HomeMy WebLinkAboutGrant Related - BOCCQ
Walk on without being on the agenda:
Request for release of funds on SIP 2018-11, Sentinel Gap Industrial & Commercial Water Study 2018 in
the amount of $30,613.63 (grant).
Memo
To: Board of County Commissioners
From Brittany Rang, Administrative Services Coordinator
Dates
Re: Authorization for Release of BOCC Approved Funds, SIP #2018-11:
Sentinel Gap Industrial & Commercial Water Study 2018
The Port of Mattawa has met the requirements for release of funds in the above -
referenced SIP project, which was approved by the BOCC pursuant to Resolution
No. 18 -078 -CC dated 08/20/18. The proof of requirements is in the form of a signed
Project Certification form from the Port of Mattawa and supporting invoicing of the
project that meets the SIP grant award amount (Attachment 1).
To that end, I am requesting the release of funds on this SIP project as follows:
(1) The grant award amount of Thirty thousand six hundred and thirteen
and 63/100 Dollars ($30,613.63) to the Port of Mattawa; with
(2) The 2.5% Administrative Fee of the project in the amount of seven
hundred sixty five and 34/100 Dollars ($765.34) to the Grant County
Economic Development Council.
Dated this
day of , 20—It77
Board of County Commissioners
Grant County. Washington
r v
' • r v Abstain
Dist#I
D'st#1 Disifl
Dist #2
Dist #2 Dist #2
Dist #3
_ Dist #3 Dist #3
December 19, 2019
Grant County
Office of the Board of Commissioners
P.O. Box 37
Ephrata, WA 98823
Re: Award Letter, SIP No. 2018-11: Sentinel Gap Industrial & Commercial Water Study 2018
Greetings,
On behalf of the Port of Mattawa, we would like to thank the Grant County Board of
Commissioners for their support on developing the Port of Mattawa's Industrial Wastewater
System. We did come under budget in this project. Attached are copies of the receipts and the
check stubs. The grand total for this project comes to $30,613.63.
Attached is the signed copy of the, awards terms and conditions acceptance letter.
If have any questions, I am available by phone, (509) 831-5971 and/or email, at
l.leland portofmattawa.org.
Best,
Lars Leland
Executive Director
20140 Road 24 SW, Ste. G • Mattawa, WA 99349 • Office 509-932-4928
GRANT COUNTY
STRATEGIC INFRASTRUCTURE PROGRAM
PROJECT CERTIFICATION
This form must be signed and returned, with an invoice, for the approved funding,
before reimbursement can be approved by Grant County.
SIP Project Proposal Number: 2018-11
SIP Funding Recipient: Port of Mattawa
SIP Project Description: Sentinel Gap Industrial & Commercial Water
Study 2018
I, the undersigned, do hereby certify under penalty of perjury, that the materials have
been furnished, the services rendered, and/or the labor performed as described in the
project proposal for the above -referenced SIP Project and that I am authorized to
authenticate and certify to this claim. I also certify that this claim is just and due, and is
an unpaid obligation against Grant County.
Further, according to the SIP Project Funding Policies, I attest that at the next audit of my
entity, this project shall be called to the attention of the Washington State Auditor's
Office and an emphasis 'audit will be requested to assure that these funds were expended
toward the project and according to the intent of the proposal.
Signature
VAS
Printed Name
lzllqkol� —
Date Signed
Title
cxec
Printed Title
Completed, signed original certification and invoice are to be mailed to:
Administrative Services Coordinator, PO Box 37, Ephrata, WA 98823
ATTACHMENT 4
PORT OF MATTAWA PORT DISTRICT NO. 3 OF GRANT COUNTY
J -U -B Engineers, INC.
