HomeMy WebLinkAbout*Other - AuditorsC.A.R.S.
Grant County
Reports for 2018
Digital Submittal Certification
for Forms Due April 1 st
A
Page 1 of 1
The documents checked below are hereby submitted from Grant County for the review and acceptance of the County
Road Administration Board.
✓ 2018 RAP Certification of Road Fund Expenditures for Traffic
Law Enforcement
I hereby certify that the above report is true and accurate and that I have reviewed and approved the report for
submission to
my Road A inistration Board in accordance with WAC 136.
Signe
Date: 110)
County Sheriff
SigMe
Date: ' • Iq
County Auditor
Signed: Date:
Chair / Executive
✓ 2018 Certification of Road Fund Expenditures for Fish Passage
Barrier Removal
✓ 2018 Annual Certification
I hereby certify that the Fish Passage Removal and Annual Certifications are true and accurate and that I have
reviewed and approved the report for submission to the County Road Administration Board in accordance with WAC
136.
Signed: l �
Chair / Executive
Signed:
Date:
)P,t.Date: 1! 2-66 Z'O�q
✓ 2018 Annual Construction Report
✓ 2018 County Arterial Preservation Report
✓ 2018 Maintenance Management Annual Certification
I hereby certify that the Annual Construction Report, County Arterial Preservation Report, and Maintenance
Management Certification are true and accurate and that I have reviewed, approved, and submitted said reports to
the County Road Administration Board in accordance with WAC 136.
Signed:
E• Date: iZ�/W t q
https://www.crab.wa.gov/cars/ 3/15/2019
C.A.R.S.
Grant County 2018
CERTIFICATION OF ROAD FUND EXPENDITURES FOR TRAFFIC LAW
ENFORCEMENT
WAC 136-150-022
Page 1 of 1
Total Road Levy:
Budgeted Road Levy revenue (as listed on the Road Levy Certification - $9,434,061.00
WAC 136-150-021):
Actual Road Levy revenue produced: $9,355,682.00
Traffic Law Enforcement Paid by Road Levy Diversion:
Budgeted Road Levy Diversion (as listed on the Road Levy Certification -
WAC 136-150-021):
Actual amount of Diverted Road Levy:
Was Diverted Road Levy deposited in a specific and identifiable account
(RCW 36.82.040):
Traffic Law Enforcement Paid by Road Fund Expenditures:
Budgeted cost reimbursements and/or operating transfers from the Road $270,000.00
Fund:
Actual total amount of cost reimbursements and/or operating transfers from $213,876.65
the Road Fund:
Total Road Portion Traffic Law Enforcement Expenditures: $213,876.65
Total Traffic Law Enforcement Expense (ALL COUNTY FUNDS): $477,502.70
RCW 36.79.140 provides that only those counties that during the preceding twelve months
have spent all revenues collected for road purposes only for such purposes, including traffic
law enforcement, as are allowed by Article II, Section 40 of the Washington State
Constitution, are eligible to receive funds from the Rural Arterial Trust Account.
This form must be reviewed and certified (on the "Engineer's Certification Form") by:
• County Sheriff
• County Auditor OR Charter designated Chief Financial Officer
• Chair, Board of County Commissioners OR County Executive
https://www.crab.wa.gov/cars/ 3/15/2019
C.A.R.S.
Page 1 of 1
FISH PASSAGE CERTIFICATION
WAC 136-150-023
Submitting County: Grant Budget Year: 2018
Fish Passage Barrier Removal Projects
Total Cost % of Total Cost
Project Project Outside of (25% Allowed by
Name Cost ROW WAC)
Total Expenditures for Fish Passage Barrier Removal Outside County
Rights -of -Way
Total Annual Road Construction Budget: $6,800,000.00
X 0.005
1/2% of Total Annual Road (Limit of "Outside of Right -of- =$34,000.00
Way" expense)
Total Expenditure for Fish Passage Barrier Removal $0.00
Outside County Right -of -Way
RCW 36.79.140 provides that only those counties that during the preceding twelve
months have spent all revenues collected for road purposes only for such purposes,
including removal of barriers to fish passage and accompanying streambed and stream
bank repair as specified and limited by RCW 36.82.070 , as are allowed by Article II,
Section 40 of the Washington State Constitution, are eligible to receive funds from the
Rural Arterial Trust Account.
https://www.crab.wa.gov/cars/ 3/15/2019
C.A.R.S. Page 1 of 2
Grant County Annual Certification For Calendar Year 2018
WAC 136-04
MANAGEMENT AND ADMINISTRATION
A. During 2018 the County Engineer performed the duties and had the responsibilities Yes
specified in RCW 36.80.030.
