised that any reply to this email may be considered a public record and be subject to disclosure upon request. Thank you. From: Kevin Schmidt <kschmidt@grantcountywa.gov> Sent: Thursday, February 22, 2024 11:48 AM To: Barbara G. Duerbeck <bgduerbeck@grantcountywa.gov> Subject: Grant County Chiller Compressor Signed Contract.pdf Ba rb, Attached is the contract for Basin Refrigeration, that we had been working on, that has been signed by them. IfY ou could please review and sign off I can pick it up and drop it at the BOCC office. Thank you, Kevin Schmidt Facilities and Maintenance Manager Grant County, Wa Phone: 509-754 2011 ext: 3272 Mobile: 509-237-4081 Email:.ksschrnidt .rantcountywa..gov FINANCIAL REQUEST Requestor Kevin Schmidt Requesters Department Facilities and Maintenancem"� Date: 2/22/2024 Fund # & Dept of Request 001.112 Capital Asset Approval Yes Budget Extension No Establish/Close Fund No Cash Transfer No In the 2024 Capital Budget it was approved to replace -a compressor an the chiller for the Law and Justice building. The chiller provides cooling for the entire buildingin the summer and if this compressor fails it will not have enough capability to keep the jail and courts comfortable. The projectt was etimated to be around $60K for the budget. A Request for Bids was. published and the low bid came back at $63,837 with tax included in that cost. I am requesting, that the balance of the project be paid from the Maintenance Operating budget. CAPITAL ASSET PURCHASE APPROVAL BUDGET REQUIREMENT Asset Description Law and Justice Chiller Additional Expense Total Purchase Expense 63,837 Additional Revenue' Less: Existing Approval..' 60,,000 Additional Cash Requirement Additional Approval Required 31,837 Additional Funding Source Capital Facility Related Yes Grant Funded No Documentation Quote/s attached BUDGET EXTENSION REQUEST Fund Name Revenue code/s Account Description Amount. Fund Name Expense cod.e/s Account Description Amount CASH TRANSFER REQUEST Fund Name (From) Code Account Description Amount (From) Fund Name (To) Code Account Description Amount (To) FORWARD TO ACCOUNTING FOR APPROVAL -APPROVED FORM, SWILL SE RETURN TO DEPT FOR, RMISSIONTO-Rocc SU Wotes,* No Concerns FUND CASH SUMMARY ................. Beginning Cash Expense Bdgt (W/amendments) Expense Ext. Requested Budget Hearing: Not necessary Revenue 13dgt (w/amendments) lResolution, Required. - Not necessary Revenue Ext. Requested (excl 308) Estimated Ending Cash Reviewed By: