Loading...
HomeMy WebLinkAboutResolution 19-081-CCBOARD OF COUNTY COMMISSIONERS Grant County, Washington 6V RESOLUTION TO INITIATE COUNTY RESOLUTION No. 19- CC ROAD PROJECT DESIGNATED AS CRP NO. 19-08 WHEREAS, IT IS HEREBY RESOLVED THAT Road 3 -NE, State Road Log No. 94000 from milepost 6.91 to milepost 8.91 be improved as follows; The work will include earthwork, drainage, HMA surface, traffic control and other items. WHEREAS, This project is hereby declared to be a public necessity and the County Road Engineer is hereby ordered and authorized to report and proceed thereon as by law provided, (RCW 36.75.0501 36.80-0301 36.80.070; NOW, THEREFORE.) BE IT HEREBY RESOLVED THAT the Board of County Commissioners declare that an appropriation from the officially adopted road fund budget and based on the County Engineer's estimate is hereby made in the amounts and for the purposes shown: PURPOSE Engineering Right of Way Acquisition PROGRAM SOURCE Local TOTAL (Not Subject to 36.77.060) Construction Local STP TOTAL (Check appropriate box) AMOUNT OF APPROPIATION $100,000 $0 $0 $148,500 $951,500 $1,5200,000 ❑ This project is included in the officially adopted Annual Road Program as item No. ® This project is hereby made a part of the officially adopted Annual Road Program in accordance with RCW 36.81.130 NAPW Company\SD\Prqject Docs\CN Projects\3-NE Phase 2 CRP 19-08 (Q -NE to S-N1E)\Resolution\CR.P 19-08 3 - NE Phase 2 CRP Resolution 2017 New format.docx Page 1 of 2 BE IT FURTHER RESOLVED: (Check appropriate box) ® The construction is to be accomplished by contract in accordance with RCW 36.81.130 ❑ The construction is to be accomplished by county forces in accordance with RCW 36.77.060 and WAC 136-18 fflL DATED this L43 day of &Akuwo,01019. ATTEST: Yea Nay F-1 BOARD OF COUNTY COMMISSIONERS Abstain GRANT COUNTY, WASHINGTON Fal x Richard Stevens, Member N:\PW Company\SD\Project Docs\CN Projects\3-NE Phase 2 CRP 19-08 (Q -NE to S-NE)\Resolution\CRP 19-08 3 - NE Phase 2 CRP Resolution 2017 Now format.docx Page 2 of 2 ➢H1Q�lI7I�Ili thiol NMI I li® ll RI51m III m i II@lmg I IIm III NINE I gi IAB HH®i1i iclow In l NMI 1tll1lI11#=MItl 1M51 INS= I IHS HH➢�5$ti al HHw Avg NMI I ismitt MCI HH5H�l4H r o r M a W z CY- I 3=NE Road CRP I 19-08, 6.91 to 8.91 LEGEND. O UD ti M d' W z 2z 2 N E4364'1 51iS�tIIIB®I58i5�B5i=st55m8lmovstnmi5@i5�355@8�i55�➢5@X95@@�!@@i�89@�➢5ti�@1L�5585 355 MPO/RTPO: Quad -Co RTPO County: Grant Agency: Grant Co. Func Project Cls Number PIN STIP ID Washington State S. T.1. P. 2019 to 2022 (Project Funds to Nearest Dollar) N Inside Y Outside Total Project Imp Length Environmental RW Begin Type Type Required Termini 07 WA -10858 04 2.000 CE No 6.91 3 -NE Phase 2 3R - Work will include earthwork, drainage, HMA surface, traffic control and other items. Location: Q NE to S NE Funding Federal Funds Phase Start Date Federal Fund Code State Fund Code October 8, 2019 Total Est. STIP End Cost of Amend. Termini Project No. 8.91 1,200,000 State Funds Local Funds Total PE 2021 0 0 1007000 100,000 CN 2021 STP(R) 951,500 0 148,500 1,100,000 Project Totals 951,500 0 248,500 132005000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 100,000 0 0 CN 0 0 1,100,000 0 0 Totals 0 0 11200,000 0 0 Page 1