HomeMy WebLinkAboutResolution 23-093-CCGRANT COUNTY
COMMISSIONERS AGENDA MEETING REQUEST FORM
(Must be submitted to the Clerk of the Board by 12:00pm on Thursday)
REQUESTING DEPARTMENT: Public Works
REQUEST SUBMITTED BY: Shilo Nellis
CONTACT PERSON ATTENDING MEETING: sam Castro
CONFIDENTIAL INFORMATION: ❑YES ✓M NO
DATE: 08/29/2023
PHONE: x3501
a=- =NJ laumn-mlial
-= -
i
❑Agreement / Contract
DAP Vouchers
DAppointment I Reappointment
DARPA Related
D Bids / RFPs / Quotes Award
D Bid Opening Scheduled
D Boards / Committees
D Budget
D Computer Related
M County Code
D Emergency Purchase
D Employee Rel.
CI Facilities Related
D Financial
D Funds
D Hearing
1--1 Invoices / Purchase Orders
❑Grants -, Fed/State/County
❑Leases
DMOA / MOU
❑Minutes
D Ordinances
D Out of State Travel
D Petty Cash
❑ Policies
D Proclamations
D Request for Purchase
® Resolution
D Recommendation
D Professional Sery/Consultant
D Support Letter
D Surplus Req.
=ax Levies
DThank You's
❑Tax Title Property
❑WSLCB
2023 Gravel -to -Oil Program, Road 12 NE and Road 8 -NE, $400,000
Signature:
(Prosecutor/Deputy Prosecutor)
FIAPPROVED
M DENIED
❑TABLED/DEFERRED/NO ACTION TAKEN
MCONTINUED TO DATE:
MOTHER
Date:
DATE OF ACTION: � `2' ' �✓�
yid` �� iF� Ei
Resolution Number � 3 -' 4 9 J
Before the Board of County Commissioners of Grant County, Washington
In the matter of initiating county road projects and assigning CRP numbers.
IT IS HEREBY RESOLVED THAT the roads listed below be improved as shown between the points indicated. These projects are
hereby declared to be public necessity and the county road engineer is hereby ordered and authorized to report and proceed thereon
as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070).
IT IS FURTHER RESOLVED THAT appropriations from the officially adopted road fund budget and based on the county engineer's
estimates are hereby made in the amounts and for the purposes shown:
1
2
3
4
5
1 6
7
8
g
ROAD NAME /
A.C. or P.C.C. Pavement
F.
TYPE OF
G.
Sidewalks
COST ESTIMATE (THOUSANDS)
Annual
Const.
CRP
BRIDGE NUMBER
ROAD
PATHS & TRAILS (RCW 47.30)
WORK (See
o
Prog.
No.
LOG
Code)
Z
o
V
ENGINEERING CONSTRUCTION
Item No.
M.P. TO M.P.
ROW
GRANT LOCAL
NO.
ROAD 12 -NE
94030
8.24 9.01
A, C, & D
X
X
$10
$190
25
23-05
(REST GRAVEL -TO -OIL)
(REET)
(REET)
ROAD 8 -NE
$10
$190
25
23-06
(REET GRAVEL -TO -OIL)
94020
1.18 1.98
A, C, & D
X
X
(REET)
(REET)
(4) TYPE OF WORK CODE
A.
Preliminary Engineering
B.
Right-of-way
C.
Grading, Draining, Surfacing
D.
Light Bit. Surf. Treatment
E.
A.C. or P.C.C. Pavement
F.
Curbs & Gutters
G.
Sidewalks
H.
Traffic Facilities
I.
Bridge Construction
J.
PATHS & TRAILS (RCW 47.30)
(5) The construction is to be accomplished by contract in
accordance with RCW 36.77.020 et. seq.
(6) The construction is to be accomplished by county forces
in accordance with RCW 36.77.060 and WAC 136-18.
DATED this 2.11. day of , 2023. BOARD OF COUNTY COMMISSIONERS
6- GRANT COUNTY, WASHINGTON
Yea Nay Abstain 77Z>
F1 R
AT EST: r
B bra J. Vasque , C Cin y Cai r, ice- hair
C erk of the Boar El F-1
Danny .Stone, Member
Recommended for use in connection with WAC 136-18-030, for multiple project initiation.
NOTE: This form is intended for use in connection with WAC 136-18-030 and makes pro vision for all pertinent information. Itis designed for
a situation where the Board of County Commissioners desires to initiate several road projects at onetime. For those desiring individual
initiation it is suggested that a Form similar to CRAB 110 be used.
BOARD OF COUNTY COMMISSIONERS
Grant County, Washington
RESOLUTION IN THE MATTER OF RESOLUTION No. 23- b ' -CC
AMENDING RESOLUTION 22 -120 -CC
AND 22 -131 -CC ADOPTING THE SIX
YEAR TRANSPORTATION
IMPROVEMENT PROGRAM FOR 2023-
2028
WHEREAS, a priority array of projects was prepared in accordance with the County Road
Administration Board Standards of good Practice: WAC 136-14 and was made available and consulted by
the Board during the preparation of the Six Year Program; and,
WHEREAS, pursuant to the requirements of R.C.W. 36.81.121 and WAC 136-14, the Grant
County Road Engineer submitted the Six Year Transportation Improvement Program for
2023 through 2028 to the Board of County Commissioners on October 11, 2022; and
WHEREAS, a report with respect to deficient Bridges was available to the Board during the
preparation and discussion of the Six Year Program; and
WHEREAS, a SEPA application was submitted for environmental pre -assessment and a letter of
Addendum was received from Grant County Development Services indicating that the social, economic
and aesthetic values would not be disturbed, and
WHEREAS, A Notice of Public Hearing was published twice for 2 weeps preceding the Hearing,
with no objections to the process and, said hearing was held on November 22 2022 and
WHEREAS, the Board of County Commissioners has reviewed the recommended program for
2023-2028 and has made the revisions and changes deemed practicable to the County's long range road
program; and
WHEREAS pursuant to the requirements of R.C.W. 3 6.81.121 the legislative authority shall
adopt a Six Year Transportation Improvement Program updated yearly, the.Board of County
Commissioners did prepare, revise, and extend the Six Year Program and did hold a Public Hearing on
November 22, 2022, Adopting said program as resolution 22 -120 -CC. Said Resolution was amended for
wording via Resolution 22 -131 -CC.
C:\Users\rlmina\Downloads\ATTACH B - 6YEAR TLP 2023-2028 AMENDED
RE S OLUTION. do ex
NOW, THEREFORE, BE IT HEREBY RESOLVED THAT the Grant County
Board of Commissioners, AMEND the Resolutions 22 -120 -CC and 22 -131 -CC to include several
projects, adopting the 2023-2028 Six Year Transportation Improvement Program for the years 2023
through 2028.
DATED this �YlA_ day of , 2023.
Barbara i
Clerk of
C:\Users\rlmina\Downloads\ATTACH B - 6YEAR TIP 2023-2028 AMENDED
RE S OLUTION. do cx
BOARD OF COUNTY
COMMISSIONERS
Yea Nay
Abstain GRANT COUNTY, WASHINGTON
%5 ��D
F� F-1
-so
Rob Jones, Chair
Q( El
F-1
d Cader,Vice-Chair
E
F
Danny .Stone, Member
C:\Users\rlmina\Downloads\ATTACH B - 6YEAR TIP 2023-2028 AMENDED
RE S OLUTION. do cx
Memo
Grant County
Department of Public Works
124 Enterprise St. S.E.
Ephrata, WA 98823
Serial No. 22.005
To: Honorable Grant County Board of County Commissioners
From: Dave Bren, PE, MSCE
County Road Engineer
Date: January 10, 2023
Re: Amending the 6 -Year Transportation Improvement Plan TIP
Adding (4) Projects to the Plan: (2) CBDL Bridges, 2023 Gravel -to -Oil Program,
and the Hiawatha/Drumheller Truck Route
Legislative History: Financial Impact:
• First Presentation: = January 10, 2023 • 2023 Truck Route Design Work
(REET) ) $ 250,000
• Second Presentation: 2023 Gravel -to -Oil Program(REET)
$ 40 0,00o
f • 2024 CBDL Bridge #247 (DIR FED) $--4-3430.1000
i
• 2025 CBDL Bridge #248 (DIR FED)
f, 5,005,000
• Action Requested: � TIP Amendment •..,7 'r.:.; 14yTTr `rrn,��t.�A ��,�;��I� tT�+��;�° y :, ,S t t t �;.{ ,w� :.
2023 Hiawatha/Drumheller Truck Route Design (REET $250,000): The REET fundingprovides for the
p Design
of the Truck Route including; LIDAR UAS/Drone survey, LIDAR UAS/Drone equipment, GPS ound
gr control
equipment, road design, and cultural report for a new truck route on the West Side of Moses Lake. A shovel ready
design will lead to funding opportunities for the construction. The future Truck Route will connect the'
H�.awatha
interchange at I-90 to a new roundabout at the SR17/S282 split with a new 7.3 -mile section of BSTaved road.
ad.
