HomeMy WebLinkAbout*Other - Public WorksMAI 10i Grant County Department of Public Works 124 Enterprise St. S.E. Ephrata, WA 98823 Serial No. 23.081 To: Honorable Grant County Board of County Commissioners From: Dave Bren, PE, MSCE County Road Engineer Date: April 25, 2023 Re: Amend the 6 -Year Transportation Improvement Plan (TIP) to add (2) projects Legislative History: Financial Impact: • First Presentation: May 2, 2023 . Silica Road Overlay (Sunland to 1 -NW) (STBG) $ 191505000 • Second Presentation: � � • S -NW Reconstruction (SR28 to 7 -NW) (RAP) $ 15615,000 • Action Requested: TIP Amend Fiscal and Policy Implications: • S -NW Reconstruction: The Rural Arterial Program (RAP) funded S -NW Reconstruction requires BOCC signature to authorize the funding agreement with the County Road Administration Board. The RAP funding provides for $1,453,000 (90%) of the project and the County Road Fund will provide for the remaining $162,000 (10%) of the funds. • Silica Road Overlay: The project is proposed to be funded by STBG funds. The STBG funding would provide $995,000 (86.5%) of the project funds and the County Road Fund will provide for the remaining $155,000 (13.5%) of the funds. Commission Packet Attachment A. Updated 6 -Year TIP Map and Projects List B. Resolution to Amend 6 -Year TIP Action Requested Public Works Staff requests a resolution for approval of an Amended 6 -Year TIP to add g projects: ✓ S -NW Reconstruction from SR28 to 7-NW,p�ppROVED v'Silica Road Overlay from Sunland to 1 -NW MAY n g 2023 ON SEN O.To meet current anal Tuture needs, serving together with; pu.bIiG and private entities„ 'wh,ile osLering a respesz'ful: an�uc�oess F til work enViron;rnent.. lnformatia..........(5C*) 754-15082 Dare are n, PET,Cou.ntY Road Engineer. ....... .........E t. 3502 Ed ..._.___.......__.-.E�t.���� FAX.. -. _ .._..... - •_ _ .. _..��t�� 754-6087 Bob Rarsanti� construction Er��irGear._ t�,til+e DeTt".t�lia aru Pe nrisor-�i t_ riko. �. ._ .........E�tk. 359 r . PUblimorl s@grantcountywa.gov Loc 0111, Act".ata nt Lead—, 10 h Brise ey, Supervi r -Dist r4o. 3._�,�._�� _._.�__.._,�.E�t 354 Sam castro, PublicWorkSDi...... _..E.xt.3504 Food F01Ieti4Foremanti Sign Sliop._ _.... 3-57 John $pie.ss Su'erVisor-Centra:I ..._.Ext�B i .fa n Collins solid Waste (509) 754-4319 Andy Booth, ar dg uperrri or._.�............... ext 35 5 �arn�u�l Dart,�s�tant�ir�i�ctor......._...�._..._.. ngs, .._......__._..._.-_•-_ T29N 6o wrev.. _ �� So T29N uV!`, 59 N Grant County T 28 N s9 G-� t} y T28N .. 58 ^ P58 a v I ��ys}'/ymd" E 57 Yew W (�V a e se M 55 55 o o T28N 54 T28N S 54 _ T 27 N T27N W 53 Z 53 3 From 2023 to 2028 52 52 51 51 50 NE 50 1��t1 Etna / %�� i/ /...!iiia % % � /�i�/��,�� �% �% ,_� � � �% �%:.. .� L 50 49 49 Amendment 3 Dated 26N 46 T27N 28 N 47 K 48 4T 28 N 7 i ' 48 A J46 I W Z 45 Z 45 I 4 44 4 43 Legend E ADA RAMPS Sidewalk upgrades "' 26N 42NE 42 NE 42 T26N 42 ' T 25 N 25NMISCELLANEOUS PROJECTS H' W 4, ® Additions 28, 29 40 40 39 a 6yrlayer N "' 3 NLLI W W 38 z 38 G 0 37 NE County Roads NW NE 77 37 Lakes and Streams T24N c38 �' 36 NE z 36 NE 36 T24N 35 .. `. sa^su' 35 e County Outline A3q 34 >4 0 33 33 iwuj; 7.7 3 DIV City Limits 32 32 A m 31 State Highways and Interstates T24N B31 r °�� T24N 30 0 30 T23N T23N �.;.. H Rail Road �° W 29 NE 29N 29 29 Q ? 2e J��� a Z 29 ° W 1 inch= 3 miles W W w w W W 27 oe�G 27 NE X 27 cli W 29 z 26 N E gQ 0 2e R 0 P 0 N M L K J I H G F E D Zg Q �`' 25 C 25 NE T23N W m OD< O 24 T22N T22N z4 SON 23 -. P 27 Z •qe Y, S23 W D • 22 22 21 Nw w 21 i' OVEREN �� �Ae,9h 20 NE z 20 N N 20 tr N i. 9NW R� 19 X W V19 - S2 *.Q O 18 NE e 2 N T22N 18 y2 T2 T 21 N 0 17 n BAIRD S RING RD Z 0 16 NW o ,.✓ , 4 16NE 16 \� M W 14 14 �P•3NW RT\N 21 N 13 12.5 N ARTIN RD A \\\ 0 2 T21 N T 20 N 12 TIN T 20 N AR 11.5 NW.. _ ...,. M :. • Q „ O 1 LLZ 0 _ 9NW � _ d \\HQ\\ \\\\ \\1\@\\\\ W W 9 9 = Z g U' O Z W � z e Y�o 7 NE 7 7� :. T20N " 6 T20N a T19N T19N 5 w 5 4 Z '}' 2 T LL 3 N E \\\\\ \\ 3 3 z I _ _ " 3 2 Z r°... - N RTH FRONTA ERA t z 1 SOUTH FRONTAGE RD ; t3y . '%N NE T1 NW T19N T18N EL � �� � t 18N SE SW z 2 3 si<i� 3 SW 3 q'F0 3 4 SW 4 0 T 5S 5 5 O V z 6 T18N T18N 6 A. o T17N T17N O 7S 0 7 7 FRENCHMAN"HtLLS Rp . ' . ❑- 9 8 ' 9SW 0 I p 10 10.5 SW 10S 10.5 SE 10.5 SE 0SEI n W 11 S 1, 12 T17N 7N T17N 12 T16N T16N ty G 13 H K L M N 0 P 0 R S T U V W X 17 14 j Lr 14 s BEVERLY BURKE D L 15 W C4 rr C ww ww w w 10 0) N M 0 M 1gSV'� I8 18 _. _. 17 STONE RD i W7 Cp F INSET MOSES LAKE '� j E K R W R -IVVA T 16 NTS t.t: t� N� T15N 18 OW �A �,�CRF a T15 �OtfDIICIRD' .1�t V19 RD B�cDN -h �lMRFiE a y W W 20 A r0i! L ✓'. ",i'�F N V p DAhL RD V_ p� HI RES DR o W21 21 2 = BEjtTRAMWY z2 t� 1S zx `K NIS' I R i 23 KE SLO E RD` 23 RAINIE a s ({ SW P GREW DD ` VALLEY— T 15 N^I ., WILD GOOSE LN 24 1 T 14 N ua' T 14 N y SCOTT RD NE 2s ' x5 1 inch 0.57 miles> W 26 SW 2e O m - x6 � .if k. er 26 it 27 SW 27A a27 27 B A 26 28 SW zs 26 A ::�- .. 28 29 3: 29 W W B C D E F NESAP D T 14 N V30 i�i<s 30 � � W W D Yr,-<w„w�ev� p TEAL RD J P z••*� . 6 8; MAE VA 31 EY RD 72r'i'`a,•'re}sem.S.�r3! 