Loading...
HomeMy WebLinkAboutRequest to Purchase - Public WorksGRANT COUNTY COMMISSIONERS AGENDA MEETING REQUEST FORM (Must be submitted to the Clerk of the Board by 12:00pm on Thursday) REQUESTING DEPARTMENT:PUBLIC WORKS DATE:01/25/2024 REQUEST SUBMITTED BY:SHILO NELLIS PHONE: 509-754-6082 CONTACT PERSON ATTENDING ROUNDTABLE: SAM GASTRO CONFIDENTIAL INFORMATION: DYES ONO ❑Agreement /Contract--- ❑AP Vouchers ❑Bids /RFPs /Quotes Award ❑Bid Opening Scheduled ❑Appointment /Reappointment ❑ARPA Related ❑Computer Related ❑County Code ❑ Facilities Related El Boards /Committees ❑Emergency Purchase ❑ Budget El Employee Rel. E] Financial EJ Invoices /Purchase Orders ❑Grants —Fed/State/County ❑Funds ❑LeasesEl Hearing ❑ Minutes ❑Ordinances 1:1 Policies ❑Proclamations ❑Out of State Travel ❑MOA / MOU ❑Petty Cash ❑Recommendation ❑Professional Sery/Consultant BRequest for Purchase ❑Su pport Letter 0 Resolution ❑Tax Levies ❑Thank You's ❑Tax Title Property ❑Surplus Req, ❑WSLCB DATE OF ACTION: I , --,m. -)J-j APPROVE: DENIED ABSTAIN D1: ----------- D2: 7A� D3: DEFERRED OR CONTINUED TO: MEMO To: From: Date: Grant County Department of Public Works 124 Enterprise St. S.E. Ephrata, WA 98823 publicworks@E!rantcountvwa Dov Board of Grant County Commissioners Sam Castro, CPO Public Works Director January 24, 2024 Serial No. 24.006 Re: Request to Purchase BaileyBridge Pa g its from Sole Source Vendor Authorization to Purchase: Road fund 101 (Bridge Repair 20 feet and over): Public Works is seeking authorization to purchase Bailey Bridge parts from: Bailey ridge Inc. 119 40 Street NE Fort Payne, AL 35967 This company is the only United States -based company that offers these parts, making them a sole source vendor. Other companies that offer these products provided b the vendor p are based out of China. The estimate Y dor for the parts is includingfreight, g t, not including taxes. These parts will be used to construct a temporary bailey bridge at Road W -SE the new bridge p over the canal u ' ridge is constructed. un I have reviewed the information and find it acceptable to move forward with the purchase of the items listed in the attached quote. Best Re rds, Sam Castro, CPO Public Works Director SC:sn "To meet current and future needs, serving together withpri and d ' p vate entities, while fostering a respectful and successful work environment." Information......................................................... 509 754-6082 ...,..•........'..'•'.•...•.. � ) Rob Harris, Assistant Engineer................................Ext. 3517 FAX ......................................... (509) 754-6087 Bob Bersanti, Construction Engineer................. Ext. John Brissey, Supervisor -Dist. No. 1 ............................ Ext. 3539 Sam Castro, Public Works Director.............................Ext..3504 Karen Maedke Admin Su 3503 Mike DeTrolio, Supervisor -Dist. No. 2..............(509) 765-4172 Andy Booth, Assistant Public Works Director ............ Ext. 3519 Support Manager..............Ext. 3551 Rod Follett, Foreman -Sign Sho Rusty Soelter, Supervisor -Dist. No. 3 ...............(509) 787-2321 Dave Bren, PE, County Road Engineer ........................Ext. 3502 p•••••..................••••.••Ext. 3579 John Spiess, Supervisor -Central Shop Jason Collings, Solid Waste............................