Loading...
HomeMy WebLinkAboutAgenda - Public Works (002)Grant County Department of Public Works 124 Enterprise St. S.E. Ephrata, WA 98823 Solid Waste Workshop (1) July 28, 2020 Fund Balance 2020 Available Fund Balance April 30, 2020 was $20,973,465.10 * 2020 Budget Operating Costs $5,625.000.00 Required to balance budget (540.000.00) "+6 Phase 3 Construction Engineer Estimate $2,300,000.00 '!i. Projected Available Fund Balance December 31, 2020 $12,508,465.10 Collect Cell Closure Liability by 2034 total required Projected Available Fund Balance December 31, 2020 Adjusted Cell Closure Liability to be collected A6 Average estimated annual tonnage based on last 5 years is ' *41- Cell Closure Liability To Be Collected Annually ,114,733.45 1ST C'ot"J. Remediation Fees Remediation and ground water monitoring projected annual costs700,000.00 Proposed Rate Increase Per Ton $6.10 Annual Operating Solid Waste Operations and Maintenance Annual Costs 2020 Current Tipping Fee Rate " Grant County Lowest Tipping Fee in the State JWighest Tipping Fee in the State isi crease P35.29 Phase 4 Construction 1 Phase 4 Construction Projected Costs $ 3,000.000.00 i Collect over 5 years based on 114.742 tons - - Proposed Rate Increase Per Ton $ 5.23 Special Programs (TF) 16 Rate increase per ton to cover special programs $1.00 per ton State Requirement Cell Closure Rate Increase Proposed $9.72 Remediation Fees Annual Costs Rate Increase Proposed $6.10 Annual Operating Costs $4,049.277.19 Current Tipping Fee $28.30 Rate Increase Proposed $35.29 Phase 4 Construction Projected Costs $3,000.000. Rate Increase Proposed $5.23 Special Programs Rate Increase Proposed $1.00 Future Land Acquisition & Development Further Study Needed to Determine Costs Unknown $$$$$$ Wages & Fringe Management Support Sam C. 25% Anna G 10% Sam D 10% Loc O 101 Rate Increase Proposed Appx. $2.00 Proposed Rate Increase to Date Current Fee 28.30 Rate Increase Proposed $59.34