Loading...
HomeMy WebLinkAboutResolution 90-052-CCBOARD OF COUNTY COMMISSIONERS GRANT COUNTY, WASHINGTON IN THE MATTER OF ADOPTING A COMPREHENSIVE SIX YEAR TRANSPORTATION IMPROVE- MENT PROGRAM FOR THE ENSUING SIX YEARS RESOLUTION NO. 90 -52 -CC WHEREAS, pursuant to the requirements of Section 6, Chapter 83, Laws of Extraordinary Session of the State of Washington, Grant County did prepare a Comprehensive Transportation Improvement Program for the ensuing six years; and WHEREAS, priority array of projects prepared in accordance with County Road Administration Board Standards of Good Practice (WAC 136-14) was made available and was consulted by the Board during the preparation of this Six Year Program; and WHEREAS, the Engineer's report with respect to deficient bridges was available to the Board during the preparation of the Six Year Program; and WHEREAS, an environmental pre -assessment of the Six Year Program indicated that the social, economic and aesthetic values would not be disturbed; and WHEREAS, pursuant further to said Law, the Board of County Commissioners, being the legislative body of the County, did prepare, revise and extend said Six Year Program and did hold a public hearing on said Comprehensive Plan at 10:30 A.M. at the Courthouse, Ephrata, Washington on the 19th day of June, 1990; NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Grant County, Washington, that the Comprehensive Six Year Road Program presented at the public hearing on the 19th day of June, 1990, and revised as necessary, be hereby adopted. DONE THIS 19th DAY OF June ATTEST:Q, - Ci rk o V oord Commissioner Constituting the Board of County Commissioners of Grant County, Washington SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 GRANT COUNTY HEARING DATE : 06/19/90 ADOPTION DATE: COUNTY NO: 13 RESOLUTION NO: 1 P F PROJECT COSTS IN - THOUSANDS OF DOLLARS- FEDERAL F.' U L M C F OBLIGATION I N PROJECT IDENTIFICATION E A' A U -EXPENDITURE FLAN- ------ FUNDS ------- PLAN .. CC /DESCRIPTION OF 'WORK N J F.• N R TL G OW R D 1ST 2ND 3RD 5TH TOT LOC RAP FED IST 2ND I A T RO Y I YEAR YEAR 4TH 6TH AND OR YEAR -6TH ( T a H R N YEAR YEAR OTH UAB YEAR Y S K G t 1 O8 -------------------------------------------------------------- J -NE RD (LONG LAKE) 1.03 --- 4 -------------------------------------------------------- F 150 150 150 P E 51050 - MP 0.37 TO 1.40. R/W GRADE, DRAIN, SURFACE (EST); FINISHED WIDTH = 28 FT. WORK CODES: ABC CON l UTIL CODES: PT F.A. PROJ NO. ---- -- - - -_ TOT 0 0 --- (. 2 03 ---------------------------- EF,'IDGE #116, LONG LAKE --------------------------- ----- .30 --- 4 ------ F 270 ----- ---------- ------- 270 ----- 0 ------ 54 ---- 216 ------ P E ------ 16 ---- 51050 - MP 0.60 TO 14P 0.90 R/W GRADE, DRAIN, SURFACE (EST), ANG BRIDGE REPLACEMENT;.. WORK CODES: ABCL CON 200 1 FINISHED WIDTH. = 23 FT. UTIL CODES: PT F.A. PROJ NO. BROS-2013-_ TOT 216 0 - ?7 EI:IL'-I1- N i 17 , PINTO RIDGE .34 4 F 270 270 45 225 P E 10 95025 - h4P C.40 TO MP 0.74 R/W RIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. WORK CODES: AB --_L CON 215 ( UTIL CODES: F'T F.A. PROJ NO. Rs -Q137-_ TOT 225 0 - 14 - -- 03 - --- ------------------------------------------------------------------------------------------------------------------ SILI--A RD (N FRONTAGE TO SUNLAND RD) 4.43 1 F 600 600 60 540 P E 00990- NP 0.00 TO HP 4.4 k/W tiNAvE, DRAIN, :URFACE(BST); FINISHED WIDTH = 23 FT.... WORK C0DEE: ABC CON ( i.='roie, �ontinu•=tion depends upon receiving contribu- UTIL CODES: PT F.A. PROJ NO. ttions t„t -ding no les= than $45,000.) - -_ TOT 0 0 l 5 16 F'4TTC'i L.L`E, (ARLINGTON TO ANDREWS) 1.01 24 X F 464 464 93 371 P E y 0?70 - MP 0. 