Loading...
HomeMy WebLinkAboutResolution 19-044-CCBOARD OF COUNTY COMMISSIONERS Grant County, Washington RESOLUTION TO INITIATE COUNTY RESOLUTION No. 19- ow -CC ROAD PROJECT DESIGNATED AS CRP NO. 19-05 WHEREAS, IT IS HEREBY RESOLVED THAT Road Q -NW, State Road Log No. 32850 from milepost 3.280 to milepost 4.120 be improved as follows; This project will grade, drain, surface (BST Class A) finished width = 26 ft. This project is 0.840 mile long. WHEREAS, This project is hereby declared to be a public necessity and the County Road Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070; NOW, THEREFORE, BE IT HEREBY RESOLVED THAT the Board of County Commissioners declare that an appropriation from the officially adopted road fund budget and based on the County Engineer's estimate is hereby made in the amounts and for the purposes shown: PURPOSE Engineering Right of Way Acquisition PROGRAM SOURCE Local TOTAL (Not Subject to 36.77.060) Construction TOTAL (Check appropriate box) Local Cost Share (Private) AMOUNT OF APPROPIATION $ 500 $ 0 $ 500 $101,875.00 $ 34,125.00 $136,500.00 ® This project is included in the officially adopted Annual Road Program as item No. 11 ❑ This project is hereby made a part of the officially adopted Annual Road Program in accordance with RCW 36.81.130 Page 1 of 2 BE IT FURTHER RESOLVED: (Check appropriate box) ❑ The construction is to be accomplished by contract in accordance with RCW 36.81.130 ® The construction is to be accomplished by county forces in accordance with RCW 36.77.060 and WAC 136-18 DATED this 2, day of , 2019. ATTEST: arbara VasPC lerk of the BOARD OF COUNTY COMMISSIONERS Yea Nay Abstain GRANT COUNTY, WASHINGTON Tom Taylor, Ch ' . e5 ❑ ❑ ` u I Cindy Cartr,ivice-Ch it Richard Stevens, Member Page 2 of 2