HomeMy WebLinkAboutGrant Related - BOCC (005)0
GRANT COUNTY
BOARD OF COUNTY COMMISSIONERS
iT I I I k, •
APPROVED
MAY 2 3 2023
CONSENT
.J
To: Board of County Commissioners
n,.
From: Janice Flynn, Administrative Services Coordinator
Date: May 15, 2023
Re SIP Advisory Committee Recommendations on SIP No.
SIP No. 2023-02
Ro�C�fiiE
MAY 15 2 023
GRANT COU Ty COMMISSIONERS
?023- an
The SIP Advisory Committee met on Friday, May 5, 2023, to review and make
recommendations on the above -referenced projects. The Committee's
recommendations were provided to the BOCC on 05/09/2023 and a copy of the
Committee's letter and the applications are attached. The proposed projects are as
follows:
1.` SIP Project #2023-01: Grant County Hospital #4 — McKay Healthcare — Phase 1,
Architecture and Engineering Site Plan. The Hospital's request was for a
$400,000.00 grant. This project was added to the Grant County comp plan in 2022.
The SIP Advisory committee has recommended a $400,000.00 grant.
Action: The BOCC APPROVES or DISAPPROVES the recommendation of
the SIP Advisory Committee to approve $400,000.00 in grant funding.
2. SIP Project #2023-02: Grant County Port District #10 — Moses Lake — Southwest
Hangar Utility Extension - The Port's request was for a $500,000.00 grant. This
project is on the list of 2023 Appendix J projects to be added to the Grant County
comp plan. It is anticipated the updated comp plan will be adopted in August 2023.
This project could be approved contingent upon approval of the comp plan.
The SIP Advisory Committee has recommended a grant in the amount of $500,000.00
Action: The BOCC APPROVES or DISAPPROVES the recommendation of
the SIP Advisory Committee to approve $500,000.00 in grant funding.
Note: The Port of Coulee City submitted an application for a new medical facility. They
subsequently pulled their application so the SIP Committee made no recommendation.
Grant
County 6594 Patton Boulevard NE Moses Lake, WA 98837
Economic Ph: 509.764.6579 Fax: 509.762.5161
Development Council www.grantedc.com
May 9, 2023
Board of Grant County Commissioners
P. 0. Box 37
Ephrata, WA 98837
Subject: April 2023
Advisory Committee —Project Review/Recommendations
Dear Commissioners:
The SIP Committee met Friday, May 5th and reviewed 2 project applications. Committee members
present for the meeting were Corinne Isaak, Chuck Allan and Brant Mayo.
Absent was Tony Massa, Curt Morris and Scott Hunter. Curt and Scott sent their recommendations via
email prior to the meeting.
SIP #2023-01: Grant County Hospital District #4 (requested $400.,000 grant)
Phase 17 Architecture and Engineering Site Plan
Applicant: McKay Healthcare & Rehabilitation Center
Recommendation: The committee voted to recommend a $400,000 grant for GC Hospital District #4
regarding their need for an architecture and engineering site plan. This project is in the City of Soap
Lake' comprehensive plan. The site plan work is integral for McKay to plan for future expansion and be
able to apply for additional grants. McKay currently serves families in Grant County from Ephrata,
Coulee City, Hartline, Quincy, Soap Lake, Grand Coulee and Moses Lake. This is an important and
valuable facility for the citizens of'Grant County. city. The committee views this as a vital step for the
continued operations, sustainability and future expansion for McKay Healthcare.
The recommendations were given a motion by Corrine Isaak and seconded by Chuck Allen. The
remaining committee voted in unanimous favor of recommendation.
SIP #2023-02: Grant County Port District #10 (requested $500,000 grant)
Southwest Hangar Utility Extension
Applicant: Port of Moses Lake
Recommendation: The committee voted to recommend a $500,000 grant for GC Port District #10
regarding their need for installation of utilities to new development area at the Grant County
International Airport. The Port of Moses Lake has already invested $1.04M in this project that includes
site prepreation and construction of new taxi -lane. The grant would support the installation of basic
utilities to the site. The Southwest Hangar Utility Extension project will support several private and
public entities in need of their own facility, bringing new investors and jobs to the area. The Port of
Moses Lake submitted this project to be included in Grant County's amended comprehensive plan.
The recommendations were given a motion by Corrine Isaak and seconded by Chuck Allen. The
remaining committee voted in unanimous favor of the recommendation, pending approval of this
project in Grant County's amended comprehensive plan later this summer.
Please contact me if you have any questions regarding the recommendations of the committee.
Sincerely,
Brant Mayo
Administrator
Grant County SIP Advisory Committee
"RCW 82.14.370 Sales and use tax for public fact'll"ties in -rural counties.
(3)(a) Moneys collected under this section may only be used to finance public facilities
serving economic development purposes in rural counties and finance -personnel in
economic development offices. The public facility must be listed as an item in the
officially adopted overall economic development plan, or the economic development
section of the county's comprehensive plan.
Ti
he Funding Source s Account 113.155 Economic Enhancement SIP.
aoaa +*0,U)oa3
01. io
A4U**
*Mw
EDC ORGANIZATION
PROJECT
FUNDING
COST
Realth6are
deed's Assessment &. Modernization Feasibility, Study,
1,13A55
$26,000
Now Wing
113.155
$312.71 538
Main! Build Ing Conversion
113.155
634,468
Outdoor Area improvements
113.155
$944,500
Subtotal
$1.3$8761506
•
Port of Quint.
Internodal Yard Loadingand Unload Ing FXP anqion
113.155
$2811500
Addition across Dock Facilit- y Intermodal Yard
113.155
$88,:180.
Upgrade Securi
*�y. and' Asset Tracking Syste- ms
1 1 -3. 1 �55
11-3.155
$2.500000
Subtotal
$610�064
1.
Saved water. District
y
N'ew Wall and Water Reservoir
113.155
$1 - 7,400
I
Water Distribution _�5ystem
113.155
.15.1
.$6.361500-1..
Subtotal
A815050
Port of Warden
Industrial Park #3 Infrastructure_ Improvement's
11 3.165
-$5.30,000
Industria): Park #5 Expansion & I nfrastructure
113.155
.-85'1000
Airport Master Plan Study and Runway Rphab.
13.155
$230,000
u btotal
$2��0453000
•S
Samaritan Healthcare
District I.Mose's Lake
New Hospital
13.155
$167,000,000
Subtotal $161060000
_ - __I
77T.
Port Of Mattawa
.Wastewater Improvoment Project
113.155
.$500,10001
-Sentinel Gap Industrial Park
111155
$,?15002000
-Subtotal
1000-3000
Town of Coulee City'
Rodeo GroundImprovements
113.155
-$117701000
Campground Improvements
113'4 155
$1 200jO0O
New Medical, Clinic - - --- -----
113.155
$3,260,000
Subtotal
$612309 -000
Port of Royal'
Industrial Park Rail SiOng
113.155
_$21 000,1000
p Fam
Well #3 and Fire Pure i1fty
113.155
$3,600;000 - .
ch Water
New 12 -in Main Extension
113.155
$?-jO001000
Road Expansion
113.155
$1,000,000
Trans Loadin g f8d I ity
113,155
$4001000
Subtotal
113.155
$9#405000
I Total 2022,Eligible Projects
1 $203,353,020
2023 ELIGIBLE PROJECTS
EDC ORGANIZATION
PROJECT
FUNDING
COST
:"-City of Oungicy
Capital. Improvements (Water)_ for 20231
$2.0.94y5oo
Water Rights
11 13. 1155
$4 6r 0,00
Peasibility Study
113,155
$:65'0'1000
Additional Intakes and t, n's
$1,51-500
DOH, SW Sdurce Approval
113.155
$567jOOO
ASIR Permitting
113.155
50,000
Capital Improvements (Wastewater) for 2023
97,000
113.155
1082,000
Reclaim,orl, M;fchr Use
113.155
$7451Qoo
Subtotal
Port of Mos* es Lake
Ai:rport'SW Hangar Utility Extension
Water
11-3.155.
)i000
$10
-
Storm Water
113.155
-000
"SpOtotal
$850,9000
ri
Royal City Library
Caplotal Build'in gject-- New Library,
Site Pr aration
113.155
$501000
Phase I - Main Structure
113.155,
$587604
Phase 11, - Inter, ior
113.155
$254'.1585.-
-Exterior Completion
113.155
190000
Subtotal
Beverly Water District
Feasibility Study - New Communit Building
111155
$20-000
Subtotal
03000
Sentinel. Gap Water Ass.
'Proposed 8GWA infrastructure ImproovempntS
30 -foot D"18 'Meter Water Tank and Booster Pump
113.155
$1 ell 7 000
,-,New Water Meters
113.155
$1161600
Install -at 4 ion of 480 feet of .4 -inch water line
113.155
$99 . X0
Subtotal
$1 �4;_
31-900
GRANT COUNTY INTERNATIONAL AIRPORT FOREIGN TRADE ZONE 14203
March 31, 2023
Grant County Strategic Infrastructure Program (SIP)
c/o Grand County Economic Development Council
6594 Patton Blvd. NE
Moses Lake, WA. 98837
RE: Strategic Infrastructure Program (SIP) Application
Dear Councik.
T 509362.5363
F. 509.762,271'a"
PORTOFMOSESLAKE-COM,
Enclosed is our completed application to the Grant County Strategic Infrastructure Program. Based on
the scope of our project we are requesting your consideration in the amount of $500pO0O.
PL6'ect Sum,Mg,ry,—,,G.,ra qqnt " rnationallAir ort "Southwest Hanffl,r.!4,t11.1it.y,EM sionl-
J -nt,,L _vj, te
The Port of Moses Lake has invested $1.04M in this project that includes site preparation and
construction of our tax! -lane. However, as we progress to the completion phase, we are seeking
community support in the amount of $500,000 for the installation of basic utilities. The Southwest
Hangar Utility Extension project will support several private and public entities in need of their own
facility*
We appreciate the opportunity to participate in this funding cycle. Please contact me if further
information is needed.
Respectfully submitted,
Don Kersey, Executive Di .. r
dg,DggElofmoseslake.com
Y '
509-762-5363
10
Enclosure,s,
SIP Application
Letters of Support
Project Maps
Grant County Strategic Infrastructure Program Application
Eligibility Requirements
The Strategic Infrastructure Program fund is available because of a state program authorized by the legislature
in 1997 (RCW 82.14.370). The legislature has established eligibility requirements for using these funds:
FIRST: Funds can only be used to finance "public facilities" such as "bridges, roads, domestic and
industrial water facilities, sanitary sewer facilities, earth stabilization, storm sewer facilities,
railroads, electrical facilities, natural gas facilities, research., testing, training,and incubation
facilities in innovation partnership zones designated under RCW 43.330.270, buildings,
structures, telecommunications infrastructure, transportation infrastructure, or commercial
infrastructure, and port facilities in the state of Washington." RCW 82,14.370(3) {c)(i).
SECOND.: The public facility must also serve "economic development purposes," which is defined as
"those purposes which facilitate the creation or retention of businesses and jobs in a county."
RCW 82.14.370(3)(a), (c)(*Ii)o I
THIRD: Finally, to be eligible for funding: "The public facility must be listed as an 'Item in the officially
adopted county overall economic development plan, or the economic development section of
the county's comprehensive plan, or the comprehensive plan of a city or town located within
the county for those counties planning under RCW 36.70A.040. For those counties that do not
have an adopted overall economic development plan and do not plan under the growth
management act, the public facility must be listed in the county's capital facilities plan or the
capital facilities plan of a city or town located within the county." RCW 82-14-370(3)(a).
Eligibility Checklist:
1. Yes No 0 This request is for a "public facility as described above.
2. Yes No EJ The public facility facilitates the creation or retention of businesses and jobs in Grant
County.
3. Z Yes No 0 The public facility is listed as an item in the economic development section of Grant
County's comprehensive plan OR [] Yes No 0 the public facility is listed as an Item in the economic
develo'pruient section ofthe com'prehensiv"'e plan of a City or Town located within Grant County.
If the answer to all three questions is yes please proceed with the application process.
If the answer to any of the three questions is no, the project is not eligible to receive funding from this program.
Grant County Strategic Infrastructure Program Application
Economic Impact of the Project
1. What economic goals and/or objectives (identified in the comprehensive plan) does this project help the
community achieve?
a. Grant County Comprehensive Plan
i. Section 4.2.3 of the Land Use Element briefly describes the role of airports as
essential public facilities and the special consideration necessary for land us
planning near airports. This section also further highlights and incorporates the
agencies Airport Master Plan and consultation to reflect future airport plans and
operations.
N. Section 4.4.2.4 Urban Land Use Designations highlight the zoning designation
"Port of Moses Lake" as areas owned and operated by the Port of Moses Lake.
This area is designated for the Port's various aviation and commercial
businesses. 'The Port maintains master planned land uses within this land use
designation.
iii. Section 5 Economic Development Element recognizes the Grant County
International Airport, owned and operated by the Port of Moses Lake, as a
strength to Grant County's economic development, specifically providing that
"the airport plays an important role in the regional economy by providing easy
access to the rest of the country as well as brining aviation training related
jobs."
iv. Section 5 of the Economic Development Element further recognizes several
manufacturing, forestry and other like services that the Port of Moses Lake
supports through its infrastructure and provides an continued global economic
opportunities.
v. When looking at the weaknesses within the Grant County landscape, the
requested funding would help create additional opportunities to bring back air
service to our market by having additional corporate hangar space, diversify the
revenue at the Port for continued investment into infrastructure, promote uses
not compatible elsewhere, and uses generally supported within the Airport
Master Plan.
vi. Per RCW 36.70.547 and 36.70A.510, consultation with airport owners,
managers, private airport operators, general aviation pilots, ports, and the
Aviation Division of WSDOT is required for comprehensive planning. Both the
Grant County and City of Moses Lake comprehensive plans incorporate and give
reference to the Port of Moses Lake Airport Master Plan as being the controlling
mechanism within the Port of Moses Lake zoning designation.
b. GLIA Port of Moses Lake Airport Master Plan
i. Exhibit 4J Development Areas, Constraints and Property Acquisition shows the
SW Hangar Site as area that is suitable for Aviation Development.
ii. Page 238 also provides that "The options for hangar development follow a
philosophy of planning similar activity levels in the same location in order to
provide a safer movement environment. As such, any future general aviation
facilities, such as T -hangars, should be planned in the same general location as
the existing T -hangars.
Please submit original, signed application with seven copies ( ht copies total) to:
Grant County EDC, 6594 Patton Blvd NE; Moses Loke, WA 98837; Phone: 509-764-6579
Please include attachments and supplemental materials in each of the copies
Grant County Strategic Infrastructure Program Application
Grant County Strategic Infrastructure Program Application
Cover Sheet
Date: April 3, 2023 Grant County SIP Number:
— -------__ -------------------------- - .... --------- --------
Applicant: Port of Moses Lake Address:7810 Andrews St. NE
Contact Name: Don Kersey City: Moses Lake
Title: Executive Director State: Washington Zip: 98837
Signature of person authorizing submittal: Phone: 509-762-5363
Position of person authorizing submittal: Fax:
Executive Director Email: dkersey@portofmoseslake.com
Project Title: Southwest Hangar Utility Extension
Population of the community: 3,939 Total area population served by the project: 102,123
The County is required to report to the State Auditors Office the estimated number of businesse's and jobs
that will be created and/or retained by this project. Retained businesses and jobs means businesses and jobs
that will be lost if not for the completion of the project.
How many businesses will be created and/or retained by this project? Within 3 years we estimate 2 new
customers.
How many jobs will be created and/or retained by this project? There are an estimated 15 job created.
What comprehensive plan lists this project as an item in its economic development section?
Grant County Comprehensive Plan Comprehensive plan of the city or town of Moses Lake North
Type of Public Facility: (check all that apply)
13 Bridge 0 Road 13 Domestic Water Facility Industrial Water Facility
,0 Sanitary Sewer Facility 13 Earth Stabilization Storm Sewer Facilities 0 Railroads
13 Electrical Facilities 0 Natural Gas Facilities 0 Buildings 0 Structures
13 Telecommunications infrastructure 13 Transportation Infrastructure 13 Port Facilities
0 Commercial Infrastructure
kk
Funding is needed for: (check all that apply)
capital facilities costs including acquisition, construction, rehabilitation, alteration,, expansion, or
improvements of public facilities 13 project specific environmental costs
0 costs of site plan and analysis 13 development and improvement for the public facilities
0 project design, including feasibility and marketing studies and plans, and debt revenue impact analysis
0 land use, and permitting costs ....
Total project cost:$ *Unknown Total SIP request to date for project: $
Amount raised to -date: $ 1.04M Current SIP Loan Request: $ 0
Current SIP Grant Request* $ 500j,000
0
Total cost of all four (4) phases ois unestimated at Previous SIP Loon Request: $ 47,270-00
this time. Previous SIP Grant Request,,, $100,.000.00
Is this a phased in Project? Yes Z No 13
If yes, how many phases? There are a total of four (4) phases.
During how many years? Four (4) to five (5) Anticipated
Project is currently in phase: "Stage 3" of Phase I
Please complete this form on your computer using Microsoft Word.
Please submit original, signed application with seven copies (fight. cogies total) to:
Grant County EDC,, 6594 Patton Blvd. NE; Moses Lake, WA 98837; Phone: 509-764-6579
Please include attachments and supplemental materials in each of the copies
Grant County Strategic Infrastructure Program Application
iii. Page 255 also describes Hangars general use and needs at the GCIA and
p Ides that "the plan called for locating any new general aviation hangars on
provides
the west end of the Airport.... and generally goes on to discuss details, as
illustrated within the project Technical Memorandum and conceptual and
schematic design drawings.
iv. Page 260 further describes this area as being located within the Aviation
Development (AD) subzoning designation and provides a list of
acceptable/approved uses.
v.- Page 272,, depicting the Capital Improvement Program (CiP) lists tho beginning
stages of the project as an intermediate term program (6-10 years) which began
in 2020,
c. City of Moses Lake Comprehensive Plan
L Within the Vision Statement of the City of Moses Lake, the following goals
support the project: Foster economic innovation and opportunity.
ii. Within the Land Use section the Port of Moses Lake is listed within the industrial
zoning classification as its own zoning designation. The Purpose identifies that
"These properties are owned by the Grant County Port District #10 (Port of
Moses Lake) and developed according to the Grant County Airport Master Plan.
