A RESOLUTION AMENDING THE RESOLUTION No. 23- 0S5 -CC
GRANT COUNTY DEVELOPMENT
SERVICES BUILDING & FIRE PERMIT
FEE SCHEDULE
WHEREAS, it is the intent of the Board of County Commissioners for Grant County to
implement reasonable building and fire application fees in order to maintain current service
levels and which are consistent with other jurisdictions; and
WHEREAS, it is the intent of the Board of County Commissioners for Grant County that
users of the Development Services Department's building and fire services bare a reasonable share of
the costs associated with those services rather than rely upon the citizenry of the County to subsidize
these costs; and
WHEREAS, Development Services Staff have conducted a fee schedule survey of
neighboring and similar Eastern Washington Counties and explains the fee schedule adjustments in a
narrative, included in Attachment B; and
WHEREAS, when compared to the survey, the Board of County Commissioners for
Grant County have determined that the attached fee schedule represents a reasonable cost for
building and fire applications in Grant County and is consistent with neighboring counties; and
WHEREAS, it is acknowledged that a more reasonable and consistent process for fee
adjustments is necessary to meet customer expectations and to also structure the fee program to
contain limited increases on an annual basis so that large impacts can be avoided; and
WHEREAS, the International Code Council publishes the Building Valuation Fee
Adjustment Schedule on a bi-annual basis that reflects the current Nationwide CPI, which can
provide a systematic adjustment to fees annually without the need for continual evaluation and
update; and
WHEREAS, Permit fees were last updated in February 2014 and the adopted fee
schedule lacked fire and other administration fees that are necessary; and
WHEREAS, the Board of County Commissioners for Grant County finds that minor
permit fee increases annually are preferrable to large, periodic fee increases and understand that
unique circumstances require modifications to the fee schedule on occasion; and
WHEREAS, the Board of County Commissioners for Grant County modify the attached
fee schedule to include the most current International Code Council Building Valuation Table
that is published in July of each year; and
WHEREAS, the Board of County Commissioners for Grant County conducted an open
record public hearing on TON 2023 to consider the attached fee schedule.
NOW, THEREFORE, BE IT HEREBY RESOLVED, THAT the Board of County
Commissioners for Grant County, Washington hereby adopt by resolution an amended Fee
1
Development Services Fee Schedule Update: Building & Fire 2023
Schedule for Grant County Development Services Building and Fire Applications and Permits as
identified in Attachment A.
DATED this day of , 2023.
BOARD OF COUNTY
COMMISSIONERS
Yea Nay Abstain GRANT COUNTY, WASHINGTON
F� F-1 Role e. , hair
F-1 El Cindy C4ter, Vice -Chair
Danny Stone, Member
ATTEST:
2
Development Services Fee Schedule Update: Building & Fire 2023
ATTACHEMENT A
GRANT COUNTY BUILDING &FIRE VALUATION/FEE SCHEDULE'
Based on the Most Current (Annual) ICC Building Valuation Data •Cost per Square Feet
VALUATION FEE
$ 1.00 to $ 19400.00 $50.00
$ 509001.00 to $ 1001000.00 $ 640.00 for the first $ 50,000.00- plus $ 7.00 for each additional $
1,000.00, or fraction thereof, to and including $ 1009000.00
$ 1009001.00 to $ 5001000.00 $ 990.00 for the first $ 100,000.00 plus $ 6.00 for each additional /$
11000.009 or fraction thereof, to and includiniz $ 500,000.00
$ 5001001.00 to $ 110009000.00 $ 3,390.00 for the first $ 500,000.00p lus $ 5.00 for each additional
$ 1,000.00, or fraction thereof, to and including $ 1,000,000.00
$ 1,000,000.00 and above $ 5,890.00 for the first $ 1,000,000.00 plus $ 36.00 for each
additional $ 10,000.00, or fraction thereof
All occupancies are based on the February Building Valuation Data published annually y the International Code
Council (ICC). New Residential Construction: Permit Fee includes Plumbing and Mechanical Fees.
Decks, carports, pergola's, gazebos, and other miscellaneous accessory structures will be valuated at 50% of cost per
square feet for utility(U) use groups.
