HomeMy WebLinkAboutGrant Related - BOCC (005)Memo
GRANT COUNTY
OFFICE OF THE
BOARD OF COUNTY COMMISSIONERS
P O Box 37
EPHRATA WA 9BB23
(509) 754-201 1
To: Board of County Commissioners
From: Janice Flynn, Administrative Services Coordinator'
Dates November 18, 2020
Re: Authorization for Release of BOCC Approved Funds, SIP #2019-11
Grant County Public Hospital District No. 1, Samaritan Healthcare has met the
requirements for release of funds in the above -referenced SIP project, which was
approved by the BOCC pursuant to Resolution No. 19 -093 -CC dated November
18, 2019. The proof of requirements is in the form of a signed Project Certification
form from Grant County Public Hospital District No. 1, Samaritan Healthcare and
supporting invoicing of the project that meets the SIP grant award amount
(Attachment 1).
To that end, I am requesting the release of funds on this SIP project as follows:
The grant award amount of One -hundred thousand and No/100
Dollars ($100,000.00) to Grant County Public Hospital District No. 1,
Samaritan Healthcare.
Dated this � day of A ID V . 20r -PO
Board of County Commissioncrs
Grant County. Washington
ApRrove DisaR r{�ove in
Dist #1 10 Dist #1 Dist #1
Dist #2Dist #2 Dist #2
Dist #3 TDist #3 Dist #3
Thank you!
"To MEET CURRENT AND FUTURE NEEDS, SERVING TOGETHER WITH PUBLIC AND PRIVATE ENTITIES, WHILE FOSTERING
A RESPECTFUL AND SUCCESSFUL WORK ENVIRONMENT."
GRANT COUNTY
STRATEGIC INFRASTRUCTURE PROGRAM
PROJECT CERTIFICATION
This form must be signed and returned, with an invoice, for the approved funding,
before reimbursement can be approved by Grant County.
SIP Project Proposal Number: 2019-11
SIP Funding Recipient: Grant Co. Public Hospital District No. 1
Samaritan Healthcare
SIP Project Description: Infrastructure Support for Replacement Public
Hospital
I, the undersigned, do hereby certify under penalty of perjury, that the materials have been
furnished, the services rendered, and/or the labor performed as described in the project
proposal for the above -referenced SIP Project and that I am authorized to authenticate and
certify to this claim. I also certify that this claim is just and due, and is an unpaid obligation
against Grant County.
Further, according to the SIP Project Funding Policies, I attest that at the next audit of my
entity, this project shall be called to the attention of the Washington State Auditor's Office
and an emphasis audit will be requested to assure that these funds were expended toward
the project and according to the intent of the proposal.
, 11�6� e
Signature
_rY121ie�GJ S1 NAY)
Printed Name
Date Signed
Title
Printed Title
LV
Completed, signed original certification and invoice are to be mailed to:
Administrative Services Coordinator, PO Box 37, Ephrata, WA 98823
ATTACHMENT 1
SAMARITAN
-;_HEALTHCARE
All of us, for each of you, every time.
November 3, 2020
Grant County Strategic Infrastructure Project
Attn: Administrative Services Coordinator
PO Box 37
Ephrata, WA 98823
RE: Strategic Infrastructure Project Recommendation - SIP No. 2019-11
This letter is sent in response to the November 18, 2019 Award Letter issued to Samaritan Healthcare regarding
Strategic Infrastructure Program funding. Included in this response is the following:
(1) Project Certification Form signed
(2) Invoices for project reimbursement up to $100,000 as follows:
Samaritan Healthcare Invoice Summary
Invoice #
Firm
Focus
Date
Amount
1
GenEngineers
Soils Evaluation
9/20/2019
$17,808.32
2
GeoEngineers
Soils Evaluation
10/18/2019
$2,636.00
3
GeoEngineers
SEPA/NEPA
9/20/2019
$15,520.00
4
GeoEngineers
SEPA/NEPA
10/18/2019
$10,347.69
5
GeoEngineers
SEPA/NEPA
11/15/2019
$15,844.50
6
GeoEngineers
SEPA/NEPA
12/6/2019
$1,196.25
7
GeoEngineers
SEPA/NEPA
1/17/2020
$3,789.25
8
GeoEngineers
SEPA/NEPA
2/21/2020
$2,812.25
9
GeoEngineers
SEPA/NEPA
6/12/2020
$177.75
10
Historical Research Associates
Cultural Resource Survey
12/12/2019
$6,773.94
11
Historical Research Associates
Cultural Resource Survey
1/10/2020
$5,509.87
12
Historical Research Associates
Cultural Resource Survey
2/10/2020
$587.75
13
Historical Research Associates
Cultural Resource Survey
3/11/2020
$683.50
14
Historical Research Associates
Cultural Resource Survey
4/12/2020
$981.00
15
Western Pacific Engineering
Traffic Study
2/10/2020
$11,300.00
16
Western Pacific Engineering
ALTA Survey
8/7/2019
$5,650.00
TOTAL
$101,618.07
We understand that the processing of this reimbursement will not occur until mid-November. Please let me
know if you have any questions regarding the information submitted.
