HomeMy WebLinkAboutResolution 90-052-CCBOARD OF COUNTY COMMISSIONERS
GRANT COUNTY, WASHINGTON
IN THE MATTER OF ADOPTING
A COMPREHENSIVE SIX YEAR
TRANSPORTATION IMPROVE-
MENT PROGRAM FOR THE
ENSUING SIX YEARS
RESOLUTION NO. 90 -52 -CC
WHEREAS, pursuant to the requirements of Section 6,
Chapter 83, Laws of Extraordinary Session of the State of Washington,
Grant County did prepare a Comprehensive Transportation Improvement
Program for the ensuing six years; and
WHEREAS, priority array of projects prepared in
accordance with County Road Administration Board Standards of Good
Practice (WAC 136-14) was made available and was consulted by the
Board during the preparation of this Six Year Program; and
WHEREAS, the Engineer's report with respect to
deficient bridges was available to the Board during the preparation
of the Six Year Program; and
WHEREAS, an environmental pre -assessment of the Six
Year Program indicated that the social, economic and aesthetic values
would not be disturbed; and
WHEREAS, pursuant further to said Law, the Board of
County Commissioners, being the legislative body of the County, did
prepare, revise and extend said Six Year Program and did hold a
public hearing on said Comprehensive Plan at 10:30 A.M. at the
Courthouse, Ephrata, Washington on the 19th day of June, 1990;
NOW, THEREFORE, BE IT RESOLVED by the Board of County
Commissioners of Grant County, Washington, that the Comprehensive Six
Year Road Program presented at the public hearing on the 19th day of
June, 1990, and revised as necessary, be hereby adopted.
DONE THIS 19th DAY OF June
ATTEST:Q, -
Ci rk o V
oord
Commissioner
Constituting the Board of County Commissioners
of Grant County, Washington
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996
GRANT COUNTY HEARING DATE : 06/19/90
ADOPTION DATE:
COUNTY NO: 13 RESOLUTION NO:
1 P
F
PROJECT
COSTS IN
-
THOUSANDS OF
DOLLARS-
FEDERAL
F.'
U
L
M C
F
OBLIGATION
I
N
PROJECT IDENTIFICATION
E
A' A
U -EXPENDITURE FLAN-
------
FUNDS
-------
PLAN
..
CC
/DESCRIPTION OF 'WORK
N
J F.•
N
R
TL
G
OW R
D 1ST
2ND
3RD 5TH
TOT
LOC
RAP
FED
IST
2ND
I
A
T
RO Y
I YEAR
YEAR
4TH 6TH
AND
OR
YEAR
-6TH
( T
a
H
R
N
YEAR YEAR
OTH
UAB
YEAR
Y
S
K
G
t 1
O8
--------------------------------------------------------------
J -NE RD (LONG LAKE)
1.03
---
4
--------------------------------------------------------
F 150
150
150
P E
51050 - MP 0.37 TO 1.40.
R/W
GRADE, DRAIN, SURFACE (EST);
FINISHED WIDTH = 28 FT.
WORK
CODES:
ABC
CON
l
UTIL
CODES:
PT
F.A.
PROJ
NO.
----
--
-
- -_
TOT
0
0
---
(. 2
03
----------------------------
EF,'IDGE #116, LONG LAKE
---------------------------
-----
.30
---
4
------
F 270
-----
----------
-------
270
-----
0
------
54
----
216
------
P E
------
16
----
51050 - MP 0.60 TO 14P 0.90
R/W
GRADE, DRAIN, SURFACE (EST),
ANG BRIDGE REPLACEMENT;..
WORK
CODES:
ABCL
CON
200
1
FINISHED WIDTH. = 23 FT.
UTIL
CODES:
PT
F.A.
PROJ
NO.
BROS-2013-_
TOT
216
0
-
?7
EI:IL'-I1- N i 17 , PINTO RIDGE
.34
4
F 270
270
45
225
P E
10
95025 - h4P C.40 TO MP 0.74
R/W
RIDGE REPLACEMENT; FINISHED
WIDTH = 34 FT.
WORK
CODES:
AB --_L
CON
215
(
UTIL
CODES:
F'T
F.A.
PROJ
NO.
Rs
-Q137-_
TOT
225
0
-
14
- --
03
- --- ------------------------------------------------------------------------------------------------------------------
SILI--A RD (N FRONTAGE TO SUNLAND
RD)
4.43
1
F 600
600
60
540
P E
00990- NP 0.00 TO HP 4.4
k/W
tiNAvE, DRAIN, :URFACE(BST);
FINISHED WIDTH = 23 FT....
WORK
C0DEE:
ABC
CON
(
i.='roie, �ontinu•=tion depends
upon receiving contribu-
UTIL
CODES:
PT
F.A.
PROJ
NO.
ttions t„t -ding no les= than
$45,000.)
- -_
TOT
0
0
l 5
16
F'4TTC'i L.L`E, (ARLINGTON TO ANDREWS)
1.01
24 X
F 464
464
93
371
P E
y 0?70 - MP 0. 00 TG I•iF 1 .01 .
R/W
iADE, DRi.!N, tUF.'FACE (ACF'),
AND CURB AND GUTTER;.....
WORK
CODES:
ABDF
CON
L
FINISHED WIDTH = 48 FT.
UTIL
CODES:
PT
F.A.
PROJ
NO.
- -_
TOT
0
0
0
19
PATTON rL`.'D BIKE PATH (ARLINGTON
TO DOVER;
.35
9 X
F 20
20
20
P E
R/W
CTKC PATH
WORK
CODE'S:
CCN
UTIL
CODES:
F.A.
PRO.J
NO.