72 L J I M G F E SW V`�^�/ S E Z{((( T S R 0 P O N M OP• •p,,,.,P,,. ;{i I - R�` NUJ ', 4 W W W w w w co N N N N N Ask VANWI&I I. gpkon Sbde Dep"Is"Ite Of T044moa! orwUlam Agency: Grant Co. County: Grant MPOIRTPO: Quad -Co RTPO Six Yeu Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start year Oryyy) Federal Fund.Cod* Federal Funds, State Fund Codw State Funds, LocalFunds Total Funds S CN 2024 STBG(11S) -934,200 0 145180a 1,080.000 01 1+10:80011080,000 Totalsi 934,2001 1 — Expenditure Schedule Phase fst 2nd 3rd 4th 5th &-ft CN .0 1,080,000 0 0 0 TataI3 0 ItiO80,0001 0 Q -0 Report Date: April 25, 2023 PageOO1 M Ac T I M _n M q A. PIN/Projett No. ff. STIP ID 0 -4 C C. Protect Title a C:1 C 3 D., Road Name or Number ck, 4d" - Cr E_ Begin & End Temdni z CL 0 40 — 0 F. Project Descrl tton a. shu, itD I P ctu 0 05 1 {A-02546 11t1WI 03 P T W 1,020 CE Yes. COCHRANAD & OTTMAR RD 41550/41660 0.15to Reconstruction - Work wilt include gTad6, dn'"inaO. HMA suifacinq.:Curb & ■ Gutter: sidewalks, - traffic control and other items. PE done under federal, prqj.eo STPU"079(901� Locatiow. Airway DR t* Valley Rd Funding Status Phase Phase Start year Oryyy) Federal Fund.Cod* Federal Funds, State Fund Codw State Funds, LocalFunds Total Funds S CN 2024 STBG(11S) -934,200 0 145180a 1,080.000 01 1+10:80011080,000 Totalsi 934,2001 1 — Expenditure Schedule Phase fst 2nd 3rd 4th 5th &-ft CN .0 1,080,000 0 0 0 TataI3 0 ItiO80,0001 0 Q -0 Report Date: April 25, 2023 PageOO1 WrAMNL vi n sbrte wwat of 104*11spoptation Agency: Grant Co. County: Grant MPOIRTPO.- Quad -Co RTPO S *1 1 x Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year JYYYY) Fed" Fund Coder Fademl funds State Fund Code State Funds Local Funds Total Funds S CN 2023 0 515-0. Totaft 0 011 F15ii 18,15 Expenditure Schedule Phase Ist 2nd 3rd 4th Sth & st1h, CM 11,5,150 0 0 0 0 Totals115,150 04 0 Page002 M Ic A. PIN/Projopt No. S. STIP ID AD -4 C. Project Thle J* - C D. Road Name or Number 0. 57 0 Cr E. Begin & End, T4rrn1n1 to a F -project Description sk, Structure M 10 CL 2 WA -12565 11/twi WIWI 21117 -CC 21 T 0.060 CE Yes .-%fet v- SR 28 and White Tail Road Roundabout U LNW 22.85 -to 22M Safety- SR 28 and While Trag R084 RaundaWut 93010 Intemedon- Work wig tnoWs earthwork, drainagei HMA surface, t(affic: control and other items Location: U NW & SR28 Intersection Funding Status Phase Phase Start Year JYYYY) Fed" Fund Coder Fademl funds State Fund Code State Funds Local Funds Total Funds S CN 2023 0 515-0. Totaft 0 011 F15ii 18,15 Expenditure Schedule Phase Ist 2nd 3rd 4th Sth & st1h, CM 11,5,150 0 0 0 0 Totals115,150 04 0 Page002 Agency.- Grant Co. Count)(: Grant MPOIRTPO.- Quad -Co RTPO SiX Year Transportation Improvement Program From 2023to 2028 N Inside YOUtside Funifihg Status Phase Plea" Stad Year (YYYY), Fedorail Fund Coft Federal Funds SWU Fund Code State Local Funds Totat Rads S PE 202.' - 0 30,000 30,,000 CN- 2023 0 120,000 120,000 tt 150,0001 1504000 D 01 Expenditure Schedule Phase 1st 2nd Mrd 4"t 6th & ft PE 30,E 0 0 0 0 CN 120"000 0 0 0 0 01 01 0 Page003 M X o A. PIN/Proita Na. B. STIP ID > 0 < 1 -4 z C. Project Title 3�- 4=1 0 = C 3 D -Road Name or Number Sesto & End TermlrA CL Cr E. x IV V 2 CD10 F. Prpjerct Descdptfon G. Structure ID 00 3 WA -13302 11MU21 11116121 21 -117 -CC 05 PT CE No - ADA Ramp/ Sidewalk upgrades PhW& I Various to Various Work Consists of ADA Ramp arWor Sidewalk upgrades and oho items JLocation` (VAriout) Funifihg Status Phase Plea" Stad Year (YYYY), Fedorail Fund Coft Federal Funds SWU Fund Code State Local Funds Totat Rads S PE 202.' - 0 30,000 30,,000 CN- 2023 0 120,000 120,000 tt 150,0001 1504000 D 01 Expenditure Schedule Phase 1st 2nd Mrd 4"t 6th & ft PE 30,E 0 0 0 0 CN 120"000 0 0 0 0 01 01 0 Page003 a Six Year Transportation Improvement Program From 2023 to 2028 ager; Grant Co - County: Grant MPOIRTPO—. Quad -Ccs RTPO U inside M M A. Plt�fl�ro}e No. H� STIP as '� -_ CIO z C Prcyje ride °' � � 0. Rif Name or Number � erSX .... rs �. rr F- 864n End TeIndni v z -� � F Project i "Cliption G. Structure to , a06 , # /991 # 4 A-09755 11115121 21 -417 -CC € 3. FITW GW CE iso Grape &: Mapte Drive 423SW42600 JVO-O to .361,75 RecmshWion-Woirk wUt incluft grade, drainage, , curb. ami g ktar, I lMk twowak traffic corgrof arta other items, l.ttMbDr, : t Ounty Line 625 X noth of SR17 to Stm t3rd Rd. Expenditure Schedule Phase 1st 2nd 3rd 4th .5th & lith CN 1,525,00 0 0 Tr taf�r 1,625,000l O 0 Page004 Alk an State wro - - - -2 of TranspoKatim Agency : Grant Co. County: MPOIRTPO: QuaGrantd-Co RTPO Six Year TransportationImprovement Program From 2023 to 2,028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Feftnd Fund Code Federal Funds -State Fund Code Statia Funds Local Funds Total Funds P PE 2023 a CRAB 1321900 UO.000 P M. 1.1955 000 Totals tt 1.892.*Wl 210,M1 2,103,000 3 4 A. PINIProlect No, B. STIP 16 C C. Project Title 3 C D- Road Nam* or Number -4 cr E. Begin & End Termini V 0 0 F. Project Description 0.Structure ID .43; CL 05 5 WJE -13303 11116121 11/15121 21 -117 -Ce 03 4.220 CC- No 9 -NW Road 9 NW 5.84. to' l 0.06 9 NW Road 193020. work *11 include earthwork. drainage. SST surface. traffic control 93020 and other items. Location: SR 283 to Dodson Rd Funding Status Phase Phase Start Year (YYYY) Feftnd Fund Code Federal Funds -State Fund Code Statia Funds Local Funds Total Funds P PE 2023 a CRAB 1321900 UO.000 P CR 2024 Q CRAB 1.1955 000 Totals tt 1.892.