Sincerely,
Theresa Sullivan, CEO
Noy' ® 5 2020
C00NTY C—UP yi,a,1'J"�--
Samaritan Hospital Samaritan Clinic on Pioneer Samaritan Clinic on Patton
801 E. Wheeler Road 1550 S. Pioneer Way 8420 Aspi Blvd
Moses Lake, WA 98837 Moses Lake, WA 98837 Moses Lake, WA 98837
509.765.5606 509.793.9770 509.793.9781
Fax: 509.764.3236 Fax: 509.764.3246 Fax: 509.764.3281
SamaritanHealthcare.com
Samaritan Healthcare Invoice Summary
1`nvoice`#
Firm
Focus
Date
Amount
1
GenEngineers
Soils Evaluation 9/20/2019
$17,808.32
2
Geo Engineers
Soils Evaluation 10/18/2019
$2,636.00
3
GeoEngineers
SEPA/NEPA 9/20/2019
$15,520.00
4
GeoEngineers
SEPA/NEPA 10/18/2019
$10,347.69
5
GeoEngineers
SEPA/NEPA 11/15/2019
$15,844.50
6
GeoEngineers
SEPA/NEPA 12/6/2019
$1,196.25
7
GeoEngineers
SEPA/NEPA 1/17/2020
$3,789.25
8
GeoEngineers
SEPA/NEPA 2/21/2020
$2,812.25
9
GeoEngineers
SEPA/NEPA 6/12/2020
$177.75
10
Historical Research Associates
Cultural Resource Survey 12/12/2019
$6,773.94
11
Historical Research Associates
Cultural Resource Survey 1/10/2020
$5,509.87
12
Historical Research Associates
Cultural Resource Survey 2/10/2020
$587.75
13
Historical Research Associates
Cultural Resource Survey 3/11/2020
$683.50
14
Historical Research Associates
Cultural Resource Survey 4/12/2020
$981.00
15
Western Pacific Engineering
Traffic Study 2/10/2020
$11,300.00
16
Western Pacific Engineering
ALTA Survey 8/7/2019
$5,650.00
TOTAL
$101,618.07
GeoEnglneers, Inc. (o/
17425 NE Union HIII Road, Suite 250
GEOENGINEERS Redmond, WA 98052.3886
Phone: (425) 861 - 6000
Fax: (425) 861 - 6050
September 20, 2019
Project No: 017000-001-01
Invoice No: 0160359
Attn: Joe Kunkel
The Healthcare Collaborative Group
1430 SE 3rd Avenue, Suite 211
Portland, OR 97214
Geotechnical Engineering Services
Samaritan Healthcare Development
Moses Lake, Washington
Professional Services from August 1. 2019 to September 13. 2019
Task 0100 Geotechnical Engineering Services
Professional Personnel
Consultants
Backhoe
Drilling
Total Consultants
Unit Billing
APC - Associated Project Costs
Mileage - Travel
Moisture Content
Moisture/Density - Rings
Particle Size Analysis - % Passing #200
Particle Size Analysis Sieve <314"
Total Units
Prompt payment will be appreciated.
Hours
Rate
Amount
Associate
1.25
185.00
231.25
Analyst/Developer 1
1.25
127.00
158.75
Engineer/Scientist 1
7.25
127.00
920.75
Technician
52.50
54.00
2,835.00
Administrator 3
5.00
79.00
395.00
Administrator 2
2.50
74.00
185.00
Administrator 1
2.50
69.00
172.50
Totals
72.25
4,898.25
Total Labor
4,898.25
Consultants
Backhoe
Drilling
Total Consultants
Unit Billing
APC - Associated Project Costs
Mileage - Travel
Moisture Content
Moisture/Density - Rings
Particle Size Analysis - % Passing #200
Particle Size Analysis Sieve <314"
Total Units
Prompt payment will be appreciated.
1,491.78
8,320.50 >:
1.15 times
9,812.28 11,284.12
293.5 APC @ 1.00
293.50
853.0 Miles @ 0.65
554.45
8.0 Tests @ 18.00
144.00
2.0 Tests @ 25.00
50.00
3.0 Tests @ 48.00
144.00
5.0 Tests @ 88.00
440.00
1.0 times
1,625.95 1,625.95
Total this
Task $17,808.32
Project 017000-001-01 Healthcare CollablSamaritan HC Dev GTES Invoice 0160359
Project Summary Current Period Prior Period Total Billings
Total Billings 17,808.32 0.00 17,808.32
Authorized Budget 21,500.00
Budget Remaining 3,691.68
TOTAL DUE THIS INVOICE $17,806.32
GeoEngineers Project Manager: Tygh Gianella
Prompt payment will be appreciated.
we
AIRWAY HEIGHTS-- 99001
Sewer ^ Water 4 Septic
Installation and Repair
Specialist
BILL TO
GEO ENGINEERS
GIFFORD INC
523 E SECOND AVE
SPOKANE, WA 99202
0i -U5
FAX: 509-244-0596+~
z Residential
VIET•ZEC121 MA Commercial
Amex = Discover o MasterCard ^ VISA Site Development
DATE
INVOICE #
9/5/2019
190250
P.O. N0, TERMS
1200 Yanczawa Blvd NET30
QTYDESCRIPTION
RATE
AMOUNT
Job Site: 1200 Yonezawa Blvd
913/19 11.5 Firs x S120.00 for i fachinc & Operator to Mobilize to job site, excavate test pits,
backfill & return to shop.
