Loading...
HomeMy WebLinkAboutGrant Related - BOCCGRANT COUNTY BOARD OF COUNTY COMMISSIONERS To: Grant County BOCC From: Janice Flynn, Administrative Services Coordinator Data August 29, 2023 Re: ARPA Reimbursement - Community Services of Moses Lake, ML Food Bank Request #1 Community Services of Moses Lake has requested reimbursement for remodel work performed at their warehouse, as part of their ARPA award from Grant County. The invoice for $200,000.00 is attached for your review. This leaves a remaining balance of $550,000.00 on their award. Thank you. SL'P 0 5 2023 J (7"",R.ANT "0'LvN!W CTJ`0\ il- S',� Vendor or Claimant (Warrant Payable to:) Community Services of Moses Lake PO Box 683 Moses Lake,, WA 98837 Vendor Contact Person: Peny Archer (509)765-8101 CSML@mlfood.gLrg Invoice Date: 12 -Jul -23 Invoice Number: M LC -20230604-1 Contractor name & UBI number Moses Lake Construction Company., LLC UBI: 603-354-161 1 Date of ARPA grant March 23,,2022 Awarding Agency Board of County Commissioners PO Box 37 Ephrata., WA 98823 Grant Award $750,000.00 Project Name: CSML Building #3 remodel Invoice Amount: $200.,000.00 Grant Budget Expended to date Amount this invoice Award Remaining $750,,000.00 $200.,000.00 $200,.000.00 $550,,000.00 Approved by: Chris Hansen, CSML Board President 11;1 0. INS"M. ..1970 CONTRACTOR INFORMATION Contractor: Moses Lake Construction Company, LLC. Project Manager: Chris Hansen Address: 2133 Westshore Dr NE, Moses Lake, WA 98837 Phone: (509) 361-4341 UBI No.: 603-354-161 Email: MosesLakeConstruction@gmail.com Contractor Registration No.: MOSESLC773JP Labor & Industries ID No.: MOSESLC773J7P Contract Bond No.: 71369 Insurance Policy No.: CPP 1311061 CLIENT INFORMATION Name: Peny Archer Phone 1: 1 (509) 765-8101 Company: Community Services of Moses Lake Phone 2: (509) 398-2617 Address: 1075 W Marina Dr E -Mail: City, State, Zip: Moses Lake, WA 98837 Website: www.mlfood.org PROJECT INFORMATION Project Name: CSML Building #2 Remodel Project Dates: 5/1/2023 — 6/2/2023 - S UMMARY OF WORK EXTERIOR WORK o All siding and metal removed from building. o Removed particle board substructure and inadequate purlins on building exterior. ■ Replaced purlins on 2' centers with 2"x4" material. o Removed excess dirt piles around building. o Cut parking lot grade down for drainage into swale. o Formed concrete sidewalk around building. ■ Installed #4 rebar into sidewalk and dowelled all forklift bays into existing foundation. o Re -graveled back side of building. o Dug septic test hole and acquired approved septic design. o Installed 1-1/4" city water tie in with frost -proof fittings and standpipe. INTERIOR WORK o Reframed all garage doors to match 12' opening. o Reinforced old section of building with 50' steel beam and posts. o Added extra angle supports into old trusses. o Installed 2"x4" purlins on 2' center across entire ceiling for sheetrock. o Framed in 3 access doors into ceiling. o Replaced existing tool room and well room roof with new plywood. o Reattached exterior walls to the foundation with up-to-date anchors. o Installed hurricane straps on trusses to bring up to code. o Furred out interior garage door wall to 2 "x6" . o Removed and framed in exterior window. o Framed in 10'x12' bathroom. ■ Installed 2'x8' ceiling with 3/" plywood above bathroom. ■ Used lag bolts and heavy-duty angle brackets to secure ceiling for load support for storage above bathroom. ELECTRICAL WORK o Installed oversized electrical conduit from Building #3 to Building #2. o Installed electrical conduit from Building #2 to Gate #3. o Submitted 60% downpayment on all electrical work. ■ Pro Electric & Controls Invoice # 88 ($52,349.91) PRICING Total Invoice $200900.00 Moses Lake Construction Company Contractor Invoice (Rev. 0) Page 1 of 1