B. At any time during 2018 was there a vacancy/change in the position of County No
Engineer? If so, were the procedures in WAC 136-12 followed?
C. The processing of County Road Accident Reports during 2018 complied with WAC Yes
136-28.
D. Priority Programming techniques were applied to the ranking of all potential projects Yes
on the arterial road system in 2018 per WAC 136-14-020.
E. As of December 31, 2018 the management of the county road department was in accordance with
policies set by the county legislative authority including, but not limited to, the following specific policies
required by WAC 136-50-050:
*Has your agency sent the most recently adopted version to CRAB WAC 136-50-051?
POLICY
WAC
DATE OF CURRENT VERSION
Re: Organization
136-50-051
01/22/2008
Re: Personnel Practices
136-50-052
04/15/2015
Re: Complaint Handling
136-50-053
08/17/2010
Re: Work for Others
136-50-054
03/14/1977
Re: Utility Accommodation
136-50-055
10/24/1995
Re: Priority Programming
136-14-030
08/21/2018
F. The following were submitted to CRAB in a timely manner:
https://www.crab.wa.gov/cars/ 3/15/2019
C.A.R.S. Page 2 of 2
G. Projects to which construction expenditures were charged were all on the originally Yes
adopted 2018 Annual Program or as amended per WAC 136-16-042 - Attach
Amendments. (If No, please attach a brief explanation.)
H. The County's construction by county forces limit for 2018 computed in accordance $1,306,017.50
with RCW 36.77.065:
I. The actual expenditure for construction by county forces as reported in the 2018 $782,869.00
Annual Const. Report:
J. As required by WAC 136-20-060, a written Bridge and Inspection Report for 2018 07/10/2018
was furnished to the legislative authority on (attach a copy):
https://www.crab.wa.gov/cars/ 3/15/2019
DOCUMENT
WAC
DUE DATE
DATE OF
DATE
ADOPTION /
SENT TO
PREPARATION
CRAB
'18
Six -Year Program
136-15-050
31 -DEC -17
11/21/2017
12/21/2017
'18
Annual Construction Program
136-16-040
31 -DEC -17
11/28/2017
12/21/2017
'18
CAPP Program
136-300-060
31 -DEC -17
12/27/2017
12/27/2017
'18
Road Fund Budget
31 -DEC -17
12/04/2017
12/21/2017
'18
Maintenance Management Work
136-11-040
31 -DEC -17
12/21/2017
12/21/2017
Plan & Budget
'18
Road Levy
136-150-021
01 -FEB -18
01/29/2018
01/18/2018
'17
Certification of Road Fund Exp.
136-150-022
01 -APR -18
03/27/2018
03/26/2018
For Traffic Law Enforcement
'17
Engineer's Certification of Fish
136-150-023
01 -APR -18
03/27/2018
03/26/2018
Barrier Removal Costs
'17
Certification of Road Fund Exp.
136-150-025
01 -APR -18
for Marine Navigation and
Moorage
'17
Annual Construction Report
136-16-050
01 -APR -18
03/27/2018
03/26/2018
'17
CAPP Report
136-300-090
01 -APR -18
03/27/2018
03/27/2018
'17
Maintenance Management
136-11-050
01 -APR -18
03/27/2018
03/26/2018
Certification
'17
Annual Certification
136-04-030
01 -APR -18
03/26/2018
03/26/2018
'17
Road Log Update
136-60-030
01 -MAY -18
03/30/2018
03/30/2018
'18
PMS Certification for CAPA
136-70-070
31 -DEC -18
12/20/2018
12/20/2018
Eligibility
G. Projects to which construction expenditures were charged were all on the originally Yes
adopted 2018 Annual Program or as amended per WAC 136-16-042 - Attach
Amendments. (If No, please attach a brief explanation.)