2023 Gravel -to -Oil ProLyram (REST $400,000): The REET funding will provide for new BST road surface
construction on (2) top scoring sections of gravel roads; 12 -NE (0.77 Miles) and 8 NE0.80 Miles). In addition,
( ) n,
the BEET funding will provide for a rescoring update of gravel roads to provide forotential continuance
p of the
Gravel -to -Oil Program in 2024, and beyond.
2024 CBDL Bridge #247 Replacement (FED DIRECTED $4,430,000): The Federally Directed funding
w111
provide a new bridge over the Irrigation Canal on Road W, South of Road 2SE. Design would begin in 2024
g ,with
construction conducted in 2025. The larger bridge would remove the canal obstruction, so that the canal capacity
could be greatly increased.
2025 CBDL Brid a #248 Replacement FED DIRECTED5 0
$ , 05,000). The Federally Directed funding will
provide a new bridge over the Irrigation Canal on Road 11 SE, West of Road U. Desi would begin in 2025 with
� g
construction conducted in 2026. The larger bridge would remove the canal obstruction, so that the canal capacity
could be greatly increased.
«To meet current and future needs, serving together with public and private entities, whip fostering a respeatFul and successful
work environment."
information ...............................................(509) 754-6082
5093 75'4-6087
Dave Sren, PE, county Road Engineer Ext 3502
..1 •.....1.1 .IY .,Ext,
Bob Bersan ti, Construction Engineer
Ed Lowry Su peruisor-Dist too • •N4 l•!•lY•••~lr•MY.1sw4... ... .•.�r 35 1 Y
'y
E-n��,�............................. pll�1�G�'dC1ri`grankCQEln�1Ya,ggv
Sam Castro, Public Works Director 4
....................pct. 350
.........._........ Est 3 03
l.ac Ohl, ArcaEir�tant Lead..,. .............••••..,_............zxt.3555
Pod Follett Foretn an -Sign Shoe
t u
Mike �visar-dist. Na 2 Eatt.3s9�.
� Pe ,......._...,..........
Jahn Brissey, Supervisor-Disdt. No S Ext 554;„
,•.......-....�........,.
y{•
Samuel Dart, Assistant Director .EXt.$5�•3
........................
Ext 3573
co �y► ............................ .
'DQ��n�, Solid �•....�.
Jason Waste.. (509) 754-4319
.., ..I. _.1.1..
John aha lM... K...w
p t 3 75.4-6086
Andy Booth, Bridge
Supervisor......... Ext:3535
3535
Fiscal and Poliev Implications: The Congressionally Directed Federal funds and REET fundsrovid
p e
for these projects do not require matching funds. These funds provide a $10,085,000 direct economic
benefit to the County during construction of the roads and bridges. In addition mic
g ,these funds provide long-
term economic benefits to the County, by increased road capacity for developable lands, increased truck
route capacity, and increased irrigation capacity for farming.
Commission Packet Attachment
A. I Updated 6 -Year TIP Map and Projects List
I B. I Resolution to Amend 6 -Year TIP
C. I Engineers Estimates for CBDL Bridge #247 and #248
Action Requested
r
Public Works Staff requests a resolution for approval of an Amended 6 -Year TIP. This will add4
the TIP as follows: () projects to
✓ 2023 F iawatha/Drumheller Truck Route Design
✓ 2023 Gravel -to -Oil Program (Roads 12 -NE and 8 -NE)
✓ 2024 CBDL Bridge #247 Replacement
✓ 2025 CBDL Bridge #248 Replacement
"To meet current and future needs, searing together with public and private entities, while fostering a respectful and successfu
l
work environment."
information .................................... ... ........ (509.) 754-6082 Dave County Road Engineer Ext 3542 Ed Lawry, supervisar-gist. No �.
FAX ................................ (509) 'T54-6087 BobBersanti, constructionExt 35 0
................................ Engineer... �......,.......F.att, 353 Mike DeTralio 3uperuisar-Gist. eta. 2...
E-mail .......................... pubfsa�wrvrksogranteauntyuva.,gav Loc C►hl,Atca�rntantt.ead...... � �...�...-...�....�xt.359i
Sal» castra Pubic Works Director.. .................._.............Ext, 3555 John Brissay, Supervisor-tzis�t Na. �3..,..... �xxt 35��.
.Ext. 3.504 Rad Follett, Foreman -Sign shop ............... )
......,.......... Jahn spies, Supervisor -Central aha
p............................Ext. 657'9 ��49} 7S4-Go36
samuel Dart, Assistant Director ... ... ...... ... ......... .Ext.3519 .Eason t0Nin.gs, solid Waste .................. ........ (549) 75.4-4319 And I�...........
Andy B+�ath, Bridge supervisor....................................Ext 3535
Funding
VW0 :ngtontate
,artt al Trwisportatim
Six Year Transportation Improvement Program
Status
From 2023 to 2028
Agency: Grant Go -
County: Grant
CN 2023 STP(US) 808,022
MPO/RTPO: Quad -Co RTPO N Inside
Y Outside
a
M
<
o
;a c o-
-,� A. PIN/Project No.
B. STIP ID D c < o B
z C. Project Title
B �,
�. c D. Road Name or Number
m
= rL Q o rt � r �* CD
0 a. E. Begin & End Termini
B -t o c
u, F. Project Description
G. Structure ID Q, rt a @ N � Q.
05 1
WA -02546 11115121 11/15121 21 -117 -CC 03 P T W 1.020 CE Yes
COCHRAN RD & OTTMAR RD
41550/41660
0/0 to .89/.13
Reconstruction - Work will include grade, drainage, HMA surfacing, Curb & Gutter,
sidewalks, traffic control and other items. PE done under federal project
STPUS-6079(001)
Location: Airway DR to Valley Rd
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code
State Funds Local Funds Total Funds
S
CN 2023 STP(US) 808,022
0 126,107 934,129
S
CN 2023 HIP(US) 126,178
0 19,693 145,871
Totals 934,200
0 145,800 1,080,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 1,080,000 0 0 0 0
Totals 1,080,000 0 o a 0
Report Date: January 10, 2023 Page 1
AdMhL
'Mr
VAP Washingwn six Year Transportation Improvement Program
Department at Transportatica
From 2023 to 2028
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO N Inside Y Outside
M
o o 0
< c
-,� A. PIN/Project No. v, --�
C. Project Title B. STIP ID 3 0 3 = o
rt CD
D. Road Name or Number = Q
N�. E. Begin End Termini "0 3 3 0 CD
» to
F. Project Description G. Structure ID a �. o V M a.
05 2 WA -12565 11/15/21 11/15121 21 -117 -CC 21 T 0.060 CE Yes
Safety- SR 28 and White Trail Road Roundabout
U NW
22.85 to 22.91
Safety- SR 28 and White Trail Road Roundabout 93010
Intersection- Work will include earthwork, drainage, HMA surface, traffic control and
other items
Location: U NW & SR28 intersection
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2023 0 0 115,150 115,150
Totals 0 0 115,150 115,150
Report Date: January 10, 2023 Page 2
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 115,150 0 0 0 0
Totals 115,150 0 0 0 0
Report Date: January 10, 2023 Page 2
AML
W*Ainsiton State Six Year Transportation Improvement Program
Department at Transportatfon
From 2023 to 2028
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO N Inside Y Outside
M
t
M O 0
0 0 c o
3 3
-n A. PIN/Project No. B. STIP ID
Z C. Project Title a _ � r* m c�
0 C D. Road Name or Number = Q � = �
,0 0 = Cr E. Begin & End Termini � �° CL 0 o m
--t
Ch "' CL
F. Project Description G. Structure ID g, rt c
00 3 ��
N M a
WA -13302 11/15/21 11/15/21 21 -117 -CC 05 P T CE No
ADA Ramp/ Sidewalk upgrades Phase 1
Various to Various
Work Consists of ADA Ramp and/or Sidewalk upgrades and other items
Location: (Various)
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2023 0 0 30,000 30,000
S CN 2023 0 0 120,000 120,000
Totals 0 OF 950,000 150,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 30,000 0 0 0 0
CN 120,000 0 0 0 0
Totals 150,000 0 0 0 0
Report Date: January 10, 2023 Page 3
Mishingban State Six Year Transportation Improvement Program
From 2028 to 2028
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO N Inside Y Outside
m
M
0 0 0
-,7 A. PIN/Project No. B. STIP ID D c < c 3 X
z C. Project Title = D M c CD
.� D. Road Name or Number Q a o rt `� r �; CD
a. E. Begin & End Termini m 'aCD ° z c M
F. Project Description G. Structure ID (. CL o N 01 a
06 4 /9913(004) WA -09755 11/15/21 11/15/21 21 -117 -CC 03 P T W 0.990 CE No
Grape & Maple Drive
42350/42600
.12/0.0 to .36/.75
Reconstruction - Work will include grade, drainage, curb and gutter, HMA, sidewalk,
traffic control and other items.
Location: County Line 625 ft. north of SR17 to Stratford Rd.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2023 STP(US) 1,319,125 0 205,875 1,525,000
Totals 1,319,125 0 205,875 1,525,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 1,525,000 0 0 0 0
Totals 9,525,000 0 0 0 0
Report Date: January 10, 2023 - Page 4
WUP
°nftn SuNte Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Grant Co.
