DEVELOPMENT SERVICES DEPARTMENT — BOCC UPDATE
APRIL 4, 2023 —11:00 a.m.
1. D.S. Update —Permitting and Revenue Statistics (Finance Concerns)
2. Fee Schedule Draft (Building and Fire)
3. MOU —ILA Moses Lake (UGA Development)
4. Personnel Policy 1607 (Capital Facilities and Transportation Plans Process)
"TO MEET CURRENT AND FUTURE NEEDS, SERVING TOGETHER WITH PUBLIC AND PRIVATE ENTITIES,
WHILE FOSTERING A RESPECTFUL AND SUCCESSFUL WORK ENVIRONMENT."
BOARD OF COUNTY COMMISSIONERS
GRANT COUNTY, WASHINGTON
A RESOLUTION AMENDING THE RESOLUTION No. 23- -CC
GRANT COUNTY DEVELOPMENT
SERVICES BUILDING & FIRE PERMIT
FEE SCHEDULE
WHEREAS, it is the intent of the Board of County Commissioners for Grant County to
implement reasonable building and fire application fees in order to maintain current service
levels and which are consistent with other jurisdictions; and.
WHEREAS, it is the intent of the Board of County Commissioners for Grant County that
users of the Development Services Department's building and fire services bare a reasonable share of
the costs associated with those services rather than rely upon the citizenryof the County to subsidize
these costs; and,
WHEREAS, Development Services Staff have conducted a fee schedule survey of
neighboring and similar Eastern Washington Counties;` and,
WHEREAS, when compared to the. survey, the Board of County Commissioners for
Grant County have determined that the attached fee schedule generally represents a reasonable
cost for building and fire applications in Grant County and is consistent with neighboring
counties; and,
WHEREAS, itis acknowledged that a more reasonable and consistent process for fee
adjustments is necessary to meet customer expectations and to. also structure the fee program to
contain very limited increases on an annual basis so that large impacts can be avoided; and,
WHEREAS, the International Code Council publishes the Building Valuation Fee
Adjustment Schedule'on. a bi=annual basis that reflects` the current Nationwide CPI, which can
provide a systematic adjustment to .our fees annually without the need for continual evaluation
and update; and,
WHEREAS, Permit fees,were last updated in February 2014 and this consideration was
not addressed and the Board of County Commissioners understands the need to incorporate fire
fees for services that historically have never been provided; and,
WHEREAS, the Board of County Commissioners for Grant County finds that minor
permit fee increases annually are pref errable to large, periodic fee increases and understand that
unique circumstances require modifications to the fee schedule on occasion; and,
WHEREAS, the Board of County Commissioners for Grant County modify the attached
fee schedule to include the International Code Council Building Valuation Table that is
published annually; and,
WHEREAS, the Board of County Commissioners for Grant County conducted an open
record public hearing on to consider the attached fee schedule.
NOW, THEREFORE, BE IT HEREBY RESOLVED, THAT the Board of County
Commissioners for Grant County, Washington hereby adopt by resolution an amended Fee
1
Development Services Fee Schedule Update: Building & Fire 2023
Schedule for Grant County Development Services Building and Fire Applications and Permits as
identified in Attachment A.
DATED this day of
, 2023.