Tax Confl.' 93FS09019D
1,380.00T
7hankyoufor the opp- mtunity to seine you,
Nwe share yourpositive e.7erie= with
neighbors 6gfi*nds H, � r—")e ,_
ll
Subtotal $1,360.00
Sales Tax (8.9 %) $111,78
Total $I,491.78
Payments/Credits $0.00
Balance Due 51,491.78
Terms: Net cash - due upon receipt of invoice.
Finance Charge of W/o Annual (1.5% Monthly); minimtun $2.00 service charge will be accessed on all accounts past due 30 days. A S40.00 Service
fee will be charged on returned Checks. Purchaser agrees to pay all costs and attorney fees if account becomes past due.
Customer is to contact Vietzkc Excavating within f0 days of receipt ol'invoice to resolve any billing questions.
Lein Rights: I hereby accept this notice that in case of non-payment, a lien may be claimed lin- all matcrinls, supplies and labor so furnished.
01522
Holocene Drilling Inc.
11412 62nd Ave East
Puyallup, WA 98373
253-848-6500 ph
253-848.6515 fax
rsmith@holocenedrillinginc.com
Bill To
GeoEngineers Inc.
4000 Kruse Way Place, Bldg 3 #200
Lake Oswego, OR 97035
Attn: Tygh Gianella
o9-rf -i 9
Invoice
Date
Invoice #
9(7112019
11047
r�(H
0L CEnE
LI )RILLinc;
HDI Job No.
P.O. No.
Terms
Project
D19300
17000-001-10
Net 30
1200 Yonezawa Blvd
Quantity
Description
Rate
Amount
9.4.19 & 9.5.19
1
Mobilization/Demobilization
1,200.00
1,200.00
144
Drill & Sample HSA
23.50
3,384.00
12
Extra Samples Each
25.00
300.00
6
Moving, Set Up, Clean Up, per Boring
135.00
810.00
4.75
Standby Per Hour
250.D0
1,187.50
1
Per Diem - Per Crew
425.00
425.00
144
Boring Decommission per Foot
6.00
864.00
6
DOE Fees - Soil Borings
25,00
150.00
Sales Tax, 1309 - Moses Lake
8.10%
0.00
If Paying by credit card, a variable rate of 2% to 5% may be added.
Total > $8,320.50
Hollow Sterni Auger Sonic Mud Rotary Probe Wireline Coring
GeoEngineers, Inc. �� v
17425 NE Union Hill Road, Suite 250
GEOENGINEER/�! Redmond, WA 98052.3886
Phone: (425) B61 -6000
Fax: (425) 861 - 6050
October 18, 2019
Project No: 017000-001-01
Invoice No: 0160916
Attn: Joe Kunkel
The Healthcare Collaborative Group
1430 SE 3rd Avenue, Suite 211
Portland, OR 97214
Geotechnical Engineering Services
iSamaritan Healthcare Development
Moses Lake, Washington
Professional Services from September 14 2019 to October 11. 2019
-----------------------------------------
Task 0100
Geotechnical Engineering Services
Professional Personnel
Hours Rate
Amount
Associate
3.50 185.00
647.50
Analyst/Developer 1
.25 127.00
31.75
Engineer/Scientist 1
12.25 127.00
1,555.75
Administrator 3
2.25 79.00
177.75
Administrator 2
1.00 74.00
74.00
Totals
19.25
2,486.75
Total Labor
2,486.75
Unit Billing
APC - Associated Project Costs 149.25 APC @ 1.00
149.25
Total Units
1.0 times
149.25
149.25
Total this Task
$2,636.00
Project Summary
Current Period Prior Period
Total Billings
Total Billings
2,636.00 17,808.32
20,444.32
Authorized Budget
21,500.00
Budget Remaining
1,055.68
TOTAL DUE THIS INVOICE
$2,636.00
GeoEngineers Project Manager:
Tygh Gianella
Prompt payment will be appreciated
GeoEngineers, Inc, a
17425 NE Union Hill Road, Suite 250
GEOENGINEERS Redmond, WA 98052.3886
Phone: (425) 861 - 6000
Fax: (425) 861 - 6050
September 20, 2019
Project No: 023985-001-00
Invoice No: 0160335
Attn: Joe Kunkel
The Healthcare Collaborative Group
1430 SE 3rd Avenue, Suite 211
Portland, OR 97214
NEPA/SEPA Documentation
Samaritan Health Replacement Campus
Moses Lake, Washington
_Professional Services from August
r .. _
-10. 2_019 to September 13_ 2019
_ _ _ _ _
_ _ _ _ r e _ ` _ _ _ _
Task 0100
Project Design Plan/Description
45.25
152.00
Professional Personnel
5.25
74.00
388.50
.50
Hours
Rate
Amount
Senior Engineer/Scientist 1
3.00
152.00
456.00
Administrator 3
.50
79.00
39.50
Totals
3.50
495.50
Total Labor
495.50
Unit Billing
APC - Associated Project Costs
29.75 APC @ 1.00
29.75
Total Units
1.0 times
29.75 29.75
Total this
Task $525.25
Task _ r 0500 NEPA Documentation
Professional Personnel
Associate
Senior Engineer/Scientist 1
Administrator 2
Administrator 1
Totals
Total Labor
Unit Billing
APC - Associated Project Costs
Total Units
Prompt payment will be appreciated.