*Wl 210,M1 2,103,000 Expenditure Schedule Phase 1st 2nd 3rd 4th M&M PE 48.000 10,01000 0 CN 0 0 0 0 I Totatsf 48,6001 100-p000r 01 0 Page005 Adhk an cs�rsroportalloe�tn Agency: Grant Co. County; Grant MPOIRTPO.- Quasi -Co RTPO so ix Year Transportation Improvement Program From 2023to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federat Fund Code Fo"I Funds. State Fund. Code State Funds: Local FuMft Tota[ Funds PE 2023 0 0 50,000 $0,000 PE 2024 .0 0 A. PIN/Project No. E. STIP 10 MOW PE W .0 0 '0 C -4 3 M z C. Project Tifla 0 104,000 10,000. P -W RE 2027 .0 a 10,000 C D. Road Marne or Number 2028 CL 0 .0 10.000 S 1r; 2023 � lb -0 D 0 a 3 Cr F. Begin & End Termini CN 3 * ' z z 0 M a 240,000 a 2025 0 F. Project Description G. Structure- ID 240.000 240,000 z 0 2026 "0 0 .240,000 CL 07 6 WA -14063 11115/21 Timm 240,000 21-117-M 03 CN 2028 0 No 240.000 240,000 Misc Projects local only Totals 01 11550,000 1,550,00,01 various to various Miscellaneous Projects inrJuding safety and maintenance, with k�al funds, Funding Status Phase Phase Start Year (YYYY) Federat Fund Code Fo"I Funds. State Fund. Code State Funds: Local FuMft Tota[ Funds PE 2023 0 0 50,000 $0,000 PE 2024 .0 0 10,000 MOW PE 2025: '0 0 10,000 10,000 PE 2026 0 0 104,000 10,000. S RE 2027 .0 a 10,000 P PE 2028 0 0 10.000 S CR 2023 � O 250.000 250,000 CN 2024 0 .240,000 240,000 CN, 2025 0 0 240.000 240,000 CN 2026 "0 0 .240,000 240,000 GN 2027 0 0. 240,000 240.000 CN 2028 0 0 240.000 240,000 Totals 01 11550,000 1,550,00,01 Page006 4? ft—M-4 S bj" %awww9s. of T"nsporWion wro ' k Agency: Grant Co. County; Grant MPOIRTPO-. Quad -Co RTPO Six, Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Expenditure Sehedule Phase 1st 2nd -3rd 4th PE 50,000 10,000 10,000 10'M 10,000 CN 250,000 240,OW 240,000 240,000 240.000 Totalsl 300.000i 250.000 250,000 250,000 250,000 Page007 M&__ an State RAW .1"Xit. of TrwmportMlon Agoncy: Grant Co. County. Grant MPOIRTPO., Quad -Co RTPO S . ix Year Transportation Improvement Program From 2.023 to 2028, N kmide Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Coder State.Funds Locaf Funds Total Furift PE 2023 t 10G.000 100.000 P M 1,100.000, Totalsl 1200,000 1.200,000 ZI A. PIN/Project No. a.- STWID 3 C. Project Title x - C D. Road Name or Humber CL r mo 0 Cr E. BogIn & End Termini z V a to G4 ii; F. Project Description. Structure ID CL CL 05 7 WA -1-2567 11115121 1111521 04 P T 4.000 CE NO Stratford Road - Phase, 2 Stratford Rd 13.24 to 17.24 Stratford ;Road - Phase 2 9405 211 - Workwillinclude earthwork. drainage; BST surface, traffic control and olher items, Location: t6 NE Road to 20 NE Road Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Coder State.Funds Locaf Funds Total Furift PE 2023 t 10G.000 100.000 P CN 2024 ti ti T'T00,000 1,100.000, Totalsl 1200,000 1.200,000 Expenditure Sthedule Phase tat 2nd 3rd, 4th 5th .6th PE 100,000 0 0 CN 0 1,1001towl 01 G Totalsi 100.0001 1.100.0001 01 Page008 VW-4M=A-1fiVW6'Wl Shft Deparb"ent of Trartsportation Agoncy: Grant Co. County: Grant MPOIRTM-'Quad-Ce RTPO Six Year Transportabon Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYYJ Federa'l fund Code Federal Funds State Fund Code State Funds Local Funds Total'Flunds. S PE 2023 .0 200,000 P M 200,000 TDWS1 01 400,000 400,000 < d% A. PIN/Projeet, No. B. STIP ID -C z C. P'r*jW Title > z E, 2L M CA= D. Road Name or Number E. EW91n & End TerminIix CL 0 lz� a' Cr F. Project Description StrMt1Ur# ID to CL ft 07 @ 1A-1 3301 11115/21 11.115121 0.200 EA No B -SE Culverts - B SE .24 to .44 Culvert replacement -Work vAR include removal of failiho existing culvert pipe, 2050 approaches, traffic control, and otheritems... Location: (.025 miles; south of Lower Crab Creek Road) Funding Status Phase Phase Start Year (YYYYJ Federa'l fund Code Federal Funds State Fund Code State Funds Local Funds Total'Flunds. S PE 2023 .0 200,000 P CN 2b24 Q 0V 200,000 TDWS1 01 400,000 400,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th, 4"6th PE 200.000; 0 0 CN 20010 00 0 0 T tela 400,000. :01 01 61 0 Page009 Page010 Six Year Transportation Improvement Program From 2023 to 2028 Agency: Grant Co, Cfll nW, . Grant UPOIRTPQ: Ouad-Cao-RTPO M Inside Y Outside V rn A. PINVPro ect No. C' Projekt Tttie D. RdadName awNumber F- v r p. Baha & End Termfni ..8d,, --t a .� se 1F. Prole t esacripttcx� ��a: f'!` cture to 9 WA43304 1111 1 lwl= 21-'11 T -CC 04, P T 1040 CE NO Straford Road Phase 3 S#ratfafd Rd 17.24 to '20.28 Stmftfd RoW 94025 aMP 17,24 to EMP 20,2a 94 2R - Vdbrk will induds earthwork. drainage, BST riaca; Uaift r=Wan *thsr Rome_ gwtion 20 HE Rd to BN$F RR Crossing UL funding status Phase Phase Start Year (YYY i Y Fe'des-W Fund ode Federal Funds State Fund Code State Funds lracat Funds Totat Fungi S CN 2023 0 CRAB 7441000 106,000 850,000 Totals Q 744.0Dwo is.is a_so:at e Page010 i 7qFAWDepwtnwn.1State Agency.- Grant Co. County: Grant MPOIRTPO.