HomeMy WebLinkAboutResolution 90-149-CCBOARD OF COUNTY COMMISSIONERS
GRANT COUNTY, WASHINGTON
IN THE MATTER OF ADOPTING
THE 1991 ANNUAL ROAD RESOLUTION NO. 90 -149 -CC
PROGRAM
WHEREAS, pursuant to the requirements of R.C.W.
36.40.070, Grant County did prepare a 1991 Annual Road Construction
Program, and a Comprehensive Road Program for the ensuing six years
of 1991 - 1996, and
WHEREAS, in accordance with W.A.C. 136.16 an
environmental assessment was made on all work within the Annual
Program, and
WHEREAS, pursuant to the requirements of R.C.W. 36.40.80,
a public hearing was held and included the 1991 Annual Road
Program, and
WHEREAS, all comments and/or objections were heard and
evaluated,
NOW, THEREFORE, BE IT RESOLVED by the Board of County
Commissioners of Grant County, Washington that the 1991 Annual Road
Construction Program attached hereto is hereby adopted.
DONE THIS -18th DAY OF December
ATTEST:e—JA,�'-44
CI fthe Board
k
Commissioner
Commissioner
Constituting the Board of County Commissioners
of Grant County, Washington
ANNUAL CONSTRUCTION PROGRAM FOR 1tO "1
(8) TYPE OF WORK CODE
A. GRADING & DRAINAGE F: SIDEWALKS DAY LABOR COMPUTATION
A
A(A) TOTAL CONSIRUCTION PROGRAM - columns (15)+(16) $ 55 201
B. BASE & TOP COURSE G. TRAFFIC FACILITIES (8) COMPUTED DAY LABOR LIMIT (see back) . . . . .
--
C. $ITEM. SURF. TREATMENT H. PATHS. TRAILS & BIKEWAYS 5 ova
(C) IOTAL OAT LABOR PROGRAM - column (I6) $ 710
D. A.C. OR P.C.0 PAVEMENT I. $RIDGES
(line C must be smaller than line $)
E. CURBS & GUTTERS J. FERRY FACILITIES
AGENCY ACTe
County.............................
Date of Submittal of
Recommended Program
Date of Enviromentabct. , 1987
Assessment.........................
Date of Final Adoption
Ordinance/Resolution No.
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10) 1 (11) (12)
(13) 1 (14) 1 (15) (16) (17)
6 YEAR
FUNDING SOURCE
ESTIMATED EXPENDITURES ($1000)
ROAD
PROGRAM
ROAD
ROAD NAME ANDNUMBER
LENGTH
= a
TYPE
OF
zCn
- W
H
COUNTY
OTHER FUNDS
PRELIM
HT
OF
CONSTRUCTION
GRAND
ITEM
ITEM
LOG
BRIDGE NUMBER
LOCATION
�U
WORK
z a
W
FUNDS
($1000)
($1000)
PROGRAM
SOURCE
ENGR
541.11
ylAy
CONTRACT
DAY
LABOR
TOTAL
541.00
H.P. to M.P.
TOTAL
NO.
NO.
N0.
541.20
15
17
36940
Martin Road
SR 28 E -NW
0.00
0.90
0.90
8
A,B,C
E
$135
$7
$108
$20
$135
16
18
36940
Bridge #315
Martin Road
0.12
0.14
0.02
7
1
E
$190
$8
$182
$0
$190
17
19
91035
Frenchman Hill Rd.(PE only
Q -SW to Adams
5.85
10.73
4.88
8
A,B,C,
E
$15
$15
$0
$0
$15
18
12
13100
13 -SE Road
Dodson Rd. to A.5 -SE
3.24
4.74
1.50
9
BIC
E
$80
$1
$0
$79
$80
19
12
46450
19 NE/NW Rd. (PE only)
SR 28 toB-NE
0.00
2.38
2.38
8
A,B,C
E
$1
$9
RAP
$10
$0
$0
$10
/3420
20
12
10300
26-S14 Road,
SR 243 to R -SW
5.03
7.00
1,97
9'
C
E
$40
$1
$0
$39
$40
21
12
91017
Adams Road
Sr 28 to SR 283
17.36
23.68
6.32
7
D
E
$1,200
CAPP
$10
$1,188
$0.
1,198
22
12
Varicus
Misceallaneous Projects
County Wide
E
-$200-�-
_
$3_..
... -- -
._ . $0 ..
$197
...$200
Sub -Totals
1
$6611$112091.