The Principal uses section identifies that " The Master Plan emphasizes the
development of aviation related industries, or industries compatible with the
airport operation."
iii. Outside of those references, the City of Moses Lake largely did not include a
Economic Development section within the new comprehensive plan,
2. How will this project foster economic growth, development, and address future economic needs?
Economic growth and development has been stagnant since COVID19 in 2020. Several private and
public entities in need of their own facility have approached the Port, including but not limited
to:
Local mosquito district
• Life Flight, which operates air ambulance services for Grant County
Maintenance, Repair and Overhaul (MRI) business
• Agriculture support company
Renewable energy companies
Aerospace companies
Establishing these businesses at the Port would result in additional economic development and
lead to career and job growth. Also, Life Flight (an air ambulance service) currently operates
their business from two separate facilities — the company would like to bring both operations to
the Port, which can provide a range of services that cannot be provided at their other facilities.
Having Life Flight stationed at the Port would decrease response times to their service area of
all Central Washington and could ultimately save lives. The expected outcome of this project
would be attracting and expanding businesses in the region while competing with locations
outside of the state of Washington for these same companies.
Please submit original, signed application with seven copies (eight copies total) to:
Grant County EDC, 6594 Patton Blvd. NE; Moses Lake, WA 98837- Phone: 509-764-6579
Please include attachments and supplemental moterials in each of the copies
Grant County Strategic Infrastructure Program Application
Companies seeking to locate to the Port will be a catalyst for other opportunities and create
new industrial hubs. The Port of Moses Lake is in a pivotable location to potentially become a
hydrogen hub, and this infrastructure will be critical to those opportunities. This additional
infrastructure will bring development opportunities to the rural communities in Central
Washington. The region is well-positioned to become an energy hub for small modular reactors,
hydrogen and renewable energy storage. However, the Port's ability to attract companies is
directly tied to available infrastructure.
3. How will this project improve local infrastructure capacity?
Currently the Airport only has eighteen (18) T -Hangars and eight (8) box hangars. The T -Hangars provide
storage for Aircraft Design Group (ADG) I aircraft, while the existing box hangars (old alert hangars, 70' x
701, 65' door width) provide storage for smaller Group 11 aircraft. These facilities are full and there is an
existing waiting list for additional hangars. Existing Box and T -Hangar demand includes facilities for ADG
I up through ADG III aircraft. In addition to needing more aircraft storage, the existing T -hangars and
Box Hangars are 1970 and 1950 vintage, and are in need of replacement. The proposed Southwest
Hangar Facility anticipates the development of a future complex of taxillanes and varying hangar sizes to
support ADG I to ADG III aircraft. These new hangars would replace the existing T -Hangars as well as
provide increased storage "capacity. The area is located west of the terminal ramp and Taxiway Bravo,
and is designated as an Aviation Development (AD) area as indicated on the Grant County International
Airport Land Use Drawing (ALP Sheet 22). A conceptual layout of the proposed site was developed as
part of a master planning effort conducted in 2019.
4. Will the project result in training or other opportunities for the local workforce? E Yes
If yes, please describe: Lifeflight desired to be the first tenant within the Phase 1 development area of
the project. The facility will include a heliport and provide for approximately 15 employees
immediately. Additional development of the project would provide for similar opportunities to
businesses and individuals with similar employment opportunities. Additionally, keeping planes coming
to this airport will provide ancillary local workforce opportunities for other tenants at the airport who
provide services such as aviation fuel supply and maintenance.
S. Will the project build and/or strengthen strategic alliances or partnerships? M Yes
The Port's current utility infrastructure has been at capacity for several years and this impedes
the Port's ability to attract new and emerging companies in our growing community. The Port
currently has a shortfall of $750.,000 to complete an infrastructure expansion project which
would put the Port is in a great position to attract several new companies to the region thanks
to incentive's from the Inflation Reduction Act (IRA). However, companies looking to locate in
Moses Lake, including renewable energy companies, are apprehensive due to the lack of basic
infrastructure and expect the Port to provide this utility. The Port doesn't have the
infrastructure built to the capacity needs of what new industries are seeking to locate here.
Attracting and retaining companies to expand and bring economic vitality to the region is our
mantra and this project would fulfill that. For the Port, this infrastructure investment is a big ask
that would yield longevous careers and the return on investment will be tremendous for the
Moses Lake community.
Please submit original, signed application with seven copies (eight copies total) to:
Grant County EDC, 6594 Patton Blvd NE; Moses Lake, WA 98837; Phone: 509-764-6579
Please include attachments and supplemental materials in each of the copies
Grant County Strategic Infrastructure Program Application
6. How many full-time,, permanent jobs will be created and/or retained as a direct result of this project?
a) Retained? Current onsite employees are 8
b) Created in 1-3 years? 15 fu litime jobs
c) Additional created in 3-5 years? Estimate undertermined due to the number of phases.
d) Wage rates for jobs created and/or retained?
7. What is the size of the population that will benefit from this project? 102..123
8. What quantifiable outcomes are you going to track to measure the success of this project?
L Job Creation —The primary mission of the Port of Moses Lake is to promote economic
development through job creation and retention. Job creation is not a means to an end, and
requires continued investment into assets that Will retain employers and employees in the local
economy.
ii. Revenue Support —The GLIA Airport Master Plan provides that revenue support activities help to:
a. Minimize 'incompatible uses adjacent to the airfield and provide;
b. Revenue support to the GLIA and;
c. Provides for opportunities for ancillary services provided for use of the runways and
tenant services.
Please submit original, signed application with seven copies (fight_coples total) to:
Grant County EDC, 6.594 Patton Blvd. NE; Moses Lake, WA 98837; Phone: 509-764-6579
Please include attachments and supplemental materials in each of the copies
.Oft - -
Gront County Strategic Infrastructure Program Application
1, When did or will you start work on the project?
The project began in 2014 during the Airport Master Plan update. From there, ongoing discussion with
the FAA and Port staff provided for preliminary review of land uses within the SW hangar site and other
alternative locations. Through that additional analysis., it was confirmed that the ideal location for the
project is in its present location. In 2020, the project had a technical memorandum prepared outlining
the project components. Initial project for grading of Phase I and It areas occurred in 2021 with
Taxilane development of Phase I area occurring in 2022. Ongoing development of the utilities within the
development began in 2022, providing a schematic design level for utilities infrastructure.
2. How many months will the work on this project take to complete? This phase? Six (6) months
It is currently estimated that the entire project development will take up to 60 months to complete.
This phase of the project is estimated to take 6 months to develop and up to 6 months for construction
activities, though the initial schedule aims to beat those estimates.
3. Please describe what steps are necessary to begin this project or this phase if you are proposing a
multi -phase project: (Please be specific)
L Design Activities: Complete design detail of water, sewer and storm facilities to serve the entire
project.
li, Perthit Activities: Complete environmental and grading permits as required. Environmental
permitting is assumed to be minimal, if required, based on the .NEPA categorical exemption
previously received.
i i L Bid Services: Complete bid set plans and specifications following a public works process.
iv. Pre -Construction Requirements : Contractor to meet contractual obligations & Pre -Construction
i
requirements.
v. Construction Phase: Contractor to build
vi. Post Construction/Acceptance Phase'. Close out., punch list, and contractual obligations.
Beginning of warranty period.
4, Summarize efforts taken to date in. terms of project funding:
a) Amount and source of funds? Federal funding has been sought however, itis currently
unavailable.
b) Matching funds? No additional matching funds available
0 if conditions are attached to any of these funds, please describe. N/A
So What engineering reports and feasibility studies have prepared?
a) When? June, 2020
b) With what recommendations? Century West Engineering, Southwest Hangar Development Area
Technical Memorandum
iM Recommendations: Design Recommendations & Criteria basis of design, Elevation
-
restrict -ion requirements, etc.
While not directly related to this project site, the Maul Foster Alongi, Port of Moses
Lake Westside Employment Center, Economic Feasibility Study, has been informally
adopted to include the SW Hangar site for decision making purposes.
Please submit original, signed applicotion with seven copies (gight.cogies total) to,, -
Grant County EDC, 6594 Patton Blvd NE; Moses Lake, WA 98837; Phone: 509-764-6579
Please include attachments and supplemental materials in each of the copies
Grant County Strategic Infrastructure Program Application
1. When: December 2018
2. Recommendations : Economic feasibility and marketability of WEC areas allows the Port of
Moses Lake to continue serving the growing market for the aviation and aerospece sector.
iii. SEPA was completed for the project under SEPA Register #202105085 and received a
DNS/Adopt, DCE.
1. When: August 2021
2. Recommendations: Requirements for Hazardous Waste &Toxics Reductions Program
for demolition activities., Water Quality Program requirements mitigation per the SEPA
checklist.
6, What permits are necessary for the project? (Please list with approval dates)
i. Utility Connection/ Use: PoML Private /City of Moses Lake
ii, Grading Permit: Grant County
iii. Building Permit: As defined by agency of jurisdiction.
iv. Construction Stormwater General Permit (CSWGP)
i.Stormwater Pollution Prevention Plan (SWPPP)
2.Temporary Erosion & Sediment Control Plan (TESL)
v. All Permit required would be submitted per design of the facilities for approval to the agency,
likely prior to or during the bid services stage of development.
7, Are there other factors significant to this project that we should be aware of? No
a) Emergency declarations.?
b) Regulatory compliance issues?
c) inability to secure alternate funds?
d) Other?
8, If your project receives a commitment for an SIP grant or loan, when will you need the funds?
As soon as they are available.
9. Identify funds (General Fund, Utility Fund, Property taxes, etc,,) that are eligible to repay a SIP loan,
General Fund
10. In the context of the local government's overall annual budget, explain the need for SIP assistance. It
the applicant has reserve funds or budget reserves, please explain why these funds are not available
for the project. There are no "reserve dollars," if funding the project is declined it will be placed onhold
until fundm'g becomes available and are approved forcing the Life Flight hangar into an unknown future.
Ig
Please submit original, signed application with seven copies (!2* htcogies total) to:
Grant County EDC,, 6594 Patton Blvd. NE; Moses Lake, WA 98837; Phone: 509-764-6579
Please include attachments and supplemental materials in each of the copies
Grant County Strategic Infrastructure Program Application
Local and Regional Support & Investment for the Project
1. Are Cities,, Port Districts,, the County, Schools, or other entities involved in funding the project? No
2. Are there any regional, State, or Federal funds being used for the project? No
3. What is the private sector investment in the project? LifeFlight (an air ambulance service) currently
operates their business from two(2) separate facilities — the company would like to bring both operations to the
Port, which can provide a range of services that cannot be provided at their other facilities. Proving LifeFfight with
a centralized station at the Port would decrease response times to their service area of all Central Washington and
would ultimately save lives. LifeFfight has committed to occupancy once the first -phase is complete.
4. What is the local investment in the project from clubs and other organizations (non-government)?
None
5. Is there other support or investment in the project not covered above? No
Please submit original., signed application with seven copies (gight coo
es ta
P1. _t. 11 to:
Grant County EDC, 6594 Patton Blvd. NE; Moses Lake., WA 98837; Phone: 509-764-6579
Please include attachments and supplemental materials in each of the copies
Grant County Strategic Infrastructure Progrom Application
Attachments
1. Economic Development Section of the Comprehensive Plan listing the public facility
2. Project Budget: Please attach a copy of your complete project budget. Attach or include your specific
budget for use of SIP funds. Please list all identified revenue sources and the dollar amounts and list
whether they are committed or requested.
3. Property Plat, Building Plans: Please attach copies of a property plat with project location clearly shown
.on the plat. Please attach engineer's drawings or at least a good drawing of the project for committee
review.
4. Letters of support: If applicable please include any letters of support for this project form partners or
others entities in the community.
Please submit original, signed application with seven copies (gi-ght c6gies total) to:
Grant County EDC,, 6594 Patton Blvd NE; Moses Lake., WA 98837; Phone: 509-764-6579
Please include attachments and supplemental materials in each of the copies
February 27, 2023
The Honorable Patty Murray
United States Senate
154 Russell Senate Office Building
Washington, D.C. 20510
The Honorable Dan Newhouse
United States House of Representatives
504 Cannon House Office Building
Washington, DC 20515
The Honorable Maria Cantwell
United States Senate
511 Hart Senate Office Building
Washington, D.C. 20510
Dear Senators Murray and Cantwell and Representative Newhouse:
I am writing on behalf of Life Flight Network to support the FY24 appropriations request
submitted by the Port of Moses Lake. The Port is seeking federal funds for utility infrastructure,
to include but not limited to water, sewer, and power to support the Port's economic
development mission, which "includes supporting the expansion plans of companies currently
located in Moses Lake and attracting new businesses to the region. All this will support the
Pott's long-standing efforts to create good -paying jobs in rural Washington.
4-�
The Port of Moses Lake has a long history of generating economic activity M' the region, having
supported the growth of several 'industries, including aerospace, renewable energy,
manufacturing and advanced technology. With respect to the aerospace industry, the Port is m* a
great position to attract several new companies to the region thanks to federal incentives
provided through Inflation Reduction Act (IRA). While prospective companies and private
developers have indicated their intent to construct their own facilities, the expectation is that
basic utility infrastructure (including water, sewer, and power) should be provided by the Port.
This means the Port's ability to attract additional business activity to the region and create jobs is
contingent upon their ability to build upon existing infrastructure investment already made by the
Porto
While the Port has invested millions of dollars to build the infrastructure needed to support new
0 10, 'A a
business growth, additional infrastructure is needed. Unfortunately, the Port is limitect m how
quickly it can make these investments given its limited annual operating budget. In other words,
this request for federal funding will allow the port to support new business growth and job
creation on an expedited timeline, while also mitigating the risk of losing business opportunities
caused by a delay M' making the necessary infrastructure investments.
I hope you will support this important funding request.
Sincerely,
Jacob Riedel I Customer Service Manager
Mobile 509-630-4136
Jr1.ede1@,1ifef1.ight.,o,M � www. Life Flig htpM
14
Automated Ag
February 23, 2023
Grant County Strategic Infrastructure Program (SIP)
c/o Grant County Economic Development Council
6594 Patton Blvd. NE
Moses Lake, WA. 98837
Dear Council Members:
I am writing on behalf of Automated Ag and Two J's Aviation, to support the FY24
appropriations request submitted by the Port of Moses fake, The Port is seeking federal funds
for utility infrastructure, to include but not limited to water, sewer, and power to support the
Port's economic development mission, which includes supporting the expansion plans of
companies currently located in Moses Lake and attracting new businesses to the region. All this
will support the Port's long-standing ettbrts to create good -paying Jobs in rural Washington.
The Port of Moses Lake has a long history of generating economic activity in the region, having
supported the growth of several industries, including aerospace, renewable energy,
manufacturing and advanced technology. With respect to the aerospace industry, the Port is in a
great position to attract several new companies to the region thanks to federal -incentives
provided through Inflation Reduction Act (IIIA). While prospective companies and private
developers have indicated their intent to construct their own facilities, the expectation is that
basic utility infrastructure (including water, sewer, and power) should be provided by the Port.
This means the Port's ability to attract additional business activity to the region and create jobs is
contingent upon `their ability to build upon existing 'infrastructure investment already made by the
Port.
While the Port has invested millions of dollars to build the infrastructure needed to support new
business growth additional infrastructure is needed. Unfortunately, the Port is limited in how
quickly it can make these investments given its limited annual operating budget. In other words,
this request for federal funding will allow the port to support new business growth and job
creation on an expedited timeline, while also mitigating the risk of losing business opportunities
caused by a delay in making the necessary infrastructure investments.
I hope you will support this 'important funding request.
Sincerely,
Kelly & John "B" Dagorret
s
YP
,
h
-. 1 •. 4
.,,>r.. .,.���
va,•wo
F(
t� Y
u
n
{��
f 1t
��f
••J ; l 3 F) i i F i i i i F L.
�
y jj
♦'
rvih
-f t
> t.... ,.
"sz t ni x
i N. 1.
.. Y r h�. 'Rr �1• `1, may. 'w,
k5 •'S
x
r `
,
t �
Y fv A
,
s A..
`
r?a ai y. Co
, yy
x :
,S ,e e
.• to ��\' y w ,M
�.a• vtyry
a, f y. � r 3�� or A/CI ! t 1AOG
P
M
j
t
T s
\
m•• \ r i /i
W 99t R
p
AAAA dlA
p ay x
& Y
1I '�v f .. '� \ ��� lY SV i ft�VtfHrw Y+:.[L�li�
ft* U
y�� .t �: � V .. \`W -r 1
;
�.i '�-.,�`•`*i�! �� {mat"!
,i;`\I 5'
.,�. 11111W_
w
r
9 C 4
t Note,.r
U tx
�F+rl 74
k •
7-
' .,Y :. ,:\rt •s �'• 4 -- x•.a,+, . vrt i, a+w.we^» : e as W a'.) x ,a.Nn \* x' wr v \
4 :• 2
\4' t 1t< Y
" .k > .c. �.. � ,n L t'8.. f ?, ,. •r,.+� ...\t. P 'F t v\
i
�,t....vr
...:; .>:.. .,, +<\ ..:: .... .. .. .:..... ;' .. i;A•f .',r\ ua. <, S.., 1. .., .. > ,, ,. .n ^W, .:';a.k nea w^ '. Mi` h', a,.::i `. r:':
>.�, 4s�h'�r r.x«.w.« • .aw«,•.�« �� .:� t.: \ �.\'za,, � fi: �'' M ` n 3 :: \^`'� \" .\ . vot ' `�\ e v:
..,. .,. .,. .P e... .. '. .\ . \ .,., . ,.. uF 1 A. r. rx'at. .r; r. ,,, a SA` .Y.?8 U:•„ \, a i" ,,.