Date Type Reference
1 /12 9/2019 Bill 130496
12/19/2019
Original Amt. Balance Due Discount
5,332.27 5,332.27
Check Amount
Money MK -General WW Rate Studies & Engineering Consultant Fee
SF6001-1 To reorder call Safeguard Solutions at 800-727-9120
®Safeguald LITHOUSA MOP CK7S08111P
Professional Personnel
PROJECT MANAGER
PROJECT ACCOUNTANT
Totals
Total Labor
Subconsultants
Katy Isaksen & Associates
Total Subconsultants
Billing Limits
Total Billings
Limit
Remaining
Be olk, Project Manager
Hours
7.50
.40
7.90
10899
Payment
5,332.27
5,332.27
5,332.27
C9V73VO010000 Y18SF013738
D858FF SLKDK01 11/21/2018 08:30 -100 0
Amount
2,106.98
48.49
2,155.47
2,155.47
3,176.80
3,176.80
Current Prior To -Date
25,281.36 30,613.63
39,000.00
8,386.37
Total this Task $5,332.27
Total this Invoice $5,332.27
VENDOR
DATE I '
CL ACCOUNT
a 2810 W. Clearwater Avenue, Suite 201, Kennewick, WA 99336 p 509 783 2144 f 509 736 0790 w www,jub.com
CJUB'i rU-B COMPANIES : THE U►NGotlN ( MTA PO0
�:d/ r•IFOUP � INC
J•U-B ENGINEERS, INC.
Invoice
Lars Leland December 17, 2019
Port of Mattawa Project No: 30-07-075
20140 Road 24 SW Ste. G Invoice No: 130496
Mattawa, WA 99349
Project 30-07-075 Port of Mattawa - Miscellaneous Engineering
Professional ......rvices from November 3 2019 to December 17 2019
.....Se................................................................................................................................................
Task 080 Water and Wastewater Rate Studies
Professional Personnel
PROJECT MANAGER
PROJECT ACCOUNTANT
Totals
Total Labor
Subconsultants
Katy Isaksen & Associates
Total Subconsultants
Billing Limits
Total Billings
Limit
Remaining
GL/
Be olk, Project Manager
Hours
Amount
7.50
2,106.98
.40
48.49
7.90
2,155.47
3,176.80
2,155.47
3,176.80
Current Prior To -Date
5,332.27 25,281.36 30,613.63
39,000.00
8,386.37
Total this Task $5,332.27
Total this Invoice $5,332.27
VENDOR W V")
DATE -��" �cl•Iq
GL ACCOUNT �616�
a 2810 W. Clearwater Avenue, Suite 201, Kennewick, WA 99336 p 509 783 2144 f 509 736 0790 w www.jub.com
PORT OF MATTAWA PORT DISTRICT NO. 3 OF GRANT COUNTY
atB Engineers, INC.
e Type Reference Original Amt.
11/18/2019 Bill 129684 5,567.46
11/25/2019
Balance Due Discount
5,567.46
Check Amount
Money MK -General WW Rate Studies, Soil Sampling/Crop Mgmt &
SF5001-1 To reorder call Safeguard Solutions at 800-727-9120
`llti Safeguard LITHOUSA SFSLIP WS08111P
1. Floating Screen Replacement Recommendation
Professional Personnel
Hours
PROJECT MANAGER 1.70
Totals 1.70
10868
Payment
5,567.46
5,567.46
5,567.46
C9V73V0010000 YlSSF013738
D858FF SLKDK01 11/21/201808:30 -13 •
Amount
484.93
484.93
Total Labor 484.93
Total this Task $484.93
....................................................................................................................................................................
Task 070 Soil Sampling & Crop Management Plan
1. Coordination with Phil Small
Professional Personnel
a 2810 W. Clearwater Avenue, Suite 201, Kennewick, WA 99336 p 509 783 2144 f 509 736 0790 w www.jub.com
Hours
Amount
PROJECT MANAGER
.60
168.56
Totals
.60
168.56
Total Labor
168.56
Total this Task $168.56
........................................................................................................................................................................