$55$1,478
$335
11868
:RAS FORM NO. 3 (REV 6/87) PAGEIPROGRAM TOTALS
$1,4221$3,9001
$119
$0
$4;491
$710
5,320
PAGE 2 OF _2
(8) TYPE OF WORK CODE
A. GRADING & DRAINAGE
B. BASE & TOP COURSE
C. BITUM. SURF. TREATMENT
D. A.C. OR P.C.0 PAVEMENT
E. CURBS & GUTTERS
F: SIDEWALKS
G. TRAFFIC FACILITIES
H. PATHS, TRAILS & BIKEWAYS
1. BRIDGES
J. FERRY FACILITIES
ANNUAL. CONSTRUCTION PRUtS J 1'UK kGENCY ACTION
DAY LABOR COMPUTATION
(A) TOTAL CONSTRUCTION PROGRAM - columns (15)+(16) $ 5.2M
(B) COMPUTED DAY LABOR LIMIT (see back) . . . . . $
(C) TOTAL DAY LABOR PROGRAM - column (16) . . . . s- 710
(line C must be smaller than line B)
County ...,.....................
Date of Submittal of NV., 1990
Recommended Program ................
Date of Enviromental
Assessment ..PE t.., 19$7 ............
Date of Final Adoption ..DT. 1987.
Ordinance/Resolution No. .�V....
(1)
(2)
1 (3)
(4)
(5)
(6)
(7)
(8)
(9)
(10) 1 (11) 1 (12)
(13) 1 (14) (is) (16) 11 (17)
6 YEAR
FUNDING SOURCE
ESTIMATED EXPENDITURES ($1000)
ROAD
PROGRAM
ROAD
LENGTH
is
TYPE
OF
z N
W
COUNTY
OTHER FUNDS
PRELIM
OF
CONSTRUCTION
GRAND
($1000)
PROGRAM
SOURCE
CONTRACT
DAY
LABOR
ITEM
.1 TEM
LOG
ROAD NAME AND/OR
BRIDGE NUMBER
LOCATION
�-j
WORK
i a
`�'
fUNDS
($1090)
ENGR
541.11
�{py
TOTAL
541.00
M.P. to M.P.
TOTAL
NO.
RO,
NO.
541.20
1
12
1017
Adams Road
SR 26.to 10 -Std
0.00
3.23
3.23
7
C
E •
$4
$21
FAS
$0
$2
$23
$25
2
2
51050
Bridge #116=,
Long Lake
0.83
1.09
0.26
8
A,B,C,I
E
$54
RAP
$3
$256
$11
$270
$116
BROS
3
3
95025
Bridge #117
Pinto Ridge
0.00
1.23
1.23
7
A,B,C,I
E
$45
$225
BR
$14
$414
$42
$470
$34
$166
FAS
4
4
30990
Silica Road
N. Front to Sunland
0.00
4.43
4.43
8
A,B,C
I
$60
$540
RAP
$3
$538
$59
$600
5
5
45270
Patton Blvd.
Arlington to Andrew
0.00
1.01
1.01
16
A,B,D,E
E
$93
$371
TIB
$6
$458
$0
$464
6
6
45270
Patton Blvd. Bike Path
Arlington to Andrew
0.00
1.01
1.01
16
H
E
$20
$1
$19
$0
$20
7
7
45010
Dover St.
SR'17 to 30th Ave.
0.00
0.38
0.38
17
A,B,D,E,
E
$200
$8
$192
$
$200
F
8
8
34050
4th/Frey/8th Ave.
Sr 28 to SR 28
0.00
0.56
0.56
17
A,B,D,E,
E
$67
$266
TIB
$5
$328
$
$333
F
9
10
94000
Wheeler Road
Wiser to O -NE
1.88
4.88
3.00
7
D
E
$640
CAPP
$8
$632
$
$640
10
11
91030
Dodson Road
I-90 to 9 -NW
15.88
23.79
7.91
7
B,C,
E
$100
$0
$0
$1
$100
11
12
34310
Grant P1.
Golf Ct. to 20 -NW
0.12
0.62
0.50
9
A,B,C
I
$50
$2
$0
$4
$50
12
12
42370
Paxson Dr.
Murphy to Gary St.
0.51
0.67
0.16
9
B,C
E
$35
$2
$0
$3
$35
13
13
91030
Bridge #381_
Dodson Road
20.94
21.15
0.21
8
I
E
$5
$5
$0
$
$5
14
14
93047
Sagebrush Flat
Statter to Baird Spr.
0.65
2.55
1.90
8
A,B,C
E
$48
$192
RAP
$7
$174
$5
$240
:RAS FORM NO. 3 (REV 6/87) PAGE/PROGRAM TOTALS =>
$7b1
$2-691
$64
$0
$3,013
$37
$3,452
PAGE 1 OF 2-