. .: : :... >- .f: -a s ..Ti .,,Yr ,, $_ )�,. .,.<, ., , .k ... \ .-.: .: \ ':s 1';. y,.-.;1v.^a-, .x:,. wv .r h... ,\e .. n. a•v'�F<
.. a,. .i.
.... .... >: ,� ,W . R.. °p1 , 7 .: ,,,.. , n \5': ... ,. ,t, :.:.; :, "L4 ...;, t .. 2. .r •. ,
4�.1h`
<,�` ,:.,..,, :, > .y '1 fix,, �,�. �• ;�a�'r�:' .,n. :,.. , ..>..,, r�,..\'„a\ {g,?aNr
..9 ;.,,.
e.i ,. r ..: �.:,.. .. t..,. �•� +, � t . : •: .. ?e ,F. as � ��>¢. s a.Z't `Uck'\?. , t ♦ ;:. ,..., `.',.x r t e2 -aa �� m \ \ �;
..sx ..� 3- '+:r�>',\,'�o>a F,>, .,`�, �����t4 '�\. ,'V„ ... „,n fyA•. '` :.a `� >. :. \. ,v '.ri`..r>>°e . „�n;�'w 0th , r\'o 7'.�
„ s „v -i. ��,.:., .o�a.P�. r ,n(<�< ,,.: �. . �r;F•,v” `�ny,�,., �.1°�t. �' a " •, \Y`a'> i, ; t n., ':.t w sA� y r a �t� a`iir7
'rx'" �• ,f ''�;,. .��'s,�`n. ;,. _. '.- ., ,. ,.. �i?A?X . fi. :t 'c \ :,t „ 5 v3a.+: t.. c M, 1 r� '`� �
{.t� Ly �< � !'' r a: is 1 k„ \$` �x4 � b c Wa o •.
� s A:•:ei ;2.s ;rt" }e �' :, ;er'`\ � � � Cs v nt�� 4
..,ry ,.t: ';:: \! '\' ,�\#r. \.. .fit t,..._ ..,,r:, :Y '..; \ t >,-'(?."' t\t•.,
.X.
An
h \
, ... 1. L rr.. .. `� ... .. , ...
t
i
t
f.
t-
f sr
r<
. \'r., „ .., r. .-'�:. "{.'_.`'A .. :?\ ton "-- :, '. . r• ^.
t a.P +R �IpY
n t x
r
w R 2 CY>
F i its
y
\� 5
V x
J 1 ! D a
S C 1 f
f .{
! P
P a
P \ \
y 1
t
b
\ +LA t
srf U
i
\ 1
x
Y'
x CY . rr
<
t
Y
a
tf, ,
x y
1�
N !
X
S c`
\
zf C
c
w
f
«
t
A �
1 ,C
w
b
t t
t
J s>,
A tJ
3 8
e, z
d
i Y
c
r<•, y'� ra 7'
'a t
Y
1
• 2 a Z Y,.n
A
a
A \i
Y
i-
\L
a`P \
4�Y
wt .a
.rv�x '!m"�`^?'�"x•^ar�`:"..�!° :h`?�.'�`Yw1.Y`�!Yt... ta'aV)tlle4�ati�4t�5VA�.,ks`a?'i.�;ti;u,�'�ne x .:. $""�,' 'tay. iF�,,. _:lR, ._.. ._..,
GRANT n+ N -71Y N T R:NAT NAL R.P -P,,
,
h
-. 1 •. 4
.,,>r.. .,.���
va,•wo
F(
t� Y
u
H. Q 2
+ a h,
{��
f 1t
��f
g v
X w
1
y jj
♦'
rvih
-f t
i i
s
1Y R
7
"sz t ni x
i N. 1.
.. Y r h�. 'Rr �1• `1, may. 'w,
k5 •'S
x
r `
,i
rtl �
a,
�'
,
n ,wt
\g.'.
r �r
Y fv A
,
s A..
C a
�x
i�1� �+�,
t ,k
u,
w) a• x a "� ' �s° ..
az
r?a ai y. Co
, yy
x :
,S ,e e
.• to ��\' y w ,M
�.a• vtyry
a, f y. � r 3�� or A/CI ! t 1AOG
A. f:
I k
•� t
S , 1
.x u<
f A ` T -i
.'�,+ ,�•,�+�.. a:` ' �{{, [1'017
,\ 1'
i
} j F ,� A s
i E yy
.LAS _ � f .. 77 S-
:J'7'l LL M t
�l a
T s
\
m•• \ r i /i
W 99t R
p
!k.,t„ ,�
,) .\ ,ATO`. •� :y„�
p ay x
& Y
1I '�v f .. '� \ ��� lY SV i ft�VtfHrw Y+:.[L�li�
ft* U
y�� .t �: � V .. \`W -r 1
;
�.i '�-.,�`•`*i�! �� {mat"!
,i;`\I 5'
5„ `Fv i
iM'� m4
R, p
Pit
w
r
9 C 4
t Note,.r
U tx
�F+rl 74
k •
c+ � 1
k,A \
:_r fttti
T iS•
i
Y m
N
�l u
y L. �1. ,K
� Y ,r r �
�j�{
bV
eofaIHeee1+a
2
Grant County Strategic Infrastructure Program A l ica n
Cover Sheet
Date-, April 14,. 2023
Grant County SIP Number.
Applicant Grant County Public Hospital District #4 Address-, 127 2tid Ave SW
d/b/a,McKay Healthcare and Rehabilitation Center
Contact Name: Sam Cole City,* Soap Lake --- - --
Title: Administrator State, Zip: Washington, 98851
Signature of par sonau-
U
u, rizing submittal,
Phone* (509) 246-1111
Position of person authorizing submittal: Fax
ChiefOperat* P..
I.Lg.Onicer Email** samcole@mckayhealthcare.org
A, I
Project Title: Phase I - Architecture and Engineering Site Plan
Population of the community* 1,551 (U,S.C.B., 2020) Total area popu
lation served bv the r+ jecti.Grant Coun!y
,
The County 'is required to report to the State Auditors Office the estimated number of businesses L and jobs
J
that will be created and/or retained by this projea, Retained businesses and *obs Mea11
s bus*nesses,and jobs
n
that Will be lost if not for the completion of the project,
How .manybusine - sses will be created and/or retained by this project? _25 locally retained
Now many jobs will be created and/or, retained by this proiect"? , 45 at McKaYi - dozens more local
What comprehensive plan lists this project as an item in its econom I ic develop pm- section?
Grant County Com p.rehensive Plan U Comprehensive plan of the city or town of
Type of Public Facility: (check all that apply)
0 Bridge 0 Road 0 Domestic Water Facility 0 Industrial Water Facility
0
Sanitary Sewer Facility 0 Earth Stabi'lization es E3 Storm Sewer Facilities 0 Railroads
0 Electrical Facilities 0 Natural Gas Facilities X Buildings 0 Structures
0 Telecom m unicatilons Infrastructure El Tra'nsportation Infrastructure 0 Port Facilities
0 Commercialinfrastructure
Fund1nJ!L is needed for: (check all that apply)
0 capital facilities costs includi
ing acquisition, construction, rehabi'litation, alteration,expans'
ion, or
improvements of public facilities i ies 0 project specific env*
ironmental costs
0 costs of site plan and analysis nalysis 0 development and improve
ment for the public facilities
0 project des,ign, inCluding feasibility and marketing studies and plans, and debt revenue impact analysis
-0
lard .use and permitting costs
Total project cost:*$400
1000 Total SIP request to date for$0
project,
Amount raised to -date: $0 Current SIP Loan R
equest: $0
Current SIP Grant Ret#
ues L * $4001000
.q
S Previous I 'IP JoCin Request.* $0
Previous $IP Front Request.- $400
. . .. .... 000
is this a phased 'in Project? Yes X No 13
If Yes, how many phases? 3
During how many years? 10
ect is currentlyin phase;
. . .... LL'
Please, complete MIS form on your computer using Microsoft Word.
Please submit original, signed application with seven copies el ht cqpies total to* -
'rant County EDC -- ------- r \L
6594 Patton Blvd. NE; Moses Lake, WA 98837 Phone: 509-764-6579
1 t
Please include attachments and supplemental materials in each of the copies
Grant County Strategic Infrastructure Program Application
Eligibility Requirements
The Strategic Infrastructure Program fund is available because of a state program authorized by the legislature
in 1997 (RCW 82.14.370). The legislature has established eligibility requirements for using these funds:
FIRST: Funds can only be used to finance "public facilities" such as "bridges, roads, domestic and
industrial water facilities, sanitary sewer facilities, earth stabilization, storm sewer facilities,
railroads, electrical facilities, natural gas facilities, research, testing, training, and incubation
facilities in innovation partnership zones designated under RCW 43.330.270, buildings,
structures, telecommunications infrastructure, transportation infrastructure, or commercial
infrastructure, and port facilities in the state of Washington." RCW 82.14.370(3) (c)(i).
SECOND: The public facility must also serve "economic development purposes," which is defined as
"those purposes which facilitate the creation or retention of businesses and jobs in a county."
RCW 82.14.370(3)(a), (c)(ii).
THIRD: Finally, to be eligible for funding: "The public facility must be listed as an item in the officially
adopted county overall economic development plan, or the economic development section of
the county's comprehensive plan, or the comprehensive plan of a city or town located within
the county for those counties planning under RCW 36.70A.040. For those counties that do not
have an adopted overall economic development plan and do not plan under the growth
management act, the public facility must be .listed in the county's capital facilities plan or the
capital facilities plan of a city or town located within the county." RCW 82.14.370(3)(x).
Eligibility Checklist:
1. Yes X No ❑ This request is for a "public facility as described above.
2. Yes X No ❑ The public facility facilitates the creation or retention of businesses and jobs in Grant
County.
3. Yes X No ❑ The public facility is listed as an item in the economic development section of Grant
County's comprehensive plan OR Yes ❑ No X the public facility is listed as an item in the economic
development section of the comprehensive plan of a City or Town located within Grant County.
If the answer to all three questions is yes please proceed with the application process.
If the answer to any of the three questions is no, the project is not eligible to receive funding from this program.
3
Economic Impact of the Project
1. What economic goals and/or objectives (identified in the comprehensive plan) does this project help
the community achieve?
Grant County Public Hospital District #4 doing business as McKay Healthcare and Rehabilitation Center
(McKay) is a long-term care and skilled nursing facility in rural Soap Lake, Washington. McKay has a
strategic vision to support underserved and marginalized seniors in the region with the development of
a comprehensive senior living community. The project is broken into three phases over 10 years and
consists of (Phase 1A and B) a unit conversion and wing addition project; (Phase 2A) an assisted
living/memory care wing; (Phase 213) an initial independent and assisted living arrangements; (Phase 3A)
additional independent living and affordable housing project; and (Phase 313) senior living amenities like
dining services, community spaces, outpatient therapy, and a variety of specialty clinics. Once complete,
the senior living community will facilitate the continuum of care model on McKay's 22 -acre property,
bringing critical rural health infrastructure to Soap Lake and rural communities in Grant County.
McKay's senior living community project is included in "Appendix J" as an amendment to the Grant
County Comprehensive Plan. The proposed amendment was approved by the Grant County Planning
Commission in September 2022 and Board of County Commissioners on November 22, 2022. The new
appendix section "Appendix J — Strategic Infrastructure Program Eligible Projects" includes a list of
McKay's projects which support the directives in Goal 3.3.6 "Economic Development" of the Grant
County Comprehensive Plan, as well as Chapter 5 "Economic Development Element" in its entirety.
Following the completion of the ZBA feasibility and capital needs ass
retai es or arc iineerin s that are required for project construction.
First, ZBA identified a need for development of a site plan with sufficient design and engineering
analysis to meet the community's future needs and to comply with the City of Soap Lake's zoning code
for a planned development. (McKay Healthcare is currently a, grandfathered or non -conforming use
under the R-1 single family residence zoning code classification and that has to be addressed before any
development can take place). Second, ZBA identified a need to complete the pre -design work / concept
development work for the main facility through a facilitated stakeholder driven process to achieve
McKay Healthcare's goals with staff and community support. This work would include schematic level
drawings, structural feasibility analysis of interior modifications, cost estimating and concept
renderings. This process will set the stage for the final design and construction process.
Economic impacts of this project will be felt by the number of jobs directly maintained and those that
will be created through McKay's continuous operations and future expansion in capacity and services.
Currently, McKay employs 48 staff within several departments including nursing services, business
office, housekeeping, facilities, activities, social services, and administration. The organization is the
second largest employer in Soap Lake and is a well-established pillar in the community. In addition to
retaining existing staff, engineering and architecture planning will allow McKay to move forward onto
Phases 2 and 3 of its comprehensive Facility Master Plan, creating several indirect local jobs for
construction and/or the completed facility's operations, routine maintenance, repairs, and service.
Furthermore, the project aligns with President Biden's Build Back Better Plan nd will achieve the
nation's goal to invest in our elderly. The engineering a d architecture planning will support McKay's
efforts to continue providing essential long-term and skilled nursing care services to severely
underserved and rural aging and disabled populations in Grant County.
Please submit original, signed application with seven copies (eight copies total) to:
Grant County EDC, 6594 Patton Blvd. NE; Moses Lake, WA 98837; Phone: 509-764-6579
Please include attachments and supplemental materials in each of the copies
2. How will this project foster economic growth, development, and address future economic needs?
Beyond meeting urgent healthcare needs, the completed senior living community and rural health
infrastructure project will bring important economic growth to the region. Soap Lake, a small rural
community in Grant County is home to an estimated 1,551 residents; 26.8% of the population is 65 or
older, 11% are veterans, 66.3% are white, and 30.3% Hispanic. The region maintains a unique history
and geology and attracts visitors during the summer months for its healing waters, outdoor recreation,
and proximity to other tourist and wine destinations. Completion of McKay's Facility Master Plan
projects and the resulting dynamic senior living community will entice retirees, seniors, and their
families to move to the area for its affordable housing, wonderful weather, sense of community, small-
town amenities, and continuum of care services.
3. How will this project improve local infrastructure capacity? The engineering and architecture site
planning documents are an essential prerequisite for the bidding, permitting, and actual construction of
McKay's unit modernization renovation and/or expansion and a new wing. Engineering/site plan
documents will ensure the project has a comprehensive project plan that takes into consideration risk,
quality, communication, finance, and resources, among other things. An approved site plan will also
signify the project's readiness to receive other grant funding. Architectural renderings will illustrate
what the renovation or expansion will look like, supporting McKay's efforts to effectively communicate
the project vision and goals to community and funding partners.
In Grant County, 14% of the population is 65 or older and there are only 239 nursing home beds — 256
less than the 2024 need projected by Washington State Department of Health. This next stage of the
project is designed to improve infrastructure for the aging population residing in Grant County. Updated
and expanded facilities, including reconfigured space and additional wings and housing options, will
dramatically increase the number of private rooms available and create a balanced physical
environment for residents, further reducing the chances for illness and other virus outbreaks. As
McKay's senior living community expands to facilitate a continuum of care model, residents here will be
able to transition seamlessly to other types of residences, have timely access to care appropriate for
their specific health conditions, improving their overall quality of life.
Increased private rooms and private pay residents will also positively influence McKay's revenue,
ensuring organizational financial sustainability and peace of mind for locals currently or prospectively
seeking medical and/or senior housing close to home and all that is familiar.
4. Will the project result in training or other opportunities for the local workforce? X Yes ❑ No
If yes, please describe: Completion of engineering and architectural planning documents are the basis
for McKay"s long-term vision to expand low-income senior living infrastructure and capacity. The
proposed unit modernization and new construction projects will support employment growth locally
and county -wide that will result in a distinct and immediate need for additional trained, certified, and
licensed personnel including nurses, certified nurse assistances, and certified medication aides. Later
phases of the larger project, including renovation of current buildings and construction of new buildings
will further support local businesses and workforce.
5. Will the project build and/or strengthen strategic alliances or partnerships? X Yes ❑ No
If yes, please describe the alliance and/or partnerships: (agencies, volunteers, etc.): McKay currently
collaborates with two other agencies to provide its full spectrum of services: TeamHealth and
Please submit original, signed application with seven copies (eight copies total) to:
Grant County EDC, 6594 Patton Blvd. NE; Moses Lake, WA 98837; Phone: 509-764-6579
Please include attachments and supplemental materials in each of the copies
W
RehabVisions. TeamHealth is based in Spokane and provides McKay with a Medical Director who
oversees clinical operations through bi-weekly visits. A nurse practitioner provides telehealth visits bi-
weekly to each patient. McKay also contracts physical, speech, and occupational therapists from
RehabVisions for specialized resident care. Engineering and architecture planning is the critical next step
in McKay's long-term strategy to support these and other service providers in their efforts to provide
efficient and sustained care to residents. It will also strengthen existing strategic alliances established
between McKay leadership and leaders from other skilled nursing facilities, as they seek to find ways to
improve the quality and availability of services for aging populations, low-income senior housing
resources, and rural community health needs.
The engineering and architecture services will provide McKay with comprehensive documents that will
support the board and staff's efforts to build, leverage, and strengthen funding partnerships for the
next phases of the overall project. McKay has partnered with the Columbia Basin Foundation (CBF) to
assist with fundraising outreach and grant writing. Together, the two organizations have raised over $2
million in philanthropic and grant support toward Phase I of McKay's Facility Master Plan. These funding
relationships will be key in raising new dollars and support for the larger senior living community
project.
6. How many full-time, permanent jobs will be created and/or retained as a direct result of this project?
a) Retained? 48 at McKay; dozens in other local businesses as McKay continues to operate.
b) Created? in 1-3 years? Approximately 7-9 FTE including registered nurses and certified nursing
assistants at McKay following the addition of a wing and expanded services as part of Phases
1 and 2.
c) Additional created in 3-5 years? Approximately 10-12 FTE for McKay including licensed and
certified roles following the addition of multiple wings and expanded services as part of
Phases 2 and 3.
d) Wage rates for jobs created and/or retained? Licensed nursing positions can earn between $26
and $40 per hour depending on licensure, skill, and experience. Entry level and certified
positions range from minimum wage to $17 per hour. To attract top performers to an
updated and expanded facility, wage rates could increase by five to 10% over time.