BOARD OF COUNTY
COMMISSIONERS
Yea Nay
Abstain GRANT COUNTY, WASHINGTON
❑ ❑
❑ Rob Jones Chair
ATTEST: ❑ ❑
❑
Cindy Carter, Vice. -Chair
Barbara J. Vasquez
Clerk of the Board ❑ ❑
❑
Danny Stone Member
y ,
2
Development Services Fee Schedule Update: Building & Fire 2023
ATTACHEMENT A
GRANT COUNTY BUILDING & FIRE VALUATION/FEE SCHEDULE
Based on the Annual ICC Building Valuation Data: Cost per Square Feet
VALUATION
FEE'
$ 1.00 to $ 1,400.00
$50.00
$ 1,401.00 to 2,000.00
$ 50.00 for the first $ 1,400.00 plus $ 3.00 for each additional $
100.00, or fraction thereof, to and including $ 2,000.00
$ 2,001.00 to $ 25,000.00
$ 68.00 for the first $ 2,000.00 plus $ 14.00 for each additional $
1,000.00, of fraction thereof, to and including $ 25,000.00
$ 25,001.00 to $ 509000.00
$ 390.00 for the first $ 25,000.00 plus $ 10.00 for each additional $
1,000.00, or fraction thereof, to and including $ 509000.00
$ 509001.00 to $ 100,000.00
$ 640.00 for the first $ 50,000.00 plus $ 7.00 for each additional $
1,000.00, or fraction thereof, to and including $ 100,000.00
$ 100,001.00 to $ 5009000.00
$ 990.00 for the first $ 100,000.00 plus $ 6.00 for each additional $
1,000.00, or fraction thereof, to and including $ 500,000.00
$ 50001.00 to $ 19000,000.00
$ 3,390.00 for the first $ 500,000.00 plus $ 5.00 for each additional
$ 1,000.00, or fraction thereof, to and including $ 1,0009000.00
$ 1,000,000.00 and above
$ 5,890.00 for the first $ 1,000,000.00 plus $ 36.00 for each
additional $ 10,000.00, or fraction thereof
All occupancies are based on the February Building Valuation Data published annually y the International Code
Council LCC). New Residential Construction: Permit Fee includes Plumbing and Mechanical Fees.
Decks, carports, per og_1a's, gazebo's, and other miscellaneous structures will be valuated at 50% of cost per square
feet for utility (U) use groups.
Calculating Permit Fees Based on Valuation:
Single -Family Dwelling = $ 150.87/Square Feet
Proposed dwelling with attached age = 2,250 square feet
2,250 X $ 150.87 = 339,458 Total Valuation ($ 100,001 to $ 500,000)
339,458 —100,000 = 239,458 _ 1,000.00 = 239 X $ 6.00 ($ 1,434.00)
$ 990.00 + $ 1,434.00 = $ 2,424 Permit Fee
$ 2,424 X .50 = $ 1,212 Plan Review Fee
Total Fee = $ $ 2,424 + $ 1,212 = $ 3,636.00
1 Building Plan Review Fees are 50 Percent of the Permit Fee for both Commercial and Residential
Development Services Fee Schedule Update: Building & Fire 2023
FEES AND REQUIREMENTS
RCW 19.27.085 There is imposed a fee of six dollars and fifty cents on each residential
building_ permit and a fee of twenty-five dollars for each commercial building permit, issued by
county or a city, plus an additional surcharge of two dollars for each residential unit, but not
including the first unit, on each building containing more than one residential unit.
RCW 19.27.087 Permitting and plan review fees under this chapter for agricultural
structures may only cover the costs to counties, cities, towns, and other municipal corporations
of processing applications, inspecting, and reviewing_ plans, preparing detailed statements
required by Chapter 43.21 C RCW, and performing necessary inspections under this chapter.
RCW 19.27.015 Agricultural structure means a structure designed and constructed to house
farm implements, hay, grain, poultry, livestock, or other horticultural products. This structure
may not be a place of human habitation or a place of employment where agricultural products are
processed, treated, or packaged, nor may it be a place used by the public.
PERMIT FEES:
STRUCTURE
FEE
Agricultural Structures (including membrane structures/silo's).
50% of the Valuation of S
Pre -Approved and Model Residential Plan Review2
Permit + 25% of the Review
Manufactured — Mobile Home — PMRV's
$ 350.00
Factory Assembled Structures FAS
Based on Project Valuation
Caro Containers used as Storage Structures U-Occu ancies
$ 100.00
Commercial Re-Roof3
Based on Project Valuation
Residential Re-Roofsheathin and/or structural modifications
Based on Project Valuation
Remodels/Tenant Im rovements
Based on Project Valuation
Fire Repairs — One -and Two -Family Dwellings
No Fee
Fire Rebuilds — One -and Two -Family Dwellings
50% of the Valuation
Fences/Retaining Walls — Length times Height of Wall
L X H X $10 = Valuation
Residential Demolition
$ 100.00
Commercial Demolition(per primary structure
$ 300.00
Towers — Communication/Weather/Wind/Etc.
