Loading...
HomeMy WebLinkAboutResolution 90-149-CCBOARD OF COUNTY COMMISSIONERS GRANT COUNTY, WASHINGTON IN THE MATTER OF ADOPTING THE 1991 ANNUAL ROAD RESOLUTION NO. 90 -149 -CC PROGRAM WHEREAS, pursuant to the requirements of R.C.W. 36.40.070, Grant County did prepare a 1991 Annual Road Construction Program, and a Comprehensive Road Program for the ensuing six years of 1991 - 1996, and WHEREAS, in accordance with W.A.C. 136.16 an environmental assessment was made on all work within the Annual Program, and WHEREAS, pursuant to the requirements of R.C.W. 36.40.80, a public hearing was held and included the 1991 Annual Road Program, and WHEREAS, all comments and/or objections were heard and evaluated, NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Grant County, Washington that the 1991 Annual Road Construction Program attached hereto is hereby adopted. DONE THIS -18th DAY OF December ATTEST:e—JA,�'-44 CI fthe Board k Commissioner Commissioner Constituting the Board of County Commissioners of Grant County, Washington ANNUAL CONSTRUCTION PROGRAM FOR 1tO "1 (8) TYPE OF WORK CODE A. GRADING & DRAINAGE F: SIDEWALKS DAY LABOR COMPUTATION A A(A) TOTAL CONSIRUCTION PROGRAM - columns (15)+(16) $ 55 201 B. BASE & TOP COURSE G. TRAFFIC FACILITIES (8) COMPUTED DAY LABOR LIMIT (see back) . . . . . -- C. $ITEM. SURF. TREATMENT H. PATHS. TRAILS & BIKEWAYS 5 ova (C) IOTAL OAT LABOR PROGRAM - column (I6) $ 710 D. A.C. OR P.C.0 PAVEMENT I. $RIDGES (line C must be smaller than line $) E. CURBS & GUTTERS J. FERRY FACILITIES AGENCY ACTe County............................. Date of Submittal of Recommended Program Date of Enviromentabct. , 1987 Assessment......................... Date of Final Adoption Ordinance/Resolution No. (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 (11) (12) (13) 1 (14) 1 (15) (16) (17) 6 YEAR FUNDING SOURCE ESTIMATED EXPENDITURES ($1000) ROAD PROGRAM ROAD ROAD NAME ANDNUMBER LENGTH = a TYPE OF zCn - W H COUNTY OTHER FUNDS PRELIM HT OF CONSTRUCTION GRAND ITEM ITEM LOG BRIDGE NUMBER LOCATION �U WORK z a W FUNDS ($1000) ($1000) PROGRAM SOURCE ENGR 541.11 ylAy CONTRACT DAY LABOR TOTAL 541.00 H.P. to M.P. TOTAL NO. NO. N0. 541.20 15 17 36940 Martin Road SR 28 E -NW 0.00 0.90 0.90 8 A,B,C E $135 $7 $108 $20 $135 16 18 36940 Bridge #315 Martin Road 0.12 0.14 0.02 7 1 E $190 $8 $182 $0 $190 17 19 91035 Frenchman Hill Rd.(PE only Q -SW to Adams 5.85 10.73 4.88 8 A,B,C, E $15 $15 $0 $0 $15 18 12 13100 13 -SE Road Dodson Rd. to A.5 -SE 3.24 4.74 1.50 9 BIC E $80 $1 $0 $79 $80 19 12 46450 19 NE/NW Rd. (PE only) SR 28 toB-NE 0.00 2.38 2.38 8 A,B,C E $1 $9 RAP $10 $0 $0 $10 /3420 20 12 10300 26-S14 Road, SR 243 to R -SW 5.03 7.00 1,97 9' C E $40 $1 $0 $39 $40 21 12 91017 Adams Road Sr 28 to SR 283 17.36 23.68 6.32 7 D E $1,200 CAPP $10 $1,188 $0. 