7. What is the size of the population that will benefit from this project?
Grant County, Washington is home to 97,733 residents, of which 14% or 13,682 people are age 65 or
older. In addition, 8.9% or 8,698 people are under age 65 and living with a disability. In Soap Lake, a
community of 1,551, 27% of the population is 65 or older and the median age is 42.5. As these
individuals age or their health conditions worsen, they will look to long-term care and skilled nursing
facilities to meet their healthcare, residential, and social needs, particularly those in rural Grant County.
8. What quantifiable outcomes are you going to track to measure the success of this project?
Completion of the engineering and architecture planning documents is the next step in McKay's unit
modernization and senior living community capital improvement plan. Afully vetted and community
supported site plan and preliminary design documents will support staff, leaders, and partners secure
additional funding necessary for the project's final design and construction which is expected to have
the following anticipated outcomes:
1. An increase in long-term care, skilled nursing, assisted living, and memory care options for
residents in Grant County.
Please submit original, signed application with seven copies (eight copies total) to:
Grant County EDC, 6594 Patton Blvd. NE; Moses Lake, WA 98837; Phone: 509-764-6579
Please include attachments and supplemental materials in each of the copies
G
a. Measured by the number of beds, rooms, and types of services available at McKay.
2. An enhanced quality of life for residents at McKay.
a. Measured by pre- and post- construction surveys that gauge current resident
satisfaction with privacy, their physical environment, and their health and well-being
among other things.
b. Also measured by McKay's ability to effectively prevent and/or mitigate the spread of
infectious disease and virus outbreaks.
Progress will be tracked by McKay's Licensed Nursing Home Administrator (Administrator) and
evaluated by the Board of Directors on a quarterly basis during the grant period.
Please submit original, signed application with seven copies (eight copies total) to:
Grant County EDC, 6594 Patton Blvd. NE; Moses Lake, WA 98837; Phone: 509-764-6579
Please include attachments and supplemental materials in each of the copies
Project Readiness
1. When did or will you start work on the project?
The engineering and architecture planning is expected to be completed in 10 months. We will start as
soon as funding is secured.
2. How many months will the work on this project take to complete? This phase?
The engineering and architecture planning will take approximately 10 months to complete. This facet of
this project is included in Phase I of McKay's 10 -year, three-phase, Facility Master Plan, which is
expected to be complete by December 2023.
3. Please describe what steps are necessary to begin this project or this phase if you are proposing a
multi -phase project: (Please be specific)
To begin the engineering and architecture planning facet of this project, McKay needs to:
1) Select a qualified architecture and engineering firm based on submission of a Request for
Qualifications.
2) Negotiate a contract with the selected firm.
3) Award a contract to the selected firm.
4) Begin the engineering and architectural planning facet of this project.
After funding award, the portion of the scope of work relating to facilitated discussion of goals, community
outreach and buy -in on final design and site plan may proceed separately under a negotiated contract.
4. Summarize efforts taken to date in terms of project funding:
a) Amount and source of funds? McKay has not received other funding to date for this part of the
Phase I project. However, staff, leadership, and nonprofit partners have diligently and
successfully secured funding for other components of Phase I facility improvements and
modernization including over $2 million in grants and contributions to purchase an
emergency generator and bus, upgrade kitchen equipment, install entrance signage, improve
the residents' outdoor area, and launched a redesigned website and branding. If awarded
$400,000 for this project, it will allow McKay to complete a major project in the
development phase of a senior living community in the heart of Grant County. Grants and
donations from federal funding sources such as Grant County American Rescue Plan Funding,
foundations like the Paul Lauzier Foundation, and other major donors will assist in the
construction of the comprehensive project.
b) Matching funds? N/A
c) If conditions are attached to any of these funds, please describe N/A
5. What engineering reports and feasibility studies have prepared?
a) When? McKay worked with Critical Data Strategies, LLC to conduct a market feasibility study
and needs assessment for organization expansion. The study was completed in August 2021.
McKay also consulted with ZBA Architecture to complete at feasibility and capital needs
assessment. That study was completed in April 2023.
b) With what recommendations? Critical Data Strategics determined the four following options
are viable at for McKay to pursue: 1) expansion of current facility 2) adult family homes 3) low-
income senior housing and 4) memory care center in current McKay facility. The cost to develop
and operate the current facility was deemed the most viable option, followed by the
Please submit original, signed application with seven copies (eight copies total) to:
Grant County EDC, 6594 Patton Blvd. NE; Moses Lake, WA 98837; Phone: 509-764-6579
Please include attachments and supplemental materials in each of the copies
construction of additional low-income senior housing. The full feasibility study is available upon
request. The finding of the ZBA feasibility plan was to proceed with a robust design plan
detailed in their attached report, Appendix C.
6. What permits are necessary for the project? (Please list with approval dates). The goal of the site plan
is to obtain zoning approval for the planned development by December 30, 2023. This will permit
future development and project construction to procced. Other permits (e.g. building and grading
permits) may be required as a result of those efforts.
7. Are there other factors significant to this project that we should be aware of?
a) Emergency declarations? COVID-19 Global Pandemic
b) Regulatory compliance issues? N/A
c) Inability to secure alternate funds. N/A
d) Other? N/A
8. If your project receives a commitment for an SIP grant or loan, when will you need the funds? If
awarded, McKay would need $400,000 to begin the engineering and architecture planning by May
2023 and to complete the same by December 30, 2023. .
9. Identify funds (General Fund, Utility Fund, Property taxes, etc.) that are eligible to repay a SIP loan.
N/A
10. In the context of the local government's overall annual budget, explain the need for SIP assistance. It
the applicant has reserve funds or budget reserves, please explain why these funds are not available
for the project. Considering the Medicaid reimbursement rate is substantially below the costs of
providing 24-hour skilled nursing services, the high variability among Medicare, private pay, and other
income sources, McKay cannot effectively budget for capital facilities projects. In addition, due to the
COVID-19 pandemic, inflation, and other socioeconomic circumstances, the costs for professional
services such as architecture, engineering, and consulting have dramatically increased making it even
more necessary to secure support from other private and public philanthropic sources.
Please submit original, signed application with seven copies (eight copies total) to:
Grant County EDC, 6594 Patton Blvd. NE; Moses Lake, WA 98837; Phone: 509-764-6579
Please include attachments and supplemental materials in each of the copies
1J
Local and Regional Support & Investment for the Project
1. Are Cities, Port Districts, the County, Schools, or other entities involved in funding the project? No
2. Are there any regional, State, or Federal funds being used for the project? Not at this time, however,
McKay will con ' dditional American Rescue Plan Funding through Grant Count for
support of this comprehensive building project.
3. What is the private sector investment in the project? There are currently no private sector funds
secured for this specific project. McKay will consider approaching local or regional corporate
foundations for support.
4. What is the local investment in the project from clubs and other organizations (non-government)?
There are currently no other local investments in this project. However, McKay plans to solicit local and
regional private, public, and community nonprofit foundations and/or individual donors for grants and
contributions to fully fund this project.
5. Is there other support or investment in the project not covered above? No
Please submit original, signed application with seven copies (eight copies total) to:
Grant County EDC, 6594 Patton Blvd. NE; Moses Lake, WA 98837; Phone: 509-764-6579
Please include attachments and supplemental materials in each of the copies
10
Attachments
1
1. Economic Development Section of the Comprehensive Plan listing the public facility. See Appendix A,
Grant County Comprehensive Plan Amendment and Public Notice of Application.
2. Project Budget: Please attach a copy of your complete project budget. Attach or include your specific
budget for use of SIP funds. Please list all identified revenue sources and the dollar amounts and list
whether they are committed or requested. See Appendix B, Project Budget
3. Property Plat, Building Plans: Please attach copies of a property plat with project location clearly shown
on the plat. Please attach engineer's drawings or at least a good drawing of the project for committee
review. See Appendix C, McKay Property Plat and Building Plans.
4. Letters of support: If applicable please include any letters of support for this project from partners or
other entities in the community. See Appendix D.
Please submit original, signed application with seven copies (eight copies total) to:
Grant County EDC, 6594 Patton Blvd. NE; Moses Lake, WA 98837; Phone: 509-764-6579
Please include attachments and supplemental materials in each of the copies
Attachment 3:
Project Boundary Maps and Building Concept Plans
TerraScan MapSifter - Grant County Washington
https:Hgrantwa-mapsifter.publicaccessnow.com/defaultHTML5.aspx
1 of 1 4/13/237 11:57 AM
w
M
Ream The McKay foundation & Columbia Rasin Foundation -present....
MASTM RMNING: RfrURE MSION FOR HEALTHCARE CLOSE TO HOME
V00own kwo* PtAqf W4 Mom*
*wI aNvog. A uewwft w
III —W, vr4topw4wt 14Vi 9R0rso
------------
OUR FAMILY CARING FOR YOURS
N
----------- ------------------
LIZ
--------- --
She plan, to W 40th pt
fa
V00own kwo* PtAqf W4 Mom*
*wI aNvog. A uewwft w
III —W, vr4topw4wt 14Vi 9R0rso
------------
OUR FAMILY CARING FOR YOURS
N
-� i icy _ .
Attachment 2:
Project Budget from ZBA Architects
and Final Report
49
1. Architects and engineering services to include:
• Site plan - $300,000
• Main building design feasibility, and
consensus development. $100,000,
(All funds are requested)
Z B A
A R C N I 7 E C T U R E
April 7, 2023
McKay Healthcare
127 2"d Ave SW
PO Box 819
Soap Lake, WA 98851
Re: Capital Needs Assessment & Modernization Feasibility Study
To Superintendent and Commissioners:
421 W, RIVERSIDE
SUITE 860
SPOKANE, WA 99201
ZMARCH ITECTU ISE. COM
t, 509.456,8236
ZBA was hired to analyze the scope of a modernization project for the McKay Healthcare and Rehabilitation Facility, a public
facility located in Soap Lake, Washington. This analysis assumed a small new wing to increase the number of single -bed
rooms while maintaining the total number of licensed beds. The goal of the report was to provide a comparison of the'cost
of current capital needs (including modernization), versus the cost of comparable new construction.
The results of this study show that both options appear to have relatively the same overall cost. Given that information,
McKay has determined they want to proceed to renovate or modernize portions of the existing building, in addition to
building a new wing. Identifying which portions of the building to salvage will be determined based on the priorities for the
project, the design and licensing requirements, and which components of the existing building are most feasible for reuse.
Additionally, we identified the need to develop a site plan and zoning overlay for the entire 20 plus acre parcel. Since the
current zone does not allow the existing use, this process is required before any new construction could occur. Further,
McKay has identified some potential future uses that need to be considered within the context of the design for the site and
building.
Our recommendation for McKay Healthcare is to proceed with a robust design process, as outlined below:
1. Goal Setting + Consensus Building. A goal -setting process will help McKay build consensus around which areas of
the building to salvage. Goals for the project and future uses will be identified and prioritized in the context of the
overall campus plan. The process will include identifying and engaging with stakeholders. The outcomes from this
process can also be a helpful tool for future grant writing, fundraising and community outreach.
2. Schematic Design + Renderings. A Schematic Design study should be conducted, with an in-depth focus on
feasibility to identify areas of the existing building to salvage or modernize. This study will integrate information
from many sources, including the goal setting outcomes, licensing requirements, engineering, and cost estimating,
to ensure that the project is being most efficient with limited funds, while still achieving McKay's highest priority
goals. This study would set the stage for the design and construction process. This process would include
schematic level drawings, cost estimating and concept renderings.
3. Site Plan + Zoning Process. The goal setting and schematic design work will inform the Planned Development
District process required by the City of Soap Lake, prior to any future development on their 20 -acre site. This
process will subdivide the lot, identify future uses, provide the necessary zoning overlay, and will include civil
engineering for access and utilities.
Please find attached the final report, as well as a scope of work and fee estimate with the recommendations listed above. It
has been a privilege to work with McKay Healthcare. We look forward to continuing this journey to help you implement an
intentional design for your organization, residents, and community. Thank you for the opportunity.
Sincerely,
Sarah Brede, AIA
Associate Architect
2241
7r 421 W. RIVERSIDE
SUITE 860
A R C H I T E C T U R E SPOKANE, WA 99201
ZMARCHITI~CTURECOM
t. 509.456.8286
McKay Healthcare Pre -Design Services
Purpose: The purpose of the McKay Healthcare Pre -Design services is to clarify their goals and priorities; to build
consensus around which portions of the building to salvage; to identify which functions would be best located
within a new wing; and consider the context of the overall campus plan and future uses.
Timeframe: 4-6 months
Deliverables: Final deliverable will be a PDF book summarizing the study process. This will include an executive
summary of recommendations supported by the Guiding Principles developed by the team, schematic plans, cost
estimates, meeting minutes and interview notes.
Estimated Fee: Time and materials invoiced on an hourly basis, not to exceed $100,000.
Goal Setting +Consensus Building
• Identify team + prepare preliminary materials
• MEETING: Kick-off meeting
o Overview of project, priorities and values (summarize what we know)
o Identify what we need to know and key players to interview, stakeholders
o Brainstorm Organization/Resident/Community goals, develop project mission statement
Develop interview materials and interview key players previously identified
o Assumes 3-5 interviews/meetings
o Synthesize information into "guiding principals"
Using data collected, update the existing site program (see Schematic Design below) including:
o Functions, adjacencies, access points, connection opportunities
o Produce schematic diagram of site and of each building w/ key functions
MEETING: Test for consensus
o Present and Review progress and plans
o Select preferred option and identify next steps
Schematic Design + Renderings
• Develop Program list and Adjacency diagrams
o functions/spaces, approximate sizes, and preferred adjacencies
o create one for campus uses and one at the building level
• 2-3 potential schematic options (bubble diagrams) representing the above program information
• Analyze/compare potential cost implications for each option
• Perform relevant licensing and code research
• Engineering analysis as needed for feasibility
• MEETING: Programming + Schematic Options Review
• Refine leading option(s) with more detail (schematic floor plans)
• Include 3D massing as needed for decision-making
• Provide final concept renderings
:moor zea
rr AR CHITEC7t1RF
McKay Healthcare Site Plan + Zoning Process Services
Purpose: To complete the Planned Development District process as required by the City of Soap Lake, for the 20 -
acre parcel.
Timeframe: 6-12 months
Deliverables: Various levels of site planning, landscape design and engineering are required throughout the city
process. The intent for the final product will include road and utility engineering, sub -division of the lot, and
completed zoning overlay process.
Estimated Fee: $300,000
Site Planning + Zoning Process
Process and deliverables will be as required by the Soap Lake Municipal Code 17.67, Planned Development District,
which may include but is not limited to the following:
• Develop schematic level as -built drawings of existing site
• Relevant code research including setbacks, land use, required parking and separations for potential uses
• Revise site program based on team feedback (estimate 1-2 revisions)
• Project management (by architect)
• Attendance and/or presentation materials for public process meetings
• Landscape concept plans
• Survey
• Preliminary topo, property research, and title report findings
• Prepare Binding Site Plan
• Establish easements, parks, right-of-way dedications
• Electrical Engineering for Street lighting
• Civil Engineering Scope:
o SEPA
o Preliminary Application & Maps including: Utility Capacity Studies, Vehicle circulation planning,
Pedestrian circulation planning, Open space/hardscape calculations, Stormwater management plan
for the campus, Advising on site plan
o Final Application & Maps including: Stamped Plans for the main roads, utilities, stormwater
management, Attend meetings and hearings, Respond to comments, Cost estimating to set bonds,
Rough grading for future developed sites
Does not include engineered design of each building phase including individual utility connections,
stormwater management, fine grading, setting finished floor elevations, parking lots, Dry utility designs
(gas, power, comm, etc.)
Does not include 3rd party reporting such as Phase 1 ESA, Title Report, Geotechnical Engineering, floodplain
review, Traffic study, etc.
2241
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December, 15 2022
TABLE OF CONTENTS
PART 1 - EXECUTIVE SUMMARY
PART 2 - OVERVIEW
2.1 Purpose
2.2 Scope
2.3 General Description
PART 3 - GENERAL PHYSICAL CONDITION
3.1
Site
3.2
Architectural
3.3
Structural
3.4
HVAC Systems
3.5
Plumbing Systems
3.6
Electrical Systems
3.7
Fire Protection Systems
3.8
Vertical Circulation Systems
3.9
Accessibility
3.10
Health and Safety
3.11
Owner Proposed Improvements
PART 4 - OPINION OF PROBABLE COSTS
PART 5 - PHOTOGRAPHS
APPENDIX A — Opinion of Probable Costs, 20 -year Cost Estimate
APPENDIX B — Needs Assessment, Mechanical
APPENDIX C— Needs Assessment, Electrical
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
PART 1 - EXECUTIVE SUMMARY
This Capital Needs Assessment and Modernization Feasibility Study is for the McKay Healthcare & Rehab Center,
located at 127 2nd Ave SW, Soap Lake, Grant County, Washington. This report was commissioned by McKay
Health and prepared by ZBA Architecture PS and a team of Engineering Consultants from L&S Engineers.
The purpose of this report is to provide a baseline comparison between the modernization of the existing facility
with comparable costs of new construction. McKay Health desires to update the facility and is exploring the
feasibility of various options, including a phased approach with some new construction.
The McKay building was originally constructed in 1935, with a major renovation and addition completed in 1967.
The property appears to have been of quality design and construction, but due to the age of the building, a
capital improvement project is required to reduce maintenance expenses and provide a more updated
environment for staff and residents. As observed, the facility has been regularly and competently maintained
over the course of its life. Most issues identified in this report are common to buildings of this age. Some
investment will be required to update and extend the life of various systems and address other deficiencies
described in this report.