Task 072 Road T7 SW Completion - Construction
Professional Personnel
Hours
Amount
PROJECT MANAGER
6.90
1,390.82
DRAFTER - CAD
3.80
222.30
LICENSED SURVEYOR
2.00
386.68
CLERICAL
1.50
88.25
PROJECT ACCOUNTANT
.30
36.37
CONSTRUCTION MANAGER
1.00
179.40
Totals
15.50
2,303.82
Total Labor
2,303.82
a 2810 W. Clearwater Avenue, Suite 201, Kennewick, WA 99336 p 509 783 2144 f 509 736 0790 w www.jub.com
Project 30-07-075 Port of Mattawa - Misc Engineering Invoice 129684
Reimbursable Expenses
Mileage 71.34
Total Reimbursables
.......................................................................................................
Task 080 Water and Wastewater Rate Studies
Professional Personnel
PROJECT MANAGER
Totals
Total Labor
Subconsultants
Katy Isaksen & Associates
Total Subconsultants
Billing Limits
Total Billings
Limit
Remaining
:d' �/ . v/ /�
Ben W. Volk, Project Manager
Hours
1.30
1.30
Current Prior To -Date
2,538.81 22,742.55 25,281.36
39,000.00
13,718.64
Total this Task $2,538.81
Total this Invoice $5,567.46
www.jub.com J -U -B ENGINEERS, Inc.
71.34
Total this Task
...........................................................
$2,375.16
Amount
365.21
365.21
365.21
2,173.60
2,173.60
Current Prior To -Date
2,538.81 22,742.55 25,281.36
39,000.00
13,718.64
Total this Task $2,538.81
Total this Invoice $5,567.46
www.jub.com J -U -B ENGINEERS, Inc.
PORT OF MATTAWA PORT DISTRICT NO. 3 OF GRANT COUNTY
J -U -B Engineers, INC.
atP Type Reference Original Amt.
11/1/2019 Bill 129323 14,599.02
11/5/2019
Balance Due Discount
14,599.02
Check Amount
Money MK -General WW Rate Studies, Soil Sampling/Crop Mgmt &
SF5001-1 To reorder call Safeguard Solutions at 800-727-9120
Safeguard umouSn S=sup c1asaelttP
dela bampiing
Subconsultants
Land Profile, Inc.
Payment
14,599.02
14,599.02
14,599.02
C9V73V0010000 YISSF013738
D858FF SLKDKO1 11/21/201808:30 .10 •
9,811.38
Total Subconsultants 9,811.38
Total this Task $9,811.38
....................................................................................................................................................................
Task 072 Road T7 SW Completion - Construction
Professional Personnel
Unit Billing
MILEAGE
161.24
Total this Task $4,225.78
......................................................................................................................................................................
Task 080 Water and Wastewater Rate Studies
Coordination with Katy Isakson
Professional Personnel
Hours Amount
PROJECT MANAGER 2.00 561.86
Totals 2.00 561.86
Total Labor 561.86
a 2810 W. Clearwater Avenue, Suite 201, Kennewick, WA 99336 p 509 783 2144 f 509 736 0790 w www.jub.com
Hours
Amount
PROJECT MANAGER
8.50
1,730.79
CLERICAL
2.00
117.66
PROJECT ACCOUNTANT
.40
4849
SENIOR CONSTRUCTION OBSERVER
5.00
642.70
CONSTRUCTION MANAGER
8.50
1,524.90
Totals
24.40
4,064.54
Total Labor
4,064.54
Unit Billing
MILEAGE
161.24
Total this Task $4,225.78
......................................................................................................................................................................