$ 600.00
Moved — Relocated Buildins
$ 500.00
Residential Swimming Pools includes built-in spa)
$ 150.00
Residential Spa/Hot Tub
$ 75.00
Commercial Swimming Pools/Spas
Based on Project Valuation
Pole Sign
$ 300.00
Monument Sin
$ 200.00
Wall Sin
$ 100.00
2 Residential Plan Reviews Conducted by Qualified Private 3rd Party receive a 25% Plan Review Credit. Model
Home Plan Review receive a 25% credit after the Model Home Plan Review has been conducted and approved as a
Model Home Review
3 No Plan Review Fee
Development Services Fee Schedule Update: Building & Fire 2023
Miscellaneous not specifically listed Based on Project Valuation
GRADING FEES:
CUT or FILL QUANTITY
FEE
500 Cubic Yards or Less
$ 50.00
Water Heater
$ 20.00
501 to 1,000 Cubic Yards
$ 100.00 for the first 500 cubic yards plus $ 20.00 for each
additional 100 cubic yards or fraction thereof
Price per Plumbing Fixture
$ 10.00
1,001 to 10,000 Cubic Yards
$ 200.00 for the first 1,000 cubic yards, plus $ 20.00 for
each additional 1,000 cubic yards or fraction thereof
Gas Piping — pera liance connection
$ 10.00
10,001 to 100,000 Cubic Yards
$ 380.00 for the first 10,000 cubic yards, plus $ 70.00 for
each additional 10,000 cubic yards or fraction thereof
Clothes Washer includes dKyer exhaust
$ 20.00
100,001 Cubic Yards or more
$ 15010.00 for the first 100,000 cubic yards, plus $ 40.00
for each additional 10,000 cubic yards or fraction thereof
RESIDENTIAL PLUMBING FEES4:
APPLIANCE/FIXTURE
FEE
Base Plumbin Permit
$ 50.00
Water Heater
$ 20.00
H dronic Heating
$ 50.00
Price per Plumbing Fixture
$ 10.00
Bathroom Grou
$ 30.00
Gas Piping — pera liance connection
$ 10.00
Boiler
$ 50.00
Clothes Washer includes dKyer exhaust
$ 20.00
Backflow Preventer
$50.00
RESIDENTIAL MECHANICAL FEES:
APPLIANCE
FEE
Base Mechanical Permit
$ 50.00
Sauna
$ 30.00
Furnace
$ 20.00
Heat Pum
$ 20.00
Solid -Fuel Burning Appliance
$ 50.00
Fuel -Fired Appliance
$ 20.00
Ground Photo -Voltaic solar Systems
$ 20.00
4 Plumbing and Mechanical Fees are included in the Building Permit Fee for new Residential Dwellings
Development Services Fee Schedule Update: Building & Fire 2023
COMMERCIAL PLUMBING AND MECHANICAL FEES:
VALUATION FEE
Plumbing Project Cost Based on Project Valuation
Mechanical Project Cost Based on Project Valuation
FIRE MARSHAL RESIDENTIAL PERMIT FEES:
APPLIANCE
FEE
Base Fire Permit
$ 50.00
Roof -Mounted Solar Arrays
$ 50.00
Propane Tank includes piping) < 501 gal
$ 50.00
Propane Tank greater than 500 gallons
$100.00
Fire Sprinkler System P2904 or NFPA 1
$ 100.00
Private Water Tank/Pum House
$ 100.00
FIRE MARSHAL COMMERCIAL PERMIT FEES6:
APPLIANCE
FEENALUATION
Under round Fire Line
$ 300.00
Fire Sprinkler System Comm. & Res.
Standpipe System
Based on Project Valuation
Based on Project Valuation
Fire Alarm System
Based on Project Valuation
S rinkler Backflow/Valves
Fire Pum
$ 150.00 plus $ 50.00 for each additional valve
$ 150.00
Private Water Tank and Hydrants
Based on Project Valuation
Above -Ground Fuel Tank includes i in
$ 500.00
Commercial LPG Tank/Riphng Tank/Piping< 501 izal.
$ 100.00
Commercial LPG Tank/Piping 501-2,000
$ 300.00
Commercial LPG Tank/Piping > 2,000 gal.