00 TG I•iF 1 .01 . R/W iADE, DRi.!N, tUF.'FACE (ACF'), AND CURB AND GUTTER;..... WORK CODES: ABDF CON L FINISHED WIDTH = 48 FT. UTIL CODES: PT F.A. PROJ NO. - -_ TOT 0 0 0 19 PATTON rL`.'D BIKE PATH (ARLINGTON TO DOVER; .35 9 X F 20 20 20 P E R/W CTKC PATH WORK CODE'S: CCN UTIL CODES: F.A. PRO.J NO. - -_ TOT 0 0 - ----------- ------- -- -------------------- -- ( SIX YEAR, TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 Page 2 GRANT COUNTY ( --------------------------------------------- P F -PROJECT COSTS IN THOUSANDS OF DOLLARS- I FEDERAL R U L M C F IOBLIGATION ( I N PROJECT IDENTIFICATION E A A U -EXPENDITURE PLAN- ------ FUNDS ------- J.PLAN O CC /DESCRIPTION OF WORK N J R N I- R TL G OW R D 1ST 2ND 3RD 5TH TOT LOC RAP FED 1ST 2ND ( I A T RO Y I YEAR YEAR 4TH 6TH AND OR YEAR -6TH - T S H R N YEAR YEAR 0TH UAB YEAR Y S K G ------------------------------------------------------------------------------------------------------------------------------------ 7 17 DOVER ST (SR 17 TO 30TH AVE) .38 12 X F 200 200 200 P E 45010 - MP 0.00 TO MP 0.38 (PROPOSED) P,/W GRADE, DRAIN, SURFACE (ACP), AND CURB AND GUTTER;..... WORK CODES: ABDF CON FINISHED WIDTH = 48 FT. (Const. by WA Army Nat. Guard) UTIL CODES: PT F.A. PROD NO. - TOT 0 0 k ------------------------------------------------------------------------------------------------------------------------------------ 8 17 4TH AV/FREY RD/8TH AVENUE (SR 28 TO SR 18) .56 24 X F 333 333 67 266 P E 34050 - MP 0.00 TO MP 0.56 R/W GRADE, DRAIN, SURFACE (ACF), AND CURB AND GUTTER;..... WORK CODES: ABDF CON FINISHED WIDTH = 48 FT. UTIL CODES: PT F.A. PROJ NO. - TOT 0 0 ------------------------------------------------------------------------------------------------------------------------------------ 9 09 1 -SW RD (G -SW TO I -SW) 2.02 1 F 70 70 70 P E NEW - MP 0.00 TO MP 2.02 R/W GRADE, DRAIN, SURFACE (GRAVEL); FINISHED WIDTH = 26 FT WORK CODES: AB CON UTIL CODES: PT F.A. PROJ NO. - -_ TOT 0 0 ------------------------------------------------------------------------------------------------------------------------------------ 10 07 WHEELER RD (WISER LN TO O -NE) 3.50 5 P 560 560 560 P E 94000 - MP 1.38 TO MP 4.8E R/W SURFACE (ACF'); FINISHED WIDTH = 48 FT. WORK CODES: D CON UTIL CODES: F.A. PROJ NO. - TOT 0 0 ------------------------------------------------------------------------------------------------------------------------------------- 11 07 GODSON RD (I-90 TO 9 -NW) 4.91 3 F 100 120 220 220 P E 91030 - MP 15.88 TO MP 23.79 R/W WIDEN AND SURFACE SHOULDERS; FINISHED WIDTH = 34 FT. WORK CODES: ABC CON UTIL CODES: PT F.A. PROJ NO. - TOT 0 0 -------------------------------------------------- 12 ---------------------------------------------------------------------------------- MISCELLANEOUS PROJECTS 45 F 100 100 200 200 600 600 P E R/W *INCLUDES COST SHARE PROJECT' WORK CODES: ABC CON UTIL CODES: PT F.A. F'F,'OJ NO. - TOT 0 0 --------------------------------------------------------------- 13 07 BRIDGE 1#381, DODSON RD --------------------------------------------------------------------- .21 4 F 5 80 85 85 P E 91030 - MP 20.94 TO MP 21.15 R/W BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. WORK CODES: L CON UTIL CODES: PT F.A. PROJ NO. - -_ TOT 0 0 l------------------------------------ ------------------------ ---- ----------------------------------------------------------------- � C ( SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 Page 3 � GRANT COUNTY P F -PROJECT COSTS IN THOUSANDS OF DOLLARS- FEDERAL R U L M C F OBLIGATION I N PROJECT IDENTIFICATION E A A U -EXPENDITURE PLAN- ------ FUNDS ------- PLAN 0 CC /DESCRIPTION OF WORK N J R N R TL G OW R D IST 2ND 3RD 5TH TOT LOC RAP FED 1ST 2ND �. I A T RO Y I YEAR YEAR 4TH 6TH AND OR YEAR -6TH t T S H R N YEAR YEAR OTH UAB YEAR Y S K G 14 07 SAGEBRUSH FLATS RD (STATTER RD TO BAIRD SPRINGS RD) 1.90 4 F 50 190 240 48 192 P E 93047 - MP 0.65 TO MP 2.55 R/W GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. WORK CODES: ABC CON UTIL CODES: PT F.A. PROJ NO. - 'TOT 0 0 ------------------------------------------------------------------------------------------------------------------------------------ 15 07 BRIDGE #168, SAGEBRUSH FLATS .02 4 F 200 50 250 40 210 P E 15 93047 - MP 0.77 TO MP 0.79. "R/W BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. WORK CODES: L CON 195 { i UTIL CODES: PT F.A. PROJ N0. RS -K136- TOT 210 0 ------------------------------------------------------------------------------------------------------------------------------------ 16 19 26 -SW (SR 243 TO R -SW) 1.98 5 P 40 40 40 P E 10300 - MP 5.03 TO MP 7.00 R/W SURFACE (BST); FINISHED WIDTH = 26 FT. WORK CODE'S: C CON C UTIL CODES: F.A. PROJ NO. - -_ TOT 0 0 ------------------------------------------------------------------------------------------------------------------------------------ C 17 08 MARTIN RD (SR 28 TO E -NW) .90 34 P 10 125 135 13 122 P E 36940 - MP 0.00 TP MP 0.90 R/W GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. WORK CODES: ABC CON UTIL CODE'_: PT F.A. PROJ NO. - -_ TOT 0 0 { --------------------------------------------------------------------------------------------------------------- -------------------- 18 08 BRIDGE #315, MARTIN RD .02 4 F' 10 130 190 19 171 P E 36940 - MF' 0.12 TO MP 0.14 R/W l BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. WC: RK CODE:: L CON UTIL CODES: PT F.A. PROJ NO. - -_ TOT 0 0 -----------------------------------------------------------------------------------'- 19 07 FRENCHMAN HILL RD (Q, -SW TO ADAMS) 4.88 4 P 15 ---------------------------------------------- 465 480 48 432 P E L 91035 - MP 5.85 TO MP 10.73 R/W GRADE, DRAIN, SURFACE(BST); FINISHED WIDTH = 34 FT. WORK CODES: .3C CON t l UTIL CODES: I' T F.A. PROJ NO. - TOT 0 0 -------------------------------------------------------------------------- --- - - ----------------------------------------------- 20 08 MAE VALLEY RD (HIAWATHA TO WESTSHJRE) 4.97 34 P 708 708 161 547 P E 40560 - MP 0.00 TO MP 4.97 R/W GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. WORK CODES: ABC CON C UTIL CODE_: PT F.A. PROD NO. - -_ TOT 0 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 GRANT COUNTY Page 4 a P F -PROJECT COSTS IN THOUSANDS OF DOLLARS- FEDERAL R U L M C F OBLIGATION I N PROJECT IDENTIFICATION E A A U -EXPENDITURE PLAN- ------ FUNDS ------- PLAN 0 CC /DESCRIPTION OF WORK N J R N R TL G OW R D IST 2ND 3RD 5TH TOT LOC PAP FED 1ST 2ND I A T RO Y I YEAR YEAR 4TH 6TH AND OR YEAR -6TH T S H R N YEAR YEAR OTH UAE YEAR Y S K G ------------------------------------------------------------------------------------------------------------------------------------ 21 17 DOVER ST (30TH AVE TO PATTON BLVD) .36 24 X P 250 250 250 P E 45010 - MP 0.38 TO MP 0.74 R/W GRADE, DRAIN, SURFACE (ACP), AND CURB AND GUTTER;..... WORK CODES: ABDF CON FINISHED WIDTH = 48 FT. UTIL CODES: PT F.A. PROJ NO. - -_ TOT 0 0 ------------------------------------------------------------------------------------------------------------------------------------ 22 19 DOVER ST BIKE PATH (PATTON BLVD. TO SR 17) .50 9 X P 24 24 24 P E R/W ( BIKE PATH WORK CODES: 0 CON UTIL CODES: F.A. PROJ NO. - TOT 0 0 ------------------------------------------------------------------------------------------------------------------------------------ ( 23 16 PATTON BLVD TRAFFIC SIGNAL .10 6 P 80 80 16 64 P E 45170 - MP 0.53 R/W TRAFFIC/PEDESTRIAN SIGNAL WORK CODES: IJ CON UTIL CODES: PT F.A. PROJ NO. - -_ TOT 0 0 ------------------------------------------------------------------------------------------------------------------------------------ 24 08 N -NE RR SIGNALIZATION (UNION CARBIDE) 6 P 110 110 1 109 P E 6 44750 - MP 0.30 R/W RAILROAD CROSSING SIGNALIZATION WORK CODES: I CON 103 UTIL CODES: F.A. PROJ NO. RP.P -2013-_ TOT 0 109 ---------------------------------------------------- t' 25 08 D-NE/6.5-NE/E-NE (MCCONIHE FLATS) --------------- ------------------------------------------------------------------ 1.66 34 P 250 250 25 225 P E 46200 - MP 2.99 TO MP 4.65 R/W GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. WORK CODES: ABC CON ( UTIL CODES: PT F.A. PROJ NO. - -_ TOT 0 0 -------------------------------------------- 26 09 ----------------------------------------------------------------------------------------- BRIDGE 11219, W SE .02 4 P 366 366 73 293 P E 10 24650 - MP 0.00 TO MP 0.20 R/W BRIDGE REPLACEMENT; FINISHED WIDTH 28 FT. WORK CODES: L CON 283 t UTIL CODES: PT F.A. P -"OJ NO. BR --S-2013-_ TOT 0 293 --------------------------------------------------- l. 27 16 POTATO HILL RD (I-90 TO BASELINE -E) -------------------------------------------------------------------------------- 1.08 24 P 664 684 137 547 P E 21590 - MP 0.00 TO MP 1.08 R/W GRADE, DRAIN, SURFACE (ACP), AiiD CURB AND GUTTER;..... WORK CODES: ABDF CON ( FINISHED WIDTH = 48 FT. UTIL CODES: PT F.A. FROJ NO. - -_ TOT 0 0 ----------------------------------------------------------------- ------------------------ ---------------------------------------- a t SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 Page 5 GRANT COUNTY ------------------------------------- P F -PROJECT COSTS IN THOUSA140S OF DOLLARS- FEDERAL R U L M C F "'OBLIGATION ( I N PROJECT IDENTIFICATION E A A U -EXPENDITURE PLAN- ------ FUNDS ------- PLAN O CC /DESCRIPTION OF WORK N J R N R TL G OW R D 1ST 2ND 3RD 5TH TOT LOC RAP FED 1ST 2ND ( I A T RO Y I YEAR YEAR 4TH 6TH AND OR YEAR -6TH T S H R N YEAR YEAR OTH UAE YEAR Y S K G 28 16 POTATO HILL BIKE PATH (I-90 TO BASELINE -E) 1.10 9 P 65 65 65 P E R/W BIKE PATH WORK CODES: 0 CON UTIL CODES: F.A. PROJ NO. - -_ TOT 0 0 - ( ------------------------------------------------------------------------------------------------------------------------------------ 29 08 POTATO HILL RD (BASELINE -E TO SAND DUNES RD) 1.02 34 P 150 150 15 135 P E 10 21590 - MP 1.08 TO MP 2.10 — R/W- GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. WORT: CODES: ABC CON 140 UTIL CODES: PT F.A. PROJ NO. - -_ TOT 0 150 ------------------------------------------------------------------------------------------------------------------------------------ 30 17 CHANUTE ST (DOVER TO PATTON) .74 34 P 350 350 70 280 P E 45140 - MP 0.00 TO MP 0.70 R/W GRADE, DRAIN, SURFACE (ACP), AND CURB AND GUTTER;..... WORK CODES: ABDFG CON FINISHED WIDTH = 40 FT. UTIL CODES: PT F.A. PRO•J NO. - -_ TOT 0 0 ------------------------------------------------------------------------------------------------------------------------------------ 31 07 ADAMS RD (I-90 TO SR 28) 8.9U P 1000 1000 1000 P E 91017 - MP 14.78 TO MP 23.68 R/W SURFACE (ACF); FINISHED WIDTH = 34 FT. 40RK CODES: D CON 1' UTIL CODES: PT F.A. PROJ NO. - -_ TOT 0 0 ------------------------------------------------------------ 32 07 SAGEBRUSH FLATS RD (BAIRD SPRINGS TO 24 -NE) -- -- 10.39 --- ------------------------------------------------------------- 4 --------------------------------------------------------32 F' 1120 1120 112 1008 P E 93047 - MP 2.55 TO MP 11.60; 93048 - MP 5.28 TO MP 6.62 R/W GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. WC -RK' CODE_: ABC CON UTIL C.30 -ES: PT F.A. PROJ NO. - -_ TOT 0 0 �' --- 33 --- 17 ------------------------------------------- - - - - -- AIRWAY DRIVE (FAIRGROUNDS TO SR 17) ----- - --- -- 1.3? - - - - -- 24 ----- P ------ ----- 836 ---- ------ 836 ------ 167 ----- 669 ---- -------- P E ----- ---- 41690 - MP 1.89 TO 3.21 R/W GRADE, DRAIN, SURFACE (ACF•), AND CURB AND GUTTER;..... WvRk CODES: ABDF CON FINISHED WIDTH = 48 FT. UTIL =ODES: PT F.A. PRO•J NO. - -_ TOT 0 0 ( --------------------------------------------------- 34 17 --------------- AIRWAY DRIVE BIKE PATH (VALLEY RD TO COCHRAN DR) ----------------------------------------------------------------- 1.20 9 P 55 55 55 P E R/W BIKE PATH WOF.•K CODES: O CON UTIL CODES: F.A. PROJ NO. - -_ TOT 0 0 L..----------------------------------------------------------------- --------------------------------------------------------------- SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 Page 6 GRANT COUNTY I c_ P F PROJECT COSTS IPJ THOUSANDS OF DOLLARS- FEDERAL R U L M C F ( OBLIGATION ( I N PROJECT IDENTIFICATION E A A U -EXPENDITURE PLAN- ------ FUNDS ------- PLAN O CC /DESCRIPTION OF WORK N J R N R TL G OW R D 1ST 2ND 3RD 5TH TOT LOC RAP FED 1ST 2ND ( I A T RO Y I YEAR YEAR 4TH 6TH AND OR YEAR -6TH T S H R N YEAR YEAR OTH UAE YEAR Y S K G 35 16 BASELINE -E (POTATO HILL TO K -SE) 1.00 34 P 100 100 20 80 P E 21700 - MP 0.00 TO MP 1.00 R/W GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 40 FT. WORK CODES: ABC CON UTIL CODES: PT F.A. PROD NO. - -_ TOT 0 0 ------------------------------------------------------------------------------------------------------------------------------------- 36 16 BASELINE -E RD (K -SE TO K.7 -SE) .77 14 P 100 100 20 80 P E 21700 - MP 1.00 TO MP 1.77 R/W ( GRADE, DRAIN, SURFACE (BST), AND CULVERT REPLACEMENT;. WORK CODES: ABCL CON FINISHED WIDTH = 40 FT. UTIL CODES: PT F.A. PROJ NO. - -_ TOT 0 0 ------------------------------------------------------------------------------------------------------------------------------------ 