Re: Request to Proceed, Jail Terminal Unit Replacements
Grant County
Facilities & Maintenance
POBox 37
Ephrata WA 98823
(S09) 754-2011 Ext -3272
May 24, 2023
Dear BOCC,
While doing maintenance on the terminal units that heat the jail, four were found that the
heating elements are not working. With these not working correctly it is difficult to keep the
areas they heat comfortable when it is cold.
Replacement of these units was put out to bid. The lowest bid received was from MacDoanld
Miller. Their cost with tax included is $14,134.28
This is a repair to the heating system for the jail and the costs would come from the Facilities
and Maintenance Repairs fund, 001.112.00.0000.518304800.
Therefore, I am recommending that this project be approved and asking permission to proceed.
The costs would be paid from the Facilities and Maintenance Repair fund, as indicated in the
previous paragraph, which has a current balance of over $66,000.
Thank you for your consideration in this matter.
Sincerely,
5;kow6t sc"6&
Kevin Schmidt
Facilities and Maintenance Manager
Grant County, Washington
MAY 3 0 2023
CONSEN
Kevin Schmidt
Manager Facilities and Maintenance
Kschmidt@grantcountywa.gov
"To meet current and future needs, serving together with public and private entities, while fostering a respectful and successful work environment"
rA A
May 17, 2023
Kevin Schmidt
Grant County
Dear Kevin,
1
MacDonald -Miller is pleased to present you our quote to replace the terminal units from the list provided by your
team.
PROJECT CLARIFICATION
MacDonald -Miller plans to demo the old terminal units and dispose of them offsite. We will disconnect electrical for
safe demo. Then disconnect duct connections to the terminal units. Once complete we will then install 4 new
terminal units in the existing duct. These will be of like size and kind, without unit controls. We will then reconnect
the high voltage electrical to the new units and reconnect the existing duct connections. Once installed we will clean
up the jobsite area and verify proper installation.
Sincerely,
Burt Ross I Service Special Projects 1 509.797.1507 1 burt.ross@macmiller.com
MA MLLLERaCOM 1-800-962.5979
SEATTLE EVERETT REDMOND TACOMA KENNEWICK PORTLAND EUGENE SPOKANE MacDonald -Miller
<Z) FACILITY SOLUTIONS
SCOPE OF WORK
This proposal includes:
• Demo 4 old terminal units and disposal
o Disconnect electrical high voltage
o Disconnect duct connections
• Install 4 new terminal units of like kind and size
o Reconnect existing high voltage connections
o Reconnect duct connections
o Transitions and duct extensions
• Jobsite clean up
EXCLUSIONS:
This proposal excludes:
• Any additional scope not specifically mentioned above
• Controls for terminal units
• Overtime labor
• High'Voltage electrical upgrades
Terminal Unit replacements
$14,134.28
tax included
2
Please indicate acceptance by signing below and returning to my attention via email at
burt.ross macmiller.com. We appreciate the opportunity and confidence in our services. Please feel free
to call with any questions you may have (509) 797-1507.
Anticipated starting date: TBD and completion date:
Upon which this proposal is based. This proposal
does not include, unless so stated, any applicable
state or federal taxes. This proposal is subject to
acceptance by purchaser within 30 days and
subject to the terms and conditions stated on the
following page.
MacDonald -Miller Facility Solutions, LLC.
Submitted by:
Burt Ross /Account Manager
Acceptance: I agree to the terms hereof and acceptance of this agreement.
Purchaser
MACMILLERaCOM 1-800-962-15979
SEATTLE EVERE?T REDMOND TACOMA KENNEu ICK PORTLAND EUGENE SPOK NEI'' ' MacDonald -Miller
FACILITY SOLUTIONS
3
1'Ut:A CMI LLE &COM 1-8007962-5979
SEATTLE EVERETT REDMOND TACOMA KENNEWICK PORTLAND EUGENE SPOKANE MacDonald -Miller
<Z) FACILITY SOLUTION
TERMS AND CONDITIONS/CONSTRUCTION SERVICES
Acceptance
By authorizing MacDonald -Miller Facility Solutions, LLC. to provide the construction services contemplated by this Agreement, Customer agrees
to the terms and conditions herein stated.
Scope of Obligations
MacDonald -Miller Facility Solutions, LLC. shall provide construction service when contracted for, pursuant to the attached proposal, purchase
order or estimate of which these terms and conditions are a part.
Obligations of Customer
Customer shall extend all reasonable cooperation requested in terms of personnel; access to premises where work is to be performed; promptly
providing information requested by contractor, and shall promptly notify MacDonald -Miller Facility Solutions, LLC. upon observation of any
unusual or unsafe condition.
Service Availability
MacDonald -Miller Facility Solutions, LLC. agrees to provide construction service during normal business hours, i.e., 6:00am to 5:30 pm, Monday
through Friday, holidays excepted. Agreed upon changes are at the hourly rate and terms, including vehicle charges or special assessments,
then in effect by MacDonald -Miller Facility Solutions, LLC.
