HomeMy WebLinkAboutGrant Related - BOCC (002)PRSRORT PE
Brittany Rang
Administrative Services Coordinator
PO Box 37
Ephrata, WA 98823
September 9, 2020
RE: SIP Project #2019-08
Dear Brittany Rang,
COMPLETED Q Y
�( q-23,20 �7
01'1P -9 -Box 147
4572 Road 13.6 S.W.
Royal City, WA 99357
Dated this .. (:� day of 20,-2-0
Board of County Comrnisvr,ters
Crant Count}. Washington
�ros_e DiSapproNre Abstain
Dist # 1 (I Dist # I Dist # 1 _
Dist P2 Dist # 2 Dist # 2 _
Dist #36E
Dist # 3 Dist # 3
Enclosed is a spreadsheet for our second reimbursement request of $26,609.64 along with the
invoices for our waterline extension project to Torklift, Royal.
On August 12th, I sent you the lst reimbursement request of $70,890.36.
This will complete our SIP Project of grant support in the amount of $97,500.
Please let me know if you have any questions or if you need additional information.
Again, we appreciate the County's support on this project as creating 178 new jobs in this area
is important!
Sincere ,
I
Cathy Potter
Executive Director
RECEIVED
GRANT CDUNTY COMMISSIONERS
Phone: 509-346-2317 portofroyal@centurytel.net Website: www.portofroyal.com
GRANT COUNTY
STRATEGIC INFRASTRUCTURE PROGRAM
PROJECT CERTIFICATION
This form must be signed and returned, with an invoice, for the approved funding,
before reimbursement can be approved by Grant County.
SIP Project Proposal Number:
SIP Funding Recipient:
SIP Project Description:
2019-08
Port of Royal Slope
Waterline Extension - Eldorado
I, the undersigned, do hereby certify under penalty of perjury, that the materials have been
furnished, the services rendered, and/or the labor performed as described in the project
proposal for the above -referenced SIP Project and that I am authorized to authenticate and
certify to this claim. I also certify that this claim is just and due, and is an unpaid obligation
against Grant County.
Further, according to the SIP Project Funding Policies, I attest that at the next audit of my
entity, this project shall be called to the attention of the Washington State Auditor's Office
and an emphasis audit will be requested to assure that these funds were expended toward
the project and according to the intent of the proposal.
1
Signature
rA,441 10
h
Panted Nam
— OLMI-01,&M
Title
Printed Title
Completed, signed original certification and invoice are to be mailed to:
Administrative Services Coordinator, PO Box 37, Ephrata, WA 98823
ATTACHMENT 4
Reimbursement Request #2
September 9, 2020
SIP AWARD # 2019-08
$
97,500.00
Submitted to Grant County 8/12/2020
$
70,890.36
Balance Due from SIP
$
26,609.64
Item # Date of Port
Vendor
Warrant Amount
SIP Amount
CERB Amount Port's Amount
Warrant
# Port Paid
20 9/9/2020
21 9/9/2020
Hall Engineering Assoc.
Smith Excavation Pay Request #2
Invoices Paid 9/9/2020
6470 $ 3,430.00
6473 $ 124,667.15
$ 128,097.15
$
$
$
754.60
25,855.04
26,609.64
$ 2,675.40
$ 81,986.06 $ 16,826.05
$ 84,661.46 $ 16,826.05
NALLfNC/NEER/NC
10 SOUTH AUBURN ST • KENNEWICK, WA 99336 • (509) 582-2200 • hallenggowt. com
September 1, 2020
Invoice No. 20059
Mrs. Cathy Potter
Port of Royal Slope
Via e-mail
Rd 13.6 SW Water Line Extension Proiect
Fixed Fee: $22,000
100% Complete
Billed/paid previously
Subtotal
Hourly charges for Change Order:
13 hr. Licensed Engineer
6 hr. Technician/Drafter
Subtotal
Amount due this Invoice
$ 22,000
20,900
$ 1,820
510
$ 1,100
$ 2,330
$ 3,430 i
1
Road 13.6 SW Water Line Extension Pay Request No. 1
8/24/2020
4xCAVATIpN
>
Biditem Description
Units
Unit Price
Bid Quantity
Bid Total
Billing #1 units
Billing #1 totals
Billing #2 Units
Billing #2 Totals
remaining
10 MOBILIZATION
LS
$ 55,200.00
1
$ 55,200.00
0.9
$
49,680.00
0.1
$
5,520.00
$
20 CONNECT TO EXISTING
EA
$
645.00
1