37 16 BASELINE -E ROAD (K.7 -NE TO SR -17) .60 34 P 80 80 16 64 P E 21740 - MP 0.00 TO MP 0.60 R/W GRADE, DRAIN, AND SURFACE(BST); FINISHED WIDTH = 40 FT WORK CODES: ABC CON UTIL CODES: PT F.A..PROJ NO. - -_ TOT 0 0 ------------------------------------------------------------------------------------------------------------------------------------ 38 08 BRIDGE #251, 2.8 -SE .02 4 P 48 48 10 38 P E 5 22010 - MP 0.20 TO MP 0.22 R/W BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. WORK CODES: L CON 33 UTIL CODES: PT F.A. PROJ NO. BROS-2013-_ TOT 0 38 --------------------------------------------------------------------- 39 07 BRIDGE #238, M -SE .21 — ------------------------------------------------------------- 4 P 50 50 10 40 P E 5 92015 - MP 1.47 TO MP 1.68 R/W BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. WORK CODES: L CON 35 UTIL CODES: PT F.A. PROD NO. ERS - -_ TOT 0 40 ------------------------------------------------------------------------------------------------------------------------------------ 40 09 BRIDGE #126, O -NE .05 4 P 44 44 9 35 P E 5 54150 - MP 4.20 TO MO 4.25 R/W BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT, WORK CODES: L CON 30 UTIL CODES: PT F.A. PR ----J NO. BROS-2013-,_ TOT 0 35 -------------------------------------------------------------------------------- 41 09 BRIDGE 11347, S -NW .10 4 P — -------------------------------------------------- 65 65 13 52 P E 5 31550 - MP 1.40 TO MP 1.50 R/W BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. WORK CODES: L CON 47 UTIL CODES: PT F.A. PROJ NO. BROS-2013-_ TOT 0 52 L------------------------------------------------------------------------------------------------------------------------------------ I c_ { SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 Page 7 GRANT COUNTY P F -PROJECT COSTS IN THOUSANDS OF DOLLARS- FEDERAL R U L M C F OBLIGATION ( I N PROJECT IDENTIFICATION E A A U -EXPENDITURE PLAN- ------ FUNDS ------- PLAN O CC /DESCRIPTION OF WORK N J R N R TL G CiW R D 1ST 2ND 3RD 5TH TOT LOC RAP FED IST 2ND ( I A T RO Y I YEAR YEAR 4TH 6TH AND OR YEAR -6TH T S H R N YEAR YEAR OTH UAB YEAR Y S K G 42 09 BRIDGE #234, 2-SE .19 4 P 64 64 13 51 P E 5 21820 - MP 0.15 TO MP 0.34 R/W BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. WORK CODES: L CON 46 UTIL CODES: PT F.A. PROJ NO. EROS-2013-_ TOT 0 51 (' ----------------------------------------------- -------------------------------------- ----------------- 43 09 BRIDGE #156, FEISS RD .25 4 P 152 152 30 122 P E 10 52410 - MP 0.10 TO MP 0.35 R/W ( BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. WORK CODES: L CON 112 UTIL CODES: PT F.A. PROJ NO. BROS-2013-_ TOT 0 122 ------------------------------------------------------------------------------------------------------------------------------------ C 44 08 BRIDGE #104, 31-NE .20 4 P 174 174 35 139 P E 10 51600 - MP 0.30 TO MP 0.50 R/W BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. WORK CODES: L CON 129 UTIL CODES: PT F.A. PRO•J NO. BROS-2013-_ TOT 0 139 ---------------------------------------------------- -------------------------------------------------------------------------------- 45 19 PATTON BLVD BIKE PATH (SR 17 TO AIRWAY) .30 9 P 15 15 15 P E R/W BIKE PATH WORK CODES: 0 CON UTIL CODES: F.A. PROJ NO. - TOT 0 0 ------------------------------------------------- - --- --- --- ------------------------------------------------------------------ 46 07 Q-NE (N FRONTAGE TO 3-NE) 2.84 4 P 450 450 81 369 P E 30 43590 - MP 0.00 TO MP 2.84 R/W GRADE, DRAIN, SURFACE (BST), AND BRIDGE. REPTAGEMENT;.. WORK CODES: ABCL CON 339 FINISHED WIDTH = 28 FT. UTIL CODES: F.A. PROJ NO. RS -M137- TOT 0 369 t ---- -- -------------------------- --- --- -- -- - - -- --- - --------------- ------ ------ ----- ------ ---- ------- ----- ------ ---- ------ ------ ---- 47 07 Q-NE RR SIGNALIZATION 6 F' 130 130 2 128 P E 10 43590 - MP 1.02 R/W RAILROAD CROSSING SIGNALIZATION WORK CODES: I CON 118 UTIL CODES: PT F.A. PRO•J NO. RRS -M137- TOT 0 128 ( --------------------------------------------------- - - ---- ------------- --------------------------------------------------------- 48 08 3-SE RD (SR 17 TO R-SE) 3.28 