Task 080 Water and Wastewater Rate Studies
Coordination with Katy Isakson
Professional Personnel
Hours Amount
PROJECT MANAGER 2.00 561.86
Totals 2.00 561.86
Total Labor 561.86
a 2810 W. Clearwater Avenue, Suite 201, Kennewick, WA 99336 p 509 783 2144 f 509 736 0790 w www.jub.com
PORTOFMATTAWA PORT DISTRICT NO. 3OFGRANT COUNTY 10806
-U-B Engineers, INC. 9/26/2019
Date Type Reference Original Amt. Balance Due Discount Payment
9/23/2019 Bill 128273 13,903.32 13,903.32 13,903.32
Check Amount 13,903.32
Money MK -General WW Rate Studies, Misc. Engineering & Road T.
S,-,-, T re .,cell ad-- -.1— 9120
®Safeguard' -- :F:L,P —a,,,P
Professional Personnel
Hours
PROJECT MANAGER .70
Totals .70
13,903.32
cewavaolaaao nuwiaaaa
D858FF SLKDKO] 11/21/201808:301 •
Amount
199.68
199.68
Total Labor
19 8
Total this Task 6 $199.68
.............................................................................................................................................................................
Task 072 Road T7 SW Completion - Construction
Professional Personnel
Hours
Amount
PROJECT MANAGER
13.70
2,644.02
CLERICAL
4.00
266.53
SENIOR CONSTRUCTION OBSERVER
54.50
7,005.43
CONSTRUCTION MANAGER
5.50
986.70
Totals
77.70
10,902.68
Total Labor
Subconsultants
Baer Testing
Total Subconsultants
Unit Billing
MILEAGE
S�$ S 556.80
Total this Task $12,523.73
...........................................................................................................................
Water and Wastewater Rate Studies
Hours Amount
4.20 1,179.91
4.20 1,179.91
1,064.25
10,902.68
1,064.25
Task 080
Professional Personnel
PROJECT MANAGER
Totals
Total Labor
1,179.91
a 2810 W. Clearwater Avenue, Suite 201, Kennewick, WA 99336 p 509 783 2144 f 509 736 0790 w www.jub.com
PORT OF MATTAWA PORT DISTRICT NO. 3 OF GRANT COUNTY
J -U -B Engineers, INC. 8/29/2019
�? Type Reference Original Amt. Balance Due Discount
8/29/2019 Bill 127556 20,196.91 20,196.91
Money MK -General Soil & Crop Mgmt., WW Rate Studies, Misc. En
SF5001.1 To reorder call Safeguard Solutions at 800-727-9120
0,':afiagMrd LITHOUSA SFSLIP OPS08111P
Professional Personnel
Hours
PROJECT MANAGER 5.10
PROJECT ENGINEER 2.20
Totals 7.30
Check Amount
10776
Payment
20,196.91
20,196.91
20,196.91
C9V73VO010000 YISSFO13738
D858FF SLKDKOI 11/21/201808:30 -220 •
Amount
1,309.00
362.90
1,671.90
Total Labor 1,671.90
Total this Task $1,671.90
.............................................................................................................................................................................
Task 070 Soil Sampling & Crop Management Plan
1. Coordination with Phil Small, Land Profile
2. Coordination with Ecology
Professional Personnel
a 2810 W. Clearwater Avenue, Suite 201, Kennewick, WA 99336 p 509 783 2144 f 509 736 0790 w www.jub.com
Hours
Amount
PROJECT MANAGER
4.10
1,141.59
Totals
4.10
1,141.59
Total Labor
1,141.59
Total this
Task
$1,141.59
.............................................................................................................................................................................
Task 072 Road T7 SW Completion - Construction
Professional Personnel
Hours ?��
Amount
PROJECT MANAGER
13.70
2,413.56
TECHNICIAN
3.50
378.11
LICENSED SURVEYOR
1.00
188.21
SURVEYOR
12.00
891.00
CLERICAL
4.80
286.44
SENIOR CONSTRUCTION OBSERVER
70.50
9,021.66
CONSTRUCTION MANAGER
.50
89.70
GROUP LEADER
.20
33.58
Totals
106.20
13,302.26
Total Labor
13,302.26
a 2810 W. Clearwater Avenue, Suite 201, Kennewick, WA 99336 p 509 783 2144 f 509 736 0790 w www.jub.com
Project 30-07-075 Port of Mattawa - Misc Engineering Invoice 127556
Unit Billing
GPS
MILEAGE
903.00
Total this Task $14,205.26
............................................................................................................................................................