Hours
Rate
Amount
37.00
185.00
6,845.00
45.25
152.00
6,878.00
5.25
74.00
388.50
.50
69.00
34.50
88.00
14,146.00
14,146.00
848.75 APC @ 1.00
848.75
1.0 times
848.75 848.75
Total this Task $14,994.75
Project 023985-001-00 Samaritan Health/Rplcmnt Medical Campus Invoice 0160335
Project Summary Current Period Prior Period Total Billings
Total Billings 15,520.00 0.00 15,520.00
Authorized Budget 50,000.00
Budget Remaining 34,480.00
TOTAL DUE THIS INVOICE $15.520.00
GeoEngineers Project Manager: Ryan Tobias
Prompt payment will be appreciated. rdgd
9- Kala4--4
GeoEnglneers,Inc.
17425 NE Union Hill Road, Suite 250
GEOENGINEERS Redmond, WA 98052-3886
Phone: (425) 861 - 6000
Fax: (425) 861 - 6050
October 18, 2019
Project No: 023985-001-00
Invoice No: 0160927
Attn: Joe Kunkel
The Healthcare Collaborative Group
1430 SE 3rd Avenue, Suite 211
Portland, OR 97214
NEPAISEPA Documentation
Samaritan Health Replacement Campus
Moses Lake, Washington
S_er_vices from September 14
2019 to October 11 2019 - - - -
- - - - - - -
- - - - - _
-professional___
Task 0200 Literature Review/Field Preparation
Professional Personnel
Hours
Rate
Amount
Administrator 3
3.00
79.00
237.00
Totals
3.00
237.00
Total Labor
237.00
Unit Billing
APC - Associated Project Costs
14.25 APC @ 1.00
14.25
Total Units
1.0 times
14.25
14.25
Total this
Task
$251.25
-----------------------------------------------
Task 0300 Site Visit
Professional Personnel
Hours
Rate
Amount
Senior Engineer/Scientist 1
15.00
152.00
2,280.00
Analyst/Developer 1
.50
127.00
63.50
Administrator 2
2.75
74.00
203.50
Totals
18.25
2,547.00
Total Labor
2,547.00
Reimbursable Expenses
1 .00
Travel
15
15'82
Meals
Total Reimbursables
1.15 times
115.82
133.19
Unit Billing
APC - Associated Project Costs
Total Units
Prompt payment will be appreciated.
152.75 APC @ 1.00 152.75
1.0 times 152.75 152.75
Project 023985-001-00 Samaritan Health/Rplcmnt Medical Campus Invoice 0160927
Total this Task $2,832.94
----------------------------------------------
Task 0500 NEPA Documentation
Professional Personnel
Associate
Senior Engineer/Scientist 1
Totals
Total Labor
Unit Billing
APC - Associated Project Casts
Total Units
Hours Rate Amount
16.50 185.00 3,052.50
25.00 152.00 3,800.00
41.50 6,852.50
6,852.50
411.0 APC @ 1.00 411.00
1.0 times 411.00 411.00
Total this Task $7,263.50
Project Summary Current Period Prior Period Total Billings
Total Billings 10,347.69 15,520.00 25,867.69
Authorized Budget 50,000.00
Budget Remaining 24,132.31
TOTAL DUE THIS INVOICE $10,342:69
GeoEngineers Project Manager: Ryan Tobias
Prompt payment will be appreciated. Page 2
GeoEnglneers, Inc.
17425 NE Union Hill Road, Suite 250
GEOENGINEERS Redmond, WA 98052.3886
Phone: (425) 861 -6000
Fax: (425) 861 - 6050
November 15, 2019
Project No: 023985-001-00
Invoice No: 0161577
Attn: Joe Kunkel
The Healthcare Collaborative Group
1430 SE 3rd Avenue, Suite 211
Portland, OR 97214
NEPA/SEPA Documentation
Samaritan Health Replacement Campus
Moses Lake, Washington
Professional Services fr
Task 0100 Project Design Plan/Description
Professional Personnel
Hours
Rate
Amount
Senior Engineer/Scientist 1
6.50
152.00
988.00
Administrator 3
1.25
79.00
98.75
Administrator 2
1.50
74.00
111.00
Totals
9.25
1,197.75
1,197.75
Total Labor
Unit Billing
APC - Associated Project Costs
71.75 APC @ 1.00
71.75
Total Units
1.0 times
71.75
71.75
Total this
Task
$1,269.50
------------------------ ------
Task 0200 Literature Review/Field Preparation
Professional Personnel
Hours
Rate
Amount
Senior Engineer/Scientist 1
8.00
152.00
1,216.00
Totals
8.00
1,216.00
1,216.00
Total Labor
Unit Billing
APC - Associated Project Costs
73.0
APC @ 1.00
73.00
Total Units
1.0 times
73.00
73.00
Total this Task
$1,289.00
-------------------------------------
Task 0300 Site Visit
Prompt payment will be appreciated.