When looking at a major capital improvement project, any repair scope falling within Years 1-5 of a 20 -year
analysis should be incorporated. Also included in the modernization budget are the Owner Proposed
Improvements, which include some reconfiguration of resident rooms to provide accessibility and greater
privacy. A small new wing would be necessary to accommodate existing residents and maintain the same
number of beds once the modernization is complete. As such, the costs of a new wing are included as part of
the modernization approach.
To help inform decision-making, the cost of an entirely new building is desired for comparison. This assessment
presumes the demolition of the existing building would occur after the new building is constructed elsewhere
on site. The summary below shows the comparison of an equivalent, new construction facility.
It should be noted that, while the grand total of the Modernization + New Wing is close to New Construction, the
ability to break that project into smaller pieces could be more advantageous, from an operational standpoint as
well as the ability to secure funding.
Modernization + New Wing
$9,639,366
New Construction: Right -Sized Facility
$8,444,500 - $9,552,500
2241 Page 1 of 20
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
PART 2 OVERVIEW
2.1 PURPOSE
ZBA was hired to provide a study to analyze the existing capital needs of the McKay Healthcare and
Rehabilitation Facility. The study examines the capital needs to maintain the building over the next 20 years,
plus investigate the feasibility of modernizing the systems during a renovation project. The goal of the report is
to provide base -line comparison of current capital needs (modernization), versus the cost of comparable new
construction.
2.2 SCOPE
This assessment is limited in scope and has been conducted to the extent necessary to render an opinion
regarding the condition, maintenance requirements, and integrity of the facility and its systems.
This report provides review of the facility's architectural components, structural systems, mechanical systems,
electrical systems, fire protection systems, health and safety issues, building code compliance and accessibility
issues. Excluded from this study are compliance with state requirements for a skilled nursing facility licensing.
A site visit was conducted on December 15, 2022. The purpose of the visit was to become generally familiar with
the building and document its condition through observation and discussions with property maintenance
personnel. No destructive testing was performed. This assessment is based upon visual observation only.
2.3 GENERAL DESCRIPTION
The McKay Healthcare building is located just south of Soap Lake at 127 2nd Avenue SW. The facility consists of a
single, roughly 20,400 sf building broken into two wings: one administrative and one resident care wing.
The. primary access to the site is via 2nd Avenue. The driveway and surface parking lot at the main entrance is
located toward the east end of the site. There is a secondary driveway that loops around the building and is
used for maintenance only.
The building was originally commissioned as a Veteran's Hospital and was constructed to meet those 1930's
hospital standards. Some of these standards still contribute to the building's value today. As an example, the
hallways and resident room doors are very wide to accommodate hospital beds and equipment. The history of
the building for the community of Soap Lake is substantive and holds sentimental value.
2241 Page 2 of 20
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
PART 3 - GENERAL PHYSICAL CONDITION
3.1 SITE CONDITION
Parking Lots and Drives
The exterior parking lot and driveways are asphalt. The surface is cracked and uneven in areas and the markings
are faded. A seal -coat and restripe is warranted, along with some areas of patching or repairs. There is one
accessible parking stall that does not meet current code. The slope is not level, there is no accessible aisle and
the signage is inadequate. This area should be reconfigured to meet ADA when the parking lot is restriped.
Landscaping,
The site was covered in snow during the walkthrough, but observations on other occasions indicate that the
grounds are generally well-maintained and kept in good condition. The landscape is simple, mostly turf grass
and mature trees. There are some sparsely planted beds with mulch adjacent to the building, and a few raised
garden beds for the residents.
Irrigation was not observed, due to the snow. There are some areas along the building perimeter where either
the irrigation or roof -runoff are causing the mulch and dirt to splash up on the stucco of the building. These
need to be observed and corrected to prevent water damage.
Hardscaping,
Concrete walkways at the main entry appear to be in good condition. There is one section of sloped ramp with
two handrails, however those rails do not meet code and should be replaced.
Site lighting is mounted on two of the power poles in the parking area. There are also some flood lights
mounted on the building. These lights likely provide sufficient lighting for security and safety, however they are
a mixture of ages and efficiencies.
2241 Page 3 of 20
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
3.2 ARCHITECTURAL
Buildina Shell
The exterior is generally made of long-lasting materials and has been maintained over the years. However,
compared to current standards, the envelope system performs poorly. The building is lacking a consistent
insulation or air barrier, leading to high energy usage and uncontrolled ventilation.
The exterior envelope of the building consists of concrete masonry block structure with a stucco finish and
aluminum -framed windows. There is one area of exterior wall damage in the dining room. The maintenance
personnel report that this area has been experiencing an ongoing leak from the roof above. It appears that the
overflow roof drain is directing a large volume of snowmelt onto the aluminum window below (see "Roofing"
section for more information). The aluminum windows throughout the building have exceeded their expected
useful life and should be replaced.
The exterior doors are hollow metal frames with insulated metal doors, most with half -lite glazing. They are
serviceable and receiving regular maintenance but have exceeded their expected useful life.
The crawispace and basement are uninsulated and the vapor barrier has been destroyed. The crawl appears to
be neither conditioned nor ventilated.
The crawlspace and part of the basement hallway has been reportedly flooding during rain or snowmelt events.
It appears that the design of the loading dock roof and slope of the paving is directing moisture to the exterior
stairwell where it infiltrates the foundation and crawl space through cracks in the concrete. Repairs to both the
roof drainage system and paving are likely required to correct this issue.
Grant County is in a Radon Zone 2 according to the EPA, which means is has a moderate risk for elevated radon
levels. There was no radon system observed. Testing for radon levels is recommended.
Roofing,
The roofing is primarily low slope design over wood frame trusses with some steeper sloped accent roofs around
the perimeter. The original finish from the 1967 remodel was a ballasted, built -up -roof. More recently, an
elastomeric coating was installed in three phases, from 2019 through 2020. The steeper pitched areas have
standing seam metal roofing.
The surface was covered in snow during the inspection, but maintenance personnel reports that there are no
active leaks. Records from the re -roof project note a 12 year warranty period. The metal flashing appears to be
in good condition. The standing seam metal roofing is faded but appears to be functional.
The leak observed at the dining room wall is likely the result of the main roof drain being clogged or iced over.
The runoff is then directed to this overflow drain which is not designed for such high volume. The primary roof
drain is likely in need of repair or deicing.
Drawings from the 1967 remodel show approximately 6" of batt insulation in the truss cavities. Much of this area
is inaccessible and could not be verified. Approximately 6-8" of blown cellulose insulation (R-21) was observed
in one portion of the attic accessible from the mechanical penthouse. The insulation had been moved around
and was not level or consistent. More insulation should be added for better energy efficiency. The attic
appeared to be well ventilated, though the mechanical penthouse and access stair were very drafty. It seems
likely that conditioned air is being lost to this drafty, unconditioned space, resulting in poor energy performance.
2241 Page 4 of 20
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
Interior Space
The interior of the building consists of two distinct wings; the east wing for administrative offices, and the west
wing for resident rooms.
The circulation corridors and common areas in the resident wing primarily consist of vinyl composition tile
flooring, wood or resilient base, painted gypsum board walls, and acoustical tile ceilings. There are some areas
with wall protection and/or handrails. The finishes are in generally fair to poor condition. The walls were
recently touched up with paint, however a different sheen was used so the repairs appear spotty. The ceiling
tiles are a mixture of style and finish, the supports are damaged. The VCT flooring is damaged in many locations,
but it contains asbestos so the Owner's ability to make repairs is currently limited.
Resident rooms and bathrooms consist of VCT flooring, resilient base, painted gypsum board walls and ceilings.
Resident rooms also have fabric drapes, a handwashing sink, mirror, and some cabinetry. The age and condition
of cabinetry and window treatments varies throughout the building. The resident bathrooms are accessed off
the corridors. There are some accessibility issues with these restrooms. Refer to Accessibility section of this
report. Bathrooms contain toilet, sink, wall -mounted mirror and a variety of accessories. Most have a privacy
curtain because the in -swinging door does not provide enough room for a resident and caregiver. Newer
ceramic tile was observed in two updated bathrooms/shower rooms, however the plumbing was in the midst of
a repair so a portion of the tile had been removed.
The administrative wing corridors are a mixture of vinyl tile and carpet, of a variety of ages and conditions. There
is a wainscot, chair rail and some handrails, similar to the resident wing. The acoustical ceiling tiles are in fair
condition. Offices are primarily carpet flooring, with painted walls and ceilings. Staff and visitor restrooms are
extremely small, accessed through a narrow corridor door, and each contain a single wall hung lavatory and
toilet. These restrooms do not meet accessibility requirements.
The commercial kitchen has quarry tile floors, and painted walls and ceilings with some FRP panel wall
protection. The cabinets are stained wood and appear original to the project.
3.3 STRUCTURAL
The building is a single -story structure, supported by concrete spread footings, which bear on rock or native
soils. The building construction consists of concrete walls supporting concrete floor slabs, were applicable.
Floors not over the basement are slab on grade. The roof consists of wood framed trusses, observable in one
location. The building appears to be in good structural condition overall and has the outward appearance
consistent with a well maintained building of its age.
The scope of this report does not include a seismic evaluation of the building.
2241 Page 5 of 20
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
3.4 HVAC SYSTEMS
See Appendix B.
3.5 PLUMBING SYSTEMS
See Appendix B.
3.6 ELECTRICAL SYSTEMS
See Appendix C.
3.7 FIRE PROTECTION SYSTEMS
Fire Alarm System
See Appendix C.
Fire Sprinkler System
The existing building is fully sprinklered. According to maintenance records, a new NFPA 13 system was
installed around 1986. Most of the building is covered by that newer system, with the exception of the
commercial kitchen and penthouse which still use components from the 1967 renovations. The main
connections to the municipal system and Fire Department Connections are also from the renovations.
The riser is located in the basement. Access to the room is through the exterior stairwell off the loading dock.
There was no signage regarding the riser location posted on the exterior of the building.
Fire department pumper connections (FDCs) are provided near the original building entrance, on the north
elevation. These connections are currently inaccessible to fire trucks. If a capital improvement plan is
implemented, remote standpipes may be required. Proximity to a fire hydrant could not be verified, but the
standpipes would need to be within 50 feet of a hydrant per the Fire Code.
Recent records indicate that a 5 -year test on the system was conducted in 2019.
Summary
The fire protection sprinkler and standpipe systems are in adequate condition. The current FCD location does
not meet fire code and should be addressed. If a modernization project is undertaken, modifications to the fire
sprinkler system are likely in order to respond to updated codes and reconfigured spaces.
2241 Page 6 of 20
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
3.8 VERTICAL CIRCULATION SYSTEMS
Elevators
There are no elevators on this project. The building is single -story, at grade level. There are some basement
spaces for maintenance personnel only.
Stairways
The interior stairways are wood framed and only used by maintenance personnel. The handrails do not meet
current code and the finishes are poor. The exterior concrete stair to the basement is in need of repair to keep
rainwater from infiltrating the building. See "Building Shell" for more details.
2241 Page 7 of 20
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
3.9 ACCESSIBILITY
General Accessibilit
The Americans with Disabilities Act of 2010 (ADA) provides standards for universal accessibility that need to be
met in buildings of public accommodation or commercial facilities. Generally, these standards require
provisions that allow people with physical disabilities to access, enter and use a site, facility, and building.
While accessibility codes were nonexistent when the building was originally constructed, McKay Health desires
to provide access to the residents for both safety and operational reasons. The ANSI A117.1 — 2009 would
become applicable to the reconfigured resident rooms.
Accessibility for the building is generally not in compliance.
Exterior site and building access do not meet requirements. There is one designated accessible parking stall that
does not have the correct signage or slope. The total number of parking stalls is unclear because they are not all
striped, but the proportion of accessible stalls should be at least 5%. The path from the parking lot to the
building does not meet the standard for slope. Sidewalks form the building to exterior amenities include ramps
that are also noncompliant.
The exterior doors are wide and have low -profile thresholds that meet requirements. There are automatic
openers to assist with the force required to open the large doors.
On the interior, the circulation areas have sufficient space to meet accessibility requirements. Doorways into
resident rooms are very wide and have no threshold.
The restrooms and shower rooms are deficient in their access, toilet height and grab bar configuration, and
fixture clearances.
2241 Page 8 of 20
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
3.10 HEALTH AND SAFETY
Exiting,
The building is equipped with several exit doors, located throughout the building. The corridor includes some
fire doors which are held open by magnetic devices. These doors close in the event of a fire. These systems
should receive routine maintenance and testing to ensure they are in working order.
The building is also equipped with an automatic fire sprinkler system (see separate section for system
evaluation.)
Handrails and Guardrails
Stairs throughout the facility are equipped with handrails. However, these handrails do not meet code. Current
code requires that the top of handrail gripping surfaces be at 34" minimum and 38" maximum above the stair
nosing. These stairs are only used by maintenance personnel, so the requirement to upgrade these outside of
an improvement project is voluntary.
Guardrails and handrails at the exterior ramps and stair do not comply with current code. There are no handrail
extensions or vertical pickets. The guardrail height is not in compliance. The ramps do not have edge protection
and the slope appears to exceed the maximum limit between landings.
Per the Existing Building Code, these deficiencies must be corrected as part of major renovations or alterations
to the building.
Lead Based Paint
The McKay Healthcare building was constructed in 1935 and renovated in 1967, before the 1978 ban on lead
based paint; therefore, lead based paint might be present in the building. A hazardous materials study is
recommended.
Asbestos Containing Material
The McKay Healthcare building was constructed in 1935 and renovated in 1967, before the 1978 ban on
asbestos containing construction materials. Recent hazardous materials testing has shown asbestos containing
materials to be present in the building. A "good faith survey" is required by State law to be conducted prior to
any construction work.
Mold and Mildew
The subject property was visually inspected for the presents of moisture intrusion and mold growth. No
evidence of moisture intrusion or mold growth was observed during our site visit.
Pest Control
The subject property was visually inspected for pest invasion. No evidence of pests was observed during our site
visit.
2241 Page 9 of 20
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
3.11 Owner Proposed Improvements
McKay Health is exploring a variety of improvements, in various stages from concept to completion.
Emergency Generator
Design and pricing for the system is complete.
New Laundry Equipment
One commercial washer and two commercial dryers have been funded. This report includes the equipment as
installed.
Reconfiguration of Resident Rooms
Preliminary concept plans and cost estimate have been developed by Kovach Architects. The costs for resident
room reconfiguration and asbestos mitigation are included in the 20 -year analysis under "Owner Proposed
Improvements." Inflation has been added to the estimate. (Costs related to finishes or HVAC are incorporated
into the baseline categories of the report since those items have exceeded their expected useful life.)
Construction of New Wina
The owner has provided conceptual plans that lay out a new, 17 resident wing of approximately 6,400 sf.
Current estimates on a cost -per -square -foot basis for new construction of a building of this type are included in
the analysis. These costs may range from an estimated $285-$325 per square foot and would include general
contractor markup and associated site work. These costs would not include design fees, engineering, permit
fees, special inspections, taxes, etc.
2241 Page 10 of 20
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
PART 4 - OPINION OF PROBABLE COSTS
Modernization of Existing Facility + New Wing (Phased Approach)
Probable Costs are tabulated and presented using the "Opinion of Probable Costs to Remedy Physical
Deficiencies" worksheet from HUD's Baseline Property Condition Assessment Process. This outlines a repair
scope over the next 20 -years (see Appendix A).
The condition of each component of the facility is evaluated with respect to its Estimated Useful Life (EUL) and
Remaining Useful Life (RUL). The worksheet then assigns the replacement costs to the appropriate year
(column) in the table. When looking ata major capital improvement project, any repair scope falling within
Years 1-5 of a 20 -year analysis should be incorporated. Also included in the modernization budget are the
Owner Proposed Improvements, which include some reconfiguration of resident rooms to provide accessibility
and greater privacy.
A small new wing would be necessary to accommodate existing residents and maintain the same number of
beds once the modernization is complete. As such, the costs of a new wing are included as part of the
modernization approach. The size of a new wing containing 17 single -occupancy rooms was referenced from
the conceptual plans by Kovach Architects. Current pricing for this building type was applied based on RS
Means data. (Note, for this line item, 18% GC Markup was removed from the RS Means data so that it is not
duplicated in the comparison below.)
New Construction of a Comparable FacilitX
The size of a new facility for the purpose of this report is an estimation. The conceptual plans by Kovach
Architects for the new wing and space reconfiguration provide an estimate for the purpose of baseline
comparison. However, if McKay decides to proceed with a new building, they might determine that a larger
building would serve their needs better (with more single rooms instead of doubles, for example). As such, I
have outlined the costs for both the baseline comparison and a slightly larger alternative. The area for this larger
building is based on ZBA Architecture's experience with facilities of this type.
An important part of this comparison is to ensure that McKay can continue to operate and accommodate
residents during the construction. This assessment presumes the demolition of the existing building would
occur after the new building is constructed elsewhere on site. Long term plans for the McKay campus should be
reviewed to ensure this is a compatible solution.
Other Project Costs
Other project costs such as architectural and engineering fees, permit fees, sales tax and other soft costs (like
furniture, fixtures and equipment) are not included. These costs are often represented as a percentage of the
cost of construction. While they would be equivalent for the purposes of comparison, they should be included
in an overall project budget. Architecture and engineering fees, based on the state fee schedule, would range
from 7-9.5%
Ongoing maintenance and operational costs should also be considered in the true costs of such a comparison.
Consideration should be given to the energy efficiency of the existing structure. The modernization budget
includes some repairs to existing insulation and air sealing, however it does not address the more aggressive
measures that would be needed to achieve the same energy efficiency as new construction. This would have
long term cost implications and may need to be addressed eventually if the Washington State Clean Buildings
Act legislation is passed.