- -_
TOT
0
0
- ----------- ------- --
--------------------
--
(
SIX YEAR, TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 Page 2
GRANT COUNTY
(
---------------------------------------------
P
F
-PROJECT
COSTS IN
THOUSANDS
OF
DOLLARS-
I FEDERAL
R
U
L
M C
F
IOBLIGATION
(
I
N
PROJECT IDENTIFICATION
E
A A
U -EXPENDITURE PLAN-
------
FUNDS -------
J.PLAN
O
CC
/DESCRIPTION OF WORK
N
J R
N
I-
R
TL
G
OW R
D 1ST
2ND
3RD 5TH
TOT
LOC
RAP
FED
1ST
2ND
(
I
A
T
RO Y
I YEAR
YEAR
4TH 6TH
AND
OR
YEAR
-6TH
-
T
S
H
R
N
YEAR YEAR
0TH
UAB
YEAR
Y
S
K
G
------------------------------------------------------------------------------------------------------------------------------------
7
17
DOVER ST (SR 17 TO 30TH AVE)
.38
12 X
F 200
200
200
P E
45010 - MP 0.00 TO MP 0.38 (PROPOSED)
P,/W
GRADE, DRAIN, SURFACE (ACP), AND CURB AND GUTTER;.....
WORK
CODES:
ABDF
CON
FINISHED WIDTH = 48 FT. (Const. by WA Army Nat.
Guard)
UTIL
CODES:
PT
F.A.
PROD
NO.
-
TOT
0
0
k
------------------------------------------------------------------------------------------------------------------------------------
8
17
4TH AV/FREY RD/8TH AVENUE (SR 28 TO SR 18)
.56
24 X
F 333
333
67
266
P E
34050 - MP 0.00 TO MP 0.56
R/W
GRADE, DRAIN, SURFACE (ACF), AND CURB AND GUTTER;.....
WORK
CODES:
ABDF
CON
FINISHED WIDTH = 48 FT.
UTIL
CODES:
PT
F.A.
PROJ
NO.
-
TOT
0
0
------------------------------------------------------------------------------------------------------------------------------------
9
09
1 -SW RD (G -SW TO I -SW)
2.02
1
F 70
70
70
P E
NEW - MP 0.00 TO MP 2.02
R/W
GRADE, DRAIN, SURFACE (GRAVEL); FINISHED WIDTH =
26 FT
WORK
CODES:
AB
CON
UTIL
CODES:
PT
F.A.
PROJ
NO.
-
-_
TOT
0
0
------------------------------------------------------------------------------------------------------------------------------------
10
07
WHEELER RD (WISER LN TO O -NE)
3.50
5
P 560
560
560
P E
94000 - MP 1.38 TO MP 4.8E
R/W
SURFACE (ACF'); FINISHED WIDTH = 48 FT.
WORK
CODES:
D
CON
UTIL
CODES:
F.A.
PROJ
NO.
-
TOT
0
0
-------------------------------------------------------------------------------------------------------------------------------------
11
07
GODSON RD (I-90 TO 9 -NW)
4.91
3
F 100
120
220
220
P E
91030 - MP 15.88 TO MP 23.79
R/W
WIDEN AND SURFACE SHOULDERS; FINISHED WIDTH = 34
FT.
WORK
CODES:
ABC
CON
UTIL
CODES:
PT
F.A.
PROJ
NO.
-
TOT
0
0
--------------------------------------------------
12
----------------------------------------------------------------------------------
MISCELLANEOUS PROJECTS
45
F 100
100
200 200
600
600
P E
R/W
*INCLUDES COST SHARE PROJECT'
WORK
CODES:
ABC
CON
UTIL
CODES:
PT
F.A.
F'F,'OJ
NO.
-
TOT
0
0
---------------------------------------------------------------
13
07
BRIDGE 1#381, DODSON RD
---------------------------------------------------------------------
.21
4
F 5
80
85
85
P E
91030 - MP 20.94 TO MP 21.15
R/W
BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT.
WORK
CODES:
L
CON
UTIL
CODES:
PT
F.A.
PROJ
NO.
-
-_
TOT
0
0
l------------------------------------
------------------------
----
-----------------------------------------------------------------
�
C
(
SIX YEAR TRANSPORTATION
IMPROVEMENT
PROGRAM 1991 TO
1996
Page
3 �
GRANT COUNTY
P
F
-PROJECT COSTS
IN
THOUSANDS
OF
DOLLARS-
FEDERAL
R
U
L
M C
F
OBLIGATION
I
N
PROJECT IDENTIFICATION
E
A A
U -EXPENDITURE PLAN-
------
FUNDS
-------
PLAN
0
CC
/DESCRIPTION OF WORK
N
J R
N
R
TL
G
OW R
D IST
2ND 3RD
5TH
TOT
LOC
RAP
FED
1ST
2ND
�.
I
A
T
RO Y
I YEAR
YEAR 4TH
6TH
AND
OR
YEAR
-6TH t
T
S
H
R
N
YEAR
YEAR
OTH
UAB
YEAR
Y
S
K
G
14
07
SAGEBRUSH FLATS RD (STATTER RD TO BAIRD SPRINGS
RD)
1.90
4
F 50
190
240
48
192
P E
93047 - MP 0.65 TO MP 2.55
R/W
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28
FT.
WORK
CODES:
ABC
CON
UTIL
CODES:
PT
F.A.
PROJ
NO.
-
'TOT
0
0
------------------------------------------------------------------------------------------------------------------------------------
15
07
BRIDGE #168, SAGEBRUSH FLATS
.02
4
F 200
50
250
40
210
P E
15
93047 - MP 0.77 TO MP 0.79.
"R/W
BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT.
WORK
CODES:
L
CON
195
{
i
UTIL
CODES:
PT
F.A.
PROJ
N0.
RS
-K136-
TOT
210
0
------------------------------------------------------------------------------------------------------------------------------------
16
19
26 -SW (SR 243 TO R -SW)
1.98
5
P
40
40
40
P E
10300 - MP 5.03 TO MP 7.00
R/W
SURFACE (BST); FINISHED WIDTH = 26 FT.
WORK
CODE'S:
C
CON
C
UTIL
CODES:
F.A.