Project 023985-001-00 Samaritan HealthlRpicmnt Medical Campus
Invoice
0161577
Professional Personnel
Hours Rate
Amount
Analyst/Developer 1
7.75 127.00
984.25
Totals
7.75
984.25
Total Labor
984.25
Unit Billing
APC - Associated Project Costs
59.0 APC @ 1.00
59.00
Total Units
1.0 times
59.00
59.00
Total this Task
$1,043.25
----------------------------------------------
Task 0500 NEPA Documentation
Professional Personnel
Hours Rate
Amount
Associate
18.00 185.00
3,330.00
Senior Engineer/Scientist 1
52.25 152.00
7,942.00
Administrator2
3.75 74.00
277.50
Totals
74.00
11,549.50
Total Labor
11,549.50
Unit Billing
APC - Associated Project Costs
693.25 APC @ 1.00
693.25
Total Units
1.0 times
693.25
693.25
Total this Task
$12,242.75
Project Summary
Current Period Prior Period
Total Billings
Total Billings
15,844.50 25,867.69
41,712.19
Authorized Budget
50,000.00
Budget Remaining
8287.81
TOTAL DUE THIS INVOICE
$15.844.50
GeoEngineers Project Manager. Ryan Tobias
rag
Prompt payment will be appreciated.
51 a, X'6at4i
GeoEngineers, Inc.
17425 NE Union Hill Road, Suite 250
GEOENGINEERSr4l)
Redmond, WA 98052-3886
Phone: (425) 861 -6000
Fax: (425) 861 - 6050
December 6, 2019
Project No: 023985-001-00
Invoice No: 0161939
Attn: Joe Kunkel
The Healthcare Collaborative Group
1430 SE 3rd Avenue, Suite 211
Portland, OR 97214
NEPA/SEPA Documentation
Samaritan Health Replacement Campus
Moses Lake, Washington
Services from November 9_2_01_9
— —
to November 29.
2019 — — — —
— — — — — — — — — — — — —
_Profe_sslonal
Task — — 0100 Project Design
Plan/Description
4.00
152.00
Professional Personnel
5.00
793.00
Hours
Rate
Amount
Administrator 3
4.25
79.00
335.75
Totals
4.25
Task $840.50
335.75
Total Labor
335.75
Unit Billing
APC - Associated Project Costs
20.0
APC @ 1.00
20.00
Total Units
1.0 times
20.00 20.00
Total this
Task $355.75
--------------------------------------------
Task 0500 NEPA Documentation
Professional Personnel
Associate
Senior Engineer/Scientist 1
Totals
Total Labor
Unit Billing
APC - Associated Project Costs
Total Units
Hours
Rate
Amount
1.00
185.00
185.00
4.00
152.00
608.00
5.00
793.00
793.00
47.5 APC @ 1.00
47.50
1.0 times
47.50 47.50
Total this
Task $840.50
Project Summary Current Period Prior Period Total Billings
Total Billings 1,196.25 41,712.19 42,908,44
Authorized Budget 50,000.00
Budget Remaining 7,091.56
Prompt payment will be appreciated
Project 023985-001-00 Samaritan Health/Rplcmnt Medical Campus Invoice 0161939
TOTAL DUE THIS INVOICE $1,196.25
GeoEngineers Project Manager: Ryan Tobias
Prompt payment will be appreciated. Page 2
�10- kul
GeoEngineers, Inc.
17425 NE Union Hill Road, Suite 250
GMENGINEERS rl Redmond, WA 98052-3886
Phone: (425) 861 - 6000
Fax: (425) 861 - 6050
January 17, 2020
Project No: 023985-001.00
Invoice No: 0162672
Attn: Joe Kunkel
The Healthcare Collaborative Group
1430 SE 3rd Avenue, Suite 211
Portland, OR 97214
NEPA/SEPA Documentation
Samaritan Health Replacement Campus
Moses Lake, Washington
Professional Services from November 30 2019 to January 10 2020
Task 0500 NEPA Documentation
Professional Personnel
Prompt payment will be appr.c,aled.
Hours
Rate
Amount
Senior Engineer/Scientist 1
6.00
152.00
912.00
Totals
6.00
912.00
Total Labor
912.00
Unit Billing
APC - Associated Project Costs
54.75 APC @ 1.00
54.75
Total Units
1.0 times
54.75
54.75
Total this
Task
$966.75
-------'----------------------------------------
Task 0600 SEPA Checklist
Professional Personnel
Hours
Rate
Amount
Senior Engineer/Scientist 1
16.00
152.00
2,432.00
Administrator 3
1.75
79.00
138.25
Administrator 2
1.25
74.00
92.50
Totals
19.00
2,662.75
Total Labor
2,662.75
Unit Billing
APC - Associated Project Costs
159.75 APC @ 1.00
159.75
Total Units
1.0 times
159.75
159.75
Total this
Task
$2,822.50
Prompt payment will be appr.c,aled.