Charges and Terms
Payment is due within 30 days of the invoice date. Any balance due after 30 days shall bear interest at the maximum legal rate permitted from
the invoice date.
Taxes
There will be added to all charges the amount of any present and future taxes or any other governmental charges now or hereafter imposed by
existing or future laws with respect to any services rendered or materials supplied.
Limitation of Liability
MACDONALD-MILLER FACILITY SOLUTIONS, LLC. SHALL NOT BE LIABLE TO CUSTOMER FOR ANY INDIRECT, INCIDENTAL,
CONSEQUENTAL OR PUNITIVE DAMAGES, INCLUDING LOSS OF PROFIT OR GOODWILL, AS A RESULT OF ANY MATTER ARISING
OUT OF OR RELATING TO THE CONSTRUCTION SERVICES PROVIDED UNDER THIS AGREEMENT AND/OR ITS SUBJECT MATTER
WHETHER SUCH LIABILITY IS ASSERTED ON THE BASIS OF CONTRACT, TORT OR OTHERWISE, EVEN IF ADVISED OF THE
POSSIBILITY OF SUCH DAMAGES.
The customer agrees that MacDonald -Miller Facility Solutions, LLC.'s liability thereunder for damage shall not exceed the amount paid for
construction services and only if such damage is the result of MacDonald -Miller Facility Solutions, LLC.'s negligence or willful misconduct.
To the fullest extent permitted by law, the Owner shall indemnify and hold harmless the Contractor and its agents and employees from any
claims, damages, losses and expenses including attorney's fees to the extent caused by the negligent acts or omissions, or willful misconduct of
the Owner.
Unless stated in writing, MACDONALD-MILLER FACILITY SOLUTIONS, LLC. DOES NOT MAKE ANY EXPRESS OR IMPLIED
WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A
PARTICULAR PURPOSE.
MacDonald -Miller Facility Solutions, LLC. shall not be responsible or liable for any loss, damages or delay in furnishing materials or failure to
perform services when caused by fire, interruption of utility services, flood, acts of civil or military authorities, insurrection, terrorist act, riot, civil
disorder, labor disturbances, or by any other cause which is unavoidable or beyond its control.
If the Contractor is delayed by any act or neglect of Owner or a separate Contractor employed by Owner, the time for completion shall be
extended as necessary and an extension of time to compete the work does not preclude recovery of damages for delay by Contractor.
Default
If Customer does not pay any amount due thereunder, or breaches any of the terms of this Agreement, MacDonald -Miller Facility Solutions,
LLC. may, in addition to any other legal remedies it may have, including the right to file a lien under state law, suspend work until payment is
made.
Term
Prices will be subject to periodic changes due to change in labor and material rates.
General
Either party may terminate this Agreement at any time for failure of the other to comply with any of its terms and conditions, but termination shall
not relieve Owner of the duty to pay for work performed by Contractor.
Customer represents that it has authority to enter into this Agreement. Owner warrants that to the best of its knowledge there are no unsafe
conditions or hazardous materials or substances in, on, around or affecting the area where the work is to be performed.
This Agreement shall be governed by the laws of the State where the work was done. In the event any party shall bring suit or action against
the other for relief arising out of this Agreement, the prevailing party shall have and recover against the other party all court costs,
disbursements, and a reasonable attorney's fee. Customer consents to and agrees to jurisdiction and venue of any proceeding in the District or
Superior Court of the State of Washington for King County at MacDonald -Miller Facility Solutions, Inc's election.
Making a final payment shall constitute a waiver of claims by the Owner except those arising from claims by third parties arising out of the
contract, failure of the work to comply with the requirements of this contract, or manufacturer warranties passed on to the Owner by Contractor.
The Owner and Contractor shall commence all claims and causes of action against the other whether in contract, tort, breach warranty or
otherwise arising out of or related to this contract within 365 days following Contractor's completion of the work.
Publicity and Promotion. Customer and MacDonald -Miller Facility Solutions, LLC., (MMFS) agree that MMFS is entitled rights of publicity or
promotion with respect to the work completed by MMFS under this Agreement, including, but in no way limited to, photographs and written or
graphical depictions of the work, the project, and product. MMFS may exercise such rights of publicity or promotion in any way it deems
appropriate for marketing or other promotional purposes. MMFS shall retain exclusive ownership of any intellectual property rights that may
result from any such publicity or promotion, including, but in no way limited to, copyright or trademark protection. Photographs or other
graphical depictions of non-MMFS personnel will only be used with written consent by the Customer and the individual. Furthermore, the
Customer agrees to the use of their name/logo by MMFS in furtherance of MMFS's rights of publicity. Any press release will be mutually agreed
upon (form and content) by both parties prior to its release. Any notice required by this Agreement shall be deemed received, delivered in
person, or by facsimile or sent by mail.
MA:+ M I L LE . M 1-800-962-5979
SEATTLE EVERETT REDMOND TACOMA KENNEWICK PORTLAND EUGENE SPOKANE MacDonald -Miller
<=:� FACILITY SOLUTIONS