$ 600.00
Type I Hood Sopression System
$ 250.00
Industrial Ovens/Spray Booths
$ 500.00
Alternative Fire -Extinguishing System
Based on Project Valuation
Smoke Control or Other Special System
Miscellaneous (not specifically listed)
Based on Project Valuation
Based on Project Valuation
FIRE MARSHAL OPERATIONAL PERMIT FEES:
ACTIVITY/USE
FEE
Transient Residence Annual Life -Safety Inspection
$ 150.00
Hazardous Materials (HMP
$ 150.00
High -Piled Storage
$ 150.00
5 Roof -mounted Solar Array on Detached Accessory Structures are Exempt from Permit
6 Commercial Plan Review is 50 Percent of the Permit Fee
6
Development Services Fee Schedule Update: Building & Fire 2023
Carbon Dioxide Systems > 100 pounds
$ 150.00
ACTIVITY/USE
FEE
Cannabis Extraction Facilities
$ 150.00
Energy Storage Systems batteries
$ 150.00
Temporary Membrane Structures < 2,501 SF
$ 150.00
Temporaly Membrane Structures > 2,501 SF
$ 300.00
Mobile Cooking Vehicles food trucks
$ 150.00
Special Event Permit Inspection
$ 150.00
Seasonal Fireworks Stand Safety Inspection
$ 150.00
P rotechnical Displqy DisplayPermit
$ 150.00
Licensed Dqy Care Inspection
$ 150.00
Licensed Adult Care Home Inspection
$ 150.00
Special Inspection or Consultation
$ 150.00
MISCELLANEOUS FEES AND PROCESSES:
ACTIVITY
FEE
Stop Work Order failure to obtain pgrmit within 72 -hours
Double the Permit Fee
Permit Re -instatement (expiration within 1- ear
50% of original permit fees
Permit Re -instatement decks and other small plo'ects
$ 100.00
Permit Extensions(projects about to expire at final
30 -day extension at no charge
Permit Extensions
50% of the permit fee — 1 -year
Special Inspection or Re -inspection after 2 failures
$ 100.00
Title of Eliminations
$ 75.00
After -the -Fact Permits
Permit Fee — No plan review
Plan Revisions after permit has been issued
$ 50.00 per hour
Plan Revisions prior topen-nit being issued
$ 50.00 min.
Minor Modifications$
$ 50.00 per hour/min.
Major Modifications
Resubmittal Required
Fire Flow Worksheet Analysis Residential >3,600 --SE)
$50.00
Fire Flow Worksheet Analysis Commercial Structures
$100.00
Activities not included and/or items not covered by the fee tables may be valued at a similar rate Formatted: Underline, Font color: Red
at the discretion of the Building_ Official, including but not limited to, accepting formal bids as
approved Project valuations.
DEPOSIT AND REFUND POLICY:
1. The Plan Review Fee (50% of the Permit Fee) is due upon application submittal for all new
commercial structures and residential dwellings. A deposit may be required for all other
submittals.
Inspections must have been completed through foundation and all required inspections completed
H Includes revised site plans after review and approval
Development Services Fee Schedule Update: Building & Fire 2023
2. If the proposed project is canceled by the applicant after the plan review has been conducted,
the deposit will not be refunded. All other fees may be refunded at the written request of the
applicant.
3. Projects that are canceled by the applicant after the permit has been issued may only receive
80% of the permit fees paid upon written request. Any plan review fees are not sub'e� ct to
refund.