Project 023985-001-00 Samaritan HealthlRplcmnt Medical Campus invoice 0162672
Project Summary Current Period Prior Period Total Billings
Total Billings 3,789.25 42,908.44 46,697.69
Authorized Budget 50,000.00
Budget Remaining 3,302.31
TOTAL DUE THIS INVOICE $3,789.25
GeoEngineers Project Manager. Ryan Tobias
Prompt payment will be appredated. Page 2
�-' Kee
I
GeoEngineers,Inc,
17425 NE Union Hill Road, Suite 250
GEOENGINEERS� Redmond, WA 98052-3886
Phone: (425) 861 - 6000
Fax: (425) 861 -6050
February 21, 2020
Project No: 023985-001-00
Invoice No: 0163386
Attn: Joe Kunkel
The Healthcare Collaborative Group
1430 SE 3rd Avenue, Suite 211
Portland, OR 97214
NEPAISEPA Documentation
Samaritan Health Replacement Campus
Moses Lake, Washington
Professional Services from January 11 2020 to February 7 2020
Task 0500 NEPA Documentation
Professional Personnel
Prompt payment will be appreciated.
Hours
Rate
Amount
Associate
1.50
185.00
277.50
Totals
1.50
277.50
Total Labor
277.50
Unit Billing
APC - Associated Project Costs
16.5 APC @ 1.00
16.50
Total Units
1.0 times
16.50
16.50
Total this
Task
$294.00
-----------------------------------------------
Task 0600 SEPA Checklist
Professional Personnel
Hours
Rate
Amount
Senior Engineer/Scientist 1
14.50
152.00
2,204.00
Administrator 3
1.00
79.00
79.00
Administrator 2
1.25
74.00
92.50
Totals
16.75
2,375.50
Total Labor
2,375.50
Unit Billing
APC - Associated Project Costs
142.75 APC @ 1.00
142.75
Total Units
1.0 times
142.75
142.75
Total this Task
$2,518.25
Prompt payment will be appreciated.
Project 023985-001-00 Samaritan HealttVRplcmnt Medical Campus Invoice 0163386
Project Summary Current Period Prior Period Total Billings
Total Billings 2,812.25 46,697.69 49,509.94
Authorized Budget 50,000.00
Budget Remaining 490.06
TOTAL DUE THIS INVOICE $2,812.25
GeoEngineers Project Manager: Ryan Tobias
Prompt payment will be appreciated. Page 2
GeoEngineers, Inc.
��� 17425 NE Union Hill Road, Suite 250
GEOEINGINEERS /,/ I Redmond, WA 98052-3886
Phone: (425) 861 -6000
Fax: (425) 861 -6050
Attn: Joe Kunkel
The Healthcare Collaborative Group
1430 SE 3rd Avenue, Suite 211
Portland, OR 97214
Note: Final Billing For File N. 023985-001-00
NEPA/SEPA Documentation
Samaritan Health Replacement Campus
Moses Lake, Washington
Professional Services from February 8, 2020 to June 5,_2020
Task 0500 NEPA Documentation
Professional Personnel
Administrator 3
Totals
Total Labor
Project Summary
Total Billings
Authorized Budget
Budget Remaining
9&921 Ku--t�
June 12, 2020
Project No:
Invoice No:
023985-001-00
0165600
Hours Rate
Amount
2.25 79.00
177.75
2.25
177.75
Total this Task
Current Period Prior Period
Total Billings
177.75 49,509.94
49,687.69
50,000.00
312.31
GeoEngineers Project Manager: Ryan Tobias
Prompt payment will be appreciated.
177.75
$177.75
TOTAL DUE THIS INVOICE $177.75
51 a- 1<6aaa
December 12, 2019
Project No: 3080.00
Alin Joe Kunkel Invoice No: 1911123
The Healthcare Collaborative Group Inc
1430 SE 3rd Avenue Suite 211
Portland, OR 97214
Project 3080.00 Moses Lake Hospital Survey
Grant County Hospital District No.1 Samaritan Health Replacement Medical Campus
Professional Services from November 15. 2019 to November 30. 2019
Professional Personnel
Historical Research Associates, Inc.