County: Grant
MPOIRTPO: Quad -Co RTPO N Inside Y Outside
M
o �
o M0 0
A. PIN/Project No. B. STIP ID c CD rt c
A Z C. Project Title = D � m
n D. Road Name or Number Q = `c rt M
CD a. E. Begin & End Termini -°a CL 3 o 0
CA F. Project Description G. Structure ID 0 a rt o N s a Q
06 5 WA -13303 11/15/21 11/15/21 21 -117 -CC 03 4.220 CE No
9 -NW Road
9 N
5.84 to 10.06
9 NW Road 93020, work will include earthwork, drainage, BST surface, traffic control 93020
and other items.
Location: SR 283 to Dodson Rd
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds
Local Funds Total Funds
P
PE 2023 0 CRAB 132,900
15,100 148,000
P
CN 2024 0 CRAB 1,759,500
195,500 1,955,000
Totals 0 1,892,400
210,600 2,103,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 48,000 1003000 0 0 0
CN 0 0 1,955,000 0 0
Totals 48,000 100,000 1,955,000 0 0
Report Date: January 10, 2023 Page 5
ft"in ton State Six Year Transportation Improvement Program
lt nsporta
ffan
From 2023 to 2028
Agency: Grant Co.
County: Grant
MPOIRTPO: Quad -Co RTPO N Inside Y Outside
M
o ;U 0 0
"n A. PIN/Project No. B. STIP ID a o tD 0 3 ;aZ C. Project Title S = 3 C
rt SU
D. Road Name or Number = a =
Er 0 Cr E. Begin & End Termini `D o o. o r,. n r
ren A) 0 F. Project Description G. Structure ID � a M o V N � a Q
07 6 WA -1406311115121 11/15/21 21 -117 -CC 03 No
Misc Projects local only
various to various
Miscellaneous Projects including safety and maintenance with local funds.
Funding
Status
Phase
Phase Start Year (YYYY) Federal Fund Code
Federal Funds State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2023
0
0
5D,000
50,000
S
PE
2024
0
0
10,000
10,000
S
PE
2025
0
0
10,000
10,000
S
PE
2026
0
0
10,000
10,000
S
PE
2027
0
0
10,000
10,000
P
PE
2028
0
0
10,000
10,000
S
CN
2023
0
0
250,000
250,000
S
CN
2024
0
0
240,000
240,000
S
CN
2025
0
0
240,000
240,000
S
CN
2026
0
0
240,000
240,000
S
CN
2027
0
0
240,000
240,000
S
CN
2028
0
0
240,000
240,000
Totals
0
0
1,550,000
1,550,000
Report Date: January 10, 2023 Page 6
VhWr>119-t-*n state
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six_ Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 50,000 10,000 10,000 10,000 10,000
CN 250,000 240,000 240,000 240,000 240,000
Totals 300,000 250,000 250,000 250,000 250,000
Report Date: January 10, 2023 Page 7
AML
Vhaffithsitim Stato
Department of Transpartation
Agency: Grant Co.
County: Grant
MPOIRTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
P
PE 2023 0 0 100,000
100,000
P
M
1,100, 000
-o
1,200,000
-a
a;a0
0
1
PINIProject No. B. STIP ID
a
CA
0A.
C
Z
C. Project Title
3
nD.
Road Name or Number
Q
Q.
c
�,
r
�,
CD
im
a
E. Begin & End Termini
�'
-a
3
0
..�
y
F. Project Description G. Structure ID
Q,
o
N
as
a
05
7
WA -12567
11/15/21
11/15/21
21 -117 -CC
04
P T
4.000
CE
No
Stratford Road - Phase 2
Stratford Rd
13.24 to 17.24
Stratford Road - Phase 2 94025
2R - Work will include earthwork, drainage, BST surface, traffic control and other
items.
Location: 16 NE Road to 20 NE Road
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
P
PE 2023 0 0 100,000
100,000
P
CN 2024 01
I 1 0 1,100, 000
1,100, 000
Totals 0 0 1,200,000
1,200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 100,000 0 0 0 0
CN 0 1,100,000 0 0 0
Totals 100,000 1,100,000 0 0 0
Report Date: January 10, 2023 Page 8
VrAf Wash;ingtonte Six Year Transportation Improvement Program
Department at Thansportatfo
From 2023 to 2028
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO N Inside Y Outside
M
A. PIN/Project No. B. STIP ID a c 0 3
z C. Project Title D
n c D. Road Name or Number a Q. o M I< r- r. M
a. E. Begin & End Termini �' "a 3 --I o ...�
N F: Project Description G. Structure ID rt o N a.
07 8 WA -13301 11/15/21 11/15/21 21 -117 -CC 11 0.200 EA No
B -SE Culverts
B SE
.24 to .44
Culvert replacement - Work will include removal of failing existing culvert pipe, 20550
approaches, traffic control, and other items. Location: (.025 miles south of Lower
Crab Creek Road)
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S
PE 2023 0 0 200,000
200,000
P
CN 2024 0 0 200,000
200,000
Totals 0 0 400,000
400,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 200,000 0 0 0 0
CN 200,000 0 0 0 0
Totals 400,000 0 0 0 0
Report Date: January 10, 2023 Page 9
Aft
Wash,>ngtir stvtL3 six Year Transportation Improvement Program
Department of Trwrsion,
From 2023 to 2028
Agency: Grant Co.
County: Grant
MPOIRTPO: Quad -Co RTPO N Inside Y Outside
M
<
oc o
-e A. PIN/Project Na B. STIP ID a c m rt c 3
Z C. Project Title = D C B c�
CCD
c D. Road Name or Number CL a o `� r �,
N o. E. Begin & End Termini 'i V o CD
u, as F. Project Description G. Structure ID Q, o 0 a
05 9 WA -13304 11/15/21 11/15/21 21 -117 -CC 04 P T 3.040 CE No
Stratford Road Phase 3
Stratford Rd
17.24 to 20.28
Stratford Road 94025 BMP 17.24 to EMP 20.28 94025
2R - Work will include earthwork, drainage, BST surface, traffic control and other
items.
Location 20 NE Rd to BNSF RR Crossing
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2023 0 CRAB 744,000 106,000 850,000
Totals 0 744,000 106,000 850,000
Report Date: January 10, 2023 Page 10
Expenditure Schedule
Phase '1st 2nd 3rd 4th 5th & 6th
CN 850,000 0 0 0 0
Totals 850,000 0 0 0 0
Report Date: January 10, 2023 Page 10
AIML
Washington Stoma
Department of Transportation
Agency: Grant Co.
County: Grant
MPOIRTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2023 0 0 40,000 40,000
P CN 2024 0 0 250, 000 250,000
Totals 0i 1 0 290,000 290,000
Expenditure Schedule
Phase 9st 2nd 3rd 4th 5th & 6th
PE 40,000 0 0 0 0
CN 0 250,000 0 0 0
Totals 40,000 250,000 0 0 0
Report Date: January 10, 2023 Page 11
M
-v
3
-a
�
o
c
o
A. PIN/Project No. B. STIP ID
CD
c rt
S
r
z
C. Project Title
-f
M
nrt
c
D. Road Name or Number
=
a
Q.
o
o
r
CD
D.
E. Begin & End Termini
M
M
ff.
B
�
-q
M
N R
`-°
F. Project Description G. Structure ID
0
CD
o
N
0
Q.
07
10
WA -14069
11/15121
11/15121
21 -117 -CC
11
0.320
No
23 -NE Rd Br 171 replacement
93048
9.323 to 9.64
23 NE Bridge 171 replacement
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2023 0 0 40,000 40,000
P CN 2024 0 0 250, 000 250,000
Totals 0i 1 0 290,000 290,000
Expenditure Schedule
Phase 9st 2nd 3rd 4th 5th & 6th
PE 40,000 0 0 0 0
CN 0 250,000 0 0 0
Totals 40,000 250,000 0 0 0
Report Date: January 10, 2023 Page 11
AMML
VhWhtngton StateSix Year Transportation Improvement Program
From 2023 to 2028
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO N Inside Y Outside
M
V
O % OCD 0.
In A. PIN/Project No. B. STIP ID n c < C -4 3 �
z C. Project Title rt �,
n 0; D. Road Name or Number m Q Q o M, `� r �,
0 Cr E. Begin & End Termini �a° -� o c
N E F. Project Description G. Structure 1D �Q, R to
o m N a
05 11 WA -10861 11/15/21 11/15/21 21 -117 -CC 04 P T 1.990 CE No
3 -NE Rd Phase 3
94000
8.91 to 10.9
Work will include earthwork, drainage, HMA surface, traffic control and other items
Location: S NE to U NE
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2023 STP (R) 865,000 0 702,126 1,567,126
Totals 865,000 0 702,126 1,567,126
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 1,567,126 0 0 0 0
Totals 1,567,126 0 0 0 0
Report Date: January 10, 2023 Page 12
AIML
wamh>irgtan state
par tment of Transportation
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S
PE 2023 STP(R) 27,000 0 10,145 37,145
S
CN 2023 STP(R) 1,541, 894 0 287,421 1,829,315
Totals 1,568,8941 i 0 297,566 1,866,460
M
3
�
c
0
0
=`
A. PIN/Project No. B. STIP ID
n
CD
Cn
<
C
Z
C. Project Title
`�
n
D. Road Name or Number
a
Q
o
�,
r-
m
�,
a
E. Begin & End Termini
�'
-a
o
.�
N W
F. Project Description G. Structure ID
a
CD
e
0
N
�
CD
Q
05
12
WA -14077
11/15/21
11/15/21
21 -117 -CC
04
P T
6.230
CE
No
Dodson Rd Overlay Ph 2
91030
21.76 to 27.99
2R Work will include HMA resurfacing and traffic control.