Task 080 Water and Wastewater Rate Studies
Professional Personnel t Z`�
Hours Amount
PROJECT MANAGER .60 168.56
Totals .60 168.56
Total Labor 168.56
Subconsultants
Katy Isaksen & Associates 3,009.60
Total Subconsultants 3,009.60
Billing Limits Current Prior To -Date
Total Billings 3,178.16 17,822.62 21,000.78
Limit 39,000.00
Remaining 17,999.22
Total this Task $3,178.16
Total this Invoice $20,196.91
1A -- --�
Ben W. Volk, Project Manager -
J -U -B ENGINEERS, Inc.
www.jub.com
PORT OF MATTAWA PORT DISTRICT NO. 3 OF GRANT COUNTY
J -U -B Engineers, INC.
.�" Type Reference Original Amt. Balance Due
7/3/2019 Bill 125945 12,451.00 12,451.00
Money MK -General USBR, Soil & Crop Mang, Road T.7 & Water Stu
SFS001-1 To reorder call Safeguard Solutions at800-727.9120
®Safeguard' LITH0u5A SPSLIP WS081111'
Professional Personnel
Hours
PROJECT MANAGER 1.00
TECHNICIAN .50
Tntalc 1.50
10714
7/3/2019
Discount Payment
12,451.00
Check Amount 12,451.00
12,451.00
C9V73V0010000 Y18SF-013738
D858FF SLKDK01 11%21/201808:30 -380 0
Amount
279.15
82.50
361.65
Total Labor
Total this Task361.65
............................................................... .. ..................
Task 070 Soil Sampling.
& CropManagement Plan
1. Review 2018 Irrigation and Crop Management Plan.�
2. Coordination with Land Profile �i 1
Professional Personnel
Hours Amount
PROJECT MANAGER 2.60 714.79
Totals 2.60 714.79
Total Labor 714.79
Total this Task $714.79
.................................................................................................................�..............................................
Task 071 Road T7 SW ...
Completion Design
Fee t��G
�
Total Fee 34,800.00
Percent Complete 100.00 Total Earned 34,800.00
Previous Fee Billing 33,060.00
1 Current Fee Billing 1,740.00
VENDOR _L�1 �N V Total Fee 1,740.00
DATE ----=--L---11 l� I
GL ACCOUNT
Total this Task $1,740.00
a 2810 W. Clearwater Avenue, Suite 201, Kennewick, WA 99336 p 509 783 2144 % 509 736 0790 w www.jub.com
roject 30-07-075 Port of Mattawa - Misc Engineering Invoice 125945
...........................................................................................................................................�,.............................
Task 072 Road T7 SW Completion - Construction C"JiJv\ S
Professional Personnel
Hours Amount
PROJECT MANAGER 3.70 637.73
CLERICAL 4.90 278.07
Totals 8.60 915.80
Total Labor
Reimbursable Expenses
Postage/Copies/Other — Yakima Herald ad
710.23
915.80
Total Reimbursables 7%.-23 -
Total this Task $1,626.03
......................................................................................................................................................................
Task 080 Water and Wastewater Rate Studies y�
Professional Personnel
Hours Amount
PROJECT MANAGER 7.10 1,951.93
Totals 7.10 1,951.93
Total Labor 1,951.93
Subconsultants
Katy Isaksen & Associates
Total Subconsultants
Billing Limits Current
Total Billings 8,008.53
Limit
Remaining
1U�1
Ben W. Volk, Project Manager
6,056.60
Prior To -Date
9,814.09 17,822.62
39,000.00
21,177.38
Total this Task $8,008.53
Total this Invoice $12.451.00
www.jub.com 1 -U -B ENGINEERS, Inc.