PROJ
NO.
- -_
TOT
0
0
------------------------------------------------------------------------------------------------------------------------------------
C
17
08
MARTIN RD (SR 28 TO E -NW)
.90
34
P 10
125
135
13
122
P E
36940 - MP 0.00 TP MP 0.90
R/W
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34
FT.
WORK
CODES:
ABC
CON
UTIL
CODE'_:
PT
F.A.
PROJ
NO.
- -_
TOT
0
0
{
---------------------------------------------------------------------------------------------------------------
--------------------
18
08
BRIDGE #315, MARTIN RD
.02
4
F' 10
130
190
19
171
P E
36940 - MF' 0.12 TO MP 0.14
R/W
l
BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT.
WC: RK
CODE::
L
CON
UTIL
CODES:
PT
F.A.
PROJ
NO.
- -_
TOT
0
0
-----------------------------------------------------------------------------------'-
19
07
FRENCHMAN HILL RD (Q, -SW TO ADAMS)
4.88
4
P 15
----------------------------------------------
465
480
48
432
P E
L
91035 - MP 5.85 TO MP 10.73
R/W
GRADE, DRAIN, SURFACE(BST); FINISHED WIDTH = 34
FT.
WORK
CODES:
.3C
CON
t
l
UTIL
CODES:
I' T
F.A.
PROJ
NO.
-
TOT
0
0
--------------------------------------------------------------------------
---
- - -----------------------------------------------
20
08
MAE VALLEY RD (HIAWATHA TO WESTSHJRE)
4.97
34
P
708
708
161
547
P E
40560 - MP 0.00 TO MP 4.97
R/W
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34
FT.
WORK
CODES:
ABC
CON
C
UTIL
CODE_:
PT
F.A.
PROD
NO.
- -_
TOT
0
0
------------------------------------------------------------------------------------------------------------------------------------
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996
GRANT COUNTY
Page 4
a
P
F
-PROJECT
COSTS IN
THOUSANDS
OF
DOLLARS-
FEDERAL
R
U
L
M C
F
OBLIGATION
I
N
PROJECT IDENTIFICATION
E
A A
U -EXPENDITURE PLAN-
------
FUNDS
-------
PLAN
0
CC
/DESCRIPTION OF WORK
N
J R
N
R
TL
G
OW R
D IST
2ND
3RD 5TH
TOT
LOC
PAP
FED
1ST
2ND
I
A
T
RO Y
I YEAR
YEAR
4TH 6TH
AND
OR
YEAR
-6TH
T
S
H
R
N
YEAR YEAR
OTH
UAE
YEAR
Y
S
K
G
------------------------------------------------------------------------------------------------------------------------------------
21
17
DOVER ST (30TH AVE TO PATTON BLVD)
.36
24 X
P
250
250
250
P E
45010 - MP 0.38 TO MP 0.74
R/W
GRADE, DRAIN, SURFACE (ACP), AND CURB
AND GUTTER;.....
WORK
CODES:
ABDF
CON
FINISHED WIDTH = 48 FT.
UTIL
CODES:
PT
F.A.
PROJ
NO.
- -_
TOT
0
0
------------------------------------------------------------------------------------------------------------------------------------
22
19
DOVER ST BIKE PATH (PATTON BLVD. TO SR
17)
.50
9 X
P
24
24
24
P E
R/W
(
BIKE PATH
WORK
CODES:
0
CON
UTIL
CODES:
F.A.
PROJ
NO.
-
TOT
0
0
------------------------------------------------------------------------------------------------------------------------------------
(
23
16
PATTON BLVD TRAFFIC SIGNAL
.10
6
P
80
80
16
64
P E
45170 - MP 0.53
R/W
TRAFFIC/PEDESTRIAN SIGNAL
WORK
CODES:
IJ
CON
UTIL
CODES:
PT
F.A.
PROJ
NO.
- -_
TOT
0
0
------------------------------------------------------------------------------------------------------------------------------------
24
08
N -NE RR SIGNALIZATION (UNION CARBIDE)
6
P
110
110
1
109
P E
6
44750 - MP 0.30
R/W
RAILROAD CROSSING SIGNALIZATION
WORK
CODES:
I
CON
103
UTIL
CODES:
F.A.
PROJ
NO.
RP.P
-2013-_
TOT
0
109
----------------------------------------------------
t' 25
08
D-NE/6.5-NE/E-NE (MCCONIHE FLATS)
---------------
------------------------------------------------------------------
1.66
34
P
250
250
25
225
P E
46200 - MP 2.99 TO MP 4.65
R/W
GRADE, DRAIN, SURFACE (BST); FINISHED
WIDTH = 34 FT.
WORK
CODES:
ABC
CON
(
UTIL
CODES:
PT
F.A.
PROJ
NO.
- -_
TOT
0
0
--------------------------------------------
26
09
-----------------------------------------------------------------------------------------
BRIDGE 11219, W SE
.02
4
P
366
366
73
293
P E
10
24650 - MP 0.00 TO MP 0.20
R/W
BRIDGE REPLACEMENT; FINISHED WIDTH 28
FT.
WORK
CODES:
L
CON
283
t
UTIL
CODES:
PT
F.A.
P -"OJ
NO.
BR --S-2013-_
TOT
0
293
---------------------------------------------------
l. 27
16
POTATO HILL RD (I-90 TO BASELINE -E)
--------------------------------------------------------------------------------
1.08
24
P
664
684
137
547
P E
21590 - MP 0.00 TO MP 1.08
R/W
GRADE, DRAIN, SURFACE (ACP), AiiD CURB
AND GUTTER;.....
WORK
CODES:
ABDF
CON
(
FINISHED WIDTH = 48 FT.
UTIL
CODES:
PT
F.A.
FROJ
NO.