H. The County's construction by county forces limit for 2018 computed in accordance $1,306,017.50
with RCW 36.77.065:
I. The actual expenditure for construction by county forces as reported in the 2018 $782,869.00
Annual Const. Report:
J. As required by WAC 136-20-060, a written Bridge and Inspection Report for 2018 07/10/2018
was furnished to the legislative authority on (attach a copy):
https://www.crab.wa.gov/cars/ 3/15/2019
C.A.R.S.
https://www.crab.wa.gov/cars/
Page 1 of 2
(17) (18)
O.M Toil
(All 05) Notes arM Commad.
wn 137
3150 442
S1 859,902
$981.207
$11,-
$866'",
11834
$886,881
$597 008
$1%325
3120351
w
$21,475
$46.718
11"
$12,273
$30038
$0
$7,01
Sae P O-.2 &
626
3/26/2019
Grant County
2018
Annual Construction Report
WAC 136-16
(A) TOTAL CONSTRUCTION
DONE (total sum of column 15 + column 16): $5,098,613.00
(B)
COMPUTED COUNTY
FORCES LIMIT: $1,306,017.50
(C) TOTAL COUNTY FORCES CONSTRUCTION (total
sum of column 16): $782,869.00
(1)
(2)
(3)
(4)
(6)
(6)
(7)
tel
(9)
(10)
(11)
(12)
(131
(14)
(1s)
(t6)
S...l.d
Eap.rMBv-
Dove- of Funds
Do6.1.
County
qMr F-
C ... buctbn
Annul
Completetl
County Fore-
Fore..
Me-
e o!Pro9nm
P
C.R.P.
Project
Road Segment lnbrm.tionLengm
Projeet Type
Pmiecl
Project
County A-
Nd,,..
PE & CE
-Y
County
Mm W.
No.
a-.
Proj-1 W-
ROW N Ro.d W.
BMP
EMP FFC
(mi.)
COW
Almmr-.-.
Cb.un
F-
Amount
Sound.
(MAO)
OWN)
C.-.
1-c-
1
13-06
F.,,
SlnOwd Rwtl NE
Road Wm.: S-- Roed NE
0.39
Br
3122.137
5250.000.00
FM Mbe
331 203
5310.935
wrtplebtl
94025 From: BNSF RR.-
20.28
20.67 07
NEW
To: SR 2.
2
14-08
Fully
AW m, Road & &IdgeRoad
Name: A,- Road
1 B5
Br
May 14, W18
Fab 4.2019
4150,442
$111.065
339.3)]
wmplebd
6331&9332
8101] Fm m: SR 28
23W
2553 W
RC
To: Wean Road
3
1804
Fully
Dodwn Roetl O -y
Road Wme: Dodson R -d
590
2R
$224.087
31,4 .B15.00
STP(R)
342,341
$1.617,581
-4-d
91030 Fmm: 3R.
0.00
5.so 07
To: Fr.whmen Hit Rd
4
16-08
Open
4NE RoadRoad
Wme: 4 -NE Roetl
2.01
RC
$95121
3883,088.00
RM
$76,787
3900,420
42900 From: N-NER..d
000
201 08
To: L -NE mad
5
14-09
Open
Cochran & 0 -,Road
Wme: Cochran R.1
0.89
RC
$11.834
$11,634
R..
41550 From: Airway Dore
000
025 17
To: gtmar Roetl
Road Wm.: OBmer R..41350 .From: Oil-Roetl
0.25
on 17
To: Valley Roed
6
17-02
Fully
R. -ph RwtlRoetl
Wm.: R-1ph Rwtl
1 .13
2R
45
$1130
3720551.00
STP(US)
$73,n5
$7.I 56
co Add
45010 From: BR 17
To: nm A --
000
0.99 16
Road Nem.: R-lph Roetl
45010 Fn, :22MAvenue
0.99
1.13 16
To: End T. -.i
7
17-03
Open
28 -SW RoetlRoad
Ift- 28 -SW natl
3.01
RC
May 14, 2018
Feb 4, 2019
3597.008
363.492
3372,705
3180.811
10290 From: OSW ROW
301
502 07
To: RSW R-
a
15-03
Fully
J -NE Roetl
Road.-: J-NERoetl
on
RC
Mey 14, 2018
FM 4,2019
$195,325
WAW
$1 W.n3
-p-d
53050 From: Pinto RMge Road
000
O.n 09
To: W -NE Rwtl
9
16-02
Open
E.. -,M-
Rand Wme: N. s""
0.27
Solely
$11.n1
$108.58000
SRTS
$I1-