P@?14ZZ4,ATTAWA PORT DISTRICT NO. 3 OF GRANT COUNTY
J -U -B Engineers, INC.
Date Type Reference
4/19/2019 Bill 124607
4/26/2019
Original Amt. Balance Due Discount
310.81 310.81
Check Amount
10645
Payment
310.81
310.81
Money MK -General M&1 Water, Soil Scientest & Water Study
310.81
SFUSA 85001-1RSL1P CK7$08111P To reorder call Safeguard Solutions at 800-727-9120
Safeguards LITHO
C9V73V0010000 YlSSF013736
D858FF
•
SLKDK01
11/21%201808.30 -1001
PROJECT MANAGER .20
55.83
Totals .20
55.83
Total Labor
55.83
Total this Task
$55.83
.............................................................................................................................................................................
Task 070 Soil Sampling & Crop Management Plan
Coordination with Phil Small, Land Profile
Professional Personnel
Hours
Amount
PROJECT MANAGER .40
109.97
CLERICAL .30
35.04
Totals .70
145.01
Total Labor
145.01
Total this Task
$145.01
.............................................................................................................................................................................
Task 080 Water and Wastewater Rate Studies G
Coordination with Katy Isaksen, KIA & Associates
Professional Personnel
Hours
Amount
PROJECT MANAGER .40
109.97
Totals .40
109.97
Total Labor
109.97
Billing Limits Current
Prior To -Date
Total Billings 109.97
9,704.12 9,814.09
Limit
39,000.00
Remaining
29,185.91
Total this Task
$109.97
r
Total this Invoice
$310.81
Ben W. Volk, Project Manager
-- �-'
u 2810 W. Clearwater Avenue, Suite 201, Kennewick, WA 99336 p 509 783 2144 f 509 736 0790 w www.jub.com
(rJ-U B
J-U•B ENGINEERS, INC.
Lars Leland
Port of Mattawa
20140 Road 24 SW Ste. G
Mattawa, WA 99349
THAY
J -U -B COMPANIES LANODON MAPPING
E GROUP INC.
Invoice
VENDOR
DATE 161 it 19, 2019)
�1�0 '--Project No: 30-07-075
GL ACCOUNT Invoice No: 124607
Project 30-07-075 Port of Mattawa - Miscellaneous Engineering
Professional Services from March 3, 2019 to March 30, 2019
Task 023 Miscellaneous Engineering _ t
South Columbia Basin Potential Water Supply W
Professional Personnel
Hours Amount
PROJECT MANAGER .20 55.83
Totals .20 55.83
Total Labor
Total this Task
........................................................................................................................................................
Task 070 Soil Sampling & Crop Management Plan
Coordination with Phil Small, Land Profile
Professional Personnel
Hours Amount
PROJECT MANAGER .40 109.97
CLERICAL .30 35.04
Totals .70 145.01
Total Labor
Total this Task
.................................................................................................................................................
Task 080 Water and Wastewater Rate Studies G
Coordination with Katy Isaksen, KIA & Associates
Professional Personnel
PROJECT MANAGER
Totals
Total Labor
Billing Limits
Total Billings
Limit
Remaining
Ben W. Volk, Project Manager
Hours
Amount
.40
109.97
.40
109.97
55.83
$55.83
..................
145.01
$145.01
.......................
109.97
Current Prior To -Date
109.97 9,704.12 9,814.09
39,000.00
29,185.91
Total this Task $109.97
Total this Invoice $310.81
a 2810 W. Clearwater Avenue, Suite 201, Kennewick, WA 99336 p 509 783 2144 f 509 736 0790 w www.jub.com
PORT OF MATTAWA PORT DISTRICT NO. 3 OF GRANT COUNTY
J -U -B Engineers, INC.
'fit@ Type Reference Original Amt.