- Quad -Co RTPO Six Year Transportation 'Improvement Program From 2023 to 2028 N inside Y Omde Funding ----_� Status Phase Phase Stad Year (YYYY) Federat Fund Kaci Federal Funds State Fund Coder State Funds Local Funds Total Funds P PE 2023 0 0 40, 40,000 P CN 2024 0 0 -250FOOO .250.000 Totals #i 0 290.000 290,000 Expenditure Schedule Phase Ist 2nd 3rd 4th 5th & 6th CN 0 5 ,4Qt 0 0 0 Totals 40,000125►0,000 01 0 Page011 M 3 V A. PIN/Project No. a. P 10 � c C. Project Mea► M D, Road Name or Number 0 L 0 0 F 0 E. Begin & End Termini z ,, a ,-+ . (A � F. Project t�weiption G. Structure iii` � �. z. :� � � � �, 07 10 WA -14069 111151.21 11115121 21-117-M 11 € 4320 NO 23 -NE Fid Sr 171 replacement 93045 9.32.3 to 9.64 23 NE Bridge 171 replacement Funding ----_� Status Phase Phase Stad Year (YYYY) Federat Fund Kaci Federal Funds State Fund Coder State Funds Local Funds Total Funds P PE 2023 0 0 40, 40,000 P CN 2024 0 0 -250FOOO .250.000 Totals #i 0 290.000 290,000 Expenditure Schedule Phase Ist 2nd 3rd 4th 5th & 6th CN 0 5 ,4Qt 0 0 0 Totals 40,000125►0,000 01 0 Page011 AM A A- Ift!"On State IW740 De- of Tunspormlon Agency-. Grant Co. County; Grant MPOIRTPO: Oua.d-Co RTPO Six. Year: Transportation Improvement Program From �2023 to 2028 N Inside-, Y Outside Funding Status Phase Phase Start .,Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Totat Funds 2023 STSG(R) 865,000 0 :702,126 1,567,126 'Totals 865,000 0 702.-12$ 1,567,1261 Expenditure Schedule Phase Ut 2nd 3rd 4th 5th & 6th CN 1.567.126 0 0 0 Totals 0 .01 0 Page012 M < V 0 M %Z A. PIN/Prqect No. a.: STIP ID > 3 C C z Project Title C, Proj > a z C z d D. Road. Name or Number CL 7 0 z E. Begin &End Termini a Q. F. ProJect Description. G. Strueture ID CL 06 WA -1M1 I 1111M 1 11/15/21 21-117-M 04 P T 990 E 'C 3 -NE- Rd Phase -3 94000 8.91 to 10.9 WorR Will include earthwork. drainage, HMA surface, tragic con" and other items Location: S NE to U NE Funding Status Phase Phase Start .,Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Totat Funds 2023 STSG(R) 865,000 0 :702,126 1,567,126 'Totals 865,000 0 702.-12$ 1,567,1261 Expenditure Schedule Phase Ut 2nd 3rd 4th 5th & 6th CN 1.567.126 0 0 0 Totals 0 .01 0 Page012 WrlowrIAMIMMMUMA state Af 0eparbimit at TrwtsporWlon Agency: Gr6ntCo, County: 'Grant MPOIRTPO: :Quad -Co RTPO Six- Year Transportation Improvement Program From 2023 to 2028 N inside Y Outside Funding Status Phase Phase Start Year (YYYY) FederAl Fund Code FederAf Funds State Fund Code State Funds LA)cal Funds Total funds S PE 2023 STP(R) 27,00 01 10,145 37,145 .S. CN 2023 STP(R) 1,541,894 28.7.421 Totals 1,569$9941 01 297.iS661 I11i66,,460 M 3 z log M q A. PIN/Projee N*. a., STIP 10 -3 to -1 0 ow z C z C. Project it X AD Cr D. Road Name or Number E. Begin & End Termini CL CL 2 6.4 0 CL -M, F. Project Description G. Structure ID to CL CL 05 12 WA -1.4077 1111.5/21 11115121 21 -117 -CC 04 PT 6.230 GE NO Dodson Rd Overlay Ph 2 91030 21.76 ta;27.99 2R Work wig inc tude HMA resurfacing and traffic control. Location 7 NW to EPhrsta- City Urrfits, Funding Status Phase Phase Start Year (YYYY) FederAl Fund Code FederAf Funds State Fund Code State Funds LA)cal Funds Total funds S PE 2023 STP(R) 27,00 01 10,145 37,145 .S. CN 2023 STP(R) 1,541,894 28.7.421 Totals 1,569$9941 01 297.iS661 I11i66,,460 Expenditure Schedule phaso 1st 2nd 3rd 4th Rh 6th ,PE 37,10 0 0 CN 1,829f31 51 0 1 0 0 T talsi — .0 0 0 0 1 1 d 11866, "07 1 Page013 waWilsqua suds Vepanma% of Tr*nspwtation Agency: Grant Co. County: Grant MPOIRTPO.- Ouad-Co RTPO Six'Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Lo"I Funds T*tal Funds PE 2023 STP(R) 2,9.90 0 1.123 4,113 S ON 2023 'STP(R),170,771 0 al 1831 202,602 Totals173,76,11 12*054 i Expenditure Schedule Phase Ist 2nd 3rd 4th Sth & Sth PE 40113 '0 0 0 CN 202,602 :0 .01 0 Totalzi 206,715 01 01 01 0. Page014 M In A. PIN/Pirojett No. B. STIP ID C. Proje4t Title 0. Road Name or Number 0 a at U 0 z Cr E. Begin & End Termini -4 14C a CL wo F. Project 1363cliptlon G.- Structure ID CL is 0 Mr CL 05 12 WA -440-781 04 -PT 0.690 CE No - Dodson Rd Ovefty Ph 3 91030 28.99 to 29M ,2R Work will include 14MA resurfacing and traffic control. Lo=ion 13 NW to Ephrata City Limits ------ Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Lo"I Funds T*tal Funds PE 2023 STP(R) 2,9.90 0 1.123 4,113 S ON 2023 'STP(R),170,771 0 al 1831 202,602 Totals173,76,11 12*054 i Expenditure Schedule Phase Ist 2nd 3rd 4th Sth & Sth PE 40113 '0 0 0 CN 202,602 :0 .01 0 Totalzi 206,715 01 01 01 0. Page014 4M vw4mooldn9t state Agency: Grant Co. County., Grant MPOIRTPO-. Quad -Co, RTPO Six Year Transportation Improvement.Program Fr'om 2023 to 2028, N lnsldY Oijtside Funding Status Phase Phase Start Year JYYYY) Federal Fund Code Federal Funds $We Fund Cade Mate Funds Lacs! Funds Total Funds S PE '2023 STP(R) 13,260 O 4,982 '18*242 S CN 2023 STP(R) 757..33915-1-11 0 141,�'l73 Totals] 770,1595 0 146,156 M1750 M -3 z 44 A. PINIProject No. B.STIP ID > 3 a C- Project Title C D. Road Name or Nurnbor 0 'ra- = Cr E. Begin& End Termini V -3 z z eq V 0 CL 0 z C* V 01 F. Project Description G.Structure Ib 0 a. CA 12 WA -14()79 11fl5121 11 15121 21 -11T -cc 04 PT 3,060 CE No Dodson Rd Overlay Ph,4 91030 18.70 to 21.76 2R Work will include I-IMA'resurfaOing and traftioontrol-, LoCaUm, 4 NW to 7 NW Funding Status Phase Phase Start Year JYYYY) Federal Fund Code Federal Funds $We Fund Cade Mate Funds Lacs! Funds Total Funds S PE '2023 STP(R) 13,260 O 4,982 '18*242 S CN 2023 STP(R) 757..33915-1-11 0 141,�'l73 Totals] 770,1595 0 146,156 M1750 Expentlitum Schadulft Phase 1s# 2nd 3rd 4th 5th & 5th PE 18,242 0 0 0 0 ON 898,508 0 0 .0 .01 0 Totatsi 916,7601 '01 0 i PageOl 5 wimidmto stute Agency: Grant Co, County: Grant MFC/R'tPO Quod-Co RTPO int thside Six Year Transportation I'Mprovement Program From 2023 to.2028 Funding Status Phase Phase Start Your ( Y) Federal Fuad Cnida Federal Funds Stste- and Corse Stag Funds Lt>�� Funds Total Funds. PE 2024. 