Loading...
HomeMy WebLinkAboutBid Opening - Public WorksBID OPENING FOR 5 -NW & U -NW ROAD OVERLAY PROJECT, CRP 18-01 BID OPENING: Tuesday, August 6, 2019 1:30 P.M. CONTRACTOR: Granite Construction C� ='�=�,,.�'' % �r, .�/ � , jL� P.O. Box 1219 BID Moses Lake, WA 98837 Central Washington Asphalt P.O. Box 939 BID Moses Lake, WA 98837 Contract T al $2,254,873.35 5 -NW & U -NW Overlay Project, 2019 CRP 18-01 Bid Tabulation, 8/6/2019 Eng. Estimate Item # Total Quantity Unit Item Description Unit Price Total Amount PREPARATION 1 100% L.S. Mobilization $70,000.00 $70,000.00 GRADING 2 17.68 Mile Shoulder Finishing $7,000.00 $123,760.00 HOT MIX ASPHALT 3 181010 S.Y. Planing Bituminous Pavement $6.00 $108,060.00 4 221900 Tons HMA Class 1/2" Incl. PG64-28 $73.00 $11671,700.00 5 -1 Calc. Job Mix Compliance Price Adjustment -$1.00 -$1.00 6 -1 Calc. Compaction Price Adjustment -$1.00 -$1.00 TRAFFIC 7 21126 L. F. Remove Existing Beam Guardrail $4.00 $81504.00 8 11529 L. F. Beam Guardrail Type 31 $25.00 $38,225.00 9 6 Each Beam Guardrail Non -Flared Terminal, 50'-0", W/ Steel Post $2,500.00 $15,000.00 10 14 Each Beam Guardrail Type 31 Anchor Type 10 $11000.00 $14,000.00 11 581600 L. F. Temporary Pavement Marking $0.20 $11,720.00 12 138,249 L. F. Paint Line $0.15 $20,737.35 13 480 L. F. Transverse Rumble Line $10.00 $4,800.00 14 36 L. F. Plastic Stop Bar $20.00 $720.00 15 8.84 Mile Centerline Rumble Strip $1,250.00 $11,050.00 16 17.68 Mile Shoulder Rumble Strip $1,250.00 $22,100.00 17 1 L.S. Project Temporary Traffic Control $120,000.00 $120,000.00 OTHER ITEMS 18 21 Each Adjust Monument Case and Cover $500.00 $10,500.00 19 100% L.S. SPCC Plan $1,000.00 $1,000.00 20 100% L.S. Trimming and Cleanup $3,000.00 $3,000.00 21 -1.00 Dol. Minor Change -$1.00 -$1.00 Contract T al $2,254,873.35