Development Services Fee Schedule Update: Building & Fire 2023
March 31, 2023
BUILDING
75,058
FIRE MARSHAL
146,574
PLANNING
I
Total Submitted current month
63
Total Submitted current month
10
Total Submitted current month
47
Total Issued current month
55
Total Issued current month
5
77,518
115,938
136,615
69,697
124,195
119,454
Address
7
Submitted by Portal
22
Submitted by Portal
8
Administrative Approval
1
Submitted in office or by mail
41
Submitted in office or by mail
2
Alt Final
0
89,161
63
131,084
10
AOI
0
2020
49,507
73,100
69,031
Boundary Line Adj / Seg
6
Commercial, Add'n, Alteration
6
FM Construction
10
Comp Plan Ammendment
10
Demolition
2
FM Operational
0
Conditional Use permit
0
Grading
0
67,952
10
Discretionary Use Permit
3
Manufactured, Mobile, PMRV
8
55,884
1,022,278
Floodplain Development Permit
6
Mechanical
4
73,959
83,331
Pre -Application Conference
0
Modular, FAS
0
78,453
105,383
Planned Unit Development
0
Plumbing
3
Revenue Totals below represented total deposit collections including Planning % and State Code Fees
SEPA
7
Residence, Add'n, Alteration
17
32,840
53,670
Shoreline Permit
0
Accessory to SFR
23
74,592
79,244
Short Subdivision - Final
3
61,745
63
885,654
2016
Short Subdivision - Prelim
2
80,066
95,765
105,484
79,092
Site Plan Review
0
67,200
46,827
58,033
48,874
Subdivision - Final
1
67,618
61,122
77,065
62,653
Subdivision - Prelim
0
68,458
56,825
72,217
68,101
Utility Easement Ext/Alt
1
47
REVENUE - Total Deposits to Planning (Excluding Grants/Dept of Ecology)
JAN FEB MAR APR MAY JUN JULY AUG SEP OCT NOV DEC YTD TOTALS
Plan Pmts 21,725 85900 16,475 475100
Bldg Pmts 2,887 11501 5,494 9,883
Total $ 24,612 103401 21,969 565983
REVENUE - Total Deposits to - Building & Fire Marshal
JAN FEB MAR APR MAY JUN JULY AUG SEP OCT NOV DEC YTD TOTALS
2023
75,058
755184
146,574
296,816
2022
57,907
77,518
115,938
136,615
69,697
124,195
119,454
104,077
77,563
72,773
71,670
33,658
1,061,065
2021
100,634
141,137
132,394
157,315
97,430
102,468
100,979
89,161
72,461
131,084
52,717
74,938
1,252,718
2020
49,507
73,100
69,031
33,351
59,050
99,208
107,035
58,555
74,159
112,694
60,709
75,255
871,654
2019
66,404
53,752
112,898
119,129
114,710
67,952
73,726
90,403
107,578
106,807
53,035
55,884
1,022,278
2018
98,766
75,264
116,947
73,959
83,331
83,592
154,358
102,688
92,607
78,453
105,383
57,852
1,123,200
Revenue Totals below represented total deposit collections including Planning % and State Code Fees
2017
32,840
53,670
98,562
100,309
88,954
89,813
74,592
79,244
82,186
80,123
61,745
43,615
885,654
2016
26,491
52,517
80,066
95,765
105,484
79,092
83,473
70,319
67,200
46,827
58,033
48,874
814,143
2015
67,618
61,122
77,065
62,653
92,795
69,859
68,458
56,825
72,217
68,101
47,980
64,587
809,279
2014
45,440
63,648
74,594
53,716
93,601
57,850
85,489
89,423
73,443
55,980
48,144
61,379
802,707
2013
52,821
38,820
48,884
81,996
96,685
48,834
67,903
62,731
60,333
57,743
45,383
46,203
708,335
2012
26,966
25,748
65,297
95,228
87,701
68,887
72,206
89,501
57,941
44,128
26,432
41,157
701,192
2011
25,427
32,240
65,252
76,693
74,534
36,694
39,373
61,474
54,560
52,012
52,103
43,067
613,430
2010
25,259
43,549
66,130
71,435
52,642
151,438
60,612
44,589
52,516
84,979
66,325
36,285
755,758
2009
25,508
27,510
49,847
74,935
38,464
32,998
62,871
59,499
35,502
40,119
25,561
53,024
525,837
2008
59,243
59,876
52,638