1,198 22 12 Varicus Misceallaneous Projects County Wide E -$200-�- _ $3_.. ... -- - ._ . $0 .. $197 ...$200 Sub -Totals 1 $6611$112091. $55$1,478 $335 11868 :RAS FORM NO. 3 (REV 6/87) PAGEIPROGRAM TOTALS $1,4221$3,9001 $119 $0 $4;491 $710 5,320 PAGE 2 OF _2 (8) TYPE OF WORK CODE A. GRADING & DRAINAGE B. BASE & TOP COURSE C. BITUM. SURF. TREATMENT D. A.C. OR P.C.0 PAVEMENT E. CURBS & GUTTERS F: SIDEWALKS G. TRAFFIC FACILITIES H. PATHS, TRAILS & BIKEWAYS 1. BRIDGES J. FERRY FACILITIES ANNUAL. CONSTRUCTION PRUtS J 1'UK kGENCY ACTION DAY LABOR COMPUTATION (A) TOTAL CONSTRUCTION PROGRAM - columns (15)+(16) $ 5.2M (B) COMPUTED DAY LABOR LIMIT (see back) . . . . . $ (C) TOTAL DAY LABOR PROGRAM - column (16) . . . . s- 710 (line C must be smaller than line B) County ...,..................... Date of Submittal of NV., 1990 Recommended Program ................ Date of Enviromental Assessment ..PE t.., 19$7 ............ Date of Final Adoption ..DT. 1987. Ordinance/Resolution No. .�V.... (1) (2) 1 (3) (4) (5) (6) (7) (8) (9) (10) 1 (11) 1 (12) (13) 1 (14) (is) (16) 11 (17) 6 YEAR FUNDING SOURCE ESTIMATED EXPENDITURES ($1000) ROAD PROGRAM ROAD LENGTH is TYPE OF z N W COUNTY OTHER FUNDS PRELIM OF CONSTRUCTION GRAND ($1000) PROGRAM SOURCE CONTRACT DAY LABOR ITEM .1 TEM LOG ROAD NAME AND/OR BRIDGE NUMBER LOCATION �-j WORK i a `�' fUNDS ($1090) ENGR 541.11 �{py TOTAL 541.00 M.P. to M.P. TOTAL NO. RO, NO. 541.20 1 12 1017 Adams Road SR 26.to 10 -Std 0.00 3.23 3.23 7 C E • $4 $21 FAS $0 $2 $23 $25 2 2 51050 Bridge #116=, Long Lake 0.83 1.09 0.26 8 A,B,C,I E $54 RAP $3 $256 $11 $270 $116 BROS 3 3 95025 Bridge #117 Pinto Ridge 0.00 1.23 1.23 7 A,B,C,I E $45 $225 BR $14 $414 $42 $470 $34 $166 FAS 4 4 30990 Silica Road N. Front to Sunland 0.00 4.43 4.43 8 A,B,C I $60 $540 RAP $3 $538 $59 $600 5 5 45270 Patton Blvd. Arlington to Andrew 0.00 1.01 1.01 16 A,B,D,E E $93 $371 TIB $6 $458 $0 $464 6 6 45270 Patton Blvd. Bike Path Arlington to Andrew 0.00 1.01 1.01 16 H E $20 $1 $19 $0 $20 7 7 45010 Dover St. SR'17 to 30th Ave. 0.00 0.38 0.38 17 A,B,D,E, E $200 $8 $192 $ $200 F 8 8 34050 4th/Frey/8th Ave. Sr 28 to SR 28 0.00 0.56 0.56 17 A,B,D,E, E $67 $266 TIB $5 $328 $ $333 F 9 10 94000 Wheeler Road Wiser to O -NE 1.88 4.88 3.00 7 D E $640 CAPP $8 $632 $ $640 10 11 91030 Dodson Road I-90 to 9 -NW 15.88 23.79 7.91 7 B,C, E $100 $0 $0 $1 $100 11 12 34310 Grant P1. Golf Ct. to 20 -NW 0.12 0.62 0.50 9 A,B,C I $50 $2 $0 $4 $50 12 12 42370 Paxson Dr. Murphy to Gary St. 0.51 0.67 0.16 9 B,C E $35 $2 $0 $3 $35 13 13 91030 Bridge #381_ Dodson Road 20.94 21.15 0.21 8 I E $5 $5 $0 $ $5 14 14 93047 Sagebrush Flat Statter to Baird Spr. 0.65 2.55 1.90 8 A,B,C E $48 $192 RAP $7 $174 $5 $240 :RAS FORM NO. 3 (REV 6/87) PAGE/PROGRAM TOTALS => $7b1 $2-691 $64 $0 $3,013 $37 $3,452 PAGE 1 OF 2-