Location 7 NW to Ephrata City Limits.
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S
PE 2023 STP(R) 27,000 0 10,145 37,145
S
CN 2023 STP(R) 1,541, 894 0 287,421 1,829,315
Totals 1,568,8941 i 0 297,566 1,866,460
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 37,145 0 0 0 0
CN 1,829,315 0 0 0 0
Totals 1,866,460 0 0 0 0
Report Date: January 10, 2023 Page 13
r
NIL
�J,n,gtan W-ato Six Year Transportation Improvement Program
parts ofTranupcwtation
From 2023 to 2028
Agency: Grant Co.
County: Grant
MPOIRTPO: Quad -Co RTPO N Inside Y Outside
M
O Mp O
CD
In � A. PIN/Project No. B. STIP ID D o C 0 3 ;U
z C. Project Title ,
r7 rt D. Road Name or Number a = CD`� r~ cru
iv 0 �. E. Begin & End Termini '�' -a CL 0 cCD
CL
W m 0 F. Project Description G. Structure ID a, o 0 N 3 a
05 12 WA -14078 04 P T 0.690 CE No
Dodson Rd Overlay Ph 3
91030
28.99 to 29.68
2R Work will include HMA resurfacing and traffic control.
Location 13 NW to Ephrata City Limits
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2023 STP(R) 2,990 0 1,123 4,113
S CN 2023 STP(R) 170,771 0 31,831 202,602
Totals 173,761 0 32,954 206,715
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 4,113 0 0 0 0
CN 202,602 0 0 0 0
Totals 206,715 0 0 0 0
Report Date: January 10, 2023 Page 14
AMIL
Wash;noton State Six Year Transportation Improvement Program
Vrp Department at Trans abort
From 2023 to 2020
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO N Inside Y Outside
M
In M A. PIN/Project No. B. STIP ID D c < � -4 3 �
z C. Project Tithe E3 �CD CD,
D. Road Name or Number cn .Q Q, Cr
E. BeginEnd Termini ca.CD
ca
F. Project Description G. Structure ID Q �, o N a
05 12 WA -14079 11/15/21 11/15/21 21 -117 -CC 04 P T 3.060 CE No
Dodson Rd Overlay Ph 4
91030
18.70 to 21.76
2R Work will include HMA resurfacing and traffic control.
Location: 4 NW to 7 NW
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2023 STP (R) 13,260 0 4,982 18,242
S CN 2023 STP(R) 757,335 0 141,173 898,508
Totals 770,595 0 1 146,155 916,750
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 18,242 0 0 0 0
CN 898,508 0 0 0 0
Totals 916,750 0 0 0 0
Report Date: January 10, 2023 Page 15
Washington State Six Year Transportation Improvement Program
Depuftme"t at IV= spartmfon
From 2023 to 2028
Agency: Grant Co_
County: Grant
MPO/RTPO: Quad -Co RTPO N Inside Y Outside
M
o' 0 0
-c A. PIN/Project No. B. STIP ID D c m o
3 z C. Project Title = 3 rl
n 0 D. Road Name or Number a Q o rt `� r �, coo
0 a. E. Begin & End Termini 0 n _ .0
�' 10 0 --t o E
N IM `� CL
F. Project Description G. Structure ID a CD o 0 N a a a
04 13 WA -12569 11/15/21 11/15/21 21 -117 -CC 04 P T 0.580 CE No
Valley Road Overlay / Sidewalk
Valley Rd
1.53 to 2.11
211 Overlay - Work will include HMA surfacing, ADA ramps, new curb & sidewalk, 41250
traffic control and other items. Location: Scott Rd to South of H -NE Rd
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2024 0 0 50,000 50,000
S CN 2024 STP(US) 389,250 0 60,750 450,000
Totals 389,250 0 910,750 500,000
Expenditure Schedule
Phase 1st 2nd 3rd '4th 5th & 6th
PE 0 50,000 0 0 0
CN 0 .450, 000 0 0 0
Totals 0 500,000 0 0 0
Report Date: January 10, 2023 Page 16
AWL
Washirr19[tan state
Department of anzportat 'ol
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S
PE 2026 0 CRAB 166,500 18,500
185,000
S
M
1,665, 000
v
1,850,000
�
o'
c
o
-
A. PIN/Project No. B. STIP ID
D
o
0
rt
0
3
�
3
Z
C. Project Title
n
3
�,
n rt
D. Road Name or Number
a
a
c
�.
`�
�,
m
0
Cr
E. Begin & End Termini
'�'
�°
�
o
CA 's'
F. Project Description G. Structure ID
,�
a
o
y
=
�
a
05
15
WA -14072
11115/21
11/15/21
21 -117 -CC
04
P T
4.670
CE
No
H SE
92005
0.00 to 4.67
Reconstruction- work will include earthwork, drainage, BST surface, traffic control
and other items.
Location 12 SE to SR 262
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds
Total Funds
S
PE 2026 0 CRAB 166,500 18,500
185,000
S
CN 2026 0 CRAB 1,498, 500 166,500
1,665, 000
Totals 0 1,665,000 185,000
1,850,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 185,000 0
CN 0 0 0 1,665,000 0
Totals 0 0 0 1,850,000 0
Report Date: January 10, 2023 Page 17
W;ionState
Department af Trweportatton
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code
State Funds Local Funds Total Funds
P
PE 2024 HIP(US) 126,178
0 0 126,178
S
M
0 216,000 1,600, 000
.Q
0 216,000 1,726,178
'D
t
O
;U
O
O
I
A. PIN/Project No. B. STIP ID
3
0
rt
o
3
z
C. Project Title
D
n
c
D. Road Name or Number
a.
a.
c
o
a
CD
�, 3
a.
E. Begin & End Termini
�'
�a
3
--�
..�
N
F. Project Description G. Structure ID
Q,
a
o
a
y
ro
CL
05
16
16069(001) WA -14073
11115/21-
11/15/21
21 -117 -CC
04
P T
2.120
CE
No
Westshore Drive Overlay / Sidewalk
40950
0.83 to 2.95
2R Work will include HMA surfacing, new ADA ramps & sidewalk, traffic control and
other items.
Location: Fairway Drive to 0.25 S. of 4 NE
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code
State Funds Local Funds Total Funds
P
PE 2024 HIP(US) 126,178
0 0 126,178
S
CN 2024 STP(US) 1,384, 000
0 216,000 1,600, 000
Totals 1,510,178
0 216,000 1,726,178
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 126,178 0 0 0
CN 0 1,600,000 0 0 0
Totals 0 1,726,178 0 j 0 0
Report Date: January 10, 2023 Page 18
Wash'ngtonto
Department of Transportatk
Six Year Transportation Improvement Program
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 160,000 0 0
From 2023 to 2028
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO N Inside
Y Outside
�
0.
M
,a G
O
p O
-n A. PIN/Project No.
B. STIP ID
� �
o c o 3
C. Project Title
D. Road Name or Number
= a
— rt cv
CD '< �' �. X
Cr E. Begin & End Termini
.o°
o
m MF. Project DescriptionG.
Structure ID a �,
o � ? a
05 17
WA -14074 11/15/21 1'1/15121
21 -117 -CC 03 P T 5.820 CE No
Q SW(George to Frenchman Hills)
91035
0.82 to 5.82
3R Work will include earthwork, drainage, BST surface, traffic control and other
items.
Location: George City Limits to Frenchman Hills Rd
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code
Federal Funds State Fund Code State Funds
Local Funds Total Funds
P PE 2025
0 CRAB 144,000
16,000 160,000
P CN 2025
0 CRAB 1,296, 000
144,000 1,440, 000
Totals
0 1,440,000
160,000 1,600,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 160,000 0 0
CN 0 0 1,440,000 0 0
Totals 0 0 1,600,000 0 0
Report Date: January 10, 2023 Page 19
Washington State
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six- Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P
PE 2025 NHPP 60,000 0 15,000 75,000
P
_
Totals 700,000 0 1751000 875,000
M
-v
V
o
o
0
-
A. PIN/Project No. B. STIP 1D
>
0
c
<
�
0
3
z
C. Project Title
D
�,
`�
—I
n rt
D. Road Name or Number
c
Q
c
F—
m
CD
C
a.
E. Begin & End Termini
V
3
a
V
N
%F.
Project Description G. Structure ID
a
o
0
N
CD
Q
06
18
WA -14075
11/15/21
11/15/21
21 -117 -CC
11
P T
0.010
CE
No
Bridge 382 H NW Rd
30430
2.28 to 2.29
Bridge replacement- Work will include demolition, structure replacement,
approaches, traffic control and other items. ,
Location: .4 miles north of SR 28
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P
PE 2025 NHPP 60,000 0 15,000 75,000
P
CN 2025 NH PP 640,000 0 160,000 800,000
Totals 700,000 0 1751000 875,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 75,000 0 0
CN 0 0 800,000 0 0
Totals 0 0 875,000 0 0
Report Date: January 10, 2023 Page 20
Vh";ngtonSte Six Year Transportation Improvement Program
part>rt of Transa->tiior.