0 0 $0,000 50,000 S GN 2024 STP(US) t ,2 4 Q ,1' 0 450,000 TOtal; 11- 382,E 01 Mt7sol 50,0001 Expenditure Schedvte Phase 1st 2nd 3rd 4th ;kith & 6t PE 0 d CN t? 4-50,000 0 0 0 TOMIS 0 500,001o 01 d Page016 M S A. P!Nl"ect into. B. STIP to C. project Tide : "� S70. IC i�oad Marna or Mumb et E. lin & F,rttt Teumfrtt � � mm � �, �- a Cr -t F. Project Description C. Structu€e tD ' �. 04 13 WA.12569 1,1115/Z2- IIII I 21-1 17 = 04 PT 0.580 cc- No Valley Road Cysrtay l SW*walk Valley Rd f.to2.1t 2R tiveday - V*wkwill'lndude HMA surfaciM ADA ramps, new oxb &-sWwmIkt 41,2501 cwVoI and adw bms. tocMion: Scott fad to Soot of H -NE Fid Funding Status Phase Phase Start Your ( Y) Federal Fuad Cnida Federal Funds Stste- and Corse Stag Funds Lt>�� Funds Total Funds. PE 2024. 0 0 $0,000 50,000 S GN 2024 STP(US) t ,2 4 Q ,1' 0 450,000 TOtal; 11- 382,E 01 Mt7sol 50,0001 Expenditure Schedvte Phase 1st 2nd 3rd 4th ;kith & 6t PE 0 d CN t? 4-50,000 0 0 0 TOMIS 0 500,001o 01 d Page016 WIg State MpWten colt,01 7*0UPOrtat Agency: grant Co. County: Grant lYlPOIRTPO: Ouad-Co RTPO S . ix Year Transportation Improvement Prograni From 2023 to 202U N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2024 0 ARAE 72rOOG 8,000 80,000 P CN 2025 0 CRAB 967.500 107,500 11075,000 Tis 0-1 5 1161,50011f'I55s000 Expenditure Schedule Phase 1st 2nd 3rd 4th 6th firth PE 0 80*000 0 0 0 CN 0 0 1.075,000 0 0 Tat,ais +D 80,000 1,075,000 0 Page017 M V 2. ` A. PIR/Project .No. S: STIP ID 0 rC_ Project Title o Ez C CrE.. Q. Road Name or Dumber Begin & End Termini � a VOL W: F. Project Dascripilon fi Structure Iii 0 CL P 0 m a C}5 14 WA45021 01110/23 Q1110123 01110/ 23-OO&CC 03 3.000 CE Na R -S (24 -SW to 27 -SW) 91041 1,01 to 4.01 Ft -S1 t(2"tib to 27-$W road.,,91041 'Re nstruction work v it 0clvde earthw r .. d4naget BST surface, traffic cartel and o-ttler items.. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2024 0 ARAE 72rOOG 8,000 80,000 P CN 2025 0 CRAB 967.500 107,500 11075,000 Tis 0-1 5 1161,50011f'I55s000 Expenditure Schedule Phase 1st 2nd 3rd 4th 6th firth PE 0 80*000 0 0 0 CN 0 0 1.075,000 0 0 Tat,ais +D 80,000 1,075,000 0 Page017 AM. W=hk%t*n3tVdV bVM1t10fTVWqXWt&ff0n Six Year Trans ortation Improvement Program p From 2023 to 2028 Agency: Grant Co. County.* Grant MPOIRTPO: Quad -Co RTPO N InsIde Y Outside A. PINMroject No. S.-01 STIP 10 C. Project 1700 S 0. Road Nanw or NumberW E. 06 z Cr Begin & End Termini 0 z C .4 CL F, Project Dewil z G. Structure 1D z a, 05 15 WAA4072 11/1-5*21 11/1&2t 04 FT 4.670 CE No H SE 92005 0.00 to 4.67 Reoonstri.Ktion- work will'ftlude earthwmk, drainage, BST swIsda., traffic tontrol and aftw items_ Location12 SE to SR 262 Expenditure Schedule Phase Ist 2nd 3rd nth 5th a Stiff PE 0 0 18510co 0 CN 0 0, 0: 1.666.0m 0 of 01 01 1,850,OODI 0 Page018 WOO Oepwtment of 9r _ Phase let 20d 3rd 4th 5th & Oth Six Year TransportationImprovement Program CN 0 11600,ODil 0 0 0 Totals 0 1,726,178 0 O From 2023 2028 Agency: Grant Co. County: Grant MPOIRTIPO: Quad -Co RTPO N Inside YOuts$de M .� A. Pl"roject No.. EL S71P tD 3:� 3. 40 1 -.. t. Project Title C � � �. � '� C) Mm 0. Road Name or Number � r a � Cr Beg;ri & EnTermini � � � � � 27 Liar. . Pr9lect�dkl NIPHOO turSID��. G, yy���(/► yy���$��c CL 5 16 1 *001). WA -14073 11115f21 11115121 '[-'i1 - 04 PT 2A20 +Cis No W stshore: Drive Ovenay ! Skumalk 50 0.83 to 2.95 2R Work will incksde HMA sWackV, Crgvsr ADA. ramps $i $ik,,"fftc ccaWof and o&mr items. Location.: FOIrway drive to 0.25S. of 4 NE Funding Status Phos Pharr Smart Year (YYYYJ Federal Fund Coder Federal funds Std Fund Code State Funds LocalFunds Total Funds P PE 2024 HIP(USX 126,178 0 0 '1 178 S CN 2024 STNUS) "l,a' t 0 116,E 1,6009000 TMs 1,S'1 A78 0 21%000i 4,726,178 Expenditure Sohodufo _ Phase let 20d 3rd 4th 5th & Oth PE 0 1265171 0 0 0 CN 0 11600,ODil 0 0 0 Totals 0 1,726,178 0 O Page019 VUwNISM on State dMiMAWt R Depwftwmt of Tmuportidion Agoncy: Grant Co. County: Grant MPOIRTPO: Qtjpd-Co RTPO Six'Year Transportation Improvement'Program .From 2023 to. 2028 K Inside Y Outside Funding Status Phase Phase Start Year (YYYY)l Federal fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P' PE. 2025 0 CRAB 144,000 16,000 160,000 P' M 1,440,000 Totals 0 160,000 1tS00,000 z < M 2. X a 0 47 A. PIN/Project No. S. SMP Its3, > 3 0 z 41 :E C. Prplect Title > C 01. Road Name or Number M CL -4 0 C 2 F_ Begin AL End Termini z F;. Project Description G. Structure to 05 17 WA -14074 