$105580
Schwl SMewe&
45170 From: PeBon BNd. IMenepbn
To: PeBon BIW.Inteneclion
1 W
187 14
10
1205
No web
Bridge 6353 R -NW
Road Nam.: R -NW Road
003
er
Incurred
30330 From: M.rtin Road NW
000
003 W
Ta: Moran R..d NW
11
NIA
Fully
Miawtneo-
000
CS
wnpbked
Project
12
14-07
Open
3.NE Ro.d-PM-1
Road Win: INE Road
1.88
3R
$21475
vi..s
84000 From: ONE Roed
5.03
6.91 07
'TO: O -NE Road
13
18-09
Open
LNE Roed
Roetl Wm.: 4-NER-d
443
RC
54,6n
Vg Og
RAP
346.718
93000 From: Him- Roed
To: Weebhon Dme
503
9.45 07
11
18-01
No wets
SNWR-RoadW--S-NW
3.16
211
I --d
93010 From: SR 281
1407
1723 07
To: T -N W Ro.d
15
1802
Open
WW. 5 M Roed
Roed Ift- Bahr .5 M Rd
1.01
RC
312,273
$12.273
n100 Fmm: NSE Roed
1.01
2.02 09
To: OSE R -d
16
1843
0-
Loywr Crab Cr-kRoad
W-Wwer Crab -k Rd
2.50
RC
530.038
$30,038
Rwd
11130 From: ESW Road
0.00
2.50 W
To: 2,5 Mil- E-1
17
18-01
N. wets
APA R.-1. tlaw A
0.00
SW
IncunW
U14P.W.-PM. it
18
18-05
No web
Grape & M." Drive
Road Name: Grape 0-
099
RC
Incvnd
42350 From: B.gin Temtini
0.03
0.27 18
SW
Tc: EM Termini
Road Nam.: M.VW Oma
42800 From: Begin T. -i
To: End T,..
000
075 18
19
1708
Open
Slnfo Rtl. NE
RoadW-SMdoN Rd. NE
401
2R
$741
$6M000
RAR
$7,401
Phe- 1
84025 From: 12 -NE R -d
9.23
1314 07
To: 16 -NE R -d!
https://www.crab.wa.gov/cars/
Page 1 of 2
(17) (18)
O.M Toil
(All 05) Notes arM Commad.
wn 137
3150 442
S1 859,902
$981.207
$11,-
$866'",
11834
$886,881
$597 008
$1%325
3120351
w
$21,475
$46.718
11"
$12,273
$30038
$0
$7,01
Sae P O-.2 &
626
3/26/2019
C.A.R.S.
Page 2 of 2
0)
/6)
116)
1111 (121
(15)
(181.
(161 11q
(n)
1161
(1)
(2)
(3)
(4)
161
(a)
(7)
E.im Eaperrdeures
Sour<ea of FUMs
Dollars
Cowdy
MMr FUM3
Comhu<tion
Compleh0
Cormty Forces
Forcn
RqM of
•nmrsl
Program
C.R.P.
Pr 1-
Rob 6e9merd In —li.n
4npth
Pmje<t Type
Project
J=O
project
County ROW
Pr<Oram
PE b CE
Way
County
r>.aM Toth
Item No.
No.
SMMs
Project Name
Rosd9 ROW Name
BMP
EMP
FFC
(ml.)
Code
nnn<u
Cbaure
Funds
Rmount Soum
(696.10)
(696.20)
DOmraCl Forces
(All M6)
NotesaM Comments
FA
$19,461
319,081
$19.481
Onty.-M
20
18-02
Fully
cortplobtl
8Mpa 93308 pJ4
R-1 Name: M -NW
32470 From: N end & &Id0e 1930
To: S eM of &Mpa 9330
1.19
1.20
W
W Y— ro contrscror
R—Name: 11 -NW
327M From: W eM of &idpe 9330
0 Ot
0.02
O9
To: E eM of &itlG 9334
.$9352
21
16-07
—y
6NWRwd
Road ml,— NW
RC
39.352
59,352
-1, ..—a.
wrnpNbtl
39340 From: Dodson
000
160
119
psynRmro mntracror
To: 1 W MMa Emst
R—:— 18 -NE
CS
Mey 14, 2018
FeC 4,2M9
5345,02)
51,955
5343.072
5345,027
MOW Resolution 18-
22
18-06
Futly
1&NE
45880 From: EMO W
0.50
2.01
09
a8'�
mr4>VtW
To: U -NE
..
ROW N. BSE
FA
21.551
31,551
51 554
MdW Resolulbn 1B
23
18-10
Open
BSE
20560 From: 0.lnWesoulh
0.24
0-
O9
"GO
To: 0.1 mlea mM
24
16-08
Open
Hodsonml Curve
3,WY
33,290
$29,61000 HSIP
$32,800
332,900
AdtlW ReeoluWnM
a2cc
61pns - PMu 3
25
1-7
Opan
C—a.