- -_
TOT
0
0
-----------------------------------------------------------------
------------------------
----------------------------------------
a
t
SIX YEAR TRANSPORTATION
IMPROVEMENT
PROGRAM 1991
TO
1996
Page
5
GRANT
COUNTY
-------------------------------------
P
F
-PROJECT
COSTS
IN
THOUSA140S OF
DOLLARS-
FEDERAL
R
U
L
M C
F
"'OBLIGATION
(
I
N
PROJECT IDENTIFICATION
E
A A
U -EXPENDITURE
PLAN-
------ FUNDS
-------
PLAN
O
CC
/DESCRIPTION OF WORK
N
J R
N
R
TL
G
OW R
D 1ST
2ND
3RD
5TH
TOT
LOC
RAP
FED
1ST
2ND
(
I
A
T
RO Y
I YEAR
YEAR
4TH
6TH
AND
OR
YEAR
-6TH
T
S
H
R
N
YEAR
YEAR
OTH
UAE
YEAR
Y
S
K
G
28
16
POTATO HILL BIKE PATH (I-90 TO BASELINE -E)
1.10
9
P
65
65
65
P E
R/W
BIKE PATH
WORK
CODES:
0
CON
UTIL
CODES:
F.A.
PROJ
NO.
-
-_
TOT
0
0
-
(
------------------------------------------------------------------------------------------------------------------------------------
29
08
POTATO HILL RD (BASELINE -E TO SAND DUNES RD)
1.02
34
P
150
150
15
135
P E
10
21590 - MP 1.08 TO MP 2.10
— R/W-
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34
FT.
WORT:
CODES:
ABC
CON
140
UTIL
CODES:
PT
F.A.
PROJ
NO.
-
-_
TOT
0
150
------------------------------------------------------------------------------------------------------------------------------------
30
17
CHANUTE ST (DOVER TO PATTON)
.74
34
P
350
350
70
280
P E
45140 - MP 0.00 TO MP 0.70
R/W
GRADE, DRAIN, SURFACE (ACP), AND CURB AND GUTTER;.....
WORK
CODES:
ABDFG
CON
FINISHED WIDTH = 40 FT.
UTIL
CODES:
PT
F.A.
PRO•J
NO.
-
-_
TOT
0
0
------------------------------------------------------------------------------------------------------------------------------------
31
07
ADAMS RD (I-90 TO SR 28)
8.9U
P
1000
1000
1000
P E
91017 - MP 14.78 TO MP 23.68
R/W
SURFACE (ACF); FINISHED WIDTH = 34 FT.
40RK
CODES:
D
CON
1'
UTIL
CODES:
PT
F.A.
PROJ
NO.
-
-_
TOT
0
0
------------------------------------------------------------
32
07
SAGEBRUSH FLATS RD (BAIRD SPRINGS TO 24 -NE)
--
--
10.39
---
-------------------------------------------------------------
4
--------------------------------------------------------32
F'
1120
1120
112
1008
P E
93047 - MP 2.55 TO MP 11.60; 93048 - MP 5.28 TO
MP 6.62
R/W
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28
FT.
WC -RK'
CODE_:
ABC
CON
UTIL
C.30 -ES:
PT
F.A.
PROJ
NO.
-
-_
TOT
0
0
�'
---
33
---
17
------------------------------------------- - - - - --
AIRWAY DRIVE (FAIRGROUNDS TO SR 17)
----- -
--- --
1.3?
- - - - --
24
-----
P
------
-----
836
----
------
836
------
167
-----
669
----
--------
P E
-----
----
41690 - MP 1.89 TO 3.21
R/W
GRADE, DRAIN, SURFACE (ACF•), AND CURB AND GUTTER;.....
WvRk
CODES:
ABDF
CON
FINISHED WIDTH = 48 FT.
UTIL
=ODES:
PT
F.A.
PRO•J
NO.
-
-_
TOT
0
0
(
---------------------------------------------------
34
17
---------------
AIRWAY DRIVE BIKE PATH (VALLEY RD TO COCHRAN DR)
-----------------------------------------------------------------
1.20
9
P
55
55
55
P E
R/W
BIKE PATH
WOF.•K
CODES:
O
CON
UTIL
CODES:
F.A.
PROJ
NO.
-
-_
TOT
0
0
L..-----------------------------------------------------------------
---------------------------------------------------------------
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 Page 6
GRANT COUNTY
I c_
P
F
PROJECT
COSTS
IPJ
THOUSANDS OF
DOLLARS-
FEDERAL
R
U
L
M C
F
( OBLIGATION
(
I
N
PROJECT IDENTIFICATION
E
A A
U -EXPENDITURE PLAN-
------
FUNDS -------
PLAN
O
CC
/DESCRIPTION OF WORK
N
J R
N
R
TL
G
OW R
D 1ST
2ND
3RD
5TH
TOT
LOC
RAP
FED
1ST
2ND
(
I
A
T
RO Y
I YEAR
YEAR
4TH
6TH
AND
OR
YEAR
-6TH
T
S
H
R
N
YEAR
YEAR
OTH
UAE
YEAR
Y
S
K
G
35
16
BASELINE -E (POTATO HILL TO K -SE)
1.00
34
P
100
100
20
80
P E
21700 - MP 0.00 TO MP 1.00
R/W
GRADE, DRAIN, SURFACE (BST); FINISHED
WIDTH = 40 FT.
WORK
CODES:
ABC
CON
UTIL
CODES:
PT
F.A.
PROD
NO.
-
-_
TOT
0
0
-------------------------------------------------------------------------------------------------------------------------------------
36
16
BASELINE -E RD (K -SE TO K.7 -SE)
.77
14
P
100
100
20
80
P E
21700 - MP 1.00 TO MP 1.77
R/W
(
GRADE, DRAIN, SURFACE (BST), AND CULVERT
REPLACEMENT;.
WORK
CODES:
ABCL
CON
FINISHED WIDTH = 40 FT.
UTIL
CODES:
PT
F.A.
PROJ
NO.