From 2023 to 2025
Agency: Grant Co.
County: Grant
MPOIRTPO: Quad -Co RTPO N Inside Y Outside
m
3
oX 0 0
M.c A. PINIProject No. B. STIP ID D o M Ie.c -
Z C. Project Title m
0 �; � D. Road Name or Number � a Q. o � `� r �, M
�. E_ Begin End Termini -0 3 -{ o
F. Project Description G. Structure ID Q o a yca
a
07 19 WA -14076 11/15/21 11115/21 21 -117 -CC 11 P T 0.010 No
Bridge 353 R NW
30330
.01. to .02
Bridge replacement - Work will include demolition, structure replacement,
approaches, traffic control and other items.
Location R NW and Martin Rd
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2027 0 0 5,000 5,0E
P CN 2027 0 095, 000 95,000
Totals TO 0 100,000 100,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 0 5,000
CN 0 0 0 0 95,000
Totals 0 0 0 0 100,000
Report Date: January 10, 2023 Page 21
AML
VrKington Wide
Af Department at Tkansportaffn
Agency: Grant Co.
County: Grant
MPOIRTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2023 0 0 10,000 10,000
P CN 2023 0 0 50,000 50,000
Totals 0 0 60,000 60,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 10,000 0 0
CN 0 0 50,000 0 0
Totals 0 0 60,000 of— 0
Report Date: January 10, 2023 Page 22
M
o
0
0
A. PIN/Project No. B. STIP ID
>
o
0
c
o
R
z
C. Project Title
D
Q
�
,_,
m
=
c
D. Road Name or Number
a
a
o
`�
o
r
m
0
a.
E. Begin & End Termini
�'
M
a
—t
...�
G.
N
F. Project Description G. Structure ID
Q,
o
N
Q.
05
20
WA -14082
11/15/21
11/15/21
21 -117 -CC
47
P T
0.070
CE
No
Stratford Bridge 110
94026
0.208 to 0.278
Work includes excavation to spring line of the pipes, CDF fill; one lift HMA, traffic
control and other items.
Location: 22.7 NE to 23 NE
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2023 0 0 10,000 10,000
P CN 2023 0 0 50,000 50,000
Totals 0 0 60,000 60,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 10,000 0 0
CN 0 0 50,000 0 0
Totals 0 0 60,000 of— 0
Report Date: January 10, 2023 Page 22
Wasir> im Sate
Department ofTrmsportation
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO N Inside
0
I A. PIN/Project No.
C. Project Title
n rt D. Road Name or Number
B0 a. E. Begin & End Termini
to ¢' F. Project Description
05 21
Dodson Road - Road 12 SW Intersection Improvements
91030
2.235 to 2.245
Install a roundabout at the intersection of Dodson and 12 SW. Work includes earth
work, curb installation, traffic control devices, and other items.
Six Year Transportation Improvement Program
From 2023 to 2025
Y Outside
Phase
1st 2nd 3rd 4th 5th & 6th
PE
Status
Phase
Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code
State Funds Local Funds
Total Funds
P
PE
2025 0
0 375,000
B
.o
P
P
RW
CN
2025 0
2026 0
M
�
<
50,000
2,075,000
Totals 0
0 2,500,000
2,500,000
0
0
B. STIP ID
>X
c
c
X
=
D
@
t
rt
O
p
Q.
O
rt
0
oCD
G. Structure ID
Q
o
CD
N
0
Q.
WA -14081
11/15/21
11/15/21
21 -117 -CC
21
P T
0.010
CE
Yes
Funding
Phase
1st 2nd 3rd 4th 5th & 6th
PE
Status
Phase
Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code
State Funds Local Funds
Total Funds
P
PE
2025 0
0 375,000
375,000
P
P
RW
CN
2025 0
2026 0
0 50,000
0 2,075,000
50,000
2,075,000
Totals 0
0 2,500,000
2,500,000
Expenditure Schedule
Phase
1st 2nd 3rd 4th 5th & 6th
PE
0 0 375,000 0 0
RW
0 0 50,000 0 0
CN
0 0 0 2,075,000 0
Totals
0 0 425,000 2,075,000 0
Report Date: January 10, 2023 Page 23
VrAfy Washington Wnto six Year Transportation Improvement Program
Department of Trmsportatfan
From 2423 to 2028
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO N Inside Y Outside
M
o' 0 0
A. PIN/Project No. B. STIP 1D Do c� -4 3
Z C. Project Title ,
�. c DCD
. Road Name or Number = a a o r �, m
a. E. Begin & End Termini M 3 o CD
v, F. Project Description G. Structure ID Q, �, o N
07 22 WA -14084 11/15/21 11115/21 21 -117 -CC 03 P T 1.060 CE No
K7NE7NEto8NE
43070
0.0 to 1.06
Work includes earthwork, BST, traffic control, and other items.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2025 0 0 15,000 15,000
P CN 2026 0 0 100,000 100,000
Totals 0 0 115,000 115,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 15,000 0 0
CN 0 0 0 100,000 0
Totals 0 0 15,000 100,000 0
Report Date: January 10, 2023 Page 24
AIML
Washington Stere
Department of Transportatfort
Agency: Grant Co.
County: Grant
MPOIRTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code
P PE 2024 0 CRAB
State Funds
108,000
Local Funds Total Funds
12,000 120,000
P CN 2024 0 CRAB
1,345,500
149,500 1,495,000
Totals 01 1
M
161,500 1,615,000
o'0
0
-n
A. PIN/Project No. B. STIP ID
n
c
<
c
o
3
�.
z
c
C. Project Title
D. Road Name or Number
=
a
Q.
a
3
,
m 3
a.
E. Begin & End Termini
-°a
B
-q
o
�.CD
-�S.
a, lv
-°
F. Project Description G. Structure ID
Q
�.
c
N
a
06
23
WA -14924
10
3.000
CD
No
S -NW Br 355
31550
0.990 to 3.990
S -NW BST surface, replace bridge 355 with pre fab concrete bridge; finished width
34ft.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code
P PE 2024 0 CRAB
State Funds
108,000
Local Funds Total Funds
12,000 120,000
P CN 2024 0 CRAB
1,345,500
149,500 1,495,000
Totals 01 1
1,4531500
161,500 1,615,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 120,000 0 0 0
CN 0 1,495,000 0 0 0
Totals 0 1,615,000 0 0 0
Report Date: January 10, 2023 Page 25
AML
Kington Stiato
Department of Transportaftm
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status
Phase
M
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2023
0
0
250,000
250,000
P
o'0
2024
0
OTHER
800,000
0
P
CN
0
0
OTHER
11
1<.
Aa PIN/Project No. B. STIP ID
800,000
P
D
o
0
rt
c
3
51300,000
z
C. Project Title
0
B
250,000
7,150,000
m
C
n 0
D. Road Name or Number
nD.
Q
o
rt
`�
r
�,
B, 3
a.
E. Begin 8< End Termini
°'
M
B
oCD
N m
`N
F. Project Description G. Structure ID
Q,
c
N
M.0
a.
07
24
01
7.100
No
Hiawatha Truck Route
40555
4.63 to 12.54
Drumheller Road upgrade from primitive to truck route, BST surface from Hiawatha
Road to a new round -about at SRI SR282 junction.
Funding
Status
Phase
Phase Start Year (YYYY) Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2023
0
0
250,000
250,000
P
CN
2024
0
OTHER
800,000
0
800,000
P
CN
2025
0
OTHER
800,000
0
800,000
P
CN
2026
0
OTHER
5,300,000
0
51300,000
Totals
0
6,900,000
250,000
7,150,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 250,000 0 0 0 0
CN 0 800,000 800,000 5,300,000 0
Totals 1 250,000 800,000 800,000 5,300,000 0 r
Report Date: January 10, 2023 Page 26
Admilb.
'iii-gton State
Department of Trmaportaffon
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2023 0 0 400,000 400,000
Totals 0 0 400,000 400,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 400,000 0 0 0 0
Totals 400,000 0 0 0 0
Report Date: January 10, 2023 Page 27
rn
M
O
O
O.
-n
A. PIN/Project No. B. STIP ID
D
N<
zC.
Project Title
CD
`�
2°�,
2)
Ci
c
D. Road Name or Number
M
'
a
Q.
o
o
r=
�,
ET 0
a.
E. Begin & End Termini
'a
3
M
—!
�
F. Project Description G. Structure ID
to
Q,
o
a
N
�
Q.
07
25
WA -14986
04
1.570
No
Gravel to OII 12 NE and 8 NE
94030194020
8.24/1.18 to 9.01 /1.98
.77 miles of 12 NE and .8 miles of 8 NE Gravel to Oil, BST surface
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2023 0 0 400,000 400,000
Totals 0 0 400,000 400,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 400,000 0 0 0 0
Totals 400,000 0 0 0 0
Report Date: January 10, 2023 Page 27
A2116
D�epartment of Transpoftatfon.