Bmfety
31 181
$10,450.00 NBIP
Et 1,811
$11,611
AtlOetl Raao— 16
043CC
Rumble Smpe
1-9
Fulry
—E
Road Name: CNE
CS
Mey 14.2018
Feb 4.2019
$53,886
553,888
553,868
MtleERemMbn18-
26
mrrwleNd
40610 From: 0.37 mtlee nosh
0.53
090
09
044CC
T<: Nodh Fronlape
27
16-05
Fuey
PNW
Rota Name: 9 -NW
2R
327,850
$27,650
$27,850
Onty rohimpe
_p—d
W200 F.:OuiMClty Limbs
407
198
06
peymenlroconbecror
To: Mmrm Road
28
1606
Fully
1—WBFSW
Road Name: 105WbFSW
RC
$10,859
$10,859
$10.859
Only raWmg.
wmplebtl
127W From: GSW
0.00
2.10
09
paymeMro wntrector
To: 11 -SW
52,M6,M4
53.466,196
5468.479
SO
$4.316,744 $762,869
36.666,092
https://www.crab.wa.gov/cars/ 3/26/2019
C.A.R.S. Page 1 of 4
Grant County
2018
County Arterial Preservation Accomplishment Report
WAC 136-300-090
CAPA CARRIED OVER FROM 2017: $0.00 MVA CARRIED OVER FROM 2017: $0.00
CAPA RECEIVED IN 2018: $1,086,970.73 MVA RECEIVED IN 2018: $155,929.99
CAPA SPENT IN 2018: $1,086,970.73 MVA SPENT IN 2018: $155,929.99
CAPA BALANCE CARRIED INTO 2019: $0.00 MVA BALANCE CARRIED INTO 2019: $0.00
CAPP Eligible Activities
(+)
(2)
(3)
(4)
(5)
(6)
(7)
181
191
I+ol
(11)
(12)
(73)
(14)
FREIGHT
&
Type of Work
#
C/L
LANE
GOODS
(I)
(ii)
(iii)
(iv) iv)
ITEM
NO.
ProjeetlRoad Name
Road #
BMP
EMP
Lanes
From
To
FFC
TRC
MILES
MILES
MILES
Work Code
CAPA & TPA $a
MVA $s
Other $a % by Contract
1
18 -NW
34050
2.24
2.44
2
Frey/18-NW Intersection
B -NW
08
99
0.20
0.40
0.00
3
$4,728
$o
$o
4
$0
$o
$3,401
2
19 -NW
34200
1.31
2.94
2
Frey/18-NW Intersection
B -NW
08
T5
1.63
3.26
1.63
3
$38,534
$o
4
$0
$o
$27,718
3
20 -NW
93032
0.00
1.03
2
B-NW/20-NW Intersection
West End of Br# 1211 S (Soap
07
TS
1.03
2.06
1.03
3
$24,350
$0
$o
Lake)
a
$o
$o
$175,140
4
20 -NW
93032
1.06
2.01
2
East End of Br # 121
Division Sl S (Soap Lake)
07
T5
0.95
1.90
0.95
3
$22,459
$0
$0
4
$0
$0
$16,154
5
20.5 -NE
50952
0.41
0.88
2
East Lake Ave
A -NE
08
99
0.25
0.50
0.00
3
$5,910
$0
$0
4
$0
$0
$4,251
6
A -NE
95015
0.15
0.40
2
210 ft. N of SR -28
20.5 -NE
08
99
0.25
0.50
0.00
3
$5,910
$0
$0
4
$0
$0
$4,251
7
Adams Sl
34360
0.13
0.40
2
SR -28
45D Tum to the WestlName
08
99
0.27
0.54
0.00
3
$6,383
$0
$0
Change
4
$0
$0
$4,591
8
8 --NW
93045
0.00
3.05
2
SR -28
l3-NW/2O-NW Intersection
07
T5
3.05
6.10
3.05
3
$72,104
$0
$0
4
$0
$0
$51,863
9
Frey Rd
34050
0.38
2.24
2
8th Ave NW
Frey/18-NW Intersection
08
99
1.86
3.72
0.00
3
$43,972
$0
$0
4
$0
$0
$31,628
10
Golf Club Rd
34360
0.40
0.58
2
45D Tum to the WestfName
Lakeview Dr
08
99
0.18
0.36
0.00
3
$4,255
$o
$0
Change
..
....
4
$0
$4..
