HomeMy WebLinkAboutResolution 19-081-CCBOARD OF COUNTY COMMISSIONERS
Grant County, Washington
6V
RESOLUTION TO INITIATE COUNTY RESOLUTION No. 19- CC
ROAD PROJECT DESIGNATED AS CRP
NO. 19-08
WHEREAS, IT IS HEREBY RESOLVED THAT Road 3 -NE, State Road Log No. 94000 from
milepost 6.91 to milepost 8.91 be improved as follows;
The work will include earthwork, drainage, HMA surface, traffic control and other items.
WHEREAS, This project is hereby declared to be a public necessity and the County Road
Engineer is hereby ordered and authorized to report and proceed thereon as by law provided, (RCW
36.75.0501 36.80-0301 36.80.070;
NOW, THEREFORE.) BE IT HEREBY RESOLVED THAT the Board of County
Commissioners declare that an appropriation from the officially adopted road fund budget and
based on the County Engineer's estimate is hereby made in the amounts and for the purposes
shown:
PURPOSE
Engineering
Right of Way Acquisition
PROGRAM SOURCE
Local
TOTAL (Not Subject to 36.77.060)
Construction Local
STP
TOTAL
(Check appropriate box)
AMOUNT OF APPROPIATION
$100,000
$0
$0
$148,500
$951,500
$1,5200,000
❑ This project is included in the officially adopted Annual Road Program as item No.
® This project is hereby made a part of the officially adopted Annual Road Program in
accordance with RCW 36.81.130
NAPW Company\SD\Prqject Docs\CN Projects\3-NE Phase 2 CRP 19-08 (Q -NE to S-N1E)\Resolution\CR.P 19-08 3 -
NE Phase 2 CRP Resolution 2017 New format.docx
Page 1 of 2
BE IT FURTHER RESOLVED: (Check appropriate box)
® The construction is to be accomplished by contract in accordance with RCW 36.81.130
❑ The construction is to be accomplished by county forces in accordance with RCW 36.77.060
and WAC 136-18
fflL
DATED this L43 day of &Akuwo,01019.
ATTEST:
Yea Nay
F-1
BOARD OF COUNTY COMMISSIONERS
Abstain GRANT COUNTY, WASHINGTON
Fal
x
Richard Stevens, Member
N:\PW Company\SD\Project Docs\CN Projects\3-NE Phase 2 CRP 19-08 (Q -NE to S-NE)\Resolution\CRP 19-08 3 -
NE Phase 2 CRP Resolution 2017 Now format.docx
Page 2 of 2
➢H1Q�lI7I�Ili thiol NMI I li® ll RI51m III m i II@lmg I IIm III NINE I gi IAB HH®i1i iclow In l NMI 1tll1lI11#=MItl 1M51 INS= I IHS HH➢�5$ti al HHw Avg NMI I ismitt MCI HH5H�l4H
r
o r
M a
W
z
CY-
I
3=NE Road
CRP I
19-08, 6.91 to 8.91
LEGEND.
O
UD
ti
M
d'
W
z
2z
2 N E4364'1
51iS�tIIIB®I58i5�B5i=st55m8lmovstnmi5@i5�355@8�i55�➢5@X95@@�!@@i�89@�➢5ti�@1L�5585 355
MPO/RTPO: Quad -Co RTPO
County: Grant
Agency: Grant Co.
Func Project
Cls Number PIN STIP ID
Washington State S. T.1. P.
2019 to 2022
(Project Funds to Nearest Dollar)
N Inside Y Outside
Total
Project
Imp Length Environmental RW Begin
Type Type Required Termini
07 WA -10858 04 2.000 CE No 6.91
3 -NE Phase 2
3R - Work will include earthwork, drainage, HMA surface, traffic control and other items.
Location: Q NE to S NE
Funding
Federal Funds
Phase Start Date Federal Fund Code State Fund Code
October 8, 2019
Total Est. STIP
End Cost of Amend.
Termini Project No.
8.91 1,200,000
State Funds Local Funds Total
PE 2021 0 0 1007000 100,000
CN 2021 STP(R) 951,500 0 148,500 1,100,000
Project Totals 951,500 0 248,500 132005000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 100,000 0 0
CN 0 0 1,100,000 0 0
Totals 0 0 11200,000 0 0
Page 1