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO
Six Year Transportation Improvement Program
From 2023 to 2028
N Inside Y Outside
Funding
Status
Phase Phase Start Year (YYYY)- Federal Fund Code Federal Funds State Fund Code
State Funds Local Funds Total Funds
P
PE 2024 BR 870,000
0 0 870,000
P
M
0 0 3,560,000
Totals 4,430,000
0 0 4,430,000
o
X
o
c
-n
A. PIN/Project No. B. STIP ID
n
co
c
"�
r --z
C. Project Title
D
CD
3
M
`<
o
C
0 �
�
D. Road Name or Number
�
CL
Q
o
M
r-1-
m
rr
E. Begin & End Termini
�'
-°a
2
--i
o
..{
n lv
F. Project Description G. Structure ID
a
rt
o
y
�
Q.
07
26
WA -14987
10
0.020
No
Bridge 247 W SE
26530
1.98 to 2.0
Replace bridge 247; has been of special concern to the Bureau of Reclamation with
expanded canal capacity.
Funding
Status
Phase Phase Start Year (YYYY)- Federal Fund Code Federal Funds State Fund Code
State Funds Local Funds Total Funds
P
PE 2024 BR 870,000
0 0 870,000
P
CN 2025 BR 3,560,000
0 0 3,560,000
Totals 4,430,000
0 0 4,430,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 870,000 0 0 0
CN 0 0 3,560,000 0 0
Totals 0 870,000 3,560,000 0 0
Report Date: January 10, 2023 Page 28
Ad#616
Washington State
Department of Transportation.
Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Grant Co.
County: Grant
MPO/RTPO: Quad -Co RTPO N Inside Y Outside
0 7
-n A. PIN/Project No. B. STIP ID u
z C. Project Title
rt D. Road Name or Number = a a C
a. E. Begin & End Termini ° _
-a 3
u, F. Project DescriptionG. Structure ID �� a rt `c
07 27 WA -14988
Bridge 24811 SE west of U SE
24500
4.21 to 4.22
Replace Bridge 248, Rd 11 SE
Funding
Status
M
State Funds Local Funds Total Funds
P
B
0 0 980,000
P
�
0 0 4,025,000
a
0 0 5,005,000
0
0
0
Q
.�
'
vi
Q.
11
0.010
No
Funding
Status
Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code
State Funds Local Funds Total Funds
P
PE 2025- BR 980,000
0 0 980,000
P
CN 2026 BR 4,025,000
0 0 4,025,000
Totals 5,005,000
0 0 5,005,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 980,000 0 0
CN 0 0 0 4,025,000 0
Totals 0 0 980,000 4,025,000 0
Federal Funds State Funds Local Funds Total Funds
Grand Totals for Grant Co. 17,666,003 14,094,900 9,985,476 41,746,379
Report Date: January 10, 2023 Page 29
Bridge 247
Bridge Number: 247
Owner: Grant County
Bridge Name: W SE @ East Low Canal
Route Carried: W SE Road
Year Built: 1951
Average Daily Traffic (ADT) =15
Existing Bridge Size and Configuration
• 87 -ft long x 24 -ft wide bridge
• Structure Depth = 24 -inches
• Gravel roadway
• 3 -Spans of timber girders supported by
concrete spread footing abutments and
concrete piers.
Nicholls Kovich
EngNneerinaptic
Pnoto 1: Widge .247 Elevation
PROPOSED SIZE AND CONSTRUCTION TYPE
Bridge Length
141'-0"
Span Length
134'-0"
Curb -to -curb width
34'-8"
Approximate Grade Raise
3 -ft
Estimated Project Length
615 -ft
Structural Depth
53 -inches
Construction Type
Prestressed Concrete Deck Bulb Tee Girders on Pile Foundations
Profile
Vertical curve on bridge to match girder camber
Detour Length
9.5 miles
Geotechnical Data Summary
• Estimated depth to basalt rock = 20 below ground surface.
• Driven piles feasible if lateral fixity can be achieved. Pre -drilling may be option using Y an p gair rotary
methods to drive and socket the piles into basalt.
Photo 2:247Aerial Image (Google Earth)
Special Features to Consider during Design
I. Horizontal alignment of roadway would require a
deviation in design speed (lowered to 20 mph).
2. Property at southwest corner of bridge would
preclude adjustment of Operating and
Maintenance (O&M) Road for guardrail
placement.
Grant County Bridges — Odessa Groundwater Replacement Program
247-1
OGWRP-COUNTY BRIDGES SUMMARY OF ESTIMATED QUANTITIES
BRIDGE 247 - 38'x 141' W SE ROAD
GRANT COUNTY
1 �
1
I
Item STD
....#
.---;•----# -- -DESCRIPTION------------------•-------------------•----------------------•-----
QUANT
...s.
;UNITS
•-- t.................... ..........'._..
'NI
EXTENDED -+
... .•... ___; _ •-.-•__ PREPARATION
1' ' •000'1 IVIOBILIZ.4TION...................................•--...
0071 ;REMOVING EXISTING BRIDGE
..... ..._. '. ........ I ;
;L•S. $ 275,000.00 ; $ 275,000.00
••.--2
........................... .....................................GRADING_..........................._......._....... �........�:S:........ ;......_ 76 X200:00 ? $
I• --, - ..............................
76:200.00
3 0310 ;ROADWAY EXCAVATION INCL. HAUL 353----
--.................i.............................
-------------•-i--------- ----------------•--•----------------...-----•----•-------•-
;
C.Y..............
I $
45.00
; $
0405_ 'COMMON BORROW INCL. HA_UL
-....................................•---------- -----...----•--•-•--•---•--••..................
;.......................•----•-----_-
842
C.Y.......
---------
--------- ----
45.00
---
15,885.00_
- -;
;EMBANKMENT COMPACTION """' ---••-'-
' 842• ;C.Y.
'
- �•.........-----••
.
' $ '20.00
_ --,-_....
; $
'
16,840.00•-
'
DRAINAGE
--.....---•---............. --•------.....-----..........•-•--....................----................_.....,......,..:
--- 6 _;__ 1040 CHANNEL EXCAVATION INCL: HAUL ' • • 3__100
7 1085• ;QUARRY SPALLS --------------•-•-------•----•--•--;----•........
'
_ _' ___
'.
C.Y:---....I-
I
'•"""'`"""
-------------
-45.00_;
1
; _ .....
$
-139,5
I '
' STORM SEWER
I 76
I .Y.
$
90.00
............................
_
,4.0
I
___ 8 ..... ;__3091 iCATCH BASIN TYPE 1 _ ""' --••-
9 3541 SCFiEDULE.A Sl'ORIVI SEWER I'fPE •12 IN..DIAM. - -' -----------------------.2;EACH_
'
' ••...---.-_. ...........,
, �; _$ _3,7UU.00 _$ '7;4
-•--•-----•-- 00.00
.............. STRUCTURE
0
L.F.
150.00
; $
12,000.00
_
1 +4001 'E1-EIVIPORARY BRIDGE ------------------------------------------•--------
................_-------.....-----....-.----------
- -.,LS.
' ----------.._..-----....,
-",
11 _4006_ iSTRUCTURAL EXCAVATION CLASS A INCL. HAUL
145
$
-_ 12 _. ............. 4013;SHORING OR EXTRA EXCAVATION CL. A- -�--- - --- --
------'�-----------------�
C.Y.:
"""-
L.S.-_.-----
$
-:-"'-"....
$
120.00
- - -
- ................................
13 �PREBORING FSR ST.PILE'---•-----•-------•---.....--•----------•----- .-----------------.
' L.F.
'
-.- -- --
I
-- ---5 000.00
i...............0.00
-�
I
5,00
--- ------
14 4085 IFURNISHING AND DRIVING STEEL TEST PILE
-•--15 •--;--4090
;
' 2
; $
'
160.00
;
2,p
4090 'FURNISHING ST.PILE....------•-----------------------------------------------
EACH
$
34,000.00
.00
' $
68,000...0.0
---16•--.. `4095 ;DRIVING S`I'. PIL.E.................................................................................336L.F.
16
......$ ..... 150.00
I EACH----- $
................................
ip
50,40.0
- • 17 .............. _;GRAVEL B_ACKF_ ILL F_ OR�VVALL'-------------------------------------I .... -^__
'79
'S'f.REINF.
C.Y:..-----
_._
' -----
' $_---•--....---9U.00
---§,.000.00
$ ---------1
$
._
BAR FOR BRIDGE-------------^-------•-----...__.._.........:... ---
•_
.19,.. .................. PERSTRUCTURE...................... . _..8565. LB.
,
3.50
------
-----•----29,977.50
7
7,110.00
----20---- ---------------------------------------•----
4322 CONC. CLASS 4000 FOR BRIDGE
•.._....;.$
S. $ 1,408,438.00
_ .........1,408,438.00•
21 iOREGON 2 -TUBE BRIDGE RAILING
-- -------;----------- ---•---•-----...._,.-----..........-SURFACING_....,_...-------------------------
54
282
' C. Y.
I $
1,600.00
I $
';
86,400.00
---•----------
--:�. ...----- ' ...........................................................410.00
1 --� -
$
115,620.00
�• 22 5100 _:CRUSHED SURFACING BASE COURSE_ ___ ______ __
23 .............-- •' --•----...........679
5120 -CRUSHED,
;TON
I
I
; $_
50.00
I
$_
33,950.00_
' TOP COURSE
750
-
;TON
�$
_
50.00
_�
;'$
--37500.00
_ _ I HOT MIX ASPHALT
..-24...i.