-
-_
TOT
0
0
------------------------------------------------------------------------------------------------------------------------------------
37
16
BASELINE -E ROAD (K.7 -NE TO SR -17)
.60
34
P
80
80
16
64
P E
21740 - MP 0.00 TO MP 0.60
R/W
GRADE, DRAIN, AND SURFACE(BST); FINISHED
WIDTH = 40 FT
WORK
CODES:
ABC
CON
UTIL
CODES:
PT
F.A..PROJ
NO.
-
-_
TOT
0
0
------------------------------------------------------------------------------------------------------------------------------------
38
08
BRIDGE #251, 2.8 -SE
.02
4
P
48
48
10
38
P E
5
22010 - MP 0.20 TO MP 0.22
R/W
BRIDGE REPLACEMENT; FINISHED WIDTH =
28 FT.
WORK
CODES:
L
CON
33
UTIL
CODES:
PT
F.A.
PROJ
NO.
BROS-2013-_
TOT
0
38
---------------------------------------------------------------------
39
07
BRIDGE #238, M -SE
.21
— -------------------------------------------------------------
4
P
50
50
10
40
P E
5
92015 - MP 1.47 TO MP 1.68
R/W
BRIDGE REPLACEMENT; FINISHED WIDTH =
34 FT.
WORK
CODES:
L
CON
35
UTIL
CODES:
PT
F.A.
PROD
NO.
ERS -
-_
TOT
0
40
------------------------------------------------------------------------------------------------------------------------------------
40
09
BRIDGE #126, O -NE
.05
4
P
44
44
9
35
P E
5
54150 - MP 4.20 TO MO 4.25
R/W
BRIDGE REPLACEMENT; FINISHED WIDTH =
28 FT,
WORK
CODES:
L
CON
30
UTIL
CODES:
PT
F.A.
PR ----J
NO.
BROS-2013-,_
TOT
0
35
--------------------------------------------------------------------------------
41
09
BRIDGE 11347, S -NW
.10
4
P
— --------------------------------------------------
65
65
13
52
P E
5
31550 - MP 1.40 TO MP 1.50
R/W
BRIDGE REPLACEMENT; FINISHED WIDTH =
34 FT.
WORK
CODES:
L
CON
47
UTIL
CODES:
PT
F.A.
PROJ
NO.
BROS-2013-_
TOT
0
52
L------------------------------------------------------------------------------------------------------------------------------------
I c_
{
SIX YEAR
TRANSPORTATION IMPROVEMENT
PROGRAM 1991 TO
1996
Page
7
GRANT COUNTY
P
F
-PROJECT
COSTS
IN
THOUSANDS
OF
DOLLARS-
FEDERAL
R
U
L
M C
F
OBLIGATION
(
I
N
PROJECT IDENTIFICATION
E
A A
U -EXPENDITURE PLAN-
------
FUNDS
-------
PLAN
O
CC
/DESCRIPTION OF WORK
N
J R
N
R
TL
G
CiW R
D 1ST
2ND
3RD
5TH
TOT
LOC
RAP
FED
IST
2ND
(
I
A
T
RO Y
I YEAR
YEAR
4TH
6TH
AND
OR
YEAR
-6TH
T
S
H
R
N
YEAR
YEAR
OTH
UAB
YEAR
Y
S
K
G
42
09
BRIDGE #234, 2-SE
.19
4
P
64
64
13
51
P E
5
21820 - MP 0.15 TO MP 0.34
R/W
BRIDGE REPLACEMENT; FINISHED
WIDTH = 28
FT.
WORK
CODES:
L
CON
46
UTIL
CODES:
PT
F.A.
PROJ
NO.
EROS-2013-_
TOT
0
51
('
-----------------------------------------------
--------------------------------------
-----------------
43
09
BRIDGE #156, FEISS RD
.25
4
P
152
152
30
122
P E
10
52410 - MP 0.10 TO MP 0.35
R/W
(
BRIDGE REPLACEMENT; FINISHED
WIDTH = 28
FT.
WORK
CODES:
L
CON
112
UTIL
CODES:
PT
F.A.
PROJ
NO.
BROS-2013-_
TOT
0
122
------------------------------------------------------------------------------------------------------------------------------------
C
44
08
BRIDGE #104, 31-NE
.20
4
P
174
174
35
139
P E
10
51600 - MP 0.30 TO MP 0.50
R/W
BRIDGE REPLACEMENT; FINISHED
WIDTH = 28
FT.
WORK
CODES:
L
CON
129
UTIL
CODES:
PT
F.A.
PRO•J
NO.
BROS-2013-_
TOT
0
139
----------------------------------------------------
--------------------------------------------------------------------------------
45
19
PATTON BLVD BIKE PATH (SR 17
TO AIRWAY)
.30
9
P
15
15
15
P E
R/W
BIKE PATH
WORK
CODES:
0
CON
UTIL
CODES:
F.A.
PROJ
NO.
-
TOT
0
0
-------------------------------------------------
- --- --- --- ------------------------------------------------------------------
46
07
Q-NE (N FRONTAGE TO 3-NE)
2.84
4
P
450
450
81
369
P E
30
43590 - MP 0.00 TO MP 2.84
R/W
GRADE, DRAIN, SURFACE (BST),
AND BRIDGE.
REPTAGEMENT;..
WORK
CODES:
ABCL
CON
339
FINISHED WIDTH = 28 FT.
UTIL
CODES:
F.A.
PROJ
NO.
RS
-M137-
TOT
0
369
t
----
--
-------------------------- ---
--- -- -- - - --
--- - ---------------
------
------
-----
------
----
-------
-----
------
----
------
------
----
47
07
Q-NE RR SIGNALIZATION
6
F'
130
130
2
128
P E
10
43590 - MP 1.02
R/W
RAILROAD CROSSING SIGNALIZATION
WORK
CODES:
I
CON
118
UTIL
CODES:
PT
F.A.
PRO•J
NO.