2241 Page 11 of 20
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
Cost Comparison Breakout
Modernization + New Wing
PHASE ONE
New 17 Bed Wing
61500 SF @ $325
$2,112,500
(includes GC markup)
PHASE TWO
Capital Improvements
Years 1-5
$4,249,600
Reconfiguration of Space
$1,794,000
(private rooms, ADA)
Asbestos Abatement
$335,100
General Contractor Markup
+/-18%
$1,148,166
Subtotal
$7,526,866
TOTAL
$9,639,366
2241 Page 12 of 20
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
PART 5 - PHOTOGRAPHS
2241 Page 13 of 20
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
[ F 9'b V Jl 7 i- C Y f r/t VY. f : '"<k t J C' FtV S'v }
Y f ,� ,1 i i , NF.4-
7 1,. ^lf..:a r.. yk i.f{
i M1 R
,J d,t,.T.F°2 Z ?,,Yl': iiiiiiY.H' v
rd k.�ry %a«7.:L W.,:.._ '),'
3r ilvi'' -L .-r t rt..rn`:
'S1�✓. x QAf'atyx t.PwJ :tT. �' d-
f N t
' s rZ't a X us
-
S 1. f +Y L�*. F 2e
X-:
_.:{�T e...
z ", i?;,
74"-b ::
7 +SNi.. _ t f --T.�'f3" .r.i.L..
4f' ` :..
:ta... a a _. k
:Y i £..2.. 'V +- ` t
"t, i { 3
P rr .,. , i,,: !� 'r, �v=
i
.`1.
, ,t . .,?�.;
X xY t { ,F.
.� ..!!
`� 'N A �`,•':
r E
",S "Y. "-'� 1 1 , F
k i
k_ ;r k
f yi , 'j� �. .{:ily ..� %k (
h. 3`.
'. ✓{.>'�1`. t VIII s 1 6 ! A`k 1.
1111
i ..F.s"^
}
- :. :_
1. 2.
Y
,. .,
r y /
1 2 ,SpY+,°Y l s
s,.. .at 'J+-,��
! 4 �f.:ek Y,..,,.it esJ. >$':
-ti
. f✓t ,sy s"
t .+1'
,1 ."'
4[�,�r
d•..i
i,,: t"i' %% `C
'I•i'"� ;r,M L H::K
;tpS' YDS d,'Yii :Y
yy,
. tij
x
��� t<, Jf.
Jt s(.. ,}d ,5-'. +" F"4[
} ,l Y .l --`F ? 'ifs
:--.rr "'" ..v'�., :.,°
y t a.?
t. 9
r '.'J t -a'. L. .l v
En.
I 11..: ,: S
r a
e
.fyy-"` •ti• k i«
1
1,I.
S ',Jr',!`".. C.?J.v :.t.4`.>
. i.r _.L t
x a.
r .y ,li. 2'
E
Y < .�''
-k: iv f.yr: ,. T•.G
,.. ; rn' ,i `
Vii.> ,=if }r9,z%k;. ,/..
i at kt. ,*.r ,.
'r sci;" is ':,.,t
.,F' ':aJ- "�w
:"SX` 2'11.
';9 . x••
}
::'ti%. ,-S
. _.�_ ....-.3is?Nixt:t+i
,i 7�
a 3>� 'C-.L.''i.
.4F G <' ..7`, :{ ;A,
3 i
3 E. i, y
�. 2`.
' ,`:a ; y,- • -sr
'S.'.w"'y' kzt% <,e.£.•
"`''u„ `x ,t,, "�
A%1...6y:;z,
- i I A 1 . r?Pi
S y. r a # 1•f
y(
�{ ,+�• dy:N, %5 t �"' ,m.''r-��Lo
"'' i3,: y
.`�.i' ^ip?x..'N
, Yr .,j's'.
n�=, s i3 ` S
�.,, .,y- 'v`���g1111
6,4 d w'i �i RiS'
Cy y
Yh ••X 'krv,1't^r^ 4!w'k
_
c
.,c% S <xG-: e ^Y.:
:
f: .4 >11T. a. R _ s f<k� •�`': y
: i
... .: tI '�� _ �' ..
'i ss
�( �� 3 S•" "" _
fly r
+Y,^.•n+.*.e,^_<. y�y 1
,IF, x ,Y
9
s :.. .. ,.i.:.
,.`Y �:-*- ,a.,,.`..c_s �.,,cr �__. i,..
4. - E ��
u _ w,. �r" _ x 4e :- '�^''1. y,.c
'+zr»n y �» ,, s
- b -
"
'•_-__ x
�- ..;�.
y .axe...
-�,,,,
t -. 1 :�
.;� r« �l
��''yyi.r„. ,,.-'r
�y ITX;w- Fk2'- h1-12�
f AAs' _ y I -11,�rv��j'', s+.e�•r'Pe
{�C fir!` '� ✓_d v < ,���;
� ;,,.r _
N �
�„ tx
yF ......- a..-.
.
,C'au,r+^+, �' 2k3,t .. .r` . #y "'J ; x.. •-ys� t�
%m s.
-
_ .
h
t X� ' i t f, �,�. i. �i+''iCSZ4 .,,
r J^it ._3Tf 3 � K .r' `,''1' '3y f _ Pif Sd'._ ,J,�` .A ��i',� ,'(I:r�
g,g
E 'u hf S�. "t` i`y�^, �h-0- tI v`y -, i`q vo- t - at'#a ^'` ''Rkf $. q.' Si "'1�?
�7 �.
q,. 'iz�,; d{',r`"�. �is."'43, a.kv f1�'"Y. K fi':. tz '2 ':m'�,., ,.✓
F
S' t' ' �'.
�
Jy
r 5Y f'• .�' �'4:z :
'S�r� i„` `i S' b
4.� :f. t�,. .!
£T1" 'JS �`
1
" 4r * 'irr. +1'^x,d..
'tom 'j {:' -
k tom... 4 `
.
�
- �,,".'I, I '�.� ��.:y? 9 ,�y{ ,y a
„,t' k v./fi Uc'cc]],kfi, zR„ it A klA�' 1'S•;'ti.GY. r' nrr�#
i';' .:. r t}u f Y•.','.., {' <�ls..<,
r^..... r?. 4,n;. / A'2."S'✓..,<.n ,✓ ,...+t ..t`... `!ttrt ;i .aSPL"' ;t .:.y., .,.
,., ..:. r ',."a/,9.3. .,..-... ak+.r..x ,n ;:'' moi: ..,-,..:} ., d: .... .,, .z£4
5 1 : ♦MM 'I1 -"!.J 1aE..�ivt.� �.<�� . ,rF`/fi. .-i/, ,'M^_d C� :.\ - 9 ,}.��<G7'',,K
.y s fs .k z,l:, 4r t,�?., 3 >. r` -r t. <a•,s' . .'z�'`''.`.`�.. .S.$'&' i,'<' F t'�1: , ,<
�t;
,1-. '��Y .., (fi,+ �s3
-.+R' .,,'i'{�'}..
'.✓n:.'.< !Y ;,g,4.. �t,,
/ •vz. MM,i. `w,.(i!'i5
��: Y�'S
�i '
".:;i,'I'll
�?cr`fi. x •`rte' ,.c a
..$"< 11 '" ,.
y i-z� 4 Y . . y. $ .. A .-..0 -
,>! ..'. 'Yi x•7p�..�_Fy �`d <�l-
.:•#.k• :<. ',A.%.+.2!'. r;,,,.A,�
d «2 A!...7' lis y' � '%ay.: ' t , i .,' +'16
Wit,. ? "'rf+r• 3�* ,i� .$ ah . :3 .�7..
�...@."✓' i,Y.t..<. ;�1,.'. Y:.�
'>rry„ i,, F� .R.. �,,.�dr...fW
r 'xZ R}. 1 f..o.,,
t Wiz...'
, 't, , 1 + •"' , 6 ,t•s�. .i
.
Greenhouse •
Staff • • •
s
v ni 24:.6 3 f'3. { _ d,{
s' 9.-�: ,}« y; ;:k. �r.
.v3 y..E.., ,f. 7 C
X � �: a< ;r
i. t':
J *y ! "d
t ���.s.
-a f>
d't t*i * e`Qi. 1' y {;y v>' cc ,*` "sf1iG 4:
,.4r e ! ;- :.J �. rT ta,. �' "�;�,i Y" R..r
wz it t�sy, f� � -
i n 2
��¢3.
: a. t r s
...ii' , _. .r --;; it :..,.-: �.. vt'; -,. ,?. '-, :.::...?� , :' ,: u, _: - `�:
-t.,.,.. r'-; 33,-
._ N _ A ""<L.: -
:y �i b ',Y i',
- "7i s« x .i
'V ... a' k' yY
,«.. _ S: k'{t- .y6.
t c
., ".a. 7..;s:"."t
,. ..
t :.1 ':Er%
i '' •:3',
:.� �i
"` Y
a�-.
s is d..''-�„ ,dt t. ;:;mt 4(.,
g z "- ;z . ux,.ziyyJ />.z �,: x r. ., �•.d
"',f/ rp '�, a, - ", t, rk 4. a, .A i �'..BtY. • ,,
�p 9 .�k,. 7, rcyd ,�. ( �?f`.q�,�,. .:' �.<.yin t VIif '�.k,-,.
-'k . ' 1; fr t S't .y,; ,r�'• SK d$:S , . M�'
Yµq'} d ... R �W � ";, f y i i
r .ia'' '.xC., is ..n rb 4 �I.F-,.
x..:. .sem
y y
ii. „*
.� ,r w
'd w
J '.'
,_ _.
>
I -4 r.
�p ' y . S x p
1. .,F , ... .^Y t ,'
f .n a s
34`. i S
a- f
:. .;i! 'r ...a .; i s y,
' >86`' , ' § 4 E's
q tp, "I' .,
fit: v 9>.:�f
. [ r:._;. ��' f`i'r
< 7 '`.ri:-.
s
Tt
:t rrb k
Gi. "., '.. }} �! .�' s
.
,.a is !{ '7�' i" k�i z%4 `A
ti. _♦3. %ar. .*roc ,,: .' F
1 th A, --,r.,...-%, ,,XML 'yF i :'t, y.:
` z i "- ";tN-Y'
`yy
:�,g
t,�"r 4
`S
i.
- d .,t,'4 „E'x r
.t ,4c',;ty :i 4 't.'� 7 -i ..� }
_ . !�
3 ' ?-
FS ^+.3..4 +`. _
ys»^ is c
((ttomu
..... Sir. .,-.
.... ,.
T'�" , [ f..r
.,i."'"x ,^'° ..
....�s�r L ^»-e+t` ;
-
M�." .:�,..
^`iso'
y.Y ,
� k ? t1
r�...�..�i
.idv 7 y„
x q ti :s.. ^ r `3 "'a i. r. 4
A i�5��.
. , . -, , ..X' :t:..::'
.' .._ . , .I ; -:
�' . {« ; - k 1 e*' rf, : h*-'
'� i i#SC ., w✓r 25RF3._
Ar ,.
..sst ,;e'ar D '',`� ,7�. °: r .'.' ' 4 .
, r at<.3,' 1.a- . r .
%1,^
......
s :...'�`; -
4r i.' ° �"-,
.b`Y` ,:I 1.3 T„#...Mst
f i _
n.,,.-, ...+, n - _.�*.
.'+� , ! zg'.zs ;mss` rr x«s k+= ,
b.$ 'l }y-',+,�y'.
-i if tin'ii;�
'1 2r�N 4C' y >� ,/�`' .,,.
({({i °�r 4•
jar,, 7 {y
k.
. -- � , ,
� j
--
:ti
€44; 7 �" n1 w. Yt t r k 2' ,'"
! 9 1 r,.% '�.� �r.I 'r
''.414 J n{if7:;.
RF� d'r , '." j�`h ,?lp k�„ /� f •i 'S'
a
'."r
-
rt`.. .. rt
+^s i,.
'.. izg' >t._,
I C.,^�y. 2.
i.w
'�71� '
T 5 fIv -,
kt 9. >.�".• a T',= 5
T�" wr ✓ t [ ` '.,?�.
; :.:�y.?rk .. .. •. -,..
q t..,�. .,,,a"N::.:.
1 , _ -
i^yif - '7 ���""
1A Y^C MijiiM14AS,.^.�r'.�VF C...
xg,�,y : ff zr3sYq; ,fib„ :t :;,�: _
3.IM' �a'2T'a'+ . if.H ; ;'j tI t.
t
"�, -£:
6 - - -
„ x f`T�yt�.^„y,.11 f;f t'k b . x . xy�-fa+ns'11
11. «.
i ' � f'x�*-=, . i•E xT K_14'.,• f ,k % �
• ~
•.,(
3'<^. � 3 s111 �:r'ft"�i`ifir'.- .. I-
,Gi,%
.. - .. �r .`. Jr -*»wb ' '
' S -.t :
I'll
r 3� _
��
I
k _- - .1
, :
. .
..: :.:. -
: Fire r
,
' .w r,.
/ _ -1 °fi,y'S3 : ,«, t 1 Y.
'�sr:
I'll, I
11.
Y >3 a". - , " t 1j,« ;.
S `/f_ t t
;'a y
�,t"!.
.-'kj" .`'.
w fix r 2��':
Y-" 37
.4 i , },ie� i , - _. ,i
�T>.
' i a �,:x�ss}y
- »�
(y as P°
,
yG` 1
F r+ .�- a x .;
1j
'" .:Y r ..y^
9 .4 ,.� J`I' +s� , k
i L 'i'fny. ` f
J f A
st
l :'S"`
3t.:r'�£�xFsx $[
;.:A dot' _ k'Y .f si � ✓�"a C! yY�d3 •� i1 !- i `
1 • ,y di:i [ +�Y..ff
1 ? f;,L 1 , r { Af' 3yGr
,
,,r' a r .:-JP.''E ,r : 'i lrt 'Y
1 : � !• .
r ,
;. 1 .. : ..
�} :g a,M
'°' j3'i't "'f-; ' -JN - , .s,*r" " ;.:i". ,. ;
^T29 _ `- 3. ., ,:� f .k -Y '"0.a+'t
ter.; ±U&t v-1? .; 7
n%=: :r2 yy�,. `r
��y.133 �;3
'"f .
i :. ,
< -i.
,
fit x - :3 ds43 "... - a...a.-
i '' �, ti: :. .l
4 ,.«.-........ -
to 1.'rz ,r,51 �" :K
,.
`" :58� A1n
..
�. ...
.... w
1�1,.rz-
r tt�
-.-� s?!
i
'. '"!�
'w'.'A.
:.. :.mY�. +
-it ... ' , .. R.'Sr'+i S
r "1 - + ,�� »�„+ - ` ,_ ..
Woo
1,. ,:Y l'.,'.,Z:.«..ai..bv&,.�5'.k"1.`59.oN..i
rt.:.<: r..w,lrwwr.,.c-. ..... ffi,yi if;J,�
, -fes,
.11 I I I
DF, s7i. - I , ,�- � -- I',,
.
-
�,
4
s ,
•
::
- - -
1. I
-
_
"
- . '
, , - ..
,-
. .. ,
'`
;
t",his,'@
.. .,
- {.. -
,k
-
'
. .
_ _
%
Parking
r r
2241 Page 14 of 20
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
BUILDING ENVELOPE
Typical windows and exterior finish
Exterior stucco finish
Loading dock area
Roof drain overflow, where leak is occuring
Interior of wall where repair is occurring
Typical exterior doors
2241 Page 15 of 20
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
2241 Page 16 of 20
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
1.11 18171 OLOIll Ilf��Ce]:1
Typical corridor
Main entrance
Acoustical ceiling tile
Crawlspace access
Resident toilet room
Resident wing corridor
2241 Page 17 of 20
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
2241 Page 18 of 20
_
WOW
r.
k
ay
..
� a
r 4:: t
: �dF,i K �r
� l �r�sx
_
r
_ -
i•
� .. � : >
£
� S� L'���rk a3 � t ..; r.' �: �. t
- � r-•�3i`S.
4i'
f 43�fiase�+�
's �
�s�i,ti,s,.{,?��,�, lf�• � '}�{, �aF'. � qty :;� E N
Y y �,?',.
66
s
VM,
j
a,
f
s
. s T
�'•Fx �
t��.ar,n
.f
t _ ��
s�3t' Y k
yy 3"4
}
s%�1
AT
Tile flooring damage
l::
`
��P^:
..�.. m,., s.. �s .. { , Kiri-„xw, s,
Jl�4 ��•,
-
j,.
Y
;.k�'� G.
.. 'f4F)f�l✓d.* rq � ��
� 'tr S- '�# ,�, C:;.
i 1• � _ �
� :
• .«, ; i E . 7
f � fv��*'sem
� l ��
=
e
a'
-------------
• •
• . •
£
�`. is „ ♦ .xJ' k7#�'�I��h
i
3
." ...�
, :�y:f. .,.'`. -J.'F� .: S 9
. d s� a �
�¢.5if
}i
_
1, `�
� Mi,'�":.°-�, �W'�fU.j,•• �`J'�f ,{:,,f �f/3°`�i���%J�''
r;.•,t�,x G ffv;kJ ,=1 k�ii> �Mi l
..
3� 3 5
3 gyp,. �,:�
'{
''
,� may.�qp��� _ 4. �• � u� sY "
t • � ,� �� c ��
�
� 3, _`3�
R i'
} 1Fy''•yY
WE
y K'r C
k k�
�
17
t
2241 Page 18 of 20
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
2241 Page 19 of 20
s.. • )'� ,�+� t
9
� ri.
'fir' r 'aRR r . � Z p
- � � R
f,
J
�
r,:n� W�
"-�It
}">s
k .F fb iii � 3 � -
� ?". •
<�i �'i � G
; �m`zG4L 4i
_ eBYcyL�A',53�.
S
ZZ{� f7s
ON
t�
rr
.-.
�� ��' . +uvs :.:,a'•.t .ff � -.
� J dX �
,+f� iKF'^"y � �� �
!, �r 1
"'� ' � t- L
'E ''�' f•G'e� f i �
1 1
S
r �,..:.... �Yi3•S
i .� ,.