Calculating Pennit Fees Based on Valuation:
Single -Family Dwelling = $ 150.87/Square Feet
Proposed dwelling with attached garage = 2,250 square feet
2,250 X $ 150.87 = 339,458 Total Valuation ($ 100,001 to $ 5001000
339,458 —100,000 = 239,458 = 1,000.00 = 239 X $ 6.00 ($ 1,434.00
$ 990.00 + $ 1,434.00 = $ 2,424 Permit Fee
$ 2,424 X.50 = $ 1,212 Plan Review Fee
Total Fee = $ $ 2,424 + $ 1,212 = $ 3,636.00
1 Valuation Table is updated annually on July 1 It
2 Building & Fire Plan Review Fees are 50 Percent of the Permit Fee for both Commercial Permits and Residential
structures
3
Development Services Fee Schedule Update: Building ,& Fire 2023
FEES AND REQUIREMENTS
RCW 19.27.085 There is imposed a fee of six dollars and fifty cents ($6.50) on each
residential building_ permit and a fee of twenty-five ($25.00) dollars for each commercial
building_ permit, issued by a county or a city, plus an additional surcharge of two dollars ($2.00)
for each residential unit, (or most current fees established by the State Building Code Council
but not including the first unit, on each building containing more than one residential unit.
RCW 19.27.087 Permitting and plan review fees under this chapter for agricultural
structures ma.T�y cover the costs to counties, cities, towns, and other municipal corporations
of processing applications, inspecting, and reviewing_ plans, preparing detailed statements
required by Chapter 43.21 C RCW, and performing necessary inspections under this chapter.
RCW 19.27.015 Agricultural structure means a structure designed and constructed to house
farm implements, hay, grain, poultry, livestock, or other horticultural products. This structure
may not be a place of human habitation or a place of employment where agricultural products are
processed, treated, or packaged, nor may it be a place used by the public.
PERMIT FEES:
STRUCTURE
FEE
0
Agricultural Structures (including membrane structures/silo's).
50% of the Valuation of S
Pre -Approved and Model Residential Plan Review
Permit + 25% of the Review
Manufactured — Mobile Home — PMRV's (Flat Fee)
$500.00
Factory Assembled Structures (FS
Based on Project Valuation
Cargo Containers used as Storage Structures (Flat Fee))
$100.00
Commercial Re -Roof Flat Fee
Based on Project Valuation
Residential Re -Roof (sheathing and/or structural modifications)
Based on Project Valuation
Remodels/Tenant Improvements
Based on Project Valuation
Fire Repairs — One -and Two -Family Dwellings
No Fee
Fire Rebuilds — One -and Two -Family Dwellings
50% of the Valuation
Fences/Retaining Walls — Length times Height of Wall
L X H X $10 = Valuation
Residential Demolition (Flat Fee)
$100.00
Commercial Demolition (per primary structure) (Flat Fee)
$300.00
Towers — Communication/Weather/Wind/Etc.
$600.00
Moved — Relocated Buildings (Flat Fee)
$500.00
Residential Swimming Pools (includes built-in spay
$ 150.00
Residential Spa/Hot Tub
$75.00
Commercial Swimming Pools/Spas
Based on Project Valuation
Pole Sign
$300.00
Monument Sign
$200.00
3 Residential Plan Reviews Conducted by Qualified Private 3rd Party receive a 25% Plan Review Credit. Model
Home Plan Review receive a 25% credit after the Model Home Plan Review has been conducted and approved as a
Model Home Review
4 Flat Fee = No Plan Review Fee
Development Services Fee Schedule Update: Building & Fire 2023
Wall Sign $100.00
Miscellaneous (not specifically listed) Based on Project Valuation
GRADING FEES:
RESIDENTIAL PLUMBING FEES5 :
APPLIANCE/FIXTURE
FEE
Base PlumbingPermit
$50.00
Water Heater
$20.00
Hydronic Heating
$50.00
Price per Plumbing Fixture
$ 10.00
Bathroom Group
$30.00
Gas Piping per appliance connection
10.00
Boiler
$50.00
Clothes Washer (includes dryer exhausts