'
5767 •rRNA CL.1�2-IN.'f'G-64-28...................•--...................,....................................................
.........,..
.........,.--------
-------------------------- 4.....-----------••-•^----------•.....---
---------- ..........
I T
1
,
I
25 6373 (SILT FENCE - 1240 ;
•rESC LEAD"------------•--......-•-------------------------------------------• .................I L.F. ---•-
1
' $
'
%
8 00
'
;
'
' $
9,920.00
-;• -6403. ...................................••--•....................----------
-- ---; - -- -; -.........................................................TRAFFIC
.................
;;
;DAY........:..........................$
...
1x0.00•;-
,.;
' -.....,.....3750.00
............................^-
.__ 27 _..._ 6727 'EXTRUDED CURB---
--------------------------------------'--•---;................96
_
----- ----
1
' -- ----
F.....---
1
------------................................
$
60.00
,
28 ? 6757- ;BEAM GUARDRAIL TYPE 312
.,,29.... ..6759 ••;BEAM -GUARDRAIL
.L
L.F.
i• -......----
$
'100.00
_$
__,60.0
TYPE�10..................................................
--•---......,--------•--•-a-------------•---------.....-----...._..
•28.......
I ----..._.
..........
-.---•-.................
'............................$
$_ --•--------
'
2;500.00
.
_
30 ' _ _ ' GUARDRAIL TRANSITION SE
-_ ----;- 6760 BEAM CTION�l'YF'E 21
31 -ANCHOR
'-'-" ----'��'-"`-"--��
2
IL.F.
11EACH
; $
120 00
'-$
- 3,360.00
1.....
; 6766 :BEAM GUARDRAIL TYPE """-""•""""""'--�•••
0
•----
-•-• - ----•
1 ....,. -
4 I EACH
. ..,.... -••--•_ ,;
I ..,.._...
2,U
.$ •.,..-.-__13,000.00-
. ;. . .. ...............
..... 32 16806 :PAINT LINE (PAVED ROADS
•'PROJECT
I
' 0
;L.F
I
$
00.00
; $
8,000.00
j3-----..,----^........................._......
......................... '................................................-;
•--•-•--....•....-OTF-IER-tT'EIIIIS .................................
,
...,..._.....---.............
�- �
3.00
I $
� $
_
35�006.00-
,
;----.......................--- --........... :00
1 -•/ -
.... ................
............
;
34 7018 :WATER 200 meal ' ..........
..........,...
--•................................................. ; ;
8,000.00
$
. .
4:000:00
,.. ..........
36 I 7038 ;ROADWAY SURVEYING•
--•-•--•-----•------------------1---
1
; 8,000.00
.................................
I L.S. $ -8,000.00 -
1
37 7490 ;TRIMMING AND CLEANUP
--•38--•-;- -7736--;SPCC
1
;L.S.
8,000.00
; $
-�•
PLAN ...... ...... .............. ........... •...^---------..,............... ...... ---,.:
........
I
... .......
fi 000.00
�
,
� $ ........,..
`?
6,000.00
............... .•
39 i :UTILITY V1%ORK-----------------------------------------•--•---------------•----
-1--
•----._ ....__IL....--------
I-----------2,ODU.00
2,000.00
,
I I
1
I
L.S.
,
$
,000.00
.$
?. ..............3,000.00
'
I
Construction Cost '
2,775,640.50
------------------------ -•-- -
I -; -----------------------•-----..........--•---------------------------------------
CONSTR.
�_ 10°
'------- �°
- '............Contingency_
?
$
277,565.00
.......... ..................................................--•----------•--•----------,--•-. ....---....._.... •. ,
...........................L............................................_............................................,1
I
Total nstruction............................ ,.
,
�
EIVGR.
,
Preliminary Eng, ; $
416,347.00
'
1
•------------ .............
1
1 14%
I
1
I Construction Eng.;
I
1
$
,
388,590.00
'
I
1 ,
TOTALS
2023 TOTAL
$
31858,142.50
'
2024
TOTAL
$
4,166,794.00
...... ..................... ...............----.............................._........................................ Inflation
1 1
8%
2025
TOTAL
$
41860,149.00
'
- 2023 TOTAL COST PER SQ. FT,
, ,
$
721,00
'
' SUPERSTRUCTURE
-------------'
'
___ _ ___
' PRESTRESSED CONCRETE GIRDERS -"'-"`-"'""-"-""'-"
1110
I L.F.-.'----
-----------------------------------------------------------
CONC. CLASS 4000 FOR B
....................... RIDGE I 41 C.Y. $
ST`.REINF. AND ..-10518....
,1
1,800.00
;
$_
,320.0
73,800.00
............. ........... EPDXY•BAR•FOR-BRIDGE.......................,
IKE1NVAl' GR......................................................... ---------•--;----- ....LB.
-------._.:...------..._....
------- �- $ ...,........ •3.50:$
---------
_:
36813.00
972 I L.F.
' PRESTRESSED GIRDER WELD TIES ' $
-----------i- -- ---- --
' 196
'---------------------------i$40.00:
-
25 00
-................................
' $
2-,
-------•-------•----------
NOSING ANGLE-
----------------------I.......................................EACH
$---•---------_7_,840.00_
..................................................IIILAST011%IERI----•----•.............. 76 -•--- LF. ---
............................ 76 _ _ _...........
C BEARING PADS .................
16 :EACH
__ _
' -$ ..---._.__
' '
15.00 c $ 1,140.00
................
'.."-""`, ----------------•
' BUTYL RUBBER STRIP , $
--•--•--•-• ----......- ' 79
' 'L
--------------------------•--•-------••-------........ I ......-------•
1 100.00
,
17,600.00
GIRDER Sl'OP PADS -•-- ---- ,, .F. .... _
...........................------------............................................................. ; 32 _;EACH ... $
---• .........................
' . , ..........................................................
_15.00 _: _$---------- _1,185.00_
80.00 $ 2,560.00
1
'-------------
----------------•-------
' •--
1 �
1 �
------------------------------------
1
�
-------------,..............................................
Total Superstructure ; $ 19408,438.00
I 1
I 1
NICHOLLS KOVICH ENGINEERING, PLLC
247-2
I Bridge 248
Bridge Number: 248
Owner: Grant County
Bridge Name: 11 SE @ East Low Canal
Route Carried: 11 SE Road
Year Built: 1952
Average Daily Traffic (ADT) = 20
Existing Bridge Size and Configuration
• 80 -ft long x 25 -ft wide bridge
• Structure Depth = 24 -inches
• Gravel roadway
• 3 -Spans of timber girders supported by
concrete spread footing abutments and
concrete piers.
MOONS Kovich
Enginee ring.pue
rr►utu .L. Driage 146 tievation
PROPOSED SIZE AND CONSTRUCTION TYPE
Bridge Length
132'-0"
Span Length
125'-0"
Curb -to -curb width
34'-8"
Approximate Grade Raise
3.5 -ft
Estimated Project Length
852 -ft
Structural Depth
53 -inches
Construction Type
Prestressed Concrete Deck Bulb Tee Girders on Pile Foundations
Profile .
Vertical curve on bridge to match girder camber
Detour Length
No detour -- include cost for temporary bridge
Geotechnical Data Summary
• Estimated depth to basalt rock =15 ft below ground surface.
• Driven piles feasible if lateral fixity can be achieved. Pre -drilling may be an option using
methods to drive and socket the p basalt.
piles into bas p g air rotary
.
vnoro Z ,serial view of 248 (Google Earth)
Special Features to Consider during Design
1. No detour available. Roadway dead ends at
private property. Assume temporary
bridge/temporary easement .is necessary.
2. Utilities on north side - 12" water line and 2"
telephone.
3. Pump station and pit at northwest corner.
Grant County Bridges — Odessa Groundwater Replacement Program
248_ 1
OGWRP-COUNTY BRIDGES SUMMARY OF ESTIMATED QUANTITIES 11SEROAD
BRIDGE 248 - 38'x 132' GRANT COUNTY
.........
Item
§fb ............................................................................................
.
. . . . . . . . . . . . . . . . .
. . . . . . . . . . . . .
. . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . .
.
..................................
. . . . .
. . . . . . . . # . ... . .. -----------------------------------------------------------------------------------
PESCRIPTION
PREPARATION
............... ........
UNITS
I
...... .............................
;UNIT
PR
j i .................................
-EXTENDED
.
-----1..... ................
2
................................................. ...........................•
0001 'MOBILIZATION ........
................................................................................................
0071 'REMOVING EXISTING BRIDGE
- L - S
........ ..........
..........
00.00
..............
& ...............
:$
...................
.......... .
000.00
.............................
.......
............................................................................................... L.S.
GRADING a ............................. .......... �601.0.00..00.1.$
........................................................................
...............
�76"bbb"66'
... j ......
..........
0310 'ROADWAY EXCAVATION INCL, HAUL'---------------
965 ... ........................................................................................
'COMMON BORROW INCL. HAUL
.
. ............ �6� ......