$3.081
https://www.crab.wa.gov/cars/ 3/26/2019
C.A.R.S.
Page 2 of 4
ltl
(2)
(3)
(4)
(6)
(6)
(7)
(9)
(9)
(10)
(11)
(72)
(13)
(14)
FREIGHT
&
Type of Work
#
CIL
LANE
GOODS
(i)
(ii)
(iii)
(iv) W)
ITEM
NO.
Project/Road Name
Road #
BMP
EMP
Lanes
From
To
FFC
TRC
MILES
MILES
MILES
Work Code
CAPA 3 TPA $a
MVA $#
Other $s % by Contract
11
Grant P1 *Lakeview Park
34310
0.12
0.62
2
Golf Club Rd
Grant PL/Ginko Int
08
99
0.50
1.00
0.00
3
$11,820
$0
$0
4
$0
$0
$8,502
12
H -NW
30430
0.00
3.70
2
9 -NW
.510 mi N of Martin Rd
08
99
3.70
7.40
0.00
3
$87,471
$0
$0
4
$0
$0
$62,916
13
Lakeview Dr
34350
0.00
0.50
2
Golf Club Rd
19 -NW
08
99
0.50
1.00
0.00
3
$11,820
$0
$0
4
$0
$0
$8,502
14
Martin Rd
30400
12.45
16.33
2
H -NW
East End of Br #315 (City
08
TS
3.88
7.76
3.88
3
$91,726
$0
$0
Limits)
4
$0
$0
$65,977
15
Park Lake Rd
50810
3.21
3.82
2
WA ST Parks Dept Gate
SR 17
08
99
0.61
1.22
0.00
3
$14,421
$0
$0
4
$0
$0
$10,373
i6
Sheep Canyon Rd
93048
0.00
0.04
2
B -NE
Sheep Canyon Rd Wye
08
99
0.04
0.08
0.00
3
$946
$0
$0
4
$0
$0
$680
17
St Andrews Dr
34550
0.00
1.20
2
20 -NW
19 -NW
08
99
1.20
2.40
0.00
3
$28,369
$0
$0
4
$0
$0
$20,405
18
4 -NE
93004
3.03
3.55
2
Division -N
irrigation Canal
07
T4
0.52
1.04
0.52
3
_.4 ..
$12,293
$0
$0
..$8.842.. _.
$0
$0
19
E -NE
40750
0.86
1.87
2
Mae Valley Rd
3 -NE
08
T4
1.01
2.02
1.01
3
$23,877
$0
$0
4
$0
$0
$17,174
20
E -NE
40750
1.87
2.88
2
3 -NE
4 -NE
08
T5
1.01
2.02
1.01
3
$23,877
$0
$0
4
$0
$0
$17,174
21
F -NE
40850
2.02
3.16
2
4 -NE
.130 mi Nof 5 -NE
07
99
1.14
2.28
0.00
3
$26,950
$0
$0
4
$0
$0
$19,385
22
Hiawatha Rd
40550
1.06
3.08
2
Mae Valley Rd
4 -NE
07
T3
2.02
4.04
2.02
3
$47,754
$0
SO
4
$0
$0
$34,349
23
Westshom Dr
40950
0.83
3.19
2
Hansen Rd (City Limas)
4 -NE
17
T5
2.36
4.72
2.36
3
$55,792
$0
$0
4
$0
$0
$40,130
24
24 -SW
91050
0.00
0.50
2
SR 243
West Side Hund Park
07
T3
0.50
1.00
0.50
3
$11,820
$0
$0
(Mattawa)
4
$0
$0
$8,502
25
Stratford Rd
94025
7.05
9.23
2
10 -NE
12 -NE
07
T3
2.18
4.36
2.18
3
$51,537
$0
$0
4
$0
$o
$37,069_.
https://www.crab.wa.gov/cars/
3/26/2019
C.A.R.S.
(1)
(2)
(3)
(4)
(6)
(6)
(7)
ITEM
(14)
#
NO.