$20.00
Backflow Preventer
$50.00
RESIDENTIAL MECHANICAL FEES:
APPLIANCE
FEE
Base Mechanical Permit
$50.00
Sauna
$30.00
Furnace
$20.00
Heat Pump
$20.00
Solid -Fuel Burning Appliance
$50.00
Fuel -Fired Appliance
$20.00
Ground Photo -Voltaic (solar) Ss�
$20.00
S Plumbing, Mechanical, and Fuel Gas Fees are included in the Building Permit Fee for new Residential Dwellings
5
Development Services Fee Schedule Update: Building & Fire 2023
COMMERCIAL PLUMBING AND MECHANICAL FEES:6
VALUATION FEE
Plumbing Project Cost Based on Project Valuation
Mechanical Project Cost' Based on Project Valuation
FIRE MARSHAL RESIDENTIAL PERMIT FEES:
APPLIANCE
FEE
Base Fire Permit
$50.00
Roof -Mounted Solar ArravB
$ 50.00
Propane Tank includes piping) < 501 gal
$50.00
Propane Tank greater than 500alg lops
$150.00
Fire S rinkler System P2904 or NFPA 13D
$150.00
Private Water Tank/Pum House
$150.00
Fire Flow Worksheet >3600SF
$50.00
FIRE MARSHAL CONSTRUCTION PERMIT FEES9:
APPLIANCE
Underground Fire Line
FEE/VALUATION
$300.00
Fire Sprinkler System (NFPA 13 & 13R)
Based on Project Valuation
Standpipe System
Based on Project Valuation
Fire Alarm System
Based on Project Valuation
Sprinlder Backflow/Valves
$ 150.00 plus $ 50.00 for each additional valve
Fire Pump
$ 150.00
Private Water Tank and Hydrants
Based on Project Valuation
Above -Ground Fuel Tank (includes pipes)
$500.00
Commercial LPG Tank/Piping < 501 gal.
$ 100,00
Commercial LPG Tank/Piping 501-2,000
$300.00
Commercial LPG Tank/Piping > 2,000 gal.
$500.00
Type I Hood Suppression System
$200.00
Industrial Ovens/Spray Booths
$500.00
Alternative Fire -Extinguishing System
Based on Project Valuation
Smoke Control or Other Special System
Based on Project Valuation
Miscellaneous (not specifically listed)
Based on Project Valuation
6 Plan Review Fee is 25% of the permit fee
7 Includes Solar Array Farms, Wind energy, etc.
Roof -mounted Solar Array on Detached Accessory Structures are Exempt from Permit
9 Commercial Plan Review is 50 Percent of the Permit Fee
6
Development Services Fee Schedule Update: Building & Fire 2023
FIRE MARSHAL OPERATIONAL PERMIT FEESio:
ACTIVITY/USE
FEE
Transient Residence Annual Life -Safety Inspection
$200.00
Hazardous Materials (HMP)
$ 150.00
High -Piled Storage
$150.00
Fireworks Stand(per event$100.00
30 -day extension at no charge
Carbon Dioxide Systems > 100 pounds
$ 150.00
Cannabis Extraction Facilities
$150.00
Energy Storage Systems batteries)
$ 150.00
Temporary Membrane Structures < 2,501 SF
$150.00
TemporaTyMembrane Structures > 2,501 SF
$300.00
Mobile Cooking Vehicles (food trucks
$150.00
Special Event Permit Inspection
$150.00
Seasonal Fireworks Stand Safety Inspection
$150.00
Pyrotechnical DisplayDisplLay Permit
150.00
Licensed Dav Care Inspection
$150.00
Licensed Adult Care Home Inspection
150.00
Special Inspection or Consultation
$150.00
Miscellaneous/Other not listed
$150.00
Annual Operational Permitil
Annual Permit
$1,000.00
$50.00 per structure (permanent and
teMporM that requires inspection
MISCELLANEOUS FEES AND PROCESSES:
ACTIVITY
FEE
Stop Work Order (failure to obtain permit within 72 -hours
Double the Permit Fee
Permit Re -instatement (expiration within 1 -years
50% of original permit fee 12
Permit Re -instatement (decks and other small projects
$100.00
Permit Extensions (projects about to expire at final)
30 -day extension at no charge
Permit Extensions
50% of the permit fee — 1 year
Special Inspection or Re -inspection
$ 100.00
Title Eliminations
$75.00
After -the -Fact Permits
Permit Fee — No plan review
Plan Revisions after permit has been issued
$ 50.00 per hour
Plan Revisions prior to permit beinR issued
$ 50.00 min.
Minor Modifications 13
$ 50.00 per hour/min.