34 P 400 400 40 360 P E 22000 - MP 0.00 TO MP 3.28 R/W GRADE, DRAIN, SURFACE (EST); FINISHED WIDTH = 34 FT. WORK CODES: ABC CON UTIL CODES: PT F.A. PROJ NO. - -_ TOT 0 0 --------------------------------------------- -------------------- ---------------------------------------------------------- L �, L SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 Page 8 GRANT COUNTY ------------------------------------------------------------------------------------------------------------------------------------ P F -PROJECT COSTS IN THOUSANDS OF DOLLARS- FEDERAL R U L MC F OBLIGATION I N PROJECT IDENTIFICATION E A A U -EXPENDITURE PLAN- ------ FUNDS ------- ( PLAN 0 CC /DESCRIPTION OF WORK N J R N R TL G OW R_D 1ST 2ND 3RD 5TH TOT LOC RAP FED 1ST 2ND I A T RO Y I YEAR YEAR 4TH 6TH AND OR YEAR -6TH T S H R N YEAR YEAR 0TH UAB YEAR Y ------------------------------------------------------------------------------------------------------------------------------------ S K G ------------------------------------------------------------------------------------------------------------------------------------ 49 17 VALLEY RD (CASCADE VALLEY PARK TO OTTMAR) .25 24 P 180 180 36 144 P E 41250 - MP 0.50 TO MP 0.75 R/W GRADE, DRAIN, SURFACE (ACP), CURB AND GUTTER, AND..... WORK CODES: ABDF CON SIDEWALK/BIKE PATH; FINISHED WIDTH = 48 FT. UTIL CODES: PT F.A. PROJ NO. - TOT 0 0 ------------------------------------------------------------------------------------------------------------------------------------ 50 07 BRIDGE #395, ADAMS RD .20 34 P 50 50 10 40 P E 5 91017 - MP 6.28 TO MP 6.45 R/W BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. WORK CODES: L CON 35 UTIL CODES: PT F.A. PROJ NO. BRS - TOT 0 40 ------------------------------------------------------------------------------------------------------------------------------------ 51 07 DODSON RD (I-90 TO SR 282) 13.83 5 P 1500 1500 252 1248 P E 8 91030 - MP 15.88 TO MP 29.71 R/W ACP OVERLAY; FINISHED WIDTH = 34 FT. WORK CODES: D CON 1240 UTIL CODES: F.A. PROJ NO. RS -E131-_ TOT 0 1248 ------------------------------------------------------------------------------------------------------------------------------------ 52 08 27 -SW RD (L -SW TO P, -SW) 6.01 34 P 450 450 45 405 P E 91042 - MP 0.99 TO MP 7.00 R/W GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. WORK CODES: ABC CON UTIL CODES: PT F.A. PROJ NO. - -_ TOT 0 0 ------------------------------------------------------------------------------------------------------------------------------------ 53 08 5-NW/U-NW RDS (SR 281 TO 6 -NW) 4.90 34 P 650 650 65 585 P E 93010 - MP 14.07 TO 18.97 R/W GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. WORK CODES: ABC CON UTIL C-DDES: PT F.A. PROJ NO. - -_ TOT 0 0 ------------------------------------------------------------------------------------------------------------------------------------- 54 08 BRIDGE #389, 5 -NW .01 4 P 50 50 5 45 P E 93010 - MP 15.12 TO MP MP 16.13 R/W BRIDGE REPLACEMENT; FINISHED WIDTH 34 FT. WORK CODES: L CON UTIL CODES: PT F.A. PROD NO. _ - -_ TOT 0 0 -- ---------------------------------- 55 08 -------------------------------------------------------------------------------------------- BRIDGE #358, 5 -NW .01 4 P 90 90 9 81 P E -- 93010 - MP 15.09 TO MP 15.10 R/W BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. WORK CODES: L CON UTIL CODES: PT F.A. PROJ NO. ------------------------------------------------------------------------------------------------------------------------------------ - -_ TOT 0 0 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 Page 9 GRANT COUNTY -------------------------------- P F -PROJECT COSTS IN THOUSANDS OF DOLLARS- ( FEDERAL R U L M C F OBLIGATION I N PROJECT IDENTIFICATION E A A U -EXPENDITURE PLAN- ------ FUNDS ------- PLAN 0 CC /DESCRIPTION OF WORK N J R N R TL "" G OW R D IST 2ND 3RD STH TOT LOC RAP FED 1ST 2ND I A T RD Y I YEAR YEAR 4TH 6TH AND OR ( YEAR -6TH T S H R N YEAR YEAR OTH UAB YEAR Y S K G 56 07 MISCELLANEOUS ON -SYSTEM BRIDGES 4 P 400 400 800 800 P E .R/W BRIDGE REPLACEMENT WORK CODES: L CON UTIL CODES: PT F.A. PROJ NO. - -_ TOT 0 0 ------------------------------------------------------------------------------------------------------------------------------------ 