1.1115/21 11115121 21 -117 -CC 03 PT 5.820 CE NG 0, SW(George to Frenchman Hills) 91035 0,82 to 5.82 3R Wo* will indude earthwork, drainage, BST surface* traffic convol and'othef items., Location: George City Ur*ts to Frenchman Rills Rd Funding Status Phase Phase Start Year (YYYY)l Federal fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P' PE. 2025 0 CRAB 144,000 16,000 160,000 P' CN 2025 01 CRAB 1,296.000 144,000 1,440,000 Totals 0 160,000 1tS00,000 Expenditure Schedule' Phase 1st 2nd 3rd 4th 6th & ath PE 0 0 180.000 0 0 CN 0 .0 1,44%000 '0 T otals01 .0 IjO00,000 0 0 i Page02O Adk Vftddrig a��aparaffion.wt Agency: Grant Co. County: Grant MPOIRTPO-* Quad -C* RTPO Six Year Transportation Improvement Progra From 2023 to 2028. N tnsfde. Y -Outside Funding .status Phase Phase Start Year (YY Y) Federal Fund Code Federal Funds State Fund �Code State Funds Local Funds Total Funds PE 2025 NHPP 9 60;000 01 15.0ml 7520001 P CN 2026 NHPP 640 -OW 0 160,0008W-,000 700,000 01 175,000 875,000 JL PIN/ProjectNo. El. S11P In 0 z ct T Project rojeMo M z ;M0 0 40 C Cr D. Read Name or Number E. Begin & End Termini CL z CL 40 w 0 F. Project Desedptlon 'G. Structure ID VW P CL 06 is WA -14075 11115/2.1 11115/21 21-IlTwCC 11 PT 0.010 GE No Bridge 382 H NW Rd 30430 218 to 2M Bridge replacernent- Work 4ill include -demolitioa. structure replacement, approaches, traffic control and other items, Loeacn:A miles north of Sid 28 Funding .status Phase Phase Start Year (YY Y) Federal Fund Code Federal Funds State Fund �Code State Funds Local Funds Total Funds PE 2025 NHPP 9 60;000 01 15.0ml 7520001 P CN 2026 NHPP 640 -OW 0 160,0008W-,000 700,000 01 175,000 875,000 Expenditure Schedule Phase Ut. 20d 3rd filth Sth'& Gth PE 0. 0 '751000 0 0 CiY 0 800,000 0 0 0 Totals01 .875,0001: l 0i Page021 1 as an Start* of Tratspor"dion Agency: Grant Co. County: Grant MPOIRTPO,. Quad -Co RTPO A -A Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Fedora I Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2027 0 0 5-.000 5.000 P CN 2027 0 0, 96,000 Totals i 01 .01 100,0001 100,000 Expenditure Schedule Phase iat 2fvd 3rd 4th Sth & $th- PE .0 01 0 .5,0 00 C! 4 4 ti 95,000 Total*[ 0j Or ti tl 104,000 Page022 M V A- PINIProject No. B. STIP ID 34l, 3 z C.. "Oct title M z 0 Z. Cr D. Road Name or Number & E Begin . End Termini 0 z -4 0 wo to — 0 -W F. Project Description G.'Stiuctm ID 07 19WA-14076 I 11146121 21-117,�CG .11 PT No Bridge 363 R. NW 30330 ,01 (0.02 Bridge replacement - Work w0 include demolition.'structure replacement, approaches, U-00 control and other items. Location P. NW and Martin Rd Funding Status Phase Phase Start Year (YYYY) Fedora I Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2027 0 0 5-.000 5.000 P CN 2027 0 0, 96,000 Totals i 01 .01 100,0001 100,000 Expenditure Schedule Phase iat 2fvd 3rd 4th Sth & $th- PE .0 01 0 .5,0 00 C! 4 4 ti 95,000 Total*[ 0j Or ti tl 104,000 Page022 AOL "r Wa~on Stake Departineo% of TransporWIon Agency: Grant Co. County. Grant MPOIRTPO., Quad -Co RTPO Six'Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund tode State, Funds Local Funds Total Funds P PE 2023 0 0 10,0001 10,0001 P CN 20230 .0 W1000 501000 -- I L 11 Tota ftl 0 0= 6Tq�T 60,000' Expenditure Sehodula Phase Ist 2nd Stir . & Sth 'PE 0 0 10,1000 0 0. CN 0 0 500001 01 0 Totals i 01 01 60t000 01 0 Page023 In M A. PIN/Project No. 8- S11P ID > o- F 3 ZE C. Project Title z D. Road Name or Number Cr E. Begin & End Termini 3 z V CL go 0 F. Project D"criptlon G. structure ID 0 a 20 WA -14082 MIMI 11115/21 2141?—CC 47 P T 0.1070 GE NO Stratford Bridge 110 94026 0.208 to 0.278 Work incfvdos excavation to spring line of tht pipes, CDF fift; rine tilt HMA, traffic control and other items. Location: 22.7 NE to 23'NE Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund tode State, Funds Local Funds Total Funds P PE 2023 0 0 10,0001 10,0001 P CN 20230 .0 W1000 501000 -- I L 11 Tota ftl 0 0= 6Tq�T 60,000' Expenditure Sehodula Phase Ist 2nd Stir . & Sth 'PE 0 0 10,1000 0 0. CN 0 0 500001 01 0 Totals i 01 01 60t000 01 0 Page023 Alk State DepwtMwt of Travqw"ion Agency: Grant Co. County: Grant MPOIRTPO.- Quad -Co RTPO Six Year Transportatton Improvement Program From 2023 to 2028 N Inside Y OutSide Funding Phase Status Phase Phase Start Year (YYYY) Federal Fund Code Federal funds StateFund Code State Funds Local Funds Total Funds P PE 2026 0. 0 0 0 P RW 2026 0 0 0 50.000 P V -2026 01- 0 2.075,000 .2.076, 000 Ott Totals.01 i 0 2,500,000 I I - 2 ,500,000 "M A. PIN/ProJect No. B..STIP ID 0 z C. Project Tilde C D. Road Name or:Number o CL .0 go Cr EL Begin & End Termini Z 0 M M. 'V 0 F. Pry act Descri Ion 0. Structure ID Pt to CL M 0, V CL 05 21, WA -14081 11115/21 11115f21 21 -11T -CC 21 P T 0.010 CE Yes Dodson Road - Road 12 SW Intersection Improvements 91030 2.235 to 2.245 Install a roundabout at the: intersection of Dodson and 12 SW. Work includes earth -worlc. curb installation, traffic control devices, and other itorns. Funding Phase Status Phase Phase Start Year (YYYY) Federal Fund Code Federal funds StateFund Code State Funds Local Funds Total Funds P PE 2026 0. 