Major Modifications
Resubmittal Required
Fire Flow Worksheet Analysis (Commercial Structuress
$100.00
10 Do not require a plan review fee
11 Applicable to large venues such as the Gorge Events, County Fair Events, etc.
12 Inspections must have been completed through foundation and all required inspections completed.
13 Includes revised site plans after review and approval.
7
Development Services Fee Schedule Update: Building & Fire 2023
Activities not included and/or items not covered by the fee tables may be valued at a similar rate
at the discretion of the Building Official, including but not limited to, accepting formal bids as
_approved project valuations.
DEPOSIT AND REFUND POLICY:
1. The Plan Review Fee (50% of the Permit Fee) is due upon application submittal for all new
commercial structures and residential dwellings. A deposit ma.y be required for all other
submittals based on complexity and circumstances of the proposed project.
2. If the proposed project is canceled b.y the applicant after the plan review has been conducted,
the deposit will not be refunded. All other fees may be refunded at the written request of the
applicant.
3. Projects that are canceled by the applicant after the permit has been issued manly receive
80% of the permit fees paid upon written request. AU plan review fees are not subject to refund.
Development Services Fee Schedule Update: Building & Fire 2023
ATTACHMENT B — NARRATIVE
Development Services, Building Division last updated its building permit fees in 2014. During
that fee adjustment, the fee schedule was adopted using square feet costs of construction that was
based on the International Code Council (ICC) Building Valuation Data of 2012. Currently, our
valuation for permits is over 10 years old and needs to be readjusted. Furthermore, the Fire
Marshal Division issues Construction Permits, such as fire sprinkler systems and Operational
Permits, such as pyrotechnic sales and these fees have never been included in Development
Services Fee Schedules. The Board of County Commissioners recently adopted Title 15 — Fire
Administration, which includes the requirement for fire construction and operationalp ermits.
Development Services is proposing not to adjust the cost of the currently adopted Valuation
Table but rather annually adopt the cost per square feet of construction that the ICC publishes.
This document accurately reflects actual average construction costs across the county. This cost
per square feet would modestly increase each year approximately $2.00 per square feet, on
average. How this represents actual permit fees is as follows:
If the proposed fee adjustment is approved, an average 2,200 square feet home permit fee would
increase approximately $1,200. However, we currently charge permit fees for plumbing,
mechanical, and fuel gas systems associated with each residential dwelling. If we adopt the ICC
Building Valuation, the cost per square feet for residential dwellings is based on the "turn -key"
cost, which includes the other fees. These additional fees represent approximately $400.00 per
dwelling, which reflects a net increase'of about $800. This increase reflects an annual increase
of approximately $90.00 over the past 9 years, which was the last time the fee schedule was
adjusted.
The annual increase, based on the average square feet cost of $2.00, would represent the
following from a permit fee standpoint:
2,200 square feet dwelling total permit fee based on the NEW square feet cost of construction
and using the OLD valuation table would be valued at $331,914.00. That translates to a total
permit fee of $3,571.00. An annual average increase of $2.00 to the ICC Building Valuation
would reflect an increased valuation of $4.,400 or a permit fee increase of $101.60 on average per
year, which is consistent with the average increase of $90.00 over the past 9 years.
A fee comparison of our neighboring counties (Douglas, Chelan, Kittitas, and Yakima) was
conducted, and the table below shows these permit fee comparisons and where Grant County
lands if the fee schedule proposal is approved.
COUNTY
.SFR
RESTAURANT
BUSINESS
RETAIL
FACTORY
STORAGE
HOTEL
MFR
A
DOUGLAS
$4,578
$ 1,251
X111893
$11,700
$14,,594
$15,70
34,O2.5
$27,28
51920
H'ELr N$5,199
$9,542
12,139
$14,439
$25,,703
$23,785
$35,392
$12,390
$5,153
KITTITAS
$2,740
$7,052
$M:519
$13,977
$341,722
$34,722
$34,722
$34,722
$11,.672
YAKIMA
$3,457$8,
-70-
$11x 171
$100844
$15,173
144750
$23,647
$23,312
$5,463
`1 ANT
%640
$9,133
$114-2 2
$13,484
$23,538
$21,36.
$32,271
$25,962
$6,024--
9
Development Services Fee Schedule Update: Building & Fire 2023