3/20%21.19 Bill 123877 18,828.74
10614
3/29/2019
Balance Due Discount Payment
18,828.74 18,828.74
Check Amount 18,828.74
Money MK -General 2018 IRR & Crop Mang Prep,WW Improv Option
SF5001-1 To reorder call Safeguard Solutions at 800-727-9120
a Safeguard' L,,NOt15A SESLIP CK7608111P
Luib Irrigation ana crop management clan rreparatlon
Professional Personnel
Hours
PROJECT MANAGER 2.30
CLERICAL .70
Totals 3.00
Total Labor
Subconsultants
Land Profile, Inc.PJ4 of J 500
18,828.74
C9V73V0010000 Y18SF013738
D858FF SLKDK01 11/21/20180830 -130 •
Amount
632.32
81.77
714.09
17,318.31
714.09
Total Subconsultants 17,318.31
Total this Task $18,032.40
.............................................................................................................................................................................
Task 080 Water and Wastewater Rate Studies
Treatment Plant Capital Improvement Options
Professional Personnel
PROJECT MANAGER
Totals
Total Labor
Billing Limits
Total Billings
Limit
Remaining
Ben W. Volk, Project Manager
Hours
Amount
3.00
796.34
3.00
796.34
796.34
Current Prior To -Date
796.34 8,907.78 9,704.12
39,000.00
29,295.88
Total this Task $796.34
Total this Invoice $18,828.74
a 2810 W. Clearwater Avenue, Suite 201, Kennewick, WA 99336 p 509 783 2144 f 509 736 0790 w www.jub.com
PO�ATTAWA PORT DISTRICT NO. 3 OF GRANT COUNTY
J-U-B Engineers, INC. 3/8/2019
Date Type Reference Original Amt. Balance Due Discount
2/21/2019 Bill 123277 28,261.35 28,261.35
Check Amount
Money MK -General MBR, 17/18 IRR & Crop Mang,W/WW Rate Stud
SF5001-1 To reorder call Safeguard Solutions at 800-727-9120
®Safeguard' LITMou$A SFSLIP CK7908111P
Professional Personnel
Hours
PROJECT MANAGER
.60
PROJECT ENGINEER
2.70
TECHNICIAN
2.50
Totals
5.80
Total Labor
10594
Payment
28,261.35
28,261.35
28,261.35
C9V73V0010000 Y18SF013738
D858FF SLKDKOI 11/21/201808:30 -150 •
Amount
167.49
403.08
279.44
850.01
Total this Task
Task 070 Soil Sampling & Crop Management Plan
1. 2017 Irrigation and Crop Management Plan (ICMP)
2. 2018 Irrigation and Crop Management Plan (ICMP)
Professional Personnel
850.01
$850.01
..............
Hours Amount
PROJECT MANAGER .40 109.97
CLERICAL .70 50.39
Totals 1.10 17.36
Total Labor �ran2Fln� X160.36
Subconsultants
Land Profile, Inc. 26,915.89
Total Subconsultants n — — 26,915.89
I'Mal this Task _ $27,076.25
............................................................................................................................................................................
Task 080 Water and Wastewater Rate Studies
1. Coordination with Katy Isaksen
2. Annual Discharge Volumes
Professional Personnel
Hours Amount
PROJECT MANAGER 1.10 300.05
CLERICAL .30 35.04
Totals 1.40 335.09
Total Labor
335.09
a 2810 W. Clearwater Avenue, Suite 201, Kennewick, WA 99336 p 509 783 2144 f 509 736 0790 w www.jub.com :21/
PORT OF MATTAWA PORT DISTRICT NO. 3 OF GRANT COUNTY
J -U -B Engineers, INC.
