Loading...
HomeMy WebLinkAboutBid Opening - Public WorksBID OPENING 3 -NE Road Reconstruction Project Tuesday August 11th @ 1:30 PM 'VGranite Construction �,2 '7-7 80 Pond Road BID Yakima, WA 98901 (509) 248-6823 Brynna.bennett(a�gcinc.com Tommer Construction PO Box 1150 Ephrata, WA 98823 BID (509) 787-3312 chris@tommerconstruction.com K�11� V Wheeler Excavation 2007 E Highland Ext Rd. ( I Z g 2 Benton City, OR 99320 BID I 1 509-528-1733 Wheelerkelley207@yahoo.com Cegnar Company P.O. Box 1393 Moses Lake, WA 98837 509-750-7562 Cegnarcompany@yahoo.com Advanced Excavation P.O. Box 1278 Moses Lake, WA 98837 bellaCoDadvancedincorporated.com 509-762-9421 N Central Washington Asphalt PO Box 939 Moses Lake, WA 98837 tracv@cwainc.us HLT 4207 N. Farr Road Spokane, WA 99206 509)844-1481 dillin@nwi.net ME BID 1 , Z 2C) , 8 `1 t'55 l:" a 10d V"^ I1if I�C ' WY` t f -i r 5S /0!V�YL_ S S x.00 r-X'� (�f7 ebt JL4 TOTAL BID ITEMS 1-29 $2,048,446.00 $2,153,418.47 $2,195,274.50 $2,261,668.00 $2,390,702.99 $2,409,044.10 WASHINGTON STATE SALES TAX (8.4%) $172,069.46 $180,887.15 $184,403.06 $189,98011 $200,819.05 $202,359.70 PHASE 3 DEVELOPMENT GRAND TOTAL $2,220,515.46 $2,334,305.62 $2,379,677.56 $2,451,648.11 $2,591,522.04 $2,611,403.80 EPHRATA LANDFILL PHASE 3 DEVELOPMENT Bid Tabulation, 8/04/2020 KRCI, LLC 125 SE McGee St. East Wenatchee, WA 98802 Deatley Construction P.O. Box 490 Clarkston, WA 99403 Selland Construction P.O. Box 119 Wenatchee, WA 98801 Strider Construction 4721 Northwest Dr. Bellingham, WA 98226 C & R Tractor and landscaping 3829 Pleasant Hill road Kelso, WA 98626 Glacier Environmental Services 34105121st Street SW Lynnwood, WA 98087 Item# Total Quantity Unit Item Description Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount 1 100% L.S. Mobilization $110,000.00 $110,000.00 $200,000.00 $200,000.00 $100,000.00 $100,000.00 $305,000.00 530S,000.00 $174,000.00 $174,000.00 $244,450.00 $244,450.00 2 100% L.S. Health and Safety Plan $2,100.00 $2,100.00 $9,000.00 $9,000.00 $250.00 $250.00 $15,000.00 $15,000.00 $1,689.68 $1,689.68 $16,030.00 $16,030.00 3 100% L.S. Surveying $12,000.00 $12,000.00 $35,800.00 $35,800.00 $10,000.00 $10,000.00 $25,000.00 $25,000.00 $12,000.00 $12,000.00 $24,000.00 $24,000.00 4 31,669 C.Y. Excavation and Haul $1.00 $31,669.00 $5.25 $166,262.25 $5.00 $158,345.00 $16.00 $506,704.00 $6.39 $102,364.91 $4.12 $130,476.28 5 4,032 C.Y. Embankment Compaction $1.00 $4,032.00 $0.70 $2,822.40 $0.50 $2,016.00 $3.00 $12,096.00 $4.78 $19,272.96 $12.50 $50,400.00 6 6,352 C.Y. GCL Bedding Layer $25.00 $158,800.00 $11.00 $69,872.00 $30.00 $190,560.00 $16.00 $101,632.00 $23.23 $147,556.96 $25.82 $164,008.64 7 38,114 S.Y. Geosynthetic Clay Liner $6.00 $228,684.00 $5.65 $215,344.30 $6.25 $238,212.50 $6.50 $247,741.00 $6.36 $242,405.04 $6.85 $261,080.90 8 38,114 S.Y. 60 Mil Textured HDPE Geomembrane $6.50 $247,741.00 $5.64 $214,962.96 $6.25 $238,212.50 $6.50 $247,741.00 $6.71 $255,744.94 $6.83 $260,318.62 9 31,768 S.Y. Geotextile Cushion Layer $4.00 $127,072.00 $2.82 $89,585.76 $3.00 $95,304.00 $3.25 $103,246.00 $3.18 $101,022.24 $3.47 $110,234.96 10 19,057 C.Y. Leachate Collection Layer $30.00 $571,710.00 $21.00 $400,19700 $24.00 $457,368.00 $9.00 $171,513.00 $24.00 $457,368.00 $35.71 $680,525.47 11 703 S.Y. Rock Armor Layer from Stockpile $8.00 $5,624.00 $25.00 $17,575.00 $5.50 $3,866.50 $6.00 $4,218.00 $10.44 $7,339.32 $6.56 $4,611.68 12 1,934 S.Y. Crushed Surfacing Top Course -In-Place $9.00 $17,406.00 $16.00 $30,944.00 $8.00 $15,472.00 $12.00 $23,208.00 $6.34 $12,261.56 $6.86 $13,267.24 13 2,457 L.F. Interim Stormwater Geomembrane Berms/North Containment Geomembrane $28.00 $68,796.00 $24.00 $58,968.00 $25.00 $61,425.00 $29.00 $71,253.00 $27.23 $66,904.11 $36.11 $88,722.27 14 334 L.F. 6 -Inch HDPE Solid Wall Leachate Pipe $28.00 $9,352.00 $23.00 $7,682.00 $40.00 $13,360.00 $25.00 $8,350.00 $36.09 $12,054.06 $25.82 $8,623.88 15 682 L.F. 3- Inch HDPE Solid Wall Leachate Pipe $20.00 $13,640.00 $28.00 $19,096.01 $30.00 $20,460.00 $16.00 $10,912.00 $24.08 $16,422.56 $14.15 $9.650.30 16 635 L.F. 6 -Inch HDPE Perforated Leachate Pipe $12.00 $7,620.00 $21.00 $13,335.00 $13.00 $8,255.00 $14.00 $8,890.00 $29.45 $18,700.75 $16.32 $10,363.20 17 316 L.F. 8 -Inch Buried HDPE Solid Wall LFG Pipe $55.00 $17,380.00 $43.00 $13,588.00 $45.00 $14,220.00 $44.00 $13,904.00 $45.30 $14,314.80 $40.15 $12,687.40 18 426 L.F. 5 -Inch HDPE Solid Wall LFG Pipe $47.00 $20,022.00 $55.00 $23,430.00 $50.00 $21,300.00 $43.00 $18,318.00 $47.69 $20,315.94 $49.41 $21,048.66 19 1,374 L.F. 4 -Inch HDPE Solid Wall LFG Pipe $27.00 $37,098.00 $38.00 $52,212.00 $52.00 $71,448.00 $33.00 $45,342.00 $36.02 $49,491.48 $13.40 $18,411.60 20 13 Each Modified Existing LFG Wellheads $2,500.00 $32,500.00 $2,200.00 $28,600.00 $2,000.07 $26,000.00 $2,000.00 $26,000.00 $2,741.15 $35,634.95 $2,035.00 $26,455.00 21 14 Each LFG Wellheads $2,300.00 $32,200.00 $3,600.00 $50,400.00 $4,500.00 563,000.00 $2,200.00 $30,800.00 $2,812.64 $39,376.96 $2,365.00 $33,110.00 22 4 Each Geomembrane Penetrations $1,000.00 $4,000.00 $823.00 $3,292.00 $600.00 $2,400.00 $1,000.00 54,000.00 $927.07 $3,708.28 $986.00 $3,944.00 23 400 L.F. 6 -Inch HDPE Solid Wall Trench Pipe $17.00 $6,800.07 $62.00 $24,800.00 $45.00 $18,000.00 $10.00 $4,000.00 $33.48 $13,392.00 $3.71 $1,484.00 24 3,000 L.F. 6 -Inch HDPE Perforated Trench Pipe $9.00 $27,000.00 $5.00 $15,000.01 $25.00 $75,000.00 $8.50 $25,500.00 $24.65 $73,950.00 $5.94 $17,820.00 25 3,400 L.F. 4 -Inch HDPE Perforated Trench Pipe $8.00 $27,200.00 $3.25 $11,050.00 $22.00 $74,800.00 $7.00 $23,800.00 $23.03 $78,302.00 $3.80 $12,920.00 26 100% 1 L.S. jUFG Meters $19,010.00 $19,000.00 $14,000.00 $14,000.00 $16,000.00 $16,000.00 $20,000.01 $20,000.00 $21,728.40 $21,728.40 $15,250.00 $15,250.00 27 100% L5. Trimming and Cleanup $6,000.00 $6,000.00 $10,007.00 $10,000.00 $15,000.00 $15,000.00 $12,500.00 $12,500.00 $4,729.43 $4,729.43 $6,200.00 1 $6,200.00 28 100% .S. Flare Facility $135,000.00 5135,000.00 $162,600.00 $162,600.00 $100,00000 $100,000.00 $85,000.00 $85,00000 $16,302.33 $18,302.33 $85,200.00 $85,200.00 29 100% 1 L.S. jElectrical and Control System $68,000.00 568,000.00 5193,000.00 $193,000.00 585,000.00 1 $85,000.00 $90,070.00 $90,000.00 $270,349.33 $270,349.33 $77,750.00 $77,750.00 TOTAL BID ITEMS 1-29 $2,048,446.00 $2,153,418.47 $2,195,274.50 $2,261,668.00 $2,390,702.99 $2,409,044.10 WASHINGTON STATE SALES TAX (8.4%) $172,069.46 $180,887.15 $184,403.06 $189,98011 $200,819.05 $202,359.70 PHASE 3 DEVELOPMENT GRAND TOTAL $2,220,515.46 $2,334,305.62 $2,379,677.56 $2,451,648.11 $2,591,522.04 $2,611,403.80