Project/Road Name
Road #
BMP
EMP
Lanes
From
26
24 -SW
10590
0.00
0.99
2
SR 243
27
24 -SW
91050
1.00
5.06
2
Boundary Ave (Mattawa CL)
28
26 -SW
10300
5.03
7.00
2
R -SW
29
28 -SW
10290
6.02
7.30
2
R -SW
30
26 -SW
10540
0.00
1.01
2
U -SW
31
Airport Way
11210
0.00
0.50
2
Desert Aire Or
32
Clubhouse Way
10668
0.00
0.25
2
Desert Aire Or
33
Columbia BIW
10672
0.00
0.34
2
Desert Aire Or
34
Desert Aire Or
10680
0.00
2.57
2
SR 243
35
Edgewater Way
11200
0.00
1.08
2
Thunderbird Way
36
Orchard Or
11220
0.00
1.37
2
Edgewater Way
37
Thunderbird Way
10680
0.00
0.92
2
Desert Aire Or
38
East Desert Aire Or
10862
0.00
0.35
2
SR 243
39
R -SW
91041
3.01
4.01
2
26 -SW
40
R -SW
91041
0.99
3.01
2
24 -SW
https://www.crab.wa.gov/cars/
Page 3 of 4
(e)
(9)
(10)
(11)
(12)
(13)
(14)
FREIGHT
&
Type of Work
C/L
LANE
GOODS
(I)
(if)
(III)
(iv) (v)
To
FFC
TRC
MILES
MILES
MILES
Work Code
CAPA & TPA $s
MVA $s
Other $s % by Contract
24-SW/U-SW Intersection
08
T5
0.99
1.98
0.99
3
$23,404
$0
$0
4
$0
$o
$16,834
OSW
07
T3
4.06
8.12
4.08
3
$95,981
$0
$0
4
$0
$0
$69,037
SR 243
08
T4
1.97
3.94
1.97
3
$46,572
$0
$0
4
$0
$0
$33,498
East Desert Aire Or
07
99
1.28
2.56
0.00
3
$30,260
$0
$0
4
$0
$0
$21,765
SR 243
08
T4
1.01
2.02
1.01
3
$23,877
$0
$0
4
$o
$0
$17,174
Clubhouse My
07
99
0.50
1.00
0.00
3
$11,820
$0
$0
4
$0
$0 ..
.$8,502
Airport Way
08
99
0.25
0.50
0.00
3
$5,910
$0
$0
4
$0
$0
$4,251
SR 243
07
99
0.34
0.68
0.00
3
$8,038
$0
$0
,...4
$0
so
$5.781..
Columbia Blvd
07
99
2.57
5.14
0.00
3
$60,757
$0
$o
4
$0
$0
$43,701
Desert Aire Or
08
99
1.08
2.16
0.00
3
$25,532
$0
$0
4
$0
$0
$18,365
SR 243
.08
99
1.37
2.74
0.00
3
$25,742
$6,646
$0
4
$0
$0
$23,296
Orchard Or
08
99
0.92
1.84
0.00
3
$0
$21,749
$0
4
$0
$0
$15,644
28 -SW
07
T5
0.35
0.70
0.35
3
$0
$8274
$0
4
$0
$0
$5,952.
27 -SW
08
T4
1.00
2.00
1.00
3
$0
$23,641
4
$0
$0
$17,004
26 -SW
08
T3
2.02
4.04
2.02
3
$0
$47,754
4
$0
$0
$34,349
3/26/2019
C.A.R.S.
(1)
(2)
(3)
(4)
(5)
(5)
ITEM
...
Work Code
(14)
Miles
0
NO.
ProjecURoad Name
Road M
BMP
EMP
Lanes
41
R -SW
91041
4.01
7.13
2
42
U -SW
10590
0.99
3.02
2
43
Dodson Rd
91030
0.00
5.90
2
44
Randolph Rd
45010
0.00
0.99
4
45
County Wide Maintenance
From
To
FFC
TRC
MILES
Management
MILES
Work Code CAPA 3 TPA $s
MVA $s
Other $s % by Contract
46
11 -SW
91020
11.07
12.07
2
47
Martin Rd
30400
4.21
7.32
2
48
Adrian Rd NE
46710
0.00
2.49
2
49
9 -NE
45200
1.00
5.02
2
50
36 -NE
95000
0.32
6.47
2
51
5 -NW
93010
0.00
2.02
2
Non-CAPP Eligible Activities
Page 4 of 4
(7)
(51
(9)
(10)
(11)
(12)
(13)
...