Date Type Reference Original Amt. Balance Due
1116/2 19 Bill 122429 666.04 666.04
Money MK -General 23/T.7 Utility Locate & Water and WW Rate Stud
SF5001-1 To reorder call Safeguard Solutions at 800-727-9120
Safeguard' �ITno Usa SFSLIP CK7SO8111P
Professional Personnel
PROJECT MANAGER
Totals
Hours
.50
.50
10540
2/1/2019
Discount Payment
666.04
Check Amount 666.04
666.04
C9V73V0010000 Y18SF013738
D858FF SLKDK01 11/21/201808:30 -210 •
Amount
133.57
133.57
Total Labor
133.57
Total this Task
$133.57
Task 080
Water and Wastewater Rate Studies..........Q. ...�J/� Cv(...�....
��%J _� /
Professional Personnel
�
Hours
Amount
PROJECT MANAGER
1.90
499.87
CLERICAL
.30
32.60
Totals
2.20
532.47
Total Labor
532.47
Billing Limits
Current
Prior To -Date
Total Billings
532.47
8,040.22 8,572.69
Limit
39,000.00
Remaining
30,427.31
Total this Task
$532.47
Total this Invoice $666.04
Ben W. Volk, Project Manager
DATE
GL ACCOUNT `" _" AD
a 2810 W. Clearwater Avenue, Suite 201, Kennewick, WA 99336 p 509 783 2144 f 509 736 0790 w www.jub.com
Port of Mattawa PAYABLE
S. BANK WARRANT
DISTRICT NO.3 OF GRANT COUNTY 1-888-800-8626 i 01
,
P.O. BOX 2328 • MATTAWA, WA 99349
(509) 932-4928
96-571
ais
11 December 28th 20 18 1
PAY Three Thousand. Two Hundred Twenty Six and 82/100 $ 3,226.82
To r �
Port of Mattawa
THE
ORDER J-U—B Engineers, Inc. DISTRICT NO. 3OFGRANT COUNTY
OF
N0N-G�11ABL�
L J 8
S(� - r' s 't e + ^+ f—; >7 < * e� $ �{ (^ Security features are included.
i� i..S l _ Y :. .d' l.r L.i ( ' O d L r 360 { 3 Q -'1 S 3&: : ` Details on back.
DETACH AND RETAIN THIS STATEMENT
THE ATTACHED WARRANT IS IN PAYMENT OF ITEMS DESCRIBED BELOW.
IF NOT CORRECT PLEASE NOTIFY US PROMPTLY. NO RECEIPT DESIRED.
DATE
INVOICE
NUMBER
DESCRIPTION
AMOUNT
DEDUCTIONS NET AMOUNT
PARTICULARS AMOUNT
12/28/18
121764
$3,226.8
- __14 ._--
2 228.
�`oi�la Z�aGor ,
Total this Task $2,228.14
..........................................................................................................................................................................
Task 070 Soil Sampling & Crop Management Plan
1. Review and Print 2016 & 2017 Irrigation and Crop Management Plans (ICMP)
2. Coordinate ICMP - 2018 with Phil Small, Lead Profile
Professional Personnel
Hours Amount
PROJECT MANAGER .70 184.16
Totals .70 184.16
Total Labor 184.16
Total this Task $184.16
a 2810 W. Clearwater Avenue, Suite 201, Kennewick, WA 99336 p 509 783 2144 f 509 736 0790 w www.jub.com
Project 30-07-075 Port of Mattawa - Misc Engineering invoice 121764
........................................................................................................................................................
Task 080 Water and Wastewater Rate Studies
Professional Personnel
Hours Amount
PROJECT MANAGER .90 236.78
CLERICAL .40 43.46
Totals 1.30 280.24
Total Labor 280.24
Billing Limits
Total Billings
Limit
Remaining
Current
280.24
Outstanding Invoices
Number Date Balance
7
Total 6,855.17
(Note: Clients will be charged 5% for credit card payments.)
Ben W. Volk, Project Manager
www.jub.com
www.jub.com
Prior To -Date
7,759.98 8,040.22
39,000.00
30,959.78
Total this Task
Total this h
$280.24
1-U-13 ENGINEERS, Inc.
1 -U -B ENGINEERS, Inc.