HomeMy WebLinkAbout*Other - Public WorksN
GRANT COUNTY
COMMISSIONERS AGENDA MEETING REQUEST FORM
(Must be submitted to the Clerk of the Board by 12:00pm on Thursday)
REQUESTING DEPARTMENT: Public Works
DATE: 09/19/2023
REQUEST SUBMITTED BY: Shilo Nellis
PHONE: x3501
CONTACT PERSON ATTENDING MEETING: Sam Castro
CONFIDENTIAL INFORMATION: FlYES,M,/ NO
k Vda rM
DAgreement / Contract DAP Vouchers
DAppointment I Reappointment
DARPA Related
D Bids / RFPs / Quotes Award 0 Bid Opening Scheduled
0 Boards / Committees
F-1 Budget
DComputer Related 0 County Code
0 Emergency Purchase
D'Employee Rel.
FlFacilities Related 01 1:1 Financial
r-1 Funds.
01-learing
D Invoices / Purchase Orders MGrants — Fed/State/County
FlLeases
DIVIOA / MOU
DMinutes DOrdinances
00ut of State Travel
El Petty Cash
D Policies El Proclamations
0 Request for Purchase
* Resolution
DRecommendation 0 Professional Serv/Consultant
DSupport Letter
E]Surplus Req.
[]Tax Levies FIThank You's
DTax Title Property
0WSLCB
3M
RESOLUTION INITIATING COUNTY ROAD PROJECT DESIGNATED AS CRP NO. 23-04� BASELINE W, ROAD (SILICA ROAD TO 0.13 MILES WEST OF V -SW), WIDEN AND OVERLAY
BASELINE W ROAD FROM SILICA RD HEADING EAST .87 MILES. FINISH WIDTH 42'WL25 THICK HOT MIX ASPHALT, $705,900
In -an Rim A
Signature:
Date:
(Prosecutor/Deputy Prosecutor)
BOARD OF COUNTY COMMISSIONERS
Grant County, Washington
RESOLUTION INITIATING COUNTY RESOLUTION No. 23- -cc
ROAD PROJECT DESIGNATED AS
CRP NO. 23-04
WHEREAS, IT IS HEREBY RESOLVED THAT Baseline W. Road (Silica Road to 0.13 Miles West of
State Road Log No. 93000 milepost 0.0 to milepost 0.87 be improved as follows:
This project will widen and overlay Baseline W. Road from Silica Road heading East 0.87 Miles.
The new roadway will have a finished width of 42' with 0.25' thick Hot Mix Asphalt finished
surface.
This project is hereby declared to be a public necessity and the County Road Engineer is hereby ordered
and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80-030,
36.80.070)
NOW, THEREFORE, BE IT FURTHER RESOLVED that an appropriation from the officially adopte road
fund budget and based on the County Engineer's estimate is hereby made in the amounts and fp the
purposes shown:
PURPOSE PROGRAM SOURCE AMOUNT OF. /PROIPIATION
Preliminary Engineering Local 0.000
TOTAL (Not Subject to 36.77.0 $20,000
Construction Lo I 85 900
Construction LTA nt $600 000
TOTAL $705,900
(Check appropriate box)
❑ This project is inclu ed in @ e o ici y adopted Annual Road Program as item No.
Z This project is her by L ea .11 art of the officially adopted Annual Road Program in
114
accordance with C .130
BE IT FURTHER RESOLVED Check appropriate box)
e con ruc i o be accomplished by contract in accordance with RCW 36-81.130
e con tr ti n is to be accomplished by county forces in accordance with RCW
36., On a WAC 136-18
DATED this 9) Day of S10
BOARD OF COUNTY COMMISSIONERS
GRANT COUNTY, WASHINGTON
Yea Nay Abstain
--jo,
14 El ❑
AT E. T: El El
Barbarcl�V squ&Z, CMC El El
Clerk of the Board
Cindy,�arltd%%, Vice -Chair
Danny E. Stwfe, Membe
LTAC ONLINE APPLICATION PRINT SCREEN
PROJECT NAME:*
Gorge Amphitheater - Baseline Road Widening for Queuing Lane
DATE:*
08/15/2023
ORGANIZATION:*
Grant County Public Works
CONTACT PERSON NAME:*
Dave Bren,, PE
CONTACT PHONE #:*
509.754.6082
CONTACT EMAIL:
dbren@grantcountywa-gov
ORGANIZATION ADDRESS:*
124 Enterprise Street SE
Ephrata,, WA 98823
2024 LTAC AMOUNT REQUESTED:*
$600,000
DID YOU RECEIVE 2023 LTAC FUNDS:*
NO
EVENT BUDGET:*
$705,900 FOR CONSTRUCTION
HOW IS THIS GRANT CRITICAL TO THE SUCCESS OF THIS EVENT?*
The County Road network directly accessing the Gorge Amphitheatre requires long-term
improvements for both the *preservation* of existing road infrastructure and long-term *capacity*
improvements. The Gorge Amphitheater is a major draw for lodging tax creation in our community
and supporting the Amphitheater with LTAC funded roadway capacity improvements is a good use of
these funds.