(509) 754-4319 Tim Massey, Bridge Supervisor....................,(509) .Ext. 3 86 .............Ext. 3535 USBR DONATION :COUNTY ON;HAND SOLE SOURCE PURCHASE LOCAL MANUFACTURE BAILEY BRIDGE PARTS LIST UNIT COST DONATED DONATION AVAILABLE AVAILABLE: PURCHASED PURCHASED SED LOCAL/MANF LOCAL/MANE USBR PARTS:' VALUE -.'COUNTY.,.'PARTS VALUE PARTS COST PARTS COST Panels $ 1,470.00 18 $ 26,460.0 $ 2;100;0 31 $ 45;570:x:' 10 $ 14 700.0 Panel Pins W Locks / $ 60 00 35 Sway Braces $ , 500 00 12 48 $ 2,880.0: 61 $ 3,660.0 $ 6 000:0 18 $ 9, Bracing Frames $ 138.00 000:0 Bracing Bolts $ 4.20 28 $ 3,864.0 Transoms $ , 1500.00 2p 112$ 470.4 $ 30,000;0, 3 $ 19,500.0 Transom Clamps w/ Locks $ 46.20 �33 $��1;524:'6 Rakers $ 126.00 1868:0. 15 $ 1;890:0; 904 3p $ $ 158. 0 3,780.0 Plain Stringers g $ 654 00 31 $ , 20,274:0 10 $ 6,540.0 , 10 $ 6,540.0 Plain Ram Stringers Ramp gers $ 300.00 6 $. 1,800.0 Button Stringers $ 750.00 14 $ 10,500:0 , 4 $ _ 3,000.0 12 $ g Button Ramp Stringers $ 300:pp 4 $' 1,200.0', ,000.0 Ramp Pedestals $ 286.00 Chess/Deck Board $ 71:40 , 8 $ 2, 288.0 Vi Steel Riband $ 300:00" 16 140 $ 9,996.00 $ ,800.0 4 _ .:. 24 ;$ 72000 Riband Bolts $ 22.2050 20 $ 444.0 Base Plates $ 810.00 Bearings $ 264.00 4 $ 3, 240.0 Mal Male End Posts $ 582.00 3 15 $ 3,960.0 $ 746:0 Female End Posts $ 582.00 2 $ 1,164.0 Jack Shoes $ 144.00 4 $ 2,328.0 Launching Nose Links ;150 :00 4 $ 576.0 2 $ 300:0 Plain Roller Templates mI pates 2 $ 50.00 Plain Rollers $ 624.00 4 $ 1,000.00 Rocking Roller Templates =$ „250:0; 4 $ 2,496.0 Rocking Rollers $ 950.40 3,801.6 4 $ 1,000.00 4 3 4 $ Crib Capsills (F17-11) $ 534.00 ,801.6 Crib Bearings (F17-12) $ 90.00 8 $ 41272.0 (16) Chord Clamps $ 78.00 8 $ 720.0 16 $ 11 248.0 $, ,107,004:6 72 710.0 $ 11, 996.00 ADD SHIPPING ADD TAX ADD TAX Bailey Bridges, Inc. - Quotation Date: January 10, 2024 Company: Grant Co. Public Works, Ephrata, WA. Attention: Tim Massey Phone: 509-760-8712 Fax: PANEL, TRUSS, BRIDGE PIN PA NEL Email: 5770 Re: Requested parts quote We are pleased to quote you a price on the BaileyBridge g parts fisted below Item 1 Qty 10 Description unit wt. tot. wt. Unit Price Total 2 61 PANEL, TRUSS, BRIDGE PIN PA NEL 577 5770 $1,470.00 $147700.00 3 28 FRAME, BRACING 6.1 44 372 1232 $60.00 $138.00 $3,660.00 4 ' 5 112 BOLT, BRACING 1 112 $4.20 $3,864.00 $470.40 6 90 30 CLAMP, TRANSOM 7 630 $46.20 $47158.00 7 10 RAKER STRINGER, PLAIN 22 260 660 2600 $126.00 $37780.00 8 9 12 STRINGER, BUTTON 267 3204 $654.00 $750.00 $67540.00 $9,000.00 10 8 20 PEDESTAL, RAMP, M2 BOLT, RIBAND (J -BOLT w&6 � w 93 4.5 744 $286.002 $ '287'97 11 12 4 PLATE, BASE, BEARING 245 90 980 $22.20 $810.00 $444.00 $3,240.Q0 13 15 2 SHOE BEARING ' G POST, END, MALE 68 1020 $264.00 $3,960.00 14 4 POST, END, FEMALE 121 130 242 520 $582.00 $582.00 $17164.00 15 16 4 SHOE, JACK, 4-3/16" 36 144 $144.00 $2,328.00 $576.00 17 4 4 ROLLER, PLAIN ROLLER,ROCKING 116 464 $624.00 $2,496.00 18 8 CAPSILL, CRIB 206 251 824 2008 $950.40 $534.00 $3,801-60 19 20 8 BEARING, CRIB 37 296 $90.00 $4,272.00 $720.00 16 CLAMP, CHORD 11 176 $78.00 $1,248.00 * These parts are modified from the original version. Total Cost F.O.B. plant Estimated Freight 22088 lbs. $72,709 g .97 Total Cost delivered $87000.00 Note: Freight will be prepaid and add based on actualcost $801709.97 Components will be delivered to the nearest site easilyaccessible Not included: Sales tax ble to over -the -road trucks. unloading, erection, supports, anchor bolts and abutment Terms: 1/3 down, net 30 days after delivery(pending designs. ter Cp ding credit approval) This quote is per our standar ms and conditions and is good for 30 days. Please call if you d y have any questions. Gil Graham Bridge Specialist