Sr Architectural Historian
PO Box 7086
i..i1
Missoula, MT 59807-7086
(406) 721.1958
Safety Coordinator
<-i
Employer ID 1181-0373761
December 12, 2019
Project No: 3080.00
Alin Joe Kunkel Invoice No: 1911123
The Healthcare Collaborative Group Inc
1430 SE 3rd Avenue Suite 211
Portland, OR 97214
Project 3080.00 Moses Lake Hospital Survey
Grant County Hospital District No.1 Samaritan Health Replacement Medical Campus
Professional Services from November 15. 2019 to November 30. 2019
Professional Personnel
Rate
104.00
92.00
99.00
70.00
78.00
64.00
91.00
122.00
56.00
Tablet charge 3.0 Days @ 65.00
Total Units
Additional Fees
Admin Fee 5.00 % of 511.85
Total Additional Fees
Billing Limits Current
Total Billings 6,773.94
Limit
Remaining
Amount
78.00
184.00
198.00
17.50
2,301.00
2,976.00
182.00
244.00
56.00
6,236.50
6,236.50
129.77
104.58
82.50
316.85 316.85
195.00
195.00 195.00
25.59
25.59
Prior To -Date
0.00 6,773.94
16,979.00
10,205.06
Total this Involpoi
i•
25.59
Hours
Sr Architectural Historian
Perrin, Natalie
.75
Safety Coordinator
Gilpin, Jennifer
2.00
GIS Coordinator
Frazier, Gabriel
2.00
Research Architectural Historian
Burk-Hise, Kathryn
,25
Research Archaeologist
Aymond, Ayla
29.50
Harriman, Taylor
46.50
Project Administrator
Curtis, Bonnie
2.00
Information Systems Specialist
Muir, Darrin
2.00
Office Manager
Watson, Marie
1.00
Totals
86.00
Total Labor
Reimbursable Expenses
Car Rental
Lodging
Meals/Per Diem
Total Reimbursables
Unit Billing
Rate
104.00
92.00
99.00
70.00
78.00
64.00
91.00
122.00
56.00
Tablet charge 3.0 Days @ 65.00
Total Units
Additional Fees
Admin Fee 5.00 % of 511.85
Total Additional Fees
Billing Limits Current
Total Billings 6,773.94
Limit
Remaining
Amount
78.00
184.00
198.00
17.50
2,301.00
2,976.00
182.00
244.00
56.00
6,236.50
6,236.50
129.77
104.58
82.50
316.85 316.85
195.00
195.00 195.00
25.59
25.59
Prior To -Date
0.00 6,773.94
16,979.00
10,205.06
Total this Involpoi
i•
25.59
1-14-20
51V1 AU'4AZ
Historical Research Associates, Inc.
rm ti PO Box 7006
Missoula, MT 59807-7086
(406) 72.1-1958
Employer ID It 81.0373761
January 10, 2020
Project No: 3080.00
Attn Joe Kunkel Invoice No: 1912110
The Healthcare Collaborative Group Inc
1430 SE 3rd Avenue Suite 211
Portland, OR 97214
Project 3080.00 Moses Lake Hospital Survey
Grant County Hospital District No. 1 Samaritan Health Replacement Medical Campus x
Professional Services from December 1. 2019 to December 31. 2019
Professional Personnel
104.00
182.00
Hours
Senior Archaeologist
64.00
Ragsdale, Emily
4,50
Sr Architectural Historian
56.00
Perrin, Natalie
1.75
Research Archaeologist
86.00
Aymond, Ayla
33.25
Harriman, Taylor
24.25
Warren, Matthew
2.00
Office Manager
Watson, Marie
.25
Administrative Assistant
Frank, Jessica
1.00
Production Assistant
Vogel, Dawn
1.25
Totals
68.25
Total Labor
Reimbursable Expenses
Car Rental
Lodging
Meals/Per Diem
Total Reimbursables
Additional Fees
Admin Fee
5.00 % of 333.69
Total Additional Fees
Billing Limits
Current
Total Billings
5,509.87 E
Limit
Remaining
Outstanding Invoices
Number Date
Balance
1911123 12/12/2019
6,773.94
Total
6,773.94
Rate
Amount
109.00
490.50
104.00
182.00
78.00
2,593.50
64.00
1.552.00
76.00
152.00
56.00
14.00
68.00
68.00
86.00
107.50
5,159.50
5,159.50
42.03
209.16
82.50
333.69 333.69
16.68
16.68
Prior To -Date
73.94 12,283.81
16,979.00
4,695.19
Total this Invoice
16.68
$5,509.87
Historical Research Associates, Inc.
PO Box 7086
Missoula, MT 59007-7086
(406) 721-1958
Employer ID 1> 81-0373761
February 10, 2020
Project No: 3080.00
AIM Joe Kunkel Invoice No: 2001039
The Healthcare Collaborative Group Inc
1430 SE 3rd Avenue Suite 211
Portland, OR 97214
Project 3080.00 Moses Lake Hospital Survey
Grant County Hospital District No. fgarnki6n Health Replacement Medical Campui l
Professional Services from January 1 2020 to January 31 2020
Professional Personnel
Outstanding Invoices
Number Date Balance
1911123 12/1212019 6,773.94
Total 6,77394 f
Submitted by >' /
Hours
Rate
Amount
Principal Architectural Historian
Perrin, Natalie
2.00
122.00
244.00
Archaeologist 2
Aymond, Ayla
1.50
88.00
132.00
Archaeologist 1
Harriman, Taylor
2.75
77.00
211.75
Totals
6.25
587.75
Total Labor
587.75
Billing Limits
Current
Prior
To -Date
Total Billings
587.75
12,283.81
12,871.56
Limit
16,979.00
Remaining
4,107.44
Total this
Invoice $587.75
Outstanding Invoices
Number Date Balance
1911123 12/1212019 6,773.94
Total 6,77394 f
Submitted by >' /
51 e_ Alallt�
March 11, 2020
Project No:
Alin Joe Kunkel Invoice No:
The Healthcare Collaborative Group Inc
1430 SE 3rd Avenue Suite 211
Portland, OR 97214
Project 3080.00
Historical Research Associates, Inc.
