Loading...
HomeMy WebLinkAboutPersonnel Action Request - Public Works (003)PERSONNEL ACTION REQUEST (PAR) Section 1- Core Employee Data (Current Data Required) Empl#. 061 Legal Name: DART, SAMUEL P. Effective Date: 05/04/20 Section 2 -15m loyee Data (Required for New Hires, Se tions, or if Ch Item CurrentData New Data Name � <Enter> Address <Enter> Telephone ( ) - ext. SS# - Birthdate 000-00-0000 — 00/00/00 Section 3 - Requested Action Action(s) Leave Data Separation Data Other (Provide Comments) A Start Date oo/00/00 Stop Date 00/0o/oo Type Reason A Eligible for Rehire Provide Details o Se aration Below Section 4 - Comments Employee assumed the position of Interim Public Works Director until permanent Director was hired. Employee was promoted to Assistant Public Works Director prior to assuming Interim position. Employee was the Associate Engineer before being promoted to Asst. PW Director. Section 5 - Core Items (Current Data Required), Item Current Data New Data Dept# -Dept ^ Public Works-loloSo ^ ^ Job# -Job Title 189 -44 -Interim Public Works Director 189 -04 -Asst. Public Works Director Hire — Position 10/12/15 - 02/05/20 10/12/15 - 05/04/20 Grp# -Name NO2-Department Head NO3-Manager-Supervisor Employee Type Full Time Regular ^ Section 6 - Secondary Items (Required only if Changing) Iter Current Data vFj New Data Base Wage $8,720.40 Monthly _$7��Monthly P�r� Band / Step 23/01 20 /yti1— p Stipend $oo.0000 <Select Type> $oo.0000 <Select Type> Pay Type/FLSA Exempt (SALRYE) ^ FTE 1.0 (4o hrs/wk) ^ FTE—GrIS Only <Enter> <Enter> Workweek Standard Su -Sat ^ $eqklo-Authorizing Signatures Department: Date: �� Z Human Resources: Date: Board Approval PRequiredEl Not Requir Chair: 1- -----, Vice-Chair:Date: Member: RECEIVED Revised 0I I l9 GRANT CouNTY (,QW ss'0NEF Barbara Vasquez From: Kirk Eslinger Sent: Tuesday, May 19, 2020 9:38 AM To: Barbara Vasquez Cc: Laurissa Perez Subject: For Signature Attachments: 2020-05-19 - Castro, Sam PAR A.docx; 2020-05-19 - Castro, Sam PAR B.pdf, 2020-05-19 - Dart, Sam PAR.pdf; 2020-05-19 - Elefson, Keith PAR.pdf Barb, the Board approved signature on these three PARs this morning RE Dart: The Board approved Band 20/ Step 4 @ $8,084.27. Can make that change on the PAR?