RRS
-M137-
TOT
0
128
(
---------------------------------------------------
- - ---- -------------
---------------------------------------------------------
48
08
3-SE RD (SR 17 TO R-SE)
3.28
34
P
400
400
40
360
P E
22000 - MP 0.00 TO MP 3.28
R/W
GRADE, DRAIN, SURFACE (EST);
FINISHED WIDTH = 34 FT.
WORK
CODES:
ABC
CON
UTIL
CODES:
PT
F.A.
PROJ
NO.
- -_
TOT
0
0
---------------------------------------------
--------------------
----------------------------------------------------------
L
�,
L
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 Page 8
GRANT COUNTY
------------------------------------------------------------------------------------------------------------------------------------
P
F
-PROJECT
COSTS
IN
THOUSANDS OF
DOLLARS-
FEDERAL
R
U
L
MC
F
OBLIGATION
I
N
PROJECT IDENTIFICATION
E
A A
U -EXPENDITURE PLAN-
------
FUNDS
-------
( PLAN
0
CC
/DESCRIPTION OF WORK
N
J R
N
R
TL
G
OW R_D
1ST
2ND
3RD
5TH
TOT
LOC
RAP
FED
1ST
2ND
I
A
T
RO Y
I YEAR
YEAR
4TH
6TH
AND
OR
YEAR
-6TH
T
S
H
R
N
YEAR
YEAR
0TH
UAB
YEAR
Y
------------------------------------------------------------------------------------------------------------------------------------
S
K
G
------------------------------------------------------------------------------------------------------------------------------------
49
17
VALLEY RD (CASCADE VALLEY PARK TO OTTMAR)
.25
24
P
180
180
36
144
P E
41250 - MP 0.50 TO MP 0.75
R/W
GRADE, DRAIN, SURFACE (ACP), CURB AND
GUTTER, AND.....
WORK
CODES:
ABDF
CON
SIDEWALK/BIKE PATH; FINISHED WIDTH =
48 FT.
UTIL
CODES:
PT
F.A.
PROJ
NO.
-
TOT
0
0
------------------------------------------------------------------------------------------------------------------------------------
50
07
BRIDGE #395, ADAMS RD
.20
34
P
50
50
10
40
P E
5
91017 - MP 6.28 TO MP 6.45
R/W
BRIDGE REPLACEMENT; FINISHED WIDTH =
34 FT.
WORK
CODES:
L
CON
35
UTIL
CODES:
PT
F.A.
PROJ
NO.
BRS
-
TOT
0
40
------------------------------------------------------------------------------------------------------------------------------------
51
07
DODSON RD (I-90 TO SR 282)
13.83
5
P
1500
1500
252
1248
P E
8
91030 - MP 15.88 TO MP 29.71
R/W
ACP OVERLAY; FINISHED WIDTH = 34 FT.
WORK
CODES:
D
CON
1240
UTIL
CODES:
F.A.
PROJ
NO.
RS
-E131-_
TOT
0
1248
------------------------------------------------------------------------------------------------------------------------------------
52
08
27 -SW RD (L -SW TO P, -SW)
6.01
34
P
450
450
45
405
P E
91042 - MP 0.99 TO MP 7.00
R/W
GRADE, DRAIN, SURFACE (BST); FINISHED
WIDTH = 28 FT.
WORK
CODES:
ABC
CON
UTIL
CODES:
PT
F.A.
PROJ
NO.
-
-_
TOT
0
0
------------------------------------------------------------------------------------------------------------------------------------
53
08
5-NW/U-NW RDS (SR 281 TO 6 -NW)
4.90
34
P
650
650
65
585
P E
93010 - MP 14.07 TO 18.97
R/W
GRADE, DRAIN, SURFACE (BST); FINISHED
WIDTH = 34 FT.
WORK
CODES:
ABC
CON
UTIL
C-DDES:
PT
F.A.
PROJ
NO.
-
-_
TOT
0
0
-------------------------------------------------------------------------------------------------------------------------------------
54
08
BRIDGE #389, 5 -NW
.01
4
P
50
50
5
45
P E
93010 - MP 15.12 TO MP MP 16.13
R/W
BRIDGE REPLACEMENT; FINISHED WIDTH 34
FT.
WORK
CODES:
L
CON
UTIL
CODES:
PT
F.A.
PROD
NO.
_
-
-_
TOT
0
0
--
----------------------------------
55
08
--------------------------------------------------------------------------------------------
BRIDGE #358, 5 -NW
.01
4
P
90
90
9
81
P E
--
93010 - MP 15.09 TO MP 15.10
R/W
BRIDGE REPLACEMENT; FINISHED WIDTH =
34 FT.
WORK
CODES:
L
CON
UTIL
CODES:
PT
F.A.
PROJ
NO.
------------------------------------------------------------------------------------------------------------------------------------
-
-_
TOT
0
0
SIX YEAR TRANSPORTATION
IMPROVEMENT
PROGRAM 1991 TO
1996
Page
9
GRANT COUNTY
--------------------------------
P
F
-PROJECT
COSTS
IN THOUSANDS
OF
DOLLARS-
( FEDERAL
R
U
L
M C
F
OBLIGATION
I
N
PROJECT IDENTIFICATION
E
A A
U -EXPENDITURE PLAN-
------
FUNDS
-------
PLAN
0
CC
/DESCRIPTION OF WORK
N
J R
N
R
TL
""
G
OW R
D IST
2ND
3RD
STH
TOT
LOC
RAP
FED
1ST
2ND
I
A
T
RD Y
I YEAR
YEAR
4TH
6TH
AND
OR
(
YEAR
-6TH
T
S
H
R
N
YEAR
YEAR
OTH
UAB
YEAR
Y
S
K
G
56
07
MISCELLANEOUS ON -SYSTEM BRIDGES
4
P
400
400
800
800
P E
.R/W
BRIDGE REPLACEMENT
WORK
CODES:
L
CON
UTIL
CODES:
PT
F.A.