$ 645.00
$
-
1
$
645.00
$
-
30 TRAFFIC CONTROL PLAN
LS
$
2,500.00
1
$ 2,500.00
$
-
1
$
2,500.00
$
40 ROAD CROSSING
LS
$ 12,000.00
1
$ 12,000.00
$
-
1
$
12,000.00
$
50 12" WATER LINE
LF
$
41.00
2188
$ 89,708.00
1571
$
64,411.00
617
$
25,297.00
$
60 TRENCH SAFETY SYSTEMS
LF
$
0.25
2188
$ 547.00
1571
$
392.75
617
$
154.25
$
-
70 ROCK EXCAVATION
CY
$
41.00
800
$ 32,800.00
577
$
23,657.00
226
$
9,266.00
$
(123.00)
80 IMPORTED BACKFILL MATERIAL
CY
$
3.50
430
$ 1,505.00
$
$
-
$
1,505.00
90 12 X 12 X 12 TEE
EA
$
1,700.00
3
$ 5,100.00
2
$
3,400.00
1
$
1,700.00
$
-
100 12" VALVE
EA
$
2,800.00
5
$ 14,000.00
1
$
2,800.00
4
$
11,200.00
$
-
110 12 X 8 REDUCER
EA
$
1,600.00
1
$ 1,600.00
$
-
1
$
1,600.00
$
-
120 12" CROSS
EA
$
2,500.00
1
$ 2,500.00
1
$
2,500.00
$
-
$
-
130 BLOW -OFF
EA
$
1,700.00
1
$ 1,700.00
$
-
1
$
1,700.00
$
-
140 12" BLIND FLANGE
EA
$
275.00
5
$ 1,375.00
1
$
275.00
3
$
825.00
$
275.00
150 MECHANICAL JOINT RESTRAINTS
EA
$
233.00
5
$ 1,165.00
4
$
932.00
1
$
233.00
$
-
$
148,047.75
$
72,640.25
S
-
Alt 1
S
S
210 MOBILIZATION
LS
$ 25,000.00
1
$ 25,000.00
1
$
25,000.00
$
-
$
-
220 12" WATER LINE
LF
$
57.00
611
$ 34,827.00
611
$
34,827.00
$
-
$
230 TRENCH SAFETY SYSTEM
LF
$
0.25
611
$ 152.75
611
$
152.75
$
$
-
240 ROCK EXCAVATION
CY
$
91.00
100
$ 9,100.00
$
-
$
$
9,100.00
250 IMPORTED BACKFILL MATERIAL
CY
$
3.50
50
$ 175.00
$
-
$
$
175.00
260 12" VALVE
EA
$
2,800.00
1
$ 2,800.00
2
$
5,600.00
$
$
(2,800.00)
270 12" BEND
EA
$
1,400.00
2
$ 2,800.00
$
-
$
-
$
2,800.00
280 FIRE HYDRANT
EA
$
6,250.00
1
$ 6,250.00
1
$
6,250.00
$
-
$
-
290 BLOW -OFF
EA
$
1,700.00
1
$ 1,700.00
1
$
1,700.00
$
$
-
300 MECHANICAL JOINT RESTRAINTS
EA
$
233.00
5
$ 1,165.00
4
$
932.00
$
-
$
233.00
$
74,461.75
$
-
$
-
Alt 2
$
-
$
410 MOBILIZATION
ILS
$ 16,800.00
1 1
$ 16,800.00
1
$
16,800.00
$
$
420 12" WATER LINE
ILF
1 $
57.00
1 400
$ 22,800.00
1 410
$
23,370.00
$
$
(570.00)
Road 13.6 SW Water Line Extension Pay Request No. 2
8/25/2020
430 TRENCH SAFETY SYSTEMS
440 ROCK EXCAVATION
450 IMPORTED BACKFILL MATERIAL
460 12 X 12 X 81 EE
470 8" VALVE
480 8" BLIND FLANGE
490 FIRE HYDRANT
LF
_ CY
CY
EA
EA
EA
EA
$
$
$
$
$
$
$
0.2S
120.00
3.50
440.00
1,760.00
220.00
6,250.00
400
50
50
1
1
1
2
$ 100.00
$ 6,000.00
$ 175.00
$ 440.00
$ 1,760.00
$ 220.00
$ 12,500.00
410
19
1
1
1
2
$
$
$
$
$
$
$
102.50
2,280.00
-
440.00
1,760.00
220.00
12,500.00
i
$
$
$
$
$ _
$
$
$
- $
$
$
- $
$
$
(2.50)
3,720.00
175.00
-
5_00 2" WATER SERVICE
EA
$
1,600.00
1
$ 1,600.00
1
$
1,600.00
$
$
510 BLOW -OFF
EA
$
1,700.00
1
$ 1,700.00
$
-
_
$
$
1,700.00
520 MECHANICALJOINTRESTRAINTS
EA
$
233.00
5
$ 1,165.00
7
$
1,631.00
$
$
(466.00)
$
60,703.50
$
-
Subtotal
$
283,213.00
$
72,640.25
Sales Tax at 8.2%
$
23,223.47
Retainage, 5%
(14,160.65)
292,275.82
Valle Change Order
ItemEst.
No. Item Description City Unit
Unit Price
Total Price
Billing Quantity
-
Billing Total
1 _
Mobilization
1
L
$
-
$ -
3•
IrafficControl Plan
1
L5
$
2,500.00
$ 2,500.00
1
$
2,500.00
4,
Road Crossing
1
LS
$
12,000.00
$ 12,000.00
1
$
12,000.00
5,
12" Water line
225
LF
$
57.00
$ 12,825.00
225
$
12,825.00
6.
French Safety Systems
225
LF
$
0.25
$ 56.25
225
$
56.25
7,
Rock Excavation
70
CY
$
120.00
$ 8,400.00
87
$
10,440.00
9.
12"90 Uegree trend
2
EA
$
1,400.00
$ 2,800.00
2
$
2,800.00
10.
12" Valve
1
EA
$
2,800.00
$ 2,800.00
1
$
2,800.00
11.
2" Water Service
1
EA
$
1,600.00
$ 1,600.00
1
$
1,600.00
13.
blow -Ott
1
EA
$
1,700.00
$ 1,700.00
1
$
1,700.00
Y
14.
12" Blind f lange
1
EA
$
275.00
$ 275-00
1
$
275.00
15.
Mechanical Joint Restraints
5
EA
$
233.00
$ 1,165.00
5
$
1,165.00
el" 7, j
(jt ✓Zd{C � Z
Change Order Subtotal
Total Base plus Change Order
Sales Tax @ 8.2%
_
$
48,161.25
$ 120,801.50
$ 9,905.72
Z ..Zo
Retainage, 5%
$
(6,040.08)
Biling #2 Total
$
124,667.15