1, y ; 1 �•.n
�W`
.iw ^��
���.._V �p '�S SSP ,3c%
M1::
j
f.
4 5.�
•Kitchen
dry storage
l
�r.
�^".. t � ���� .�-
V
�t'
v{ .
ie,�a
C`. �'
__aft• r
AM
a1 (AV
`4m Y YtY, I')j�� dE�y..�
n
t
i
�-,
iR...�.rr ::r..tn`:..'1
� 4, Y.: �s
��"1- .4+:�"•
�.� .iia.
s^
t P
W^
1
,
�
3
1
Dishwashing area
-1,
H
R
"-- - - A. Q
.
? r • tf. - - l
��
3•- -.
�� d �ia�. i14aa$
� - � y31,3'aLh � '• 23i ..:�� XD��>�- � ��"�- y- f" �. �'
�._�
�:
,
'T �
Yet L. Mr.� >¢
.r
} • ;� d t
s„'r''
_t
k''��aaf.�'"II+
tF.-..Jjr"��'>��_
'S�y
✓ as
;z '. �
..-
�
t :..
r �..aA ��**a4 ;�,.+A�`4 3f 1p{�� k+-.��[y'� .��y� i�"'
( `�� ✓{Z�a�.ai'^ Rl "'l Til 3'7� SAtY ;w+ jL f . i
O}:d'-
�.',SM x) .� E +'<.'�e s + .�
�`z. a :- �
�M ;,, �.'!+y ., lamj'.
N. CS ��,ia+sRe. g�.2,tL° y?�rYT.TSJ
�f,+ _».> �a "i b�'•w� g S {�yp�,i.P". � ,at
i•l�)1�'"� 41 f'%F. :.� }b��'SN�tlj�y" r'}P •kN � S�
Li`� ¢ r .t :' i' '
�' �'t' �,��$ag�'t�F ikRii �s�j. ism,':
+'�-�:: .t� aS.,r ,;,; �;
�i�`}(�,
Y?! �S i�++T � ,.pY^�j � � :§iI � 33 y�
�L' 'Y}Y�.,*[� �t�`✓ly: �'; _
2241 Page 19 of 20
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
-
ji
u i
17
t
a.
_ _ N
- t �'
1
kj y
e
'es
Jlw,\ x Y.i.�'s h.'.: � •.� i l` ,C �f� `."f�, c 5/�y., l'�s�h,1t�>
Resident bath room
�f f s� [ Ae r y
$uas �✓ �'. 3
z
>f Y
vi i +�� "iw�u' �3���.�•ff�wTfS� I d %,y { Z }. Ln�'?s
X� y
w
.Cf'..•
.1
-
�
�i �• �Y
:,; Sys, :_ '�*sn � y:
+r n
t 3�
z
i
• - �,� j 4C
%7,N
}fes{...
jY
W"Alk VII
1
End of Property Condition Report
2241 Page 20 of 20
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
Opinion of Probable Costs, 20 -Year Cost Estimate
W-51
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
APPENDIX B
Needs Assessment, Mechanical
2241
o
Engineering
t R High Performance Design
x� MEMORANDUM
DESIGN
CONSTRUCTION
PROJECT
COMPANY:
SUBJECT:
REMARKS:
Sarah,
McKay Health Center
D SITE
CONFERENCE
TELEPHONE
Project Journal
DATE January 27, 2023
JOB. NO. 2022-042
BY Brad Bergler, P.E.
ZBA Architecture ATTN: Sarah Brede
Mechanical Narrative
The following are some items of interest regarding the mechanical systems at McKay health based on our December 15
2022 building tour:
The original building was built in 1935, with a major renovation and addition completed in 1966. Mechanically, the
building is served by a gas (propane) fired steam boiler, which provides steam for heat to air handlers and steam unit
heaters. A steam to water heat exchanger provides pumped hydronic heating water to unit ventilators in each of the
patient rooms. A water cooled chiller provides chilled water to the unit heaters in residents rooms during summer,
utilizing the heating water pipes and pumps. The air handlers provide ventilation air to the occupied spaces. Controls
are a mixture of pneumatic and electromechanical controls. The Kitchen is served by a rooftop make up air unit, hoods
and exhaust fans.
The plumbing system shows signs of its age, and is past it's useful life, except for newer water storage tanks and the
new water softener.
A note about the Clean Buildings Act. The CBA was passed by the legislature and requires all buildings greater than
50,000 SF to meet energy use criteria prior to staggard compliance dates. Buildings that do not comply will be required
to pay fines of up to one dollar per square feet annually. The McKay health facility does not meet the area
requirement threshold. However, phase II of the CBA now requires buildings down to 20,000 SF to calculate and report
energy use. It is our assumption that the phase II buildings will be required to meet energy use criteria in the future.
This should be taken into consideration during future planning exercises.
Mechanical:
• Controls — The 1965 temperature controls are pneumatic controls with air compressors in the basement, with
some amount of conversion to electromechanical controls. This system is well beyond its useful life. The
technology was great at the time, but has now been completely replaced with Direct Digital Control Systems.
Any new controls will be DDC.
Sarah Brede
January, 2023
Page 2
Pneumatic control panel
Compressor
Manual control
• Air handling units. The upper mechanical room has two air handling units and one relief fan, one of the AHUs is
partially disassembled. These appear to have been providing ventilation air to the entire building. All units are
well beyond their useful life. The east unit is still in operating, but appears to be just getting by, with plywood
over louver openings as make shift dampers.
Disassembled AMU Relief fan East AHU
Chiller and associated fluid cooler. The chiller and cooling tower are in need of replacement. They require
manual control and change over to utilize the 2 -pipe heating system. The chiller uses R-22 refrigerant which is
being phased out and is no longer produced or imported.
Chiller
Cooling tower Corrosion
Cooling tower
216 W. Pacific Suite 211 Spokane, WA 99201 Principals:
(509) 747-2179 FAX (509) 747-2186 E-mail Iseng@lseng.com Bradley G. Bergler, P.E. Jessica D. Wagoner, P.E.
Sarah Brede
January, 2023
Page 3
• Boilers —the facility has three propane fires steam boilers. Two are from the original construction, but only one
is operational. The third is a "new" boiler, installed in the 1960's. The original boilers are well past their useful
life. The third boiler, while past its useful life is in good working condition and can be expected to last until a
decision is made regarding expansion.
Original boilers
1966 Boiler
216 W. Pacific Suite 211 Spokane, WA 99201 Principals:
(509) 747-2179 FAX (509) 747-2186 E-mail Iseng@lseng.com Bradley G. Bergler, P.E. Jessica D. Wagoner, P.E.
Sarah Brede
January, 2023
Page 4
Steam system components; steam to water heat exchanger, steam piping, traps and condensate sumps/feed
pumps, are all past their useful lives. Steams serve steam coils in the air handlers and various steam radiators,
and a steam to water converter for hydronic heating of unit ventilators.
Steam to water heat exchanger
Steam condensate receiver and boiler feed pump.
216 W. Pacific Suite 211 Spokane, WA 99201 Principals:
(509) 747-2179 FAX (509) 747-2186 E-mail Iseng@lseng.com Bradley G. Bergler, P.E. Jessica D. Wagoner, P.E.
Sarah Brede
January, 2023
Page 5
• Hydronic pumps, piping and accessories —the hydronic system is beyond its useful life. There are two heating
water pumps (providing redundancy) that serve as chilled water pumps during summer. No pipe insulation was
observed.
• Kitchen hoods, exhaust fans and make up air unit. The Kitchen is served by a gas fired make up air unit, with
evaporative cooling. Hoods and exhaust fans are in operation and used every day. All equipment is past their
useful lives.
Kitchen MAU and Exhaust fans
Kitchen hood
System Longevity — All of the mechanical systems are beyond their useful lives. The boiler system and kitchen are the
most critical to be in operation, and currently appear to be operating as intended and should be able to be maintained
for the short term.
Limitation to remodel or expansion:
Mechanically there are no real limitations to expansion, other than energy code changes which will eliminate propane
as an option for a source of heat. The biggest limitation regarding remodel will be space. The current energy code will
require a dedicated outdoor air system, which would most likely require a large air handler and extensive ductwork.
The current facility does not have adequate space for all the equipment that will be required to satisfy current codes.
216 W. Pacific Suite 211 Spokane, WA 99201 Principals:
(509) 747-2179 FAX (509) 747-2186 E-mail Iseng@lseng.com Bradley G. Bergler, P.E. Jessica D. Wagoner, P.E.
CNA & Modernization Feasibility Study
McKay Healthcare & Rehabilitation Center
December 15, 2022
APPENDIX C
Needs Assessment, Electrical
2241
IEPNWAM
High Performance
MEMORANDUM � SITE DATE January 13, 2023
DESIGN � CONFERENCE JOB. NO. 2022-042
CONSTRUCTION � TELEPHONE BY Jessica Wagoner
PROJECT McKay Health Center
COMPANY: ZBA Architecture ATTN: Sarah Brede
SUBJECT: Narrative CC:
REMARKS:
Sarah,
Please see the following comments from our site inspection on December 15, 2022.
• The service to the building is fed underground from a pole to a pad mounted transformer owned by
Grant County PUD. The service is rated at 120/208V, 3 phase, 4 -wire, 1600 amps. The service
capacity is adequate for the existing building and should be able to supply a new wing addition. The
high demand in December was 186 KW. With NEC factors applied this equates to 258 KVA, 718 amps.
Figure I Power Po%
t
Figure 2 Transformer
216 W. Pacific Avenue, Suite 211, Spokane, WA 99201 Mechanical Principal: Bradley G. Bergler, P.E.
(509) 747-2179 Fax: (509) 747-2186 Website: www.Iseng.com Electrical Principal: Jessica D. Wagoner, P.E.
McKay Health Center
Sarah Brede
January 13, 2023
Page 2
Figure 3 Utility Meter
The main switchgear was installed during a 1967 addition and remodel of the 1935 building. It is
beyond its useful life and finding replacement breakers are difficult. The main gear is also limited to six
main service disconnects, since it does not have a main breaker. Six service disconnects are already
used, so no additional main breakers may be added. The 2020 NEC placed additional requirements on
the service disconnects. They may no longer be mounted in the same vertical enclosure. Anew
switchboard would require just one main service disconnect to avoid having six separate vertical
sections. Mounted on the side of the switchgear is a manual transfer switch and disconnect for the
range and hood. It is unclear whether this has been tapped off the main bus. It may be an additional
main breaker which would violate the six main service disconnect rule.
Figure 4 Switchgear
216 W. Pacific Avenue, Suite 211, Spokane, WA 99201 Mechanical Principal: Bradley G. Bergler, P.E.
(509) 747-2179 Fax: (509) 747-2186 Website: www.Iseng.com Electrical Principal: Jessica D. Wagoner, P.E.
McKay Health Center
Sarah Brede
January 13, 2023
Page 3
Figure 5 Manual Transfer Switch
• Many of the branch circuit panels are original to the 1967 remodel. They have limited spare capacity
and breaker space available. They have outlived their useful life. There are a few newer panels that
have been installed with some spare breaker space. In general, the electrical distribution system needs
to be upgraded.
Figure 6 Existing Panelboards
216 W. Pacific Avenue, Suite 211, Spokane, WA 99201 Mechanical Principal: Bradley G. Bergler, P.E.
(509) 747-2179 Fax: (509) 747-2186 Website: www.Iseng.com Electrical Principal: Jessica D. Wagoner, P.E.
McKay Health Center
Sarah Brede
January 13, 2023
Page 4
The generator is housed in the basement behind the boiler. It is difficult to access and refill the fuel
tank. it needs to be replaced with an outdoor generator. The generator capacity is limited to 50
kw. Existing emergency panels do not have loads separated between emergency equipment and life
safety. To meet current codes, new panels dedicated to life safety or equipment branch would need to
be provided. The generator must provide a minimum of four hours of power for night lights, exit signs,
exit corridors, stairways, dining and recreation areas, workstations, medication preparation areas, boiler
rooms, electrical service room and emergency generator location. If residents congregate in the
recreation areas/dining areas during power outages, the HVAC System in those areas must receive
power through the generator. It does not appear these areas are provided with emergency power.
Figure 7 Emergency Generator
216 W. Pacific Avenue, Suite 211, Spokane, WA 99201 Mechanical Principal: Bradley G. Bergler, P.E.
(509) 747-2179 Fax: (509) 747-2186 Website: www.lseng.com Electrical Principal: Jessica D. Wagoner, P.E.
McKay Health Center
Sarah Brede
January 13, 2023
Page 5
• Existing fixtures are mostly fluorescent with some incandescent in maintenance and utility
areas. Fixtures should be updated to more energy efficient LED. Lighting controls are limited to on/off
control. Resident rooms are provided with wall mounted bed lights as required by code. There are no
occupancy sensors, daylight sensors or dimming controls to help reduce energy costs in the
facility. New construction nursing homes require night lights for resident rooms with a switch at the
door. The current configuration would not meet the Washington State Energy Code.
Figure 8 Hallway Fixture
Figure 9 Above the Bed Fixture
216 W. Pacific Avenue, Suite 211, Spokane, WA 99201 Mechanical Principal: Bradley G. Bergler, P.E.
(509) 747-2179 Fax: (509) 747-2186 Website: www.Iseng.com Electrical Principal: Jessica D. Wagoner, P.E.
McKay Health Center
Sarah Brede
January 13, 2023
Page 6
• The Fire Alarm system is limited to hallways and select room smoke detection with horn/strobes for
notification. It appears to cover the main exit pathways with pull stations at exit doors. The fire alarm
system monitors the flow and tamper switches of the sprinkler system. The system has been updated
with a Silent Knight combination panel and communicator. Parts of the outdated Simplex system still
exists in the Nurses Station. Adding to this system might require a panel upgrade. Patient rooms are
not monitored with smoke detection.
Figure 10 Nurse's Station FA Annunciator
Figure I I Fire Alarm Panel
216 W. Pacific Avenue, Suite 211, Spokane, WA 99201 Mechanical Principal: Bradley G. Bergler, P.E.
(509) 747-2179 Fax: (509) 747-2186 Website: www.lseng.com Electrical Principal: Jessica D. Wagoner, P.E.
McKay Health Center
Sarah Brede
January 13, 2023
Page 7
• The current paging speakers in the hallways are not functional.
Figure 12 Paging Speaker
• The Nurse Call system is a Newer Jeron Provider System. It replaced the original Rauland Nurse Call
System. It appears to cover areas required by code. The resident rooms have call buttons at their
beds, the bathrooms have pull cords, and in the hallways, there is dome light notification. There are
also additional call buttons for staff assist.
Figure 13 Nurse Call Bed Cords
216 W. Pacific Avenue, Suite 211, Spokane, WA 99201 Mechanical Principal: Bradley G. Bergler, P.E.
(509) 747-2179 Fax: (509) 747-2186 Website: www.Iseng.com Electrical Principal: Jessica D. Wagoner, P.E.
McKay Health Center
Sarah Brede
January 13, 2023
Page 8
Figure 14 Staff Assist Call Station
Figure 15 Nurse Station Call Annunciator
Figure 16 Nurse Call Panel
216 W. Pacific Avenue,, Suite 211, Spokane, WA 99201 Mechanical Principal: Bradley G. Bergler, P.E.
(509) 747-2179 Fax: (509) 747-2186 Website: www.Iseng.com Electrical Principal: Jessica D. Wagoner, P.E.
McKay Health Center
Sarah Brede
January 13, 2023
Page 9
Figure 17 Nurse Cell Pull Cord
Figure 18 Nurse Call Dome Light Above Door
• The Wander Alert system was just installed, I do not believe at this time that the residents have the
bracelets or badges that stop them from exiting the building by locking the doors.
• The Stanley door lock system monitors select doors. (Front Door, Admin Office, Kitchen, A Hall, and
Physical Therapy). The alarms are annunciated at the Nurse's Station. If automatic door locking is
added to the Wander Alert System, the doors would need to automatically release if power is lost to the
system, the fire alarm system is activated, or an override switch is activated at the staff workstation.
216 W. Pacific Avenue, Suite 211, Spokane, WA 99201 Mechanical Principal: Bradley G. Bergler, P.E.
(509) 747-2179 Fax: (509) 747-2186 Website: www.Iseng.com Electrical Principal: Jessica D. Wagoner, P.E.
McKay Health Center
Sarah Brede
January 13, 2023
Page 10
Figure 19 Stanley Keypad
Figure 20 Stanley Nurse's Station Annunciator
Figure 21 Stanley Door Monitoring
216 W. Pacific Avenue, Suite 211, Spokane, WA 99201 Mechanical Principal: Bradley G. Bergler, P.E.
(509) 747-2179 Fax: (509) 747-2186 Website: www.Iseng.com Electrical Principal: Jessica D. Wagoner, P.E.
McKay Health Center
Sarah Brede
January 13, 2023
Page 11
• Resident Room receptacles for new construction must meet WAC 388-97-3200. Each resident room
must have a minimum of seven outlets including four hospital grade electrical outlets located at 44
inches above floor at the bed, two electrical outlets in resident room and 1 duplex GFI outlet at the
handwash sink. Per the 2020 NEC all electrical outlets in patient sleeping rooms of nursing homes
must be Arc -Fault protected. Currently receptacles do not meet all these requirements. No outlet was
installed at the handwash sink and receptacles are not Arc -Fault protected.
Figure 22 Above Bed Receptacles
Figure 23 No GF/ Receptacle at sink
216 W. Pacific Avenue, Suite 211, Spokane, WA 99201 Mechanical Principal: Bradley G. Bergler, P.E.
(509) 747-2179 Fax: (509) 747-2186 Website: www.lseng.com Electrical Principal: Jessica D. Wagoner, P.E.
Attachment 1:
County Comp Plan Amendment:
is Except of BOCC Resolution dated
November 22, 2022 including App. A and
• Appendix J- List of SIP Projects
• Public notice of comp plan amendment to
establish SIP Project list.