60,400
72,817
77,845
123,377
72,034
103,473
58,981
16,642
36,007
793,333
2007
60,262
115,510
71,858
79,082
98,849
222,999
112,753
99,290
56,248
112,195
69,822
72,035
1,170,903
2006
29,864
36,947
104,947
128,888
62,024
73,374
80,742
59,827
81,688
57,743
75,505
40,717
832,266
2005
53,846
37,174
61,848
37,888
84,000
117,816
82,759
68,397
44,973
140,659
51,332
48,580
829,272
2004
15,185
49,731
54,150
88,783
56,587
57,328
54,381
50,093
46,373
82,471
60,229
30,990
646,301
* Mid -Year Change 2022 to Permit Types put some projects that were previously listed as Buliding Permits into a separate FM Permit category after June 9, 20220
APPS IN
JAN
FEB
MAR
APR
MAY
JUN
JULY
AUG
SEP
OCT
NOV
DEC
TOTAL
YTD AVG
2023
* Note - some previous month numbers may change with the next report as Portals are accepted, returned for add'I info
or voided
due to SmartGov tracking
2023
33
69
63
136
45
2022
40
59
76
61
165
55
2022
57
71
75
70
90
81
71
51
66
56
43
33
764
64
2021
108
162
85
95
79
83
52
77
49
73
60
50
973
81
2020
70
67
67
62
45
84
76
85
80
113
73
131
953
79
2019
76
63
76
72
87
56
68
96
83
78
61
46
862
72
2018
68
142
75
72
94
88
63
85
73
79
96
48
983
82
2017
34
76
74
91
81
92
71
66
60
96
64
37
842
70
2016
49
76
99
52
69
113
65
73
55
57
49
47
804
67
2015
38
48
68
51
73
61
41
43
72
62
40
39
636
53
2014
59
60
44
76
67
50
76
51
56
69
37
63
708
59
2013
23
49
44
56
70
76
52
52
45
47
32
39
585
49
2012
30
56
67
58
75
68
57
57
45
49
35
37
634
53
2011
33
53
69
50
58
58
51
60
51
44
41
31
599
50
2010
33
45
117
70
61
61
53
52
52
54
16
48
662
55
2009
41
41
56
67
52
67
59
54
59
40
51
26
613
51
2008
47
63
86
91
77
101
61
73
51
64
39
33
786
66
2007
72
95
123
109
94
121
98
95
69
82
60
41
1059
88
2006
58
71
183
112
91
108
123
110
115
92
56
83
1202
100
2005
35
69
96
62
92
146
70
99
89
113
56
29
956
80
2004
51
57
118
77
74
105
74
86
76
79
53
36
886
74
2006
58
71
183
112
91
108
123
110
115
92
56
83
1202
100
2005
35
69
96
62
92
146
70
99
89
113
56
29
956
80
2004
51
57
118
77
74
105
74
86
76
79
53
36
886
74
* Mid -Year Change 2022 to Permit Types put some projects that were previously listed as Buliding Permits into a separate FM Permit category after June 9, 20220
PERMITS ISSUED
JAN
FEB
MAR
APR
MAY
JUN
JULY
AUG
SEP
OCT
NOV
DEC
TOTAL
YTD AVG
2023
46.
35
55
136
45
2022
40
59
76
61
56
84
68
68
49
52
46
32
691
58
2021
80
66
114
91
76
95
81
57
63
96
62
52
933
78
2020
42
56
43
24
71
56
78
52
63
84
64
91
724
60
2019
74
63
51
96
75
57
56
86
90
92
47
42
829
69
2018
50
54
97
82
79
76
81
114
63
66
71
70
903
75
2017
40
33
64
76
78
79
66
80
71
71
70
38
766
64
2016
27
52
79
72
58
46
77
54
70
45
47
60
687
57
2015
32
56
75
49
43
66
58
56
54
67
38
45
639
53
2014
36
53
58
50
58
.47
59
60
58
58
45
56
638
53
2013
37
29
53
50
57
50
61
47
43
47
40
33
547
46
2012
22
30
33
63
59
59
72
58
47
59
30
32
564
47
2011
29
32
68
49
70
45
61
43
52
59
40
38
586
49
2010
29
29
54
52
54
84
44
43
61
48
54
33
585
49
2009
27
44
51
65
48
55
63
52
50
45
34
45
579
48
2008
43
51
50
70
67
79
99
84
86
49
23
42
743
62
2007
71
65
38
62
130
144
104
97
63
96
77
70
1017
85
2006
34
43
108
116
77
98
85
76
87
80
66
47
917
76
2005
47
39
63
55
88
130
91
77
58
102
108
44
902
75
2004
22
64
68
105
82
75
79
75
56
67
70
49
812
68
* Mid -Year Change 2022 to Permit Types put some projects that were previously listed as Buliding Permits into a separate FM Permit category after June 9, 20220