PROJ
NO.
- -_
TOT
0
0
------------------------------------------------------------------------------------------------------------------------------------
57
09
MISCELLANEOUS OFF -SYSTEM BRIDGES
4
P
400
400
800
800
P E
R/W
BRIDGE REPLACEMENT
WORK
CODES:
L
CON
UTIL
CODES:
PT
F.A.
PROJ
NO.
- -_
TOT
0
0
�'
-------------------------•-----------------------------------------------------------------------------------------------------------
58
07
DODSON RD (12 -SW TO BRIDGE #324)
1.48
34
P
10
170
180
0
162
18
P E
2
91030 - MP 2.24 TO MP 3.72
R/W
(
3R (BST); FINISHED WIDTH = 34 FT.
WORK
CODES:
ABC
CON
16
UTIL
CODES:
PT
F.A.
PROJ
NO.
RS
-E131-_
TOT
0
18
------------------------------------------------------------------------------------------------------------------------------------
59
08
MCCONIHE RD (SR 17 TO F -NE)
.81
34
P
10
165
175
17
158
P E
46200 - MP 0.00 TO MP 0.31
R/W
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT.
WORK
CODES:
ABC
CON
{
(
UTIL
CODES:
PT
F.A.
PROJ
NO.
- -�
TOT
0
0
----------------------------------
-------------------------------------------------------------------------------------------------
60
08
K -NW RD (SR 283 TO N FRONTAGE RD)
4.55
34
P
350
350
35
315
P E
38550 - MP 0.00 TO MP 4.55
R/W
GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT.
WORK
CODES:
ABC
CON
l
UTIL
CODES:
PT
F.A.
PROJ
NO.
- -_
TOT
0
0
�
------------------------
-------- ------- ---------------------------------------------------------------------------------
�
61
16
POTATO HILL kk SIGNALIZATION*
6
P
75
75
4
71
P E
6
21590 - MP 1.19
R/W
RAILROAD CROSSING SIGNALIZATI„'tJ
WORK
CODES:
I
CON
65
UTIL
CODES:
F.A.
PROD
NO.
RRP
-6055-_
TOT
0
71
t'
------------------------
62
17
--------- - -- ---------------
RANDOLPH RR SIGNALIZATION
6
P
75
75
4
71
P E
6
45010 - MP 0.96
R/W
RAILROAD CROSSING SIGNALIZATION
WORK
CODES:
I
CON
65
�
UTIL
CODES:
F.A.
PROJ
NO.
RRP
-6074-_
TOT
0
71
L
------------------------------------------------------------------------------------------------------------------------------------
L
L
4
'
2 :{4,
(
SIX YEAR
TRANSPORTATION
IMPROVEMENT
PROGRAM 1991 TO
1996
Page
10
GRANT COUNTY
P
F
-PROJECT COSTS
IN
THOUSANDS
OF
DOLLARS-
FEDERAL
R
U
L
M C
F
OBLIGATION
(
I
N
PROJECT IDENTIFICATION
E
A A
U -EXPENDITURE PLAN-
------
FUNDS
-------
PLAN
0
CC
/DESCRIPTION OF WORK
N
J R
N
R
TL
G
OW R
D 1ST
2ND 3RD
5TH
TOT
LOC
RAP
FED
IST
2ND
(
I
A
T
RD Y
I YEAR
YEAR 4TH
6TH
AND
OR
YEAR
-6TH
T
S
H
R
N
YEAR
YEAR
0TH
UAB
YEAR
Y
S
K
G
63
19
MAPLE DRIVE RR SIGNALIZATION
6
P
75
75
4
71
P E
6
42600 - MP 0.37
R/W
RAILROADCROSSING SIGNALIZATION
WORK
CODES:
I
CON
65
UTIL
CODES:
F.A.
PROJ
NO.
RRP
-2013-_
TOT
0
71
--------------------------------------------------------------------------
64
07
N -NE RR SIGNALIZATION (SUGAR MILL)
6
P
75
75
4
71
P E
6
92025 - MP 5.03
R/W
(
RAILROAD CROSSING SIGNALIZATION
WORK
CODES:
I
CON
65
UTIL
CODES:
F.A.
PROJ
NO.
------------------------------------------------------------------------------------------------------------------------------------
RRP
-M135-_
TOT
0
71
65
09
2.8 -SE RR SIGNALIZATION
6
P
75
75
4
71
P E
6
22010 - MP 1.38
R/W
RAILROAD CROSSING SIGNALIZATION
WORK
CODES:
I
CON
65
UTIL
CODES:
F.A.
PROJ
NO.
RRP
-2013-_
TOT
0
71
------------------------------------------------------------------------------------------------------------------------------------
66
08
B -NW RD (SR 28 TO WEST CANAL BRIDGE)
1.31
34
P
225
225
23
202
P E
93045 - MP 0.00 TO MP 1.31
R/W
GRADE, DRAIN, SURFACE (BST); FINISHED
WIDTH = 34 FT.
WORK
CODES:
ABC
CON
l
UTIL
CODES:
PT
F.A.
PROJ
NO.
- -_
TOT
0
0
------------------------------------------------------------------------------------------------------------------------------------
67
08
K-SE/1-SE RDS (BASELINE -E TO SR 17)
2.55
34
P
350
350
35
315
P E
21750 - MP 0.00 TO MP 0.45/21780 - MP
0.00 TO MP 2.10
R/W
1
GRADE, DRAIN, SURFACE (BST); FINISHED
WIDTH = 28 FT.
WORK
CODES:
ABC
CON
UTIL
CODES:
PT
F.A.
PROJ
NO.
- -_
TOT
0
0
------------------------------------------------------------------------------------------------------------------------------------
68
17
VALLEY RD (OTTMAR TO COLE)
.78
24
P
500
500
100
400
P E
41250 - MP 0.70 TO MP 1.53
R/W
GRADE, DRAIN, SURFACE(ACF'), AND CURB
AND GUTTER;......