57 09 MISCELLANEOUS OFF -SYSTEM BRIDGES 4 P 400 400 800 800 P E R/W BRIDGE REPLACEMENT WORK CODES: L CON UTIL CODES: PT F.A. PROJ NO. - -_ TOT 0 0 �' -------------------------•----------------------------------------------------------------------------------------------------------- 58 07 DODSON RD (12 -SW TO BRIDGE #324) 1.48 34 P 10 170 180 0 162 18 P E 2 91030 - MP 2.24 TO MP 3.72 R/W ( 3R (BST); FINISHED WIDTH = 34 FT. WORK CODES: ABC CON 16 UTIL CODES: PT F.A. PROJ NO. RS -E131-_ TOT 0 18 ------------------------------------------------------------------------------------------------------------------------------------ 59 08 MCCONIHE RD (SR 17 TO F -NE) .81 34 P 10 165 175 17 158 P E 46200 - MP 0.00 TO MP 0.31 R/W GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. WORK CODES: ABC CON { ( UTIL CODES: PT F.A. PROJ NO. - -� TOT 0 0 ---------------------------------- ------------------------------------------------------------------------------------------------- 60 08 K -NW RD (SR 283 TO N FRONTAGE RD) 4.55 34 P 350 350 35 315 P E 38550 - MP 0.00 TO MP 4.55 R/W GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. WORK CODES: ABC CON l UTIL CODES: PT F.A. PROJ NO. - -_ TOT 0 0 � ------------------------ -------- ------- --------------------------------------------------------------------------------- � 61 16 POTATO HILL kk SIGNALIZATION* 6 P 75 75 4 71 P E 6 21590 - MP 1.19 R/W RAILROAD CROSSING SIGNALIZATI„'tJ WORK CODES: I CON 65 UTIL CODES: F.A. PROD NO. RRP -6055-_ TOT 0 71 t' ------------------------ 62 17 --------- - -- --------------- RANDOLPH RR SIGNALIZATION 6 P 75 75 4 71 P E 6 45010 - MP 0.96 R/W RAILROAD CROSSING SIGNALIZATION WORK CODES: I CON 65 � UTIL CODES: F.A. PROJ NO. RRP -6074-_ TOT 0 71 L ------------------------------------------------------------------------------------------------------------------------------------ L L 4 ' 2 :{4, ( SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 Page 10 GRANT COUNTY P F -PROJECT COSTS IN THOUSANDS OF DOLLARS- FEDERAL R U L M C F OBLIGATION ( I N PROJECT IDENTIFICATION E A A U -EXPENDITURE PLAN- ------ FUNDS ------- PLAN 0 CC /DESCRIPTION OF WORK N J R N R TL G OW R D 1ST 2ND 3RD 5TH TOT LOC RAP FED IST 2ND ( I A T RD Y I YEAR YEAR 4TH 6TH AND OR YEAR -6TH T S H R N YEAR YEAR 0TH UAB YEAR Y S K G 63 19 MAPLE DRIVE RR SIGNALIZATION 6 P 75 75 4 71 P E 6 42600 - MP 0.37 R/W RAILROADCROSSING SIGNALIZATION WORK CODES: I CON 65 UTIL CODES: F.A. PROJ NO. RRP -2013-_ TOT 0 71 -------------------------------------------------------------------------- 64 07 N -NE RR SIGNALIZATION (SUGAR MILL) 6 P 75 75 4 71 P E 6 92025 - MP 5.03 R/W ( RAILROAD CROSSING SIGNALIZATION WORK CODES: I CON 65 UTIL CODES: F.A. PROJ NO. ------------------------------------------------------------------------------------------------------------------------------------ RRP -M135-_ TOT 0 71 65 09 2.8 -SE RR SIGNALIZATION 6 P 75 75 4 71 P E 6 22010 - MP 1.38 R/W RAILROAD CROSSING SIGNALIZATION WORK CODES: I CON 65 UTIL CODES: F.A. PROJ NO. RRP -2013-_ TOT 0 71 ------------------------------------------------------------------------------------------------------------------------------------ 66 08 B -NW RD (SR 28 TO WEST CANAL BRIDGE) 1.31 34 P 225 225 23 202 P E 93045 - MP 0.00 TO MP 1.31 R/W GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 34 FT. WORK CODES: ABC CON l UTIL CODES: PT F.A. PROJ NO. - -_ TOT 0 0 ------------------------------------------------------------------------------------------------------------------------------------ 67 08 K-SE/1-SE RDS (BASELINE -E TO SR 17) 2.55 34 P 350 350 35 315 P E 21750 - MP 0.00 TO MP 0.45/21780 - MP 0.00 TO MP 2.10 R/W 1 GRADE, DRAIN, SURFACE (BST); FINISHED WIDTH = 28 FT. WORK CODES: ABC CON UTIL CODES: PT F.A. PROJ NO. - -_ TOT 0 0 ------------------------------------------------------------------------------------------------------------------------------------ 68 17 VALLEY RD (OTTMAR TO COLE) .78 24 P 500 500 100 400 P E 41250 - MP 0.70 TO MP 1.53 R/W GRADE, DRAIN, SURFACE(ACF'), AND CURB AND GUTTER;...... WORK CODES: ABDF CON l FINISHED WIDTH = 48 FT. UTIL CODES: PT F.A. PROJ NO. - TOT 0 0 l' ------------------------------------------------------------------------------------------------------------------------------------ 69 08 BRIDGE #338, MONUMENT HILL .21 4 P 50 50 5 45 P E 93035 - MP 1.34 TO MP 1.55 R/W BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. WORK CODES: L CON UTIL CODES: PT F.A. PROJ NO. ------------------------------------------------------------------------------------------------------------------------------------ - -_ TOT 0 0 l ( SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 Page 11 GRANT COUNTY P F -PROJECT COSTS IN THOUSANDS OF DOLLARS- I FEDERAL R U L M C F I OBLIGATION I N PROJECT IDENTIFICATION E A A U -EXPENDITURE PLAN- ------ FUNDS ------- I PLAN " 0 CC /DESCRIPTION OF WORK N J R N R TL G OW R D IST 2ND 3RD 5TH TOT LOC RAP FED I IST 214D I A T RO Y I YEAR YEAR 4TH 6TH AND OR I YEAR -6TH T S H R N YEAR YEAR OTH UAB I YEAR Y S K G 70 08 BRIDGE #345, R -NW .21 4 P 45 45 5 40 P E 93025 - MP 0.67 TO MP 0.88 R/W BRIDGE REPLACEMENT; FINISHED WIDTH = 34 FT. WORK CODES: L CON UTIL CODES: PT F.A. PROJ NO. - -_ TOT 0 0 ( ------------------------------------------------------------------------------------------------------------------------------------ 71 08 BRIDGE #385, K -NW .03 4 P 240 240 24 216 P E 93041 - MP 0.17 TO MP 0.20 R/W- BRIDGE REPLACEMENT; FINISHED WIDTH = 28 FT. WORK CODES: L CON UTIL CODES: PT F.A. PROJ NO. - -_ TOT 0 0 �' ------------------------------------------------------------------------------------------------------------------------------------ 72 07 7 -NE RD (STRATFORD RD TO K -NE RD) 1.40 34 P 120 120 12 108 P E 94030 - MP 0.00 TO MP 1.40 R/W 3R (BST); FINISHED WIDTH = 28 FT. WORK CODES: ABC CON ( UTIL CODES: PT F.A. PROJ NO. - -_ TOT 0 0 �' ------------------------------------------------------------------------------------------------------------------------------------ 73 09 F -NE (N FRONTAGE TO MAE VALLEY) .95 1 P 130 130 130 P E NEW - MF' 0.00 TO 0.95 R/W GRADE, DRAIN, SURFACE (EST); FINISHED WIDTH = 26 FT. WORK CODES: ABC CON UTIL CODES: F.A. PROJ NO. - TOT 0 0 �' ---------------------- 74 09 --------------------------------------------------------------------------------------------------------------- BLACK SANDS AREA ROADS 2.00 1 P 160 160 160 P E NEW R/W GRADE, DRAIN, SURFACE (GRAVEL); FINISHED WIDTH = 26 FT WORK CODES: AB CON l UTIL CODES: PT F.A. PROJ NO. - TOT 0 0 1 -------------------------- -------------------------------------------------------------------------------------------------------- 75 09 MATTAWA AREA ROADS 2.00 1 P 160 160 160 P E NEW R/W GRADE, DRAIN, SURFACE (GRAVEL); FINISHED WIDTH = 26 FT WORK CODES: AB CON UTIL CODES: PT F.A. PROJ NO. - TOT 0 0 l---------------------- --------------------------------------------- —-------------------------------- ------------------------------ L r C SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1991 TO 1996 Page 12 GRANT COUNTY SUMMARY OF COSTS BY FUNDING CATEGORY EXPENDITURE PLAN FUNDING PLAN FEDERAL OBLIGATION PLAN ------------------------------------------------------------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------------------------ FUNDED PROJECTS I 1st Year 2832 I Local 1698 I 1st Year Rem Years All Years I 2nd Year, 540 I RAP 786 I P E 41 0 41 C I 3-4 Year 200 I UAB 637 I R/W 0 0 0 I 5-6 Year 200 I Fed. 651 I CONST 610 0 610 Totals ... 3772 3772 651 0 651 ------------------------------------------------------------------- ---------- --------------------------------------------- UNFUNDED PROJECTS I 1st Year 595 I Local 5913C I 1st Year Rem Years All Years (Proposed and Unknown) I 2nd Year 4847 I RAP 5677 I P E 0 156 156 I 3-4 Year 6433 I UAB 2328 I R/W 0 0 0 I 5-6 Year, 5080 I Fed. 3037 I CONST 0 3031 3031 � Totals ... 16955 16955 0 3187 3187 ------------------------------------------------------------------------------------------------------------------------------------ TOTAL ALL PROJECTS I 1st Year 3427 I Local 7611 I 1st Year Re!i Years All Years i 2nd Year, 5387 I RAP 6463 I P E 41 156 197 I 3-4 Year, 6633 I UAB 2965 I R/W 0 0 0 I 5-6 Year 5280 I Fed. 3688 I CONST 610 3031 3641 Totals ... 20727 20727 651 3187 3838 C c c- c_