Grant County Hospital District No. 1 Samaritan Health Replacement Medical Campus
PO Box 7086
ii
Missoula, M'1' 59807-7086
(406) 721.1958
Hours
Employer ID 1181-0373761
March 11, 2020
Project No:
Alin Joe Kunkel Invoice No:
The Healthcare Collaborative Group Inc
1430 SE 3rd Avenue Suite 211
Portland, OR 97214
Project 3080.00
Moses Lake Hospital Survey
Grant County Hospital District No. 1 Samaritan Health Replacement Medical Campus
Professional Services from February1,
2020 to February 29, 2020
Professional Personnel
Hours
Principal Architectural Historian
Perrin, Natalie
1.00
Archaeologist 2
Aymond, Ayla
1.50
Architectural Historian 2
Burk-Hise, Kathryn
1.00
Archaeologist 1
Harriman, Taylor
4.50
Totals
8.00
Total Labor
Billing Limits Current
Total Billings 683.50
Limit
Remaining
Outstanding Invoices
Number
1911123
Total
Submitted by
Date Balance
12/1212019 6.773A4
Rate
122.00
88.00
83.00
77.00
3080.00
2.002060
Amount
122.00
132.00
83.00
346.50
683.50
Prior To -Date
12,871.56 13,555.06
16,979.00
3,423.94
Total this Invoice
683.50
$683.50
Historical Research Associates, Inc.
PO Box 7086
Missoula, MT 59807-7086
j ; , (406) 721-1958
Employer IDR 81-0373761
April 12, 2020
Project No: 3080.00
Attn Joe Kunkel Invoice No: 2003145
The Healthcare Collaborative Group Inc
1430 SE 3rd Avenue Suite 211
Portland, OR 97214
Project 3080.00 Moses Lake Hospital Survey
Grant County Hospital District No. 1 Samaritan Health Replacement Medical Campus `
Professional Services from March 1. 2020 to March 31. 2020
Professional Personnel
Outstanding Invoices
Hours
Rate
Amount
Principal Architectural Historian
12/12/2019 6,773.94
2002060
3/11/2020 683.50
Perrin, Natalie
1.00
122.00
122.00
Archaeologist 2
Aymond, Ayla
8.00
88.00
704.00
Archaeologist 1
Harriman, Taylor
1.50
77.00
115.50
Accounting Specialist
Stoll, Michele
.50
79.00
39.50
Totals
11.00
981.00
Total Labor
981.00
Billing Limits
Current
Prior
To -Date
Total Billings
981.00
13,555.06
14,536.06
Limit
16,979.00
Remaining
2,442.94
Total this
Invoice $981.00
Outstanding Invoices
Number
Date Balance
1911123
12/12/2019 6,773.94
2002060
3/11/2020 683.50
Total
7,457.44
Submitted by
6 ' 1
Western Pacific Engineering & Survey, Inc.
1328 Hunter Place
Moses Lake, WA 98837
(509)765-1023
The Healthcare Collaborative Group
Inc.
Attn: Joe Kunkel
1430 SE 3rd. Ave. Suite 211
Portland, OR 97214
Description
Invoice
QTY Rate
Invoice #: 11645
Invoice Date: 2/10/2020
Due Date: 2/10/2020
Project: 19533
P.O. Number:
Serviced Amount
Professional Engineering Services to complete a traffic study for
the development of a new hospital campus in Moses Lake to be
located on parcel nos. 09.0869-030, 09-0869-031, 11.0074.000,
11-0074-001 and 09-0869-032, in a portion of Section 26,
Township 19 N, Range 28 E, W.M. Grant County.
Traffic Study
1
11,300.00
11,300.00
*Licensed in Washington and Idaho
Total $11,300.00
Payments/Credits $0.00
Balance Due $11,300.00
Western Pacific Engineering & Survey, Inc.
1328 Hunter Place
Moses Lake, WA 98837
(509)765-1023
The Healthcare Collaborative Group
Inc.
Attn. Joe Kunkel
1430 SE 3rd. Ave. Suite 211
Portland, OR 97214
Description
Invoice
QTY Rate
Invoice #:
11338
Invoice Date:
8/7/2019
Due Date:
8/7/2019
Project:
19110
P.O. Number:
Serviced Amount
Professional Surveying services provided to complete an ALTA
and Topography Survey for Samaritan Healthcare. Located on
parcel nos. 09.0869-030, 09-0869.031, 09-0869-025, 11.0074.000,
and 11.0074.001, in a portion of Section 26, Township 19
North, Range 28 East, W.M., Grant County
Topography
0.5
11,300.00
5,650.00
*Licensed in Washington and Idaho
Total
$5,650.00
Payments/Credits -$5,650.00
Balance Due $0.00