WORK
CODES:
ABDF
CON
l
FINISHED WIDTH = 48 FT.
UTIL
CODES:
PT
F.A.
PROJ
NO.
-
TOT
0
0
l'
------------------------------------------------------------------------------------------------------------------------------------
69
08
BRIDGE #338, MONUMENT HILL
.21
4
P
50
50
5
45
P E
93035 - MP 1.34 TO MP 1.55
R/W
BRIDGE REPLACEMENT; FINISHED WIDTH =
28 FT.
WORK
CODES:
L
CON
UTIL
CODES:
PT
F.A.
PROJ
NO.
------------------------------------------------------------------------------------------------------------------------------------
- -_
TOT
0
0
l
(
SIX YEAR
TRANSPORTATION
IMPROVEMENT
PROGRAM 1991 TO
1996
Page
11
GRANT COUNTY
P
F
-PROJECT COSTS
IN
THOUSANDS
OF
DOLLARS-
I FEDERAL
R
U
L
M C
F
I OBLIGATION
I
N
PROJECT IDENTIFICATION
E
A A
U -EXPENDITURE PLAN-
------
FUNDS -------
I PLAN
"
0
CC
/DESCRIPTION OF WORK
N
J R
N
R
TL
G
OW R
D IST
2ND 3RD
5TH
TOT
LOC
RAP
FED
I IST
214D
I
A
T
RO Y
I YEAR
YEAR 4TH
6TH
AND
OR
I YEAR
-6TH
T
S
H
R
N
YEAR
YEAR
OTH
UAB
I
YEAR
Y
S
K
G
70
08
BRIDGE #345, R -NW
.21
4
P
45
45
5
40
P E
93025 - MP 0.67 TO MP 0.88
R/W
BRIDGE REPLACEMENT; FINISHED WIDTH = 34
FT.
WORK
CODES:
L
CON
UTIL
CODES:
PT
F.A.
PROJ
NO.
- -_
TOT 0
0
(
------------------------------------------------------------------------------------------------------------------------------------
71
08
BRIDGE #385, K -NW
.03
4
P
240
240
24
216
P E
93041 - MP 0.17 TO MP 0.20
R/W-
BRIDGE REPLACEMENT; FINISHED WIDTH = 28
FT.
WORK
CODES:
L
CON
UTIL
CODES:
PT
F.A.
PROJ
NO.
-
-_
TOT 0
0
�'
------------------------------------------------------------------------------------------------------------------------------------
72
07
7 -NE RD (STRATFORD RD TO K -NE RD)
1.40
34
P
120
120
12
108
P E
94030 - MP 0.00 TO MP 1.40
R/W
3R (BST); FINISHED WIDTH = 28 FT.
WORK
CODES:
ABC
CON
(
UTIL
CODES:
PT
F.A.
PROJ
NO.
-
-_
TOT 0
0
�'
------------------------------------------------------------------------------------------------------------------------------------
73
09
F -NE (N FRONTAGE TO MAE VALLEY)
.95
1
P
130
130
130
P E
NEW - MF' 0.00 TO 0.95
R/W
GRADE, DRAIN, SURFACE (EST); FINISHED WIDTH
= 26 FT.
WORK
CODES:
ABC
CON
UTIL
CODES:
F.A.
PROJ
NO.
-
TOT 0
0
�'
----------------------
74
09
---------------------------------------------------------------------------------------------------------------
BLACK SANDS AREA ROADS
2.00
1
P
160
160
160
P E
NEW
R/W
GRADE, DRAIN, SURFACE (GRAVEL); FINISHED
WIDTH = 26 FT
WORK
CODES:
AB
CON
l
UTIL
CODES:
PT
F.A.
PROJ
NO.
-
TOT 0
0
1
--------------------------
--------------------------------------------------------------------------------------------------------
75
09
MATTAWA AREA ROADS
2.00
1
P
160
160
160
P E
NEW
R/W
GRADE, DRAIN, SURFACE (GRAVEL); FINISHED
WIDTH = 26 FT
WORK
CODES:
AB
CON
UTIL
CODES:
PT
F.A.
PROJ
NO.
-
TOT 0
0
l----------------------
---------------------------------------------
—--------------------------------
------------------------------
L
r
C
SIX
YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991
TO 1996
Page 12
GRANT
COUNTY
SUMMARY OF COSTS BY FUNDING
CATEGORY
EXPENDITURE
PLAN
FUNDING
PLAN
FEDERAL OBLIGATION
PLAN
-------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
FUNDED PROJECTS
I
1st
Year
2832
I Local
1698
I
1st Year
Rem Years
All
Years
I
2nd
Year,
540
I RAP
786
I P E
41
0
41
C
I
3-4
Year
200
I UAB
637
I R/W
0
0
0
I
5-6
Year
200
I Fed.
651
I CONST
610
0
610
Totals ...
3772
3772
651
0
651
-------------------------------------------------------------------
----------
---------------------------------------------
UNFUNDED PROJECTS
I
1st
Year
595
I Local
5913C
I
1st Year
Rem Years
All
Years
(Proposed and Unknown)
I
2nd
Year
4847
I RAP
5677
I P E
0
156
156
I
3-4
Year
6433
I UAB
2328
I R/W
0
0
0
I
5-6
Year,
5080
I Fed.
3037
I CONST
0
3031
3031
�
Totals ...
16955
16955
0
3187
3187
------------------------------------------------------------------------------------------------------------------------------------
TOTAL ALL PROJECTS
I
1st
Year
3427
I Local
7611
I
1st Year
Re!i Years
All
Years
i
2nd
Year,
5387
I RAP
6463
I P E
41
156
197
I
3-4
Year,
6633
I UAB
2965
I R/W
0
0
0
I
5-6
Year
5280
I Fed.
3688
I CONST
610
3031
3641
Totals ...
20727
20727
651
3187
3838
C
c