Loading...
HomeMy WebLinkAboutGrant Related - BOCC (005)Via: Regular Mail and Email June 6, 2023 Ms. Janice Flynn, Administrative Services Coordinator Grant County Board of County Commissioners PO no 37 Ephrata,,, WA 98823 M . JUN 1 3 2023 REC 'IVED JUN 0 6 2,023 GRAiNT COLINTY COMMISTONERS RE: Request for extension of time for,51rategic Infrastructure Project- SIP GrantNo. 2021-01, and SIP Grant No. 2022-02 6 Dear Janice, 4 I am writing to request an extension of -the completion date for the above two SIP grants. They are both for the see emergency generator and electrical system upgrades project at McKay Healthcareeering . As you recall, 81P Grant 2021-01 was awarded, for $350,000 to cover professional W des'gn, development of construction documents, and construction of the base bid engini emergency elec%txical generator and electrical system upgrades. I believe you mentioned this grant has a current completion date M July 2023 6 In June 2022, Public Hospital District No. 4 (d./b`/­ a McKay Healthcare) was awarded SIP Grant No. 2022-02 for additional funding to over the added costs resulting from the unanticipated effects of the Pandemic and the expanded scope of work associated with the Alternate Bid items. ,According to your recent letter dated June 2, 2023, SIP Project No. 2022-2 has a completion date of June 21, 2023# On July 6. 2022, we executed a chain order with the contractor to expand the scope of work to include the Alternate Bid items and extend the completion date by 231 days to July 4, 2023, This extension covered the delay M the am*val of -the emergency generator and added time for construction of the Alteivate Bid items that included electrical system upgrades within the building. Since then, the contractor has reported that Western. States, its electrical equipment s H a 'Ii upp, ier, cannot snip the 1.600 amp switchboard until October 11, 202.3. We are. told the delayvvas . 41 * unanticipated because -the manufacturer was not able to keep to 'Its prior commitment to the supplier. In turn, the supplier could not honor its commitment to the contractor. However, we, are told that the delivery date of Mid -October, 2023'is a firm date. Because of the added work to connect conduit and wire after the switchboard arrives, the contractor reports that the project on- site work may be delayed to January 19, 2024. While we are attempting to work out a completion date with -the contractor sooner than January 19, 2024, we don"t know if we Will be able to. In the meantime, we have reached out to local suppliers and to our electrical engineering finn who have confirmed that the supply chain delays are a real and conn -non problem within the electrical industry. Our options are iimited. PO BOX 819 SOAP LAM WA 98851 (509) 246-1111 WWW.MCKAYREALTHCAMORC After substantial completion of the on-site work by January 19, 2024, assuming we stay with the contractor's lastestimated completion date, there are approximately 60 days at a minimum to perform the final inspection,. cm�plete punch list items., obtain as -built drawings, complete final reports, obtain, a Certificate of Completion and Release from the contractor and verify with state agencies that all subcontractors and employees have been paid. After that is completed final payment Will be made by the District. Then, the District will be able to request reimbursement from the Grant County SIP Program. Accordingly, because the two SIP grants 2021-01 and 2022- 02 are for the same pr ject, we are requesting that pr ject compleflon date for each grant be Qj 01 extended to March 3 2024* Thank you for your consideration of our request. Please call me with any questions. Sincerely, Cliff Sears Counsel for McKay Healthcare 2176 Road 17.7 NW Ephrata, WA cc.: Randi S aeter, Interim, Admi'nistrator Correspondence -file N 2 PO BOX 817 SOAP LAKE, WA 98851 (509) 246-1111 WWW,MCKAYR EALTHCARC.OPC