0 0 0 P RW 2026 0 0 0 50.000 P CN -2026 01- 0 2.075,000 .2.076, 000 Totals.01 i 0 2,500,000 I I - 2 ,500,000 Expenditure Schedule Phase lot 2r*d 3rd 4th 5th & 6th PE 0 0 375.000 0 RW 0 0 501-000 0 CN 0 0 0 2,076,000 0 Totals 01 0[ 425,000. 2,075,000 0 Page024 Wm"nqton State, ft t of I rutsportsomwWw Agency.- Grant Co. County: Grant MPOJRTFO., Quad -Co RTPO J"w*ix Year Transportation Improvement Pro 'g From 2023 to 2021. N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Fe&ral Fund Code Federal Funds State Fund Code State Funds Local Funds- Totat Funds PE 2025 0 P CN 2026 0 01 100.000 1004000 Totals l 1151000L 115,000 Expanditura Uhedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0fl 15,0 0 .0 0 0 000 0 i Totalsi 01 0 16,0001 100,000 0 Page025 A. PIN/Project.No. S. STIP ID > 0 3 z z C. Project Title yF 0 CI) = C D. Road Name or Number ITermini E. Besin & End e F. Project Nscri'Ptio" G.AttructurID 07 2 A-14084 1111.5121 11115/21 21 -11T -CG 03 P T 1.060 CE No K7 NE 7 NEto8 NE 43070 0.0 to 1.0G Werk includes earthwork, BST, traffic control, and other items. I _J Funding Status Phase Phase Start Year (YYYY) Fe&ral Fund Code Federal Funds State Fund Code State Funds Local Funds- Totat Funds PE 2025 0 P CN 2026 0 01 100.000 1004000 Totals l 1151000L 115,000 Expanditura Uhedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0fl 15,0 0 .0 0 0 000 0 i Totalsi 01 0 16,0001 100,000 0 Page025 Adak air IV 40 state DO of Trampartation Agency: Grant Co. County: Grant MPOIRTFO: QUad-Co RTPO Six Year Transportation Improvement Program From 2023 to: 2028 N Inside Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund:Codo State Funds Local Funds Total Funds PE W24 CFS 108,000 12-CWOOO P M TotaisF, 01 _0 'A. PIN/Project No., S. $TIP ID � � � � m C. Projea Title 0 17 3 D. Road Name or Number Q. Ow0 cr E. Begin & End Tennini V 3 9L F. Project Description :G.-Sttuctute ID a 06 + go 06 23 WA,44024 01AW3 01t10/23 23 -006 -CG 10 No S -NW Br 366 31550 0.990 to 3,990 S -NW SST surface, replace bridge 355 With pre -fab concrete bridge; finished Width Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund:Codo State Funds Local Funds Total Funds PE W24 CFS 108,000 12-CWOOO P CN 2024 CRAB 1,345,500 TotaisF, 01 Expenditure Schedule Phase Ist 2nd 3rd 4th 5th &. 6th PE 0 120,000 0 0 CN 0 1,4195io0o of 09 Q a 0 Totalsi Page026 AML Wro Deparbim of TnnspodAflon Agency: GranrCo. County: Grant MPOIRTPO: Quad -Co RTPO Six..'Year Trans portatio nimprovement Program From 2023 to 2028 N Inside Y'Outside Funding Status Phase Phase Start Year 4 Federal Fund Code M Stat# Fund Code State Funds Local Funds Total Funds P PE 2023 0 0 250,000 '26.0,000 P e.X 2024 D OTHER 800,000 0 800,000 P CN 2026 0 OTHER 8001000 0 800,000 P CN 2026 A. PINIProlect No. B.S-nP,10 OTHER -T 5,300,000 0 5,300POW Totalsi -4 60900,000 I 250,0001 7,150.000 'I C. Project Tide > C 0. Read Name or Number E. Begin & End Termini 0 su ims CL -3 z M r - 9A Cr a Z' A -*1 0 0 z *0 CL 0 to M #A & F. Project Description G. Structure ID a M CL 24 W 1502 01110123 01110/21 23 -006 -CC 01 7.100 CE No Hiawatha Truck Route 40555 4.63 to 1154 Drumheller Road upgrade from p0mitive to truck route, EST surface from Hiawatha Road to a new round about at SRI 7 SR 282 junction Funding Status Phase Phase Start Year 4 Federal Fund Code Federal Funds Stat# Fund Code State Funds Local Funds Total Funds P PE 2023 0 0 250,000 '26.0,000 P ON 2024 D OTHER 800,000 0 800,000 P CN 2026 0 OTHER 8001000 0 800,000 P CN 2026 0 OTHER -T 5,300,000 0 5,300POW Totalsi 0 1 60900,000 I 250,0001 7,150.000 'I Exp,enditure Schedule Phase '1st 2nd 3rd 4th, 5th & Gth PE 250,000 0 0 CN 01 800,000 800,000 5.300,000 0 250,000I 800,000 V0000,300j000 0 I �0 5 Page027 WaW*%gstan ro . oinwapairtation Agency., Grant Co. County: Grant MPOIRTPO: Quad -Ca RTPO N Inside Six Year Transportation provement Program From 2023, to 2028 Y Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code: Federal Funds 'State Fund Code State Funds L*ral Funds Total Funds P CN 2023 1 a 0 400,000 400,0001 Totals 0 400,0001 400,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 6W & Oth CN 400,000 0 0 Totals 400*000 0 0 0 It - -- --- - 0. 0 Page028 A. PIN/Project No. B. WIP 10 C z C. Project Title F C D. Road Name or Number E. Begin & End Unnini 0 V 0 Z4 V F. Project Description G. Strticture 10: tr Q. 07 25 -WA-14986 01110123 0111012 23 -006 -CC 04 1.570 No Gravel to Oil 12 NE and 8 NE 94030/94020 8.24/1.18 to 4.0111.99 .77 miles of 12 NE and .8 *f 8 NE Gravel to Oil, B surface Funding Status Phase Phase Start Year (YYYY) Federal Fund Code: Federal Funds 'State Fund Code State Funds L*ral Funds Total Funds P CN 2023 1 a 0 400,000 400,0001 Totals 0 400,0001 400,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 6W & Oth CN 400,000 0 0 Totals 400*000 0 0 0 It - -- --- - 0. 