BOARD OF COUNTY COMAUSSIONERS
GRANT COUNTY, WASHINGTON
RESOLUTION NO, dd- 1ly]' M
A Resolution Relating to Comprehensive Planning in Grant County in
Accordance with the Washington State Growth Management Act (RCW
36.70 A) and amending the Comprehensive Plan, associated Zone Changes and
Unified Development Code Amendment,
WHEREAS; in 1990, the Washington State Legislature passed, and the Governor signed into
law the Growth Management Act (GMA) as contained in SHB No 2929 (Washington Laws,
1990 lst Ex. Sess., Ch 17), which was subsequently codified as among other chapters,
Chapter 36.70A RCW; and,
WHEREAS, the Washington State Growth Management Act requires all counties and cities
in the State to plan extensively in keeping with state goals and policies on: sprawl reduction,
affordable housing, economic development, open space and recreation, regional
transportation, environmental protection, property rights, natural resource industries, historic'
lands and buildings, permit processing, public facilities and services, and early and
continuous public participation; and,
WHEREAS, the Washington State Growth Management Act requires all counties and cities
within the state to classify, designate, and conserve natural resource lands (agriculta rat and
mineral) and protect critical areas (wetlands, geologically hazardous areas, fish and wildlife
habitat conservation areas, aquifer recharge areas, and frequently flooded areas); and,
WHEREAS, Chapter 36.70 RCW required Grant County to adopt a Comprehensive Plan
that met specified GNU goals and addressed the mandated GNU elements; and,
WHEREAS, after complete review and public record of the State Environmental Review
process, Grant County issued a Final Environmental Impact Statement on July 2, 1999; and
subsequent amendments through 2018; and,
WHEREAS, on July 11, 2022, Grant County issued a SEPA Determination of Non -
Significance (DNS) for these non -project proposals; and,
WHEREAS, over the past years, the Comprehensive Plan's policies may have changed to
ensure that the development patterns in the County remain consistent with the intent of the
communities' vision for the future and the Plan's goals and policies; and,
WHEREAS, it is important that amendments to this plan retain the broad perspectives
articulated in the community vision statements,, satisfies the goals and policies of this.Plan,
and remain consistent with the intent of the GNIA; and,
Grant County
Board of County Commissioners
Grant County Comprehensive Plan Amendment Resolution for the Year 2022
WHEREAS, the Growth Management Act (GMA) establishes procedures for the review and
amendment of Comprehensive Plans governing counties and cities planning under the Act;
and,
WHEREAS, the County has established a public participation program identifying
procedures whereby proposed amendments or revisions of the Comprehensive Plan are
considered by the governing body of the County no more frequently than once every year;
and,
WHEREAS, amendments to the Comprehensive Plan fall into several maj or categories or
types and different review application and review criteria apply to each. The kinds of
amendments identified herein may include:
0 Urban Growth Area Boundary Changes;
0 Plan policy or text changes;
• Plan Map changes;
0 Supporting document changes; emergency amendments; and
• Site-specific amendments; and,
WHEREAS, policy amendments may be initiated by the County or by other entities,
organizations or individuals through petition; and,
WHEREAS, petitions were received on forms provided by the Department, containing
appropriate maps showing the proposed change and addressing the policy or map evaluation
criteria as described in the Comprehensive Plan; and,
WHEREAS, On May 3, 2022, the Board of County Commissioners directed -staff to initiate
the SEPA review process and schedule each of the complete amendments proposed, along
with staff recommendations before the Planning Commission for public hearing; and,
WHEREAS, public hearings were conducted by the Planning Commission on August 24 and
August 25, 2022, to hear staff recommendations and take public testimony on each of the
proposed amendments to the Grant County Comprehensive Plan and proposed Zone
Changes; making recommendations and listing Findings of Fact on each amendment and
zone change; and,
WHEREAS, the Planning Commission staff reports, and recommendations are made a part
of the record of this public hearing as it relates to SEPA and the attached amendments and
zone changes; and,
WHEREAS, a non -project proposal to consider adoption of amendments to the
Comprehensive Plan, including site-specific land use designation changes, changes to various
Urban Growth Areas were considered, as well as associated Zone Changes: and,
WHEREAS, copies of the SEPA DNS were distributed to agencies, organizations and
individuals listed on the Planning Department distribution list and requesting that comments
be submitted in accordance with WAC 197-11-340 (2); and,
Grant County
Board of County Commissioners
Grant County Comprehensive Plan Amendment Resolution for the Year 2022
2
WHEREAS, the Board of County Commissioners conducted an open -record public hearing
on Tuesday, November 1, 2022, to consider the 2022 requests for amendments to the Grant
County Comprehensive Plan, and the recommendation from the Planning Commission for
each of the' proposed amendments and their respective zone changes (if applicable);
NOW, THEREFORE, BE IT RESOLVED, that the Board of County Commissioners for
Grant County adopts the attached Findings of Fact per Attachment "B" and the attached
record pertaining to the approval or denial of the 2022 Comprehensive Plan amendments and
Zone Changes; and,
BE IT FURTHER RESOLVED, that the Board of County Commissioners for Grant
County adopts Findings of Fact as per Attachment "A" in support of these actions.
PASSED by the Board of County Commissioners in regular session at Ephrata, Washington,
by the following vote, then signed by its membership and attested to by its Clerk in
authorization of such passage this day of 4kP?04e,---
20,22.
DATED this jPrd day of AIZW04e'�- ,2022.
BOARD OF COUNTY
.COMMISSIONERS
Yea Nay Abstain GRANT COUNTY,
WASHINGTON
�4
Danny S,4one, Chair
ATTEST:
Clerkof A , --a'rd
t - d ❑
V
Ce- r
!Ro &, I
',. s
13 4Cindyer, Memb-e.39;
Grant County
Board of County Commissioners
Grant County Comprehensive Plan Amendment Resolution for the Year 2022
3
ATTACHMENT "A"
GRANT COUNTY COMPREHENSIVE PLAN AMENDMENTS
2022 FINDINGS OF FACT
Section I — General Findings
1.1 Grant County has experienced and will continue to experience population growth and
accompanying development, resulting in competing demands for public facilities,
services and land uses, and is required to prepare and adopt amendments to the
Comprehensive Plan and land use regulations pursuant to the Growth Management
Act.
1.2 Growth Management requires that land be managed properly and wisely. Otherwise
meeting the demands of a rapidly growing county population is likely to cause urban
and suburban sprawl, commercial strip development, development at inappropriate
locations and densities, damage to environmentally sensitive areas, and the loss of
natural resource lands, rural character, open space, and critical areas. Also, this pattern
of development is likely to create demands for urban services and -utilities that are
insufficient to support their extension in a cost-effective manner.
1.3 The 2022 Comprehensive Plan amendment process responds to the environmental
concerns raised during the public hearing process, while protecting property owners
from unconstitutional takings and substantive due process violations.
1.4 RCW 36,70A.020 sets for a list of 13 goals "to guide the development and adoption
of comprehensive plans and development regulations." In the amendment public
hearing process, and these findings of fact, the Planning Commission and Board of
County Commissioners considered the 13 Growth Management Goals, weighed them
as they apply to the subject matter of these findings, and has attempted to achieve a
reasoned balance among them.
Section 2 - Public Participation
1
2.1 Petitions received by the Planning Department were reviewed by the Board of County
Commissioners, and the Board directed the Planning Department to proceed with
further review of the petitions and to prepare environmental documentation consistent
with the requirements of RCW 43.21 C and Grant County Code Chapter 24.04 (SEPA).
2.2 In accordance with Grant County Unified Development Code Chapter 25.12 --
Legislative Actions, the Planning Commission held public hearings on August 24 and
August 25, 2022, at which time testimony was taken from interested agencies,
organizations, and individual citizens, regarding the proposed amendments and zone
changes.
Attachment "All
Grant County Comprehensive Plan
Amendment 2022
General Findings of Fact
2.3 Board of County Commissioners and Planning Commission meetings, hearings, and
study sessions requiring "legal notice" were advertised in the local paper of record
pursuant to the requirements of R.Cw 36.70 and the Grant County Unified
Development Code. Copies of the proposed amendment applications were broadly
disseminated for public and agency review at no charge. All meetings and hearings to
which the public was invited were conducted in an open f6rum. At hearings, all persons
desiring to speak were given an opportunity to do so. Public testimony and written
correspondence were given full consideration as part of the amendment process.
2.4 The existing enhanced public participation policies within Grant County ensure that the
public had an opportunity to provide meaningful comments on the proposed
amendments.
2.5 The appeal mechanisms contained within Grant County ordinances provide sufficient
due process to allow interested parties an opportunity to respond at a meaningful time
and in a meaningful manner.
Section 3 — Criteria for Amendment Approval
3.1 A petition for a site-specific land use redesignation.. was reviewed for conformance
with pertinent provisions of the Grant County Comprehensive Plan and Unified
Development Code.
3.2 In reviewing the amendments, the Planning Commission and Board of County
Commissioners considered testimony provided at public hearings and
recommendations provided by staff and interested or affected agencies with
jurisdiction. The Planning Commission and Board of County Commissioners
approved, approved with conditions, or rejected an application for a change of
designation or density based on the following criteria:
(a) The change would benefit the public health, safety, and/or welfare;
(b) The change is warranted because of changed circumstances or because of a need
for additional property in the proposed land -use designation.
(c) The change is consistent with the criteria for land use designations specified in the
Comprehensive Plan.
(d) The change will not be detrimental to uses or property in the immediate vicinity
of the subject property.
(e) The change has merit and value for the community as a whole
(f) The change, if granted, will not result in an enclave of property owners enjoying
greater privileges and opportunities than those enjoyed by other property owners
in the vicinity where there is not substantive difference in the properties
themselves with different designations.
(g) The benefits of the change will outweigh any significant adverse impacts of the
change
Attachment "A"
Grant County Comprehensive Pian
Amendment 2022
General Findings of Fact
(h) The change. is consistent with the purpose and intent of the Comprehensive Plan
and the requirement s of Grant County Code Titles 22, 23, 24, and 25; and
(i) The change complies with all other applicable criteria and standards of Grant
County Unified Development Code Chapter 25.12
Section 4 — Board of County Commissioners Final Recommendations
And/or Actions
4.1 Recorded motions. by the Board of County Commissioners for each proposed
comprehensive plan amendment and Findings of Fact are listed in Attachment "B"
4.2 Recorded motions by the Board of County Commissioners for each proposed zone
change and Findings of Fact are listed in Attachment "B"
4.3 Supporting Findings of Fact for each decision were identified under Section 3 as
detailed above, unless - otherwise noted in the record of the Board of County
Commissioners.
4.4 Detailed applications along with supporting documentation and staff reports are made
a part of this recommendation.
Attachment "All
Grant County Comprehensive Plan
Amendment 2022
General Findings of Fact
2) The change is warranted because of changed circumstances or because of a need for
additional property in the proposed land -use designation;
3) The change is consistent with the criteria for land use designations specified in the
Comprehensive Plan;
4) The change will not be detrimental to uses or property in the immediate vicinity of the
subject property;
5) The change does have merit for the community as a whole;
6) The change, if granted, will not result in a group of 'property owners enjoying greater
privileges and opportunities than those enjoyed by other property owners in the vicinity
where there is not substantive difference in the properties themselves which justify
different designations-,
7) The benefits of the change will outweigh any signifi
4) The public interest will he served by the proposed amendments;
5) Appropriate notice has been given to the Washington State Department of Commerce
Growth Management Services in accordance with ROW 36.70A..106;
6) The proposed amendments are consistent with applicable portions of RCW 36.70B; and
7) The Planing Commission authorizes staff to make, necessary language revisions to maj<e
the Code relevant.
Attachment "B"
Decisions and Findings of Fact
Board of County Commissioners
2022 Comprehensive Plan Amendments and Zone Changes
13
fac.inties.1in rural countes
I CW 82.14*370 Sales and use tax for public
(3)(0) Morlelys collected under this section may only be used to finance public facilities
serving economic development purposes ire rwral,counties and finance personnel in
economic development offices. The public fability mu S -t b listed as an ite
m in ine
officially adopted overall econornic�development 'Ian, or. the economic develoPpmenL
P
section of the co"untv'o pr h ve plan.
The Funding Source is Account, 11 3.155.Econo-micEnha-nceme'nt SIP,
2022 ELIGIBLE PROJECTS
_EDC ORGANIZATION
PROJECT
FUNDING
COST
-McKay Healthcare
Needs Assessment & Modernization Feasibility Study
113.155
$26Y000
New Wing
113.155
$3,271,538
Main Building Conversion
113.155
$9,634,468
Outdoor Area Improvements
113.155
$944,500
Subtotal
$13s876,506
Port of Quincy
Intermodal Yard Loading and Unloading Expansion
113.155
$2817500
Addition across Dock Facility — Intermodal Yard
113.155
$88,180
Upgrade Security and Asset Tracking Systems
113.155
$250,000
Subtotal
$6195964
Beverly Water District
New Well and Water Reservoir
113.155
$1,517,400
Water Distribution System
113.155
$636,500
Subtotal
$1,5815050
r.
-Port of Warden
Industrial Park #3 Infrastructure Improvements
113.155
$530,000
Industrial Park #5 Expansion & Infrastructure
113.155.
$1,285,000
Airport Master Plan Study and Runway Rehab.
113.155
$230,000
Subtotal
$2,045,000
Samaritan Healthcare
District I Moses Lake
New Hospital
113.155
$167,000,000
Subtotal
$1679000,000
..
77777=.rt
Port of Mattawa,
Wastewater Improvement Project
113.155
$500,000
Sentinel Gap Industrial Park
113.155
$2,500,000
Subtotal
$31000$000
iii
1- 1. 5.,
Town of Coulee City
Rodeo Ground Improvements
113.155
$1,770;000
Campground Improvements
113.155_
$17200,000
New Medical Clinic
113.155
$3,260,000
Subtotal
$6,230,000
-Port of Royal
Industrial Park Rail Siding
113.155
$2,000,000
Well #3 and Fire Pump Facility
113.155
$3,600,000
New 12 -inch Water Main Extension
113.155
$2,000,000
Road Expansion
113.155
$1,000,000
Trans Loading Facility
113.155
$400,000
Subtotal
113.155
$9,000,000
Total 2022 Eligible Projects
1
1 $203,3533020
Notice of Application and Public
Hearing
June 13, 2022
NOTICE IS HEREBY GIVEN,
that Grant County has received the
following Comprehensive Plan
amendment and zone change
applications and associated SEPA
Checklists. The Grant County
Planning Commission will conduct a
public hearing in accordance with
Chapter 25.12 of the Grant County
Unified Development Code to
consider proposed amendments to
the Grant County Comprehensive
Plan and Zone Changes submitted in
accordance with the criteria listed in
the Unified Development Code
adopted in October, 2000, and in
accordance with State Law RCW
36.70A.
DESCRIPTION OF CURRENT
PROPOSALS:
Non -project proposals to consider
the adoption of amendments to the
Grant County 2018 GMA
Comprehensive Plan. Proposed
amendments considered for adoption
include site-specific land use
designation changes, zone changes,
UGA Amendment and SEPA
Checklists. The proposed
amendments specifically include
proposals submitted by the
following list of applicants and will
be heard by the Planning
Commission on Wednesday,
August 24, 2022 at 7 p.m., and
Thursday, August 25, 2022 at 7
p.m., in the Grant County
Commissioner's Hearing Room on
End of Notice
the bottom floor of the Grant County
Courthouse in Ephrata, Washington,
at which time any person may
appear and be heard either for or
against the proposed amendments
being considered at the public
hearing. Limited in person
attendance will be allowed. To
participate in the hearing via audio
please call the following numbers
and enter the event number listed for
each day. Anyone who wishes to
submit written comments on the
proposed amendments must do so
by the end of business hours on
June 28, 2022. A summary of the
site specific proposals are listed
below:
Wednesday, August 24, 2022
Call-in number: 1-408-418-9388
Access Code: 2492 776 1781
Tentative Agenda:
P22-0130 P22-0131— BEXCO
Property XXII LLC — Warden Area
— Land use designation change to
RD and zone change to RD.
P22-0152 P 22-0153 — Deanna
Detwiler — Rural Moses Lake Area —
Land use designation change to RR1
and zone change to RR1.
P22-0156 P22-0157 — Astro
Enterprises, LLC — Rural Moses
Lake Area — Land use designation
change to RR1 and zone change to
RR1.
P22-0154 P22-0155 — REC Silicon
Inc — Moses Lake Area — Land use
designation change to Urban
Industrial and zone change to UHI.
Expansion of Moses Lake UGA.
Thursday, August 25, 2022
Call-in number: 1-408-418-9388
Access Code: 2498 546 4584
Tentative Agenda:
P22-0138 P22-0139 — Jay Gerow -
Quincy Area — Land use change to
SD4/RRem and zone change to
SD4/RRem.
P22-0142 P22-0143 — Live Nation —
Quincy Area — Land use designation
change to MPR and zone change to
MPR.
P 22-0150 P22-0151— Sentinel
Shores LLC — Beverly Area — Land
use designation change to RC and
zone change to RC.
P22-0158 P22-0159 — Grant County
— Ephrata Area — Siting of an
essential public facility.
P22-0160 P22-0161 — Grant County
— Countywide — Establish Strategic
Infrastructure Project list as an
appendix to the Grant County
Comprehensive Plan.
Copies of the proposed amendment
applications, zone changes and SEPA
Checklists are available for review at
the Grant County Planning
Department, 264 West Division
Avenue, Ephrata, WA. Additional
background data, including the
petitions for site specific land use re-
designation and other amendments to
the Comprehensive Plan, Zone
changes and SEPA checklists
prepared for proposed amendments,
and other pertinent data is also
available for public review. Contact
Tyler Lawrence, Deputy Director, at
(509) 754-2011, ext. 2501.
Note to Pticblisher: Please publish the following on Monday, June 13, 2022 and bill Grant
County Development Services (Planning Division). We also require an Affidavit of Publication.
Please place the ad in your normal six -column format, columnar, as shown.