Work Code
(14)
Miles
FFC
TRC
$s
Combined Various 09
3 - Seals, all types
71.45
FREIGHT
09 - Rural Local Access
Non Truck Route
$1,376,944
Combined Various 09
4 - Preparation for seals and overlays (crack sealing, digouts, patching, prelevel)
71.45
142.90
09 - Rural Local Access
Non Truck Route
$807,398
3
3 - Seats, all types
9.01
Type of Work
09 - Rural Local Access
T5 - 20,000 in 60 days
$173,636
Combined Various 09-T5
4 - Preparation for seals and overlays (crack sealing, digouts, patching, prelevel)
CIL
LANE
GOODS
lil
(ii)
(iii)
(iv) (v)
From
To
FFC
TRC
MILES
MILES
MILES
Work Code CAPA 3 TPA $s
MVA $s
Other $s % by Contract
27 -SW
SR 243
08
T3
3.12 :;
6.24
3.12
3
$o
$47,888
$25,893
4
so
$0
$53,053
24 -SW
26 -SW
08
99
2.03
4.06
0.00
3
S0
$0
$47,991
4
$0
$0
$34,519
SR -26
Frenchman Hill Rd
07
T3
5.90
11.80
5.90
1
$0
$0
$1,659,902
SR 17
22nd Ave
16
T3
0.99
3.96
0.99
1
$0
$0
$866,681
07..
99
..
0.00
6
$0
$0
$133,929
F -SW
E -SW
08
T3
1.00
2.00
1.00
2
$0
$0
$9,296
P -NW
Adams Rd NW
08
99
3.11
6.22
0.00
2
$0
$0
$28,912
20 -NE
SR 28
08
99
2.49
4.98
0.00
2
$0
$0
$123,148
W -NE
S -NE
08
99
4.02
8.04
0.00
2
$0
$0
$37,372
Coulee City Limits
P -NE
08
99
6.15
12.30
0.00
2
$0
$0
$57,173
Dodson Rd
E -NW
07
T4
2.02
4.04
2.02
2
$0
$0
$18,789
81.38
164.74
44.57
$1,086,970.73
$155,929.99
$4,113,850.76
https://www.crab.wa.gov/cars/ 3/26/2019
Centerline
Lane
Description
Work Code
Miles
Miles
FFC
TRC
$s
Combined Various 09
3 - Seals, all types
71.45
142.90
09 - Rural Local Access
Non Truck Route
$1,376,944
Combined Various 09
4 - Preparation for seals and overlays (crack sealing, digouts, patching, prelevel)
71.45
142.90
09 - Rural Local Access
Non Truck Route
$807,398
Combined Various 09-T5
3 - Seats, all types
9.01
18.02
09 - Rural Local Access
T5 - 20,000 in 60 days
$173,636
Combined Various 09-T5
4 - Preparation for seals and overlays (crack sealing, digouts, patching, prelevel)
9.01
18.02
09 - Rural Local Access
T5 - 20,000 in 60 days
$101,815
Combined Various 19
3 - Seals, all types
0.17
0.34
19 - Urban Local Access
Non Truck Route
$3,276
Combined Various 19
4 - Preparation for seals and overlays (crack sealing, digouts, patching, prelevel)
0.17
0.34
19 - Urban Local Access
Non Truck Route
$1,921
Combined All Various 09 8 19
2 - Stand Alone Maintenance
34.89
69.78
09 - Rural Local Access
Non Truck Route
$196,709
https://www.crab.wa.gov/cars/ 3/26/2019
C.A.R.S. Page 1 of 1
ANNUAL CERTIFICATION - STANDARD OF GOOD PRACTICE
MAINTENANCE MANAGEMENT WAC 136-11
The following information is provided for the annual review of county compliance with the
requirements of WAC 136-11-040. The information provided herein is current as of
December 31, 2018, and summarizes Maintenance Management activities for Calendar Year
2018.
Yes In accordance with WAC 136-11-040 , maintenance management procedures have
been used by this county to guide cost-effective maintenance and preservation
activities on county roads in the previous calendar year.
Grant County's maintenance management practices meet the following requirements, in
accordance with WAC 136-11-040:
Yes (1) An inventory of significant maintainable road features (physical assets) has been
prepared and/or updated.
Yes (2) Activity Guidelines have been prepared, reviewed and/or updated for all
significant maintenance activities.
Yes (3) A work program and budget has been prepared for maintenance activities
planned in the year. This work program and budget is based upon the road features
to be maintained, the types and amounts of maintenance work planned and the
costs for the labor, equipment and materials needed to complete the work.
Yes (4) Labor, equipment and material resource requirements needed to accomplish the
planned workload are identified.
Yes (5) Work scheduling procedures are identified, documented, and utilized in carrying
out the maintenance work program.
Yes (6) Reports showing work accomplishment and cost have been prepared and
reviewed by managers and supervisors.
https://www.crab.wa.gov/cars/ 3/15/2019