From: Janice Flynn, Administrative Services Coordinator
Data August 29, 2023
Re: ARPA Reimbursement - Community Services of Moses Lake,
ML Food Bank Request #1
Community Services of Moses Lake has requested reimbursement for remodel
work performed at their warehouse, as part of their ARPA award from Grant
County. The invoice for $200,000.00 is attached for your review.
This leaves a remaining balance of $550,000.00 on their award.
Thank you.
SL'P 0 5 2023
J
(7"",R.ANT "0'LvN!W CTJ`0\ il- S',�
Vendor or Claimant (Warrant Payable to:)
Community Services of Moses Lake
PO Box 683
Moses Lake,, WA 98837
Vendor Contact Person:
Peny Archer (509)765-8101
CSML@mlfood.gLrg
Invoice Date:
12 -Jul -23
Invoice Number:
M LC -20230604-1
Contractor name & UBI number
Moses Lake Construction Company., LLC
UBI: 603-354-161 1
Date of ARPA grant
March 23,,2022
Awarding Agency
Board of County Commissioners
PO Box 37
Ephrata., WA 98823
Grant Award
$750,000.00
Project Name:
CSML Building #3 remodel
Invoice Amount:
$200.,000.00
Grant Budget Expended to date Amount this invoice Award Remaining
$750,,000.00 $200.,000.00 $200,.000.00 $550,,000.00
Approved by:
Chris Hansen, CSML Board President
11;1
0.
INS"M. ..1970
CONTRACTOR INFORMATION
Contractor: Moses Lake Construction Company, LLC. Project Manager: Chris Hansen
Address: 2133 Westshore Dr NE, Moses Lake, WA 98837 Phone: (509) 361-4341
UBI No.: 603-354-161 Email: MosesLakeConstruction@gmail.com
Contractor Registration No.: MOSESLC773JP Labor & Industries ID No.: MOSESLC773J7P
Contract Bond No.: 71369 Insurance Policy No.: CPP 1311061
CLIENT INFORMATION
Name: Peny Archer Phone 1: 1 (509) 765-8101
Company: Community Services of Moses Lake Phone 2: (509) 398-2617
Address: 1075 W Marina Dr E -Mail:
City, State, Zip: Moses Lake, WA 98837 Website: www.mlfood.org
PROJECT
INFORMATION
Project Name: CSML Building #2 Remodel Project Dates: 5/1/2023 — 6/2/2023
- S
UMMARY OF WORK
EXTERIOR WORK
o All siding and metal removed from building.
o Removed particle board substructure and inadequate purlins on building exterior.
■ Replaced purlins on 2' centers with 2"x4" material.
o Removed excess dirt piles around building.
o Cut parking lot grade down for drainage into swale.
o Formed concrete sidewalk around building.
■ Installed #4 rebar into sidewalk and dowelled all forklift bays into existing foundation.
o Re -graveled back side of building.
o Dug septic test hole and acquired approved septic design.
o Installed 1-1/4" city water tie in with frost -proof fittings and standpipe.
INTERIOR WORK
o Reframed all garage doors to match 12' opening.
o Reinforced old section of building with 50' steel beam and posts.
o Added extra angle supports into old trusses.
o Installed 2"x4" purlins on 2' center across entire ceiling for sheetrock.
o Framed in 3 access doors into ceiling.
o Replaced existing tool room and well room roof with new plywood.
o Reattached exterior walls to the foundation with up-to-date anchors.
o Installed hurricane straps on trusses to bring up to code.
o Furred out interior garage door wall to 2 "x6" .
o Removed and framed in exterior window.
o Framed in 10'x12' bathroom.
■ Installed 2'x8' ceiling with 3/" plywood above bathroom.
■ Used lag bolts and heavy-duty angle brackets to secure ceiling for load support for storage above bathroom.
ELECTRICAL WORK
o Installed oversized electrical conduit from Building #3 to Building #2.
o Installed electrical conduit from Building #2 to Gate #3.
o Submitted 60% downpayment on all electrical work.
■ Pro Electric & Controls Invoice # 88 ($52,349.91)
PRICING
Total Invoice $200900.00
Moses Lake Construction Company Contractor Invoice (Rev. 0) Page 1 of 1