Grant County Public Works is requesting LTAC funding in the amount of $600,,000, which along with a
matching 15% provided by the Road Fund, will Overlay and Widen Baseline Road NW for
approximately one mile and provide additional queuing capacity for amphitheater events.
LTAC ONLINE APPLICATION PRINT SCREEN
WHAT WILL FUNDS BE USED FOR?*
Grant County Public Works is requesting LTAC funding in the amount of $600,,000, which along with a
matching 15% provided by the Road Fund, will Overlay and Widen Baseline Road NW for
approximately one mile and provide additional queuing capacity for amphitheater events.
Please be specific about what these funds will be used for. This information will be consistent with
your contract and request for reimbursement.
STATE REPORTING REQUIRED QUESTIONS:
You are required by state law to provide estimates for your event. You will be required to provide
actual attendance numbers after your event.
TOTAL ATTENDANCE:*
25,000+ for many events each Summer
The total attendance you estimate will attend this event.
50+ MILES:*
20,000+ for many events each Summer
The number of attendees you estimate will travel more than 50 miles to attend the event.
OUT OF STATE/COUNTRY-.*
1,,000+ for many events each Summer
The number of attendees you estimate will travel from out of the state or country to attend the event.
OVERNIGHT LODGING:* •
15,p000 - 20,,000 per event night
The number of attendees you estimate will be paying for overnight lodging to attend this event.
NOT PAYING FOR LODGING:*
5,000 -10,000 per event
The number of attendees you estimate will NOT be paying for overnight lodging,
PAID LODGING NIGHTS:*
5,000+ per event night
1- A.
1 or more people occupying a room/spot for a single night =1 lodging night.
LTAC ONLINE APPLICATION PRINT SCREEN
SECTION 2: SCORING QUESTIONS:
1. EVENT-.*
The Gorge Amphitheater brings 25,,000 visitors each weekend over the Summer to our community.
Several events are multiple nights. Most lodging and campsites are full over these event weekends.
Local lodging providers count on the Amphitheater event visitors coming to our area. We should
support the long-term success and growth of the Gorge Amphitheater.
The majority of the Gorge Amphitheater visitors come from out of our area. This bring much needed
out of area money to our community. There are even many visitors coming from other States, Canada,
or father.
Preserving and increasing capacity of the adjacent County Road network accessing the Amphitheater
iimportant mportant for its continued success and long-term growth.
Tell us about your event/activity and why you think it will increase tourists traveling to., and staying in
G ra nt Co u nty.
2. LONGEVITY:*
The Gorge Amphitheater started in 1988 and the first concert was held in 1989. The Gorge
Amphitheater continues to grow, year after year, it brings much needed money from outside our area,
to be spent in our area. With over 30+ years of sustained growth it has proven longevity in our
community.
How many years has this event been going and how will the grant help its future success?
3. MARKETING CAMPAIGN:*
N/A - This is a Public Works project to improve the County Road infrastructure around the Gorge
Amphitheater. The project would have public notice and public construction.
Describe your marketing campaign., when and where your marketing occurs., and what is the duration.
4. METHOD OF PROMOTION:*
N/A - This is a Public Works project to improve the County Road infrastructure around the Gorge
Amphitheater. The project would have public notice and public construction.
Describe in detail what methods you are using to promote your event.
LTAC ONLINE APPLICATION PRINT SCREEN
5.. OVERNIGHT STAYS:*
N/A - This is a Public Works project to improve the County Road infrastructure around the Gorge
Amphitheater. The project would have public notice and public construction.
Describe in detail, how your event will increase tourism and overnight stays in rural Grant County.
6. GROWTH*
N/A - This is a Public Works project to improve the County Road infrastructure around the Gorge
Amphitheater. The project would have public notice and public construction. This project would
increase the transportation capacity to and from the Gorge Amphitheater.
Describe in detail, the potential for growth of this event - does it have the funds, the volunteers, or
support to grow?
7. BUDGET*
Grant County Public Works is requesting LTAC funding in the amount of $600,,000., which along with a
matching 15% provided by the Road Fund, will Overlay and Widen Baseline- Road NW for
approximately one mile and provide additional queuing capacity for amphitheater events.
$600,000 LTAC Grant Request
$105,,900 Grant County Road Fund 15% Match
$705,900 Total Funds
The Funds would be used as follows:
$20,,000 for PE Design by County
$685,900 for CN Construction
PROJECT: Gorge Amphitheater - Baseline Road Widening for Queuing Lane
E3ASELIN VN.
(Sallica Rd. To 0.15
TNT'�FIC.,..,00AL f;ZOADV A"' 5 C=O..,oTION
FILL 5LOn
2.4' 5.0'
��- 0.25' HMA
0.�0' GSBG
Shoulder finishing
117,.0'
FINISHED MONLE CSE
r
7r •
0.25' HMA OVERLAY .25' HMS
EX1 5T11�� i�OY 0
0.50' 0550
Shoulder Finishing
OUT 5LOPE
2.4' 3.0'