......... ..... ......
................
C.Y. ...........
-1 ---------------------
1$ ...................
...........................
.1.qU $ 25,425.66-
..................................
...... ..........
5
...............................
.......................................................................................... T�66
0470 .EMBANKMENT COMPACTION ----•-••-----•--•:---•---------------45:00.;4
.................................................................................f6.0
.....
i $
..; .......................
70,470.00
'66*
-------............... -N ..............................
DRAINAGE----------------------------------
.......................................................................................
0$
31,326.
'CHANNEL EXCAVATION INCL, HAUL
------------------- ......................................................... ...........
ibb�_,,QUARRY SPALLS
.........
......... ....... ........
.......
....................
$ -------------------
0 ...............................
0
-----------------------------------------
: $
134,1 0U.616"
.....................
STORM SEWER
C.Y. -----------
90.00
-;- $
"
6,210.00
9
.............................
..................................................................................
3091 jCATCH BASIN TYPE 10.00
3541 :SCHEDULE A STORM SEWER
.............................................. R PIPE 12 IN. DIAM.
.............. ..................
2
80
...........----.....---•-------••----•-•-••-
EACH
L.F.
1.
f .......... .....7,400.00 ' '' -
-
......................................... ...................................
----------------------:
$
-1 ......................
15
$
------
12,000.00
......
.........
----------------------------------------------------------------------------
4001 iTEMPORARY BRIDGE
...
-----------_- ---
1
..................
.1 ..............................
I -----------------------------------
11
1. . . ................
�Aljc
....................
137
L.S. $
------
268,013.25 -
........................ 268,013.25
..............
...... 12
!SHORING OR EXTRA EXCAVATION CL.
.............. I ..................................................................................................
L.S.
120.00..,
-6,000.00
4063 !PREBORING FORST. PILE
......................................................
450
$
5,000.00
_;f�d ......
$
..................................
L.F,
....................... .................
2
...............................................................................................................
$
..............
72,000.00
.............
;FURNISHING ST PILE343
"""
EACH 1
................. ......
1000.00
........00.00
1:
68,0
16
................................................................................................
4095450.00
:DRIVING ST. PILE
41 ...................................
L.F.
----
..............
......
...... 17 .........49
4025 '-GRAVEL BACKFILL FOR
-WALL
.................................................................................................
16 EACH 44,000.00
79 C.Y.
...... i.� .........
-ST.REINF. BAR FOR BRIDGE
... i -------------------------------------------------------------------------------------------------
......
.................
LB.
.........-•-----••-•--•
90.00 -:1.
3.50
', - � ..............
7,110.00
*5-0-
i.�
'�jbb :SUPERSTRUCTURE
.....................................
1
L�
----------- * --------------------------------------------------
I
�,"�77
...........
0
......... ................................................................................................
�322 CLASS 4000 FOR BRIDGE
1
...................................
L.S. :'$
.
.I.i ..........................
I
1,162,587.00
'.,
j ..................................
1,162,587.00
. . . . . . . . . . . . . .
21
-;GONG.
. . . . . . . . . . . . . . A ................................................................................................. 54 C.Y.
IOREGON 2 -TUBE BRIDGE RAILING ............ ... I ..........................................
1,600.00_;_$..............86,400:00
..............
.............. ........................................................................ 264 L.F. : $-------
......................... ................... ............... 410.00
..................
SURFACING ...............
$
..................................
108,240.00
22 ..................
5100 ..."CRUSHED SURFACING BASE COURSE 1109
TON
$
..................
5120 ..................
-----------------------------------------------------------------
.....................
1225
........
.................
50.00
�6
i .............................
55,450.00
...... .........
.... HOT MIX ASPHALT ------------------------------ ................
.........
...............
_'$
-------- ----------------------------------
61,250.66'
.............................
96 ...............
.............................................................. ;E ................................
EROSION
.................................. ..............
0 TON
...................................
I
-------------...........
.
.........
..........25 ..................6373
26
... CONTROL AND F ANTING
------------------------------------------------------------------------------------------------------------
.. 1.
................................................................................... 1880
6403 :ESC LEAD ............. ....................................
L.F.
..............................
...............................
$
..............
8.00
...........................
-1. ..................................
: $
.......
15,040.00
.............................
............................................................
25
DAY
............... . ............... . .......
!�q. $ 3,750.00
...... ff ...................
TRAFFIC
6727 !EXTRUDED CURB ........................................................
........................................................................................................•-...... �6 -
..................
:BEAM GUARDRAIL TYPE 3125
, F.- -----------
: ...........
..................
..........................
......
......... 60.00
..................................
..................................
$
5,760.00
29
...................................................................................
6759 :BEAM GUARDRAIL TYPE 10,•---------------•__-.------•------
6760 .:BEAM GUARDRAIL TRANSITION SECTION TYPE 21
............................................................................................
..
. ...............................................
1 28
2
L.F.
L.F.120.00
EACH
..............................
$
........................
3,360.00
-00
30 ........................
...... 31 .........
6766 .. I -B ffAM GUARDRAIL L ANCHOR TYPE 10
............................................................
-ROADS).................................
...................
4
$
6,50
$ ..........
lmdb
�f
gff :-F5;kfWrERff-(P..A-_V-ED (PAVED
.
0 L.F.LF-----_"--
00.00
..............
--
............... fff�bf;��VTRAFFIC CONTROL
-- -----------------------------------------------
1 .............
...........
.....
$
j ..................
...... ....
----- ........................................... ..............................
.................................. OTHER ITEMS
--------------_------------
.00
$
4 ----------------------------------
0.00
9
35
7018 :WATER ...............................................................................
37 -STRUCTURE SURVEYING
..................
meal
20.00
I ..................
$
6,000.00
.........
..................................................................................................... .............
:ROADWAY SURVEYING 1 .......
1
L..S
L.S.
------------
8,000.00
�'.6ff.bb.j
..................................
8,000.00
...... ....
TRIMMING AND CLEANUP ...................................................... .................. ...................
.............. .................................................................................................. i
11 .......
$
.. ..............................
8,000.00
9
7736 'SPCC PLAN
...................................
L.S. 1 J ...........
0
6,000.00
...................
4 ............................................................................. .. ..
"UTILITY WORK
.... 1
....... ..........
L.S.
. ...........
'� ---------
.................................
................
.......
'000.00
.............................
..............................
................................................................................................
..........................................................................................
: i E.�
....................................
I i4l 000.00
.............................
is $
.................................
.............
14,000.00
.................
...............................................................................................I
.............
1
j•.C...o..n.stru.c...t
?PR3,252.75
.........................................................................................................................CONSTR.
........... .Contingency.:$....!
...
.i.o.n .C...o.s..t.
.... ....
290,326.00
---------------------------------------------------------------........................-
otalConstruction
3,193,578.75
.............................
.................................................................................. ENGR.
.............. ...................................
15%
Preliminary Eng. $
.........................
435,488.00
.............................
................................................................................................................
............... ..............................
14%
_,..
Construction Eng.:,
............
456.00
U'uu
.............................
: --------------
................................................................................... TOTALS4,035,522.75
.............
2023 TOTAL
$
............................•
..........................................................................
2024 TOTAL
$
4,358,365.00
...........
... I
........................................
.. i ....................................................................
i
Inflation
8%
2025 TOTAL
$
5,083,597.00.
.............................
................................................................................. ...............
............ 2023 TOTAL COST PER SQ. FT.
$
- 805.00
............................
..............
SUPERSTRUCTURE
I
..............
------------------------------------------------------------------------------
PRESTRESSED CONCRETE GIRDERS ----------------------- --------------------------------
.............. ................................................................................................. ------ 909 .......
CONC. CLASS 4000 FOR BRIDGE
L.F.
----------------
J--� ...........-1,0.08,990.00.................
......................
------------------
.............................
.............................
............................................... . .............................. 40
ST.REINF. AND EPDXY BAR F R BRIDGE ..............................
............................................................... 10262
��Y -------72,000.00
LB.
• ..............
3.50
$
-
..............................................................................................................................
KEYWAY GROUT ..................................
...... .......
- -----------
E �
------------------_-
.. ...............................
5,917.00
..............
PRESTRESSED GIRDER WELD TIES
...............................................................................................................
4 ..................
156
.. :..: ........ 25.00_!__$19,475.00
EACH * -jj-j---
---------------
--
---- NOSING ANGLE6,240.00
.....156 ....
76
40.00
L.F. ....................15.00".
$
... ........................ . --
............................
LAMINATED ELASTOMERIC BEARING PADS
... .......................................................... 1 1_4
EACH
1,100.00
1
1,140.00
.............................
Ki:K"f�Gff
.........................................................
....... .....
: 79:$
...........
L.F.
•..................
T ...........
;' $
; ..--........_..15,400:00.
GIRDER STOP PADS
-----------------------
-------
-------------
5. 0 0
-------------L-
$
------------------
1_,1_85._00_*
..............................................................................................................
.............. I
28 EACH
................ ..................... 80.00
............. ........................................................................... ............... .............................
:$
J, ..............................
2,240.00
.............................
.....................
................................
......................
Total Superstructure e
qr-� ........
1,162,587.00
NICHOLLS KOVICH ENGINEERING, PLLC
248-2