0 Page028 *-- W.W MmUnghneS 0 WrAAV I ON a 0 at Tnnsp"tation Agency: Grant Co. County: Grant MPOIRTPO-. Quad -Ca RTPO Six Year Transportation Improvement -Program From 2023 to 2028, N Inside Y Out0da Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds Staite Fund Code State Funds LocalFunds Total Funds P PE 21324 BR 870,000 8,70,000 P M 0 0 3,560,000 Totals 4, 01,000 -J 01 01 4y430,000 A. PINIProject No. a. STIP ID, 0 -4 ,2 z C. Project Titlee C 0- Road Name or Number -C, z ze, rr E. Begin & End Termini z I I CL V 0 F. Project Description :G. Structure 1 D 0 % CL 07 26 WA -14987 01/10123 01110/23 23-0061-ce :w Bridge 247 W SE 26530 1,98"to 2.0 Replace bridge 247; has been of special concem- to the Bureau of ReclamaVon with expanded canal capacity. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds Staite Fund Code State Funds LocalFunds Total Funds P PE 21324 BR 870,000 8,70,000 P CN 2025 SR 3.560=0 0 0 3,560,000 Totals 4, 01,000 -J 01 01 4y430,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 870.000 0 0 0 CN 0 0 3,5601000 01 0 Totals01 S70,0001 3,50,000 01 0 i Page029 Amh Mrviftstingtm Sib" o . - - - -- t of Trowwwtation Agency: Grant Co. County: Grant MPOIRTPO: Quad-CoRTPO' Six Year Transportation Improvement Program From 202.3 to 20 28 N Inside Y Outside Funding status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2025 BR 980,1000 0 0 9801000 1 P M 0 0 4.D259000 Totals, 5,t3d ,v€ 01 0 5,005t90o T M 10 �z A. Nect No, B STIP ID 3 M z C , PPIrQ/Projjw Title x > CL a o D. Road Name or Number �z lb 1 0 CL 3 Cr E. B*Wn.& End Termini z M 40 4V M F. Project Description G. Structure ID Z CL 07 27 WA -14988 01/10M 01MOM 234* -CO 1 i 0,010 No Bridge 24811 SE west of U SE 24500 4.21 to4.22 Replace Bridge 248, Rd 11 SE Funding status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2025 BR 980,1000 0 0 9801000 1 P CN 2026 SR. 4.02,6f.000 0 0 4.D259000 Totals, 5,t3d ,v€ 01 0 5,005t90o �Expenditure Schedule Phase 1st 2nd 3rd Ml. Sth &'Gth PE 0 980,000 0 0 CN 0 0 4,025. 0 ToUls! 0 0 040$000 4p11250000 Page03O WROLWMAi4vt She Departntm of Tmu4mwtation Agency: Grant Co. County: Grant MPOIRTPO: Quad -Co RTPO SIX Year Transportation Improvement Program From 2023 to 2028 N InWe Y Outside Funding Status Phase Phase Start Year (yyyy) Federal Fund Code Federal Funds State Fund Code State. unds Locat Funds Total Funds P PE 2023 0 'CRAB 106,000 12.0W 120.000 P CN 2024 0 CRAB, M 1,495,000 Tatats 01 1,453,0001 162,000 1.6151,000 A. PIN/Projed No. E. STIP ID 0 < C =0 z C;. Project Title > L. in = C D. Road Name or Number 3 .0 C 0 Cr E. Begin & End Termini z IV V 02 to e� F. Project'Description 0. Structure ID 0 M 0 a 0 CL 06 28 WA -1 5113 04 P T 1000 No S -NW Reconstruction 31550 .99040 3.990 Reconstructing 3 miles with SST surfAm from SR 28 to'? -NW. Funding Status Phase Phase Start Year (yyyy) Federal Fund Code Federal Funds State Fund Code State. unds Locat Funds Total Funds P PE 2023 0 'CRAB 106,000 12.0W 120.000 P CN 2024 0 CRAB, 1,346w0001 1,495,000 Tatats 01 1,453,0001 162,000 1.6151,000 Expenditure Scheduler Phase Ist 2nd 3rd Ah 5th & 6th PE 120,000 0 9 U 0 ctq 0 1,495.,9W 0 Tons 120,0 9601 1,495j000 01 01 a Page031 AOL 1prarwashh7astdOW—B De at TState ransportation AgencY., Grant Co. County: Grant MPOIkIrPO- Ovad-Co FZTPO Six Year Transportation Improvement Program From 2023 to 2028 N Inside Y Outside Funding Status Phase Phase Start,Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Laval Funds Total Funds P PE 2023 -STSG 50,000 0 SOMO, P CN 2024 '$TBG 950,000 0 150.000 111M,000i Totals 1,000,000 0 160,0004 11150100.0 'M V A. PINIProject No. BO snt) ID C. Project Tittle > C. D. Road Name or Number C cr E. Begin & End Tirmini F, Project Descriptlonei .G. Strueturo ID. LU 07 29 WA -15114 04 P T 1.990 NO Silka Road Overfay� 30990 5,003 to 6.998 JACPsurface oveft Funding Status Phase Phase Start,Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Laval Funds Total Funds P PE 2023 -STSG 50,000 0 SOMO, P CN 2024 '$TBG 950,000 0 150.000 111M,000i Totals 1,000,000 0 160,0004 11150100.0 Expenditure Schedule Phase 1st :2nd 3rd 4th 5th & 6th PE 501OW 0 0 CN 01 17100.QOO of 01 0 Totall 50,000 V 01 0 01 1100.000 1 Federal Funds- State, Funds Local Funds TO urs s Grand Totals for Grant Co. 15,447,4501 11 14,178,4001 9,581,3511 39'215,20-11 1 Page032 Aw1k6 Viftsithigton bvmd of Transportation Agency:- Grant Co.. County: Grant MPGIRTPO: Quad -Co RTPO Six Year; T. ransportation Improvement Program From 2023 to 2.028 N Inside Y Outside Funding Status Phase Phase Sart Year (YYYYY Federal Fund Code Federal Funds State Fund Code State Funds. LocalFunds Total Funds P PF 2023 STBG 50,000 0 0 50,000 P r 2024 STSG -945,000 0 155,000 111001000 1,150,000 9951000.1 0 1 155,0001 —J < IA- PIN/Project No. 'SIP STIP I[3 > S 1* 1 C. Prolect Title k z C D. Road Name or Number End Termini CL o3 IM If E. Begin z a CL 0 ca F. Project Description G, Structure iD 0 CL 07 29 WA -1 54 .14 04 P T it -9941), No Silica Road Overlay 2 30990 6.003 to 6.998 ACP surface overlay from 1 -Std to 1-N #. Funding Status Phase Phase Sart Year (YYYYY Federal Fund Code Federal Funds State Fund Code State Funds. LocalFunds Total Funds P PF 2023 STBG 50,000 0 0 50,000 P r 2024 STSG -945,000 0 155,000 111001000 1,150,000 9951000.1 0 1 155,0001 —J Expenditure Schedule Phase 1st 2nd 3rd 4th nth & fith PE :50,000 0 0 CN 1.1GO"000 0 0 Totalsi 50,000 1,100,0001 01 Ot 0 Federal Funds State Funds, Local Funds Totat Funds Ora ,.16 375,450 40,